39 Mass. App. Ct. 418 | Mass. App. Ct. | 1995
Thirty-three months after evidence of construction activity on the locus (which we shall describe) became visible and eighteen and one-half months after they had documented their grievance about the endorsement on a perimeter plan of the locus by the planning board of Uxbridge under G. L. c. 41, § 81P, that subdivision control approval was not required, the plaintiffs, the Stefanicks, brought an action seeking a declaratory judgment that the locus did not front on a public way, from which it would follow that the § 8 IP endorsement was unlawful. A judge of the Superior Court, acting on a motion for summary judgment, ruled that the action of the Stefanicks was time barred insofar as it challenged the § 8IP endorsement and the construction of a dwelling on one of the lots on the locus.
These are the material and undisputed facts on which the motion judge acted. Patricia and Robert Barry on July 12, 1988, submitted to the planning board for ANR endorsement a perimeter plan showing three lots, each containing slightly over two acres and with frontage, in excess of that required by the Uxbridge zoning by-law, on a way called Landry Lane. That six-plus acre property is the one we have referred to as the locus. At its next meeting, on July 18, 1988, the planning board, having made a determination that Landry Lane was a public way, endorsed the Barrys’s perimeter
During this period, the Barrys also built a residence on the parcel designated Lot 1 on the endorsed perimeter plan. Construction activity on the locus must have been apparent to their neighbors, the Stefanicks, sometime before September 8, 1988, because on that date the building inspector certified that the foundation for the residence had been placed in accordance with law. Members of the Stefanick family lived on and farmed a property adjoining the locus and served by Landry Lane. Starting on November 16, 1989, the Stefanicks’s lawyer and one of the Stefanicks launched a series of communications to the planning board which challenged the determination made by the board that Landry Lane was either a public way, used as a public way, or was a way which the board could categorize as having sufficient width, suitable grades, and suitable construction to provide for the needs of vehicular traffic in relation to the proposed use of the abutting land. See G. L. c. 41, § 81L. Correspondence and meetings between the plaintiffs and the board continued for considerably better than a year without change in the board’s position. On May 28, .1991, the plaintiffs filed their complaint seeking, among other things, a declaration that the Barrys’s § 8 IP plan showed a subdivision, as defined in G. L. c. 41, § 81L; i.e., that subdivision approval was required.
Section 8IP is singular in that it provides for judicial review if a planning board determines that subdivision ap
If, however, the planning board determines that a plan does not disclose a subdivision and makes a § 8IP endorsement on the plan, there are no provisions for notice to interested persons, a hearing (indeed, the statute provides that the planning board shall act without a public hearing), or for any filing of the board’s action with the town or city clerk.
The Superior Court judge in the instant case decided that § 81BB must be the avenue of judicial review from the grant of a § 81P endorsement as well as the denial of one. In that regard he had support in decisions which seem to assume the availability of § 81BB review of a § 81P endorsement, although in those cases that issue was not squarely confronted. See Carey v. Planning Bd. of Revere, 335 Mass. 740, 743-745 (1957); Bloom v. Planning Bd. of Brookline, 346 Mass, at 283; Gifford v. Planning Bd. of Nantucket, 376 Mass, 801, 802 n.3 (1978). See discussion in Cassani v. Planning Bd. of Hull, 1 Mass. App. Ct. 451, 457 n.4 (1973). It is perhaps possible to overcome the literal barrier in the statutory scheme (the provision for an appeal under § 8IBB only
Yet, consistent with the policy for speedy resolution previously adverted to, there must be a limitations period for challenges to § 8 IP endorsements. The permissible expedient of a complaint for declaratory judgment or for equitable relief (e.g., to expunge a § 8 IP endorsement) does not suspend the application of statutes which limit the time for judicial review. Board of Appeals of Rockport v. DeCarolis, 32 Mass. App. Ct. 348, 352 (1992), and cases cited. There is in the subdivision control law, at G. L. c. 41, § 81Y, fourth par., a one-year limitation period for actions to enforce the provisions of the subdivision control law by a planning board or by ten taxable inhabitants of the municipality concerned. The Stefanicks, obviously, are neither a planning board nor ten taxpayers, but the question occurs whether the one-year limitations period of § 81Y might be applied as a yardstick for what is a reasonable period for challenges to § 8IP endorsements. That hypothesis was implicitly rejected in Carey v. Planning Bd. of Revere, 335 Mass, at 742-743, and explicitly
