STATION #2, LLC v. MICHAEL LYNCH, ET AL.
Record No. 091410
SUPREME COURT OF VIRGINIA
June 10, 2010
PRESENT: Koontz, Kinser, Lemons, Goodwyn, Millette, and Mims, JJ., and Carrico, S.J. FROM THE CIRCUIT COURT OF THE CITY OF NORFOLK, Junius P. Fulton, III, Judge
In this appeal, we consider whether an oral agreement to allow Station #2, LLC (“Station #2“) to install soundproofing material in a void space between the ceiling of premises leased by it and the floor of premises owned by another was made unenforceable by the statute of frauds. We also consider claims of fraudulent inducement to contract and statutory conspiracy.
I. BACKGROUND AND MATERIAL PROCEEDINGS BELOW
The circuit court decided this case on demurrers and a special plea in bar.
Michael and Lisa Lynch owned a three-story building at 233 Granby Street in the City of Norfolk. They conveyed the second and third stories to 237 Granby LLC (“237 Granby“), which intended to renovate and sell them as condominiums. In December 2004 the Lynches leased the first story to Station #2, which intended to operate a restaurant offering music and live entertainment. The lease provided that:
Tenant will insure that in conjunction with the construction of the condominiums located above the business that additional soundproofing material to be selected by the Tenant with professional sound engineering consultants will be installed between the ceiling of the Premises and the floor of the lower level of the condominiums located above the business. Tenant will use reasonable efforts to work in conjunction with the builder of the condominiums with regard to soundproofing. . . . The [material] is to be of sufficient sound abatement characteristic as to effectively minimize noise and vibration from the leased premises being transmitted to the condominiums and to meet Landlord‘s covenant of quiet enjoyment passing to the owner of the condominiums.
Prior to executing the lease, members of Station #2 retained a sound attenuation expert and met with Michael Lynch, Frank T. Gadams, and representatives of Hourigan Construction Corp. (“Hourigan“) to discuss installation of the soundproofing material. Gadams was a principal of Marathon Development Group, Inc. (“Marathon“), an agent of 237 Granby in possession of the two upper stories.1 Marathon had hired Hourigan to renovate and develop the condominium units.
Gadams and Marathon agreed to allow Station #2 access to the second story to install the soundproofing material in the void space between the ceiling of the first story and the floor of the second story. Nevertheless, Hourigan closed the void space without informing Station #2‘s sound attenuation expert. Hourigan claimed it had done so at Gadams’ and Marathon‘s direction. The Lynches subsequently refused to intervene on behalf of Station #2 with Gadams and Marathon or to allow Station #2 to install the soundproofing material in the void space through the ceiling of the first story.
The City of Norfolk began citing Station #2 for violations of its noise ordinance in the summer of 2005. After repeated citations the City ordered Station #2 to cease all musical performances in February 2006. Consequently, the restaurant suffered a sharp decline in regular patronage. It also was forced to cancel scheduled weddings, wedding rehearsals, and parties. Station #2 informed Michael Lynch that it would withhold payment of rent until it was permitted to install the soundproofing material, whereupon he locked Station #2 out of the premises. The restaurant ceased operation.
Station #2 filed an amended complaint in the circuit court alleging breach of contract by Gadams and Marathon (“Count V“), fraudulent inducement to contract by Gadams and Marathon (“Count VI“), and statutory conspiracy among Gadams, Marathon, and the Lynches (“Count VII“).2 The defendants filed demurrers to Counts VI and VII, which the circuit court sustained. Gadams and Marathon also entered a special plea of
II. ANALYSIS
A. THE DEMURRERS TO COUNT VI AND VII
“A demurrer tests the legal sufficiency of facts alleged in pleadings, not the strength of proof. . . . Because the decision whether to grant a demurrer involves issues of law, we review the circuit court‘s judgment de novo.” Augusta Mut. Ins. Co. v. Mason, 274 Va. 199, 204, 645 S.E.2d 290, 293 (2007) (internal citations and quotation marks omitted). Station #2 argues that the circuit court erred in sustaining the demurrer to Count VI because the complaint alleged all elements necessary for a claim of fraud or fraudulent inducement. We disagree.
Although we clearly have stated the proposition, we often must repeat it: an omission or non-performance of a duty may sound both in contract and in tort, but only where the omission or non-performance of the contractual duty also violates a common law duty. Richmond Metro. Auth. v. McDevitt Street Bovis, Inc., 256 Va. 553, 558, 507 S.E.2d 344, 347 (1998) (citing Foreign Mission Bd. v. Wade, 242 Va. 234, 241, 409 S.E.2d 144, 148 (1991)); see also Dunn Constr. Co. v. Cloney, 278 Va. 260, 266-67, 682 S.E.2d 943, 946 (2009); Augusta Mutual, 274 Va. at 205, 645 S.E.2d at 293. The only duty Station #2 alleged was contractual: that Gadams and Marathon had agreed to allow Station #2 access to install the soundproofing material. Consequently, Station #2 has not pleaded a proper claim for fraud.
Even if we assume, as Station #2 invites us to do, that Gadams’ and Marathon‘s agreement induced Station #2 to contract with the Lynches, and that Gadams’ and Marathon‘s contractual duty to allow the installation did not spring from the lease between Station #2 and the Lynches, its fraud claim fails. Station #2 contends it relied on its existing agreement with Gadams and Marathon when it leased the first story from the Lynches. It further contends that Gadams and Marathon never intended to allow Station #2 to install the soundproofing material. Consequently, their promise to do so was a false representation of material fact.
