This action was brought to recover damages for injuries sustained by the negligence of defendant. The plaintiff, T. C. Steele, was on 9 September, 1913, engaged as a carpenter in the construction of a five-story reenforced concrete building for H. L. Grant, defendant, in the city of Goldsboro. Steele is a carpenter by trade, with several years experience, and had been at work on this building since 1 July, 1913. An elevator was used for conveying the material up on the building as it progressed, and for taking trash down, and plaintiff had helped to build this elеvator shaft. On the day before the injury plaintiff was told to raise the head block of the elevator above the fifth floor of the building so as to get ready to pour the cement for the fifth floor. On the morning of the injury plaintiff, with others, was engaged in putting in the cut-off plank on the fifth floor under or near the head block which plaintiff had helped to raise the afternoon before. In putting in this cut-off plank it seems to have been necessary to remove one of the braces which was in the way, and plaintiff sent a negro down below to nail on another brace, so that he (plaintiff) could remove the brace that was binding the elevator cable and release the cable. After that had been done, and while plaintiff was in the act of putting in the cut-off plank, one end of this same head block fell, struck plaintiff, and caused the injury complained of. When the head block had been removed so as to permit of the work in hand being done, Bailey, the foreman of carpenters, had his attention (637) directed by plaintiff to the dangerous condition of the head block, if left to rest upon the stiff knee, if the elevator should be moved,
Plaintiff testified: “I was at work on Grant building on or about 9 September, 1913. I was injured on that morning between the hours of 9 and 10 o‘clock. I went to put in a cut-off plank on the fifth floor, where the accident was, where I got hurt. [Here elevator model was exhibited.] This elevator was constructed as most all elevators are. On the morning that I went to work to put in the cut-off plank right here in that floor, the cut-off plank was to be raised 4 inches above that floor. Cut-off board is where the concrete is poured, and to hold the concrete. That was raised 4 inches above this floor on the morning. This head block had been raised the evening before. That went here. There was a little brace that was underneath here (attached to form a stiff knee) to hold this 4x4 before the head block was raised. The head block was resting on the floor the evening before it was raised temporarily, and this brace I put there to hold that (the stiff knee). We had to have this 4x4 (stiff knee) braced so that we could lift this (the head block) up and then brace it after it was raised. The next morning I had to have this brace removed, and therefore I sent a negro down below there to nail on this brace so I could release the cable here in this brace in front. After that was done, and while I was in the act of putting in that cut-off, the head block, the first I knew of it, was coming down on me. I didn‘t know the elevator was in use. I didn‘t know they were using the elevator. It was raised temporarily here, and we were not to use it. This elevator was constructed as follows: Those (638) were the guides that went to the basement, where they rested on solid foundation. These guides all the way up were thoroughly braced and nailed secure. Then the head block here (that is, the supporting head block), the first head block that held the guides in position were bolted in there (in the guides) with four bolts running clean through, so, and fastened securely. It being perfectly secure with that head block (the supporting head block) raised under this (the head block), but to take that head block out from under there and raise this head block with the shives in it above this post, this stiff knee in therе would not be safe, as this post here (guide-post) didn‘t come up any further
M. H. Moore testified: “I was at work as a carpenter on the Grant building on the morning of 9 September. I was near-by at the time оf the injury. On the evening before the injury occurred on the 9th, I heard something said between Steele and Bailey about the elevator. I could not say word for word; I know there was something said. The substance of it was that Bailey told plaintiff that the elevator was not safe for operation. I could not be positive who he was speaking to; they were all there together. Mr. Lee is the labor foreman, best I understood it; he had charge of that part of it. That stiff knee in here, that one, that had been pieced, broke, and the head block swung around, gate fashion, and caught Mr. Steele, and he was laying under it when I got there. We tried to raise the head block off of him, and could not do it, and called to the edge of the building to the engineer to lower the elevator, so that we could lift the head block off Mr. Steele. This portion of the elevator at the time would weigh 600 or 700 pounds. I did not notice whether or not the elevator was loaded at the time.”
There was testimony of a medical expert as to the nature and extent of the injuries.
