Defendants-appellants Idarado Mining Company, Newmont Mining Corporation, and Newmont Services Limited appeal from a mandatory injunction issued by the district court on February 22, 1989. Plaintiff-appellee State of Colorado (State) is the beneficiary of the injunction, issued on the authority of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. §§ 9601-9626, as amended by the 1986 Superfund Amendments and Reauthorization Act (SARA), Pub.L. No. 99-499, 100 Stat. 1613 (1986). Subsequent to the issuance of the injunction, the district court entered judgment in favor of the State for past response costs plus prejudgment interest.
State of Colorado v. Idarado Mining Co.,
The injunction issued on the authority of § 121(e)(2) of CERCLA, 42 U.S.C. § 9621(e)(2), directs appellants to carry out an extensive environmental cleanup plan proposed by the State and adopted, with various modifications, by the district court.
See Colorado v. Idarado Mining Co.
I.
As enacted in 1980 and amended in 1986, CERCLA was designed to facilitate cleanup of environmental contamination caused by releases of hazardous substances. The act sets forth several mechanisms for responding to such releases and delineates the respective powers of the federal government, the states, Indian Tribes and private parties. Section 111 of CERCLA provides for the creation of a Hazardous Substance Superfund to finance cleanup actions at sites affected by releases or threatened releases of hazardous substances. 42 U.S.C. § 9611. Section 104(a) authorizes the federal government to take necessary cleanup actions financed by the Superfund to respond to such releases or threatened releases. 42 U.S.C. § 9604(a). Alternatively, under § 104(d), the federal government may enter into cooperative agreements with states, political subdivisions or Indian Tribes to conduct cleanup actions using the Superfund. 42 U.S.C. § 9604(d).
To shift the financial burden of a cleanup to the parties responsible for the releases, a governmental entity may sue these parties for the costs incurred in responding to a release. CERCLA § 107(a); 42 U.S.C. § 9607(a). In such a cost recovery action, responsible parties include, among others, the “owner or operator” of the facility from which the release occurred. Id. Even when no cooperative agreement exists permitting use of Superfund money for cleanup, CERCLA § 114(a) preserves the right of a state or other party to proceed under applicable state law to conduct a cleanup of a site affected by hazardous substances. 42 U.S.C. § 9614(a). States or other parties which incur response costs not financed by the Superfund may bring a cost recovery action against the responsible parties. 42 U.S.C. § 9607(a).
*1489
When a cost recovery action is brought by the federal government, a state, an Indian Tribe or a private party, § 107(a)(4) imposes liability on responsible parties for response costs “not inconsistent with the national contingency plan [NCP].” 42 U.S.C. § 9607(a)(4). The NCP consists of procedural and substantive guidelines issued by the Environmental Protection Agency (EPA) governing CERCLA cleanup actions.
See
40 C.F.R. pt. 300 (1989). Liability among responsible parties is joint and several,
O’Neill v. Picillo,
In addition to the authority to finance cleanups from the Superfund and to recover costs from responsible parties, CERCLA provides the federal government with additional power to deal with releases of hazardous substances by bringing an abatement action in federal district court.
See generally Koppers Indus., Inc. v. United States EPA,
II.
This action relates to a cleanup of a highly mineralized area that has been prospected and mined extensively throughout the century.
Idarado,
Idarado’s properties are located in three areas. Two are in the Telluride and Red Mountain valleys, separated by the mountains in which Idarado’s mine is located. The Telluride Valley property contains six tailings piles and two mine portals. Id. at 1233. The San Miguel River flows through Idarado’s property, down the valley, and past the town of Telluride. The Red Mountain Valley property contains five tailings piles and several portals and waste rock piles. Id. Red Mountain Creek flows through the valley past Idarado’s property and empties into the Uncompahgre River above the town of Ouray. The third property is known as the High Country, consisting of the mountain basins between the Telluride and Red Mountain Valleys. The parties have agreed in large part upon remediation for the High Country.
The State of Colorado initiated this action against Idarado, its parent company, Newmont Mining Corporation, and a subsidiary of the parent which had provided services to Idarado, Newmont Services Limited. The State’s complaint, as amend *1490 ed, sought to hold the defendants liable for cleanup costs associated with the Idarado mining properties. 1 Following the enactment of SARA in 1986, the state further supplemented its pleadings to seek an injunction directing Idarado to cleanup the sites.