In general, “if a defendant makes a promise that, when made, he has no intention of performing, that promise is considered a misrepresentation of present fact and may form the basis for a claim of actual fraud.” SuperValu, Inc. v. Johnson, 276 Va. 356, 368, 666 S.E.2d 335, 342 (2008); accord Richmond Metro. Auth., 256 Va. at 560, 507 S.E.2d at 348.3 However, Station #2 did not plead sufficiently that Gadams and Marathon intended not to allow installation of the soundproofing material at the time they promised to do so. The only mention of a contemporaneous intent not to perform on the promise to permit the installation appears in Count VII, the statutory conspiracy claim:
[A]ll of the defendants were aware that there was never an intention by any of them to allow sound attenuation materials to be installed . . . or, alternatively, they decided at some point to
breach their agreements. In either event, whether the promises were false at the inception or were agreements that were broken later, the defendants deceived the principals of Station #2 . . . .
Station #2 does not allege that Gadams’ and Marathon‘s promise was false when made but rather that the Lynches, Gadams, and Marathon all agreed to prevent Station #2 from effecting the installation, either before or after Station #2 entered into the lease. Accordingly, Station #2‘s allegations were
Station #2 also argues that the circuit court erred in sustaining the demurrers to Count VII because the complaint alleged all elements necessary for a claim of statutory conspiracy. We again disagree.
In Worrie v. Boze, 198 Va. 533, 536, 95 S.E.2d 192, 196 (1956), we recognized a common law claim of conspiracy by a plaintiff who alleged the defendants had conspired to procure the breach of a contract. We commented in Chaves v. Johnson, 230 Va. 112, 119-20, 335 S.E.2d 97, 102 (1985), that such claims were embraced by
To permit a mere breach of contract to constitute an “unlawful act” for the purposes of the conspiracy statute would be inconsistent with the diligence we have exercised to prevent “turning every breach of contract into an actionable claim for fraud.” Dunn Constr. Co., 278 Va. at 268, 682 S.E.2d at 946; Augusta Mutual, 274 Va. at 208, 645 S.E.2d at 295; Richmond Metro. Auth., 256 Va. at 560, 507 S.E.2d at 348. Non-performance of a contractual promise does not, without more, create a basis for recovery in tort. Likewise, we do not believe it can rise to the level of an “unlawful act” under
civil, or independently by common law. Thus, non-performance, without more, is not an “unlawful act.”
Station #2‘s agreements with the Lynches and with Gadams and Marathon do not implicate statutory or independent common law duties. Consequently, merely alleging breach of those contracts is insufficient to establish a claim of statutory conspiracy under
B. THE PLEA IN BAR TO COUNT V
While “[t]he standards of review for a defensive plea in bar and a demurrer are substantially similar,” Sullivan v. Jones, 42 Va. App. 794, 802, 595 S.E.2d 36, 40 (2004), “[a] plea in bar presents a distinct issue of fact which, if proven, creates a bar to the plaintiff‘s right of recovery. The moving party has the burden of proof on that issue.” Hilton v. Martin, 275 Va. 176, 179-80, 654 S.E.2d 572, 574 (2008). A circuit court‘s judgment that a party has met his burden of proof “will be upheld unless it is plainly wrong or without evidence to support it.” Hudson v. Lanier, 255 Va. 330, 333-34, 497 S.E.2d 471, 473 (1998); see also Upper Occoquan Sewage Auth. v. Blake Constr. Co., 266 Va. 582, 590-92, 587 S.E.2d 721, 725-26 (2003) (reversing judgment on a plea in bar that the court sustained without evidence to support it).
Gadams and Marathon argue that Station #2‘s breach of contract claim is barred by the statute of frauds.9 However, they have failed to prove that the statute applies. They argue that Station #2 needed an easement to install the soundproofing material in the void space. However, they did not prove that 237 Granby owned the void space.10 Based upon these facts we conclude that Station #2 merely needed a license, i.e., permission to enter the second story for the purpose of installing the soundproofing material.11
Permission to enter the real property of another does not rise to the level of an easement. An easement concerns the continuing use of real property. Russakoff v. Scruggs, 241 Va. 135, 138, 400 S.E.2d 529, 531 (1991) (“Easements are . . . the privilege to use the land of another in a particular manner and for a particular purpose.” (quoting Brown v. Haley, 233 Va. 210, 216, 355 S.E.2d 563, 567-68 (1987)) (internal quotation
“[T]he grant of an easement is embraced within the statute of frauds, and therefore must be in writing.” Buckles v. Kennedy Coal Corp., 134 Va. 1, 15, 114 S.E. 233, 237 (1922) (quoting Wynn v. Garland, 19 Ark. 23, 34 (1857)) (internal quotation marks omitted). However, it has long been established that a license may be granted orally without violating the rule. Power, 66 Va. (25 Gratt.) at 790. The record establishes nothing more than that 237 Granby owned the upper stories. Moreover, the parties agree that the circuit court did not determine the ownership of the void space. Without establishing 237 Granby as the owner, Gadams and Marathon failed to show there was any real property in their possession and control that Station #2 would need to use. Absent such a showing, Station #2 required no more than their permission to enter the second story.
Gadams and Marathon did not prove that the agreement required more than the grant of a license to which the statute of frauds does not apply. The circuit court erred in sustaining their plea in bar because there is no evidence to support it. We will reverse and remand for trial on Station #2‘s breach of contract claim.12
III. CONCLUSION
For the reasons set forth above, we will affirm the judgment of the circuit court as to both demurrers, reverse the judgment sustaining the plea in bar, and remand for trial on Station #2‘s breach of contract claim.
Affirmed in part, reversed in part, and remanded.