Defendant introduced no testimony, but at the close of plaintiff‘s, he moved for judgment of nonsuit, which was refused, and he excepted. Verdict and judgment for plaintiff, and appeal by defendant. After stating the facts: There was evidence of negligence in this case, which we must assume was properly submitted to the jury
The principle has found frequent and varied expression in the books. Where a seaman was killed by the explosion of a steam valve, due to the concurring negligence of the master in arranging the pipe to which it was attached in an unsafe manner and the negligence of the servant in opening the valve, it has been hеld that the master was liable. Southern Pacific v. Dacasta, 190 Fed. Rep., 689; 111 C.C.A., 417. “A master is liable for the injury to his servant, who is free from contributory negligence, where it is caused by the concurrent negligence of the master or his vice principal and a fellow-servant.” 26 Cyc., 1302. “A servant does not assume the risk from the negligence of a fellow-servant augmented by that of the master.” Humphrey v. Raleigh C. and C. Co., 80 S.E. (W.Va.), 803. It has been said that while an employee cannot recover for personal injuries if the negligence of a fellow-servant was the proximate cause of the injury, if the injury is caused by the employer‘s nеgligence, as by furnishing defective machinery, the employee may recover even though the negligence of a (644) fellow-servant was a contributory cause of the injury. Helley v. Perkins Machine Co., 102 N.E. 944. It has also been held that an employee can recover for an injury caused by the negligence of his employer in providing a defective angle cock on the air-brake hose of an engine about which he worked, although the negligence of the engineer in moving the train while he was between the cars was also a proximate cause оf the injury. Watson v. A. C. L. Railway, 74 S.E. 121. The duty of a master to provide reasonably safe tools and machinery and place to work does not go to the extent of a guarantee of safety, but does require that reasonable precautions be taken to secure safety; and this obligation cannot be avoided by delegating it to others. The duty of exercising reasonable care in furnishing suitable and safe machinery and appliances, and keeping them in repair, is a personal obligation which the master cannot rid himself of by delegating it to аn agent to perform. If instead of himself performing the positive obligations which he owes to his servants, the master engages another to do them for him, he is liable for the neglect of that other, which is the neglect of the master to do the things which it is his duty to perform. It therefore follows that the duty of the master is not performed by the appointment of an agent to supply reasonably and adequately safe instrumentalities for the servant, but he is liable if the agent fails to do so. It being the duty of the master to exercise reasonable care to furnish suitable machinery and appliances and repair and inspect the same in proper
Applying this well settled doctrine to the case in hand, we find that the lift or elevator was in a defective condition, which was called to the attention of the foreman. If he, or any subordinate to whom he intrusted this primary duty of the master to cure the defect or to guard аgainst its evil consequences, neglected the duty, the defendant, as master, was responsible just the same as if he had been personally present and acting for himself; and there was also some evidence from which the jury might have inferred that Bailey, the foreman, stood, in his relation to the defendant, as a vice principal.
But there was superadded to the default of the master, in having defective shafting, the express promise of the foreman that he would see to it that the servant‘s position was not made dangerous thereby, while he was engaged in performing his work. That is, in its legal character and essence, not unlike a promise to make needed repairs, called to the master‘s attention by the servant, in which case the rule is thus stated in 1 Labatt on Master and Servant (Ed. of 1904), sec. 421: “After the servant has shown that there has been a promise, actual or implied, on the part of the master, and that this promise amounts to an undertaking to remove, not only a danger, but a danger by which he himself is threatened, he still has the onus of proving that the inducing motive of his continuance in the employment was his reliance upon (647) the fulfillment of the promise. Recovery cannot be had where the only reasonable inference from the testimony is that the servant continued work, not because he relied on the master‘s promise, as given, but merely because of an expectation, based on the defendant‘s habit, that he would make the repairs in question. But the mere fact that the servant has some suspicion that the master‘s assurances will not be made good is not enough to deprive him of his right of action. When complaining of defective instrumentalities or machinery it is not
We, therefore, conclude by the application of well defined principles of the law that the case was properly submitted to the jury. The only exception taken in the record and discussed in the brief was directed against the refusal to nonsuit, and that matter, as we have seen, was correctly decided by the court, in almost any view we can take of the
No error.
Cited: Ridge v. R. R., 167 N.C. 525; Cochran v. Mills Co., 169 N.C. 61; Lynch v. Veneer Co., 169 N.C. 172; Yarborough v. Geer, 171 N.C. 336; Wooten v. Holleman, 171 N.C. 464; Vogh v. Geer, 171 N.C. 679; Dunn v. Lumber Co., 172 N.C. 136; Taylor v. Power Co., 174 N.C. 587; Beck v. Tanning Co., 179 N.C. 125; Newton v. Texas Co., 180 N.C. 565; Comrs. of Jennings, 181 N.C. 399; Cook v. Mfg. Co., 183 N.C. 56; Beck v. Chair Co., 188 N.C. 746; Perkins v. Wood Coal Co., 189 N.C. 607; Paderick v. Lumber Co., 190 N.C. 312.