In the absence of a statutorily prescribed right of judicial review of a § 8IP endorsement on a plan, the review, whether framed as a declaratory judgment action or one seeking injunctive relief, is in the nature of certiorari. What the plaintiffs seek is correction of an error “in proceedings which are not according to the course of the common law” and are not “otherwise reviewable by motion or by appeal.” G. L. c. 249, § 4, as appearing in St. 1973, c. 1114, § 289. MacDonald v. Board of Health of Braintree, 347 Mass. 76, 77-78 (1964). The limitations period for bringing a complaint in the nature of certiorari is “within sixty days next after the proceeding complained of.” G. L. c. 249, § 4, as amended through St. 1986, c. 95. As applied to the submission of plans that are endorsed as not requiring subdivision approval, the proceeding would have concluded, and the sixty-day period would have begun to run on the date the § 81P endorsement is made. Not only does certiorari best fit the nature of the judicial review applied in cases of § 81P endorsement, but the sixty-day limitations period suits the need for expedition inherent in the subdivision control law with, nevertheless, a modicum of opportunity for the interested party to become aware that the planning board has made such an endorsement and, to seek judicial review. See Bobrowski, supra at § 16.1.1. To interested parties who have
In the case at bar, the plaintiffs are tardy by a wide margin in testing the lawfulness of the § 8 IP endorsement under the sixty-day test. The entry of judgment in favor of the planning board and the Barrys, individually, as to that endorsement was correct. Although a § 8 IP endorsement does not mean that the lots shown on the endorsed plan are build-able lots, Cricones v. Planning Bd. of Dracut, 39 Mass. App. Ct. at 268, the Superior Court judge rightly granted summary judgment in favor of the building inspector of Uxbridge. To the extent that an action might be maintained against the building inspector it would be on the theory that the inspector had failed to enforce zoning or building regulations. Nothing in the record suggests that the Stefanicks ever made written request of the building inspector to enforce the zoning by-law (assuming it had been violated) and that the building inspector had refused to take enforcement action. See G. L. c. 40A, § 7. Having asked nothing and received nothing from the building inspector, the Stefanicks could not arid did not take the next step of appealing to the board of appeal in Uxbridge from an adverse determination of the building inspector. G. L. c. 40A, § 8. No action lies against a building inspector to compel enforcement of zoning by-laws until the question has been determined at the local administrative level. Neuhaus v. Building Inspector of Marlborough, 11 Mass. App. Ct. 230, 231-235 (1981).
Judgment affirmed.
The summary judgment was partial as it left open the question whether an easement granted by the plaintiff to the Barrys had been overburdened, a question which in turn would evaporate were it determined that the way on which the locus fronted was a public one. The judge directed entry of a final judgment under Mass.R.Civ.P. 54(b), 365 Mass. 821 (1974).
In pertinent part, § 8IP, as amended through St. 1987, c. 122, provides: “If the board shall determine that in its opinion the plan requires approval, it shall within twenty-one days of such submittal, give written notice of its determination to the clerk of the city or town and the person submitting the plan, and such person may submit his plan for approval as provided by law and the rules and regulations of the board, or he may appeal from the determination of the board in the manner provided in section eighty-one BB.”
Similarly, in what constitutes the preponderance of activity under § 81BB, appeals from actions of a planning board on subdivision plan submissions, interested parties will have had notice of the proposed subdivision plan and meetings of the planning board at which the plan is to be considered. G. L. c. 41, § 81T.
If a planning board fails to act on the submission of a plan for endorsement under § 81P for twenty-one days, the board shall be “deemed to have
We pass over a semantic flaw in § 81T. It pertains to persons submitting a “definitive plan of land” a term of art generally understood to mean a fully detailed subdivision plan, whereas an “approval not required plan” is only a perimeter plan.