In March 1987, the State issued a Record of Decision (ROD) which contained its proposed plan for remedial activities to be undertaken at' the sites. Thereafter, the district court ruled that Newmont Mining was an “owner and operator” of the Idara-do facilities and that Newmont Services was an “operator” of those facilities because both entities “were involved directly in day-to-day operations of Idarado Mining Company and the sites here in dispute.”
See Colorado v. Idarado Mining Co.,
18 Envtl.L.Rep. (Envtl.L.Inst.) 20,578, 20,579 (D.Colo.1987);
see also United States v. Kayser-Roth Corp.,
During twenty-six trial days, the district court considered the testimony of over thirty witnesses and received over 1,000 documents into evidence. The record on appeal consists of sixty volumes and we obtained the pleadings below. Much of the evidence concerns the extent, if any, of environmental harm and whether the proposed remediation alternatives presented by the State and Idarado were technically feasible, cost-effective and consistent with the NCP. The district court determined that surface and ground water had been contaminated by releases from tailings, as evidenced by damage to the aquatic environment.
Idarado,
III.
On appeal, defendants contend that the district court (1) lacked authority under
*1491
CERCLA to grant the State injunctive relief, (2) made inadequate and unsupported findings of fact in deciding that the State’s cleanup plan was “not inconsistent with” the NCP, (3) lacked authority to hold the defendants liable for the permanent relocation of the residents of a trailer park, (4) improperly held defendants liable for cleaning up Red Mountain Creek, (5) improperly held defendants liable for remediation of releases from certain mine portals, and (6) improperly held that the defendants New-mont Mining Corp. and Newmont Services Ltd. were owners or operators of defendant Idarado’s facilities. We vacate the district court’s injunction and remand on the basis of the first and third points. We decline to decide the remaining issues at this time because the district court will modify its relief based upon this opinion and various portions of the case, which could affect the phase just completed, have yet to be resolved.
See Thornburgh v. American College of Obstetricians & Gynecologists,
A.
Defendants argue that even if we decide that the district court lacked authority to issue the mandatory injunction, we should exercise pendent appellate jurisdiction over whether the State’s plan is “not inconsistent with” the NCP because this issue is critical to the implementation of an appropriate remedy, regardless of
who
actually implements the remedy. Appellants’ Brief at 41 n. 28. Without question, we have jurisdiction to consider those matters which are closely related to the grant or denial of the injunction.
Asset Allocation & Management v. Western Employers Ins. Co.,
B.
This is a case in which the district court bifurcated the trial pursuant to Fed.R. Civ.P. 42(b), see supra n. 1; “[tjhere is no final judgment until all of the issues have been resolved and judgment entered on the whole case.” 9 C. Wright & A. Miller, Federal Practice & Procedure § 2392 (1971 & 1990 Supp.). This interlocutory appeal concerns the district court’s authority to grant injunctive relief; our resolution turns on the construction of CERCLA §§ 121(e) and 101(24), rather than on the remaining issues raised by defendants under other provisions of CERCLA. Al *1492 though the defendants are confident that the district court will not reconsider its findings and conclusions on these remaining issues, see Appellants' Brief at 41 n. 28, we simply do not have before us a judgment which finally resolves the remedial issue consistent with liability permitted under the Act. Nor do we have before us the district court’s interlocutory order awarding the State past response costs, which, in the interest of judicial economy, should be considered at the same time the State’s plan (as modified) is evaluated for cost recovery.
Any appellate determination about whether the State’s plan is “not inconsistent with” the NCP, is primarily factual, and in view of our resolution of the injunction issue, not closely related to the merits we must address. In
Tri-State,
we stated that “this court as a matter of law may justifiably, though cautiously, decide other generally nonappealable
legal
issues.”
In points two (adequacy of district court findings whether State’s plan is “not'inconsistent with” the NCP) and four (whether defendants are liable for remediation of Red Mountain Creek), the defendants are challenging in large part whether the district court’s factual findings are supported by the record. These claims primarily concern application of the clearly erroneous standard of review to the voluminous record. See Fed.R.Civ.P. 52(a). We decline to exercise pendent appellate jurisdiction over these claims in the interest of judicial efficiency and consistency. These issues should be resolved when past response costs and any natural resource damages are considered. At that time, any subsequent factual findings will be before us. Resolving numerous fact-bound issues in a single appeal from a final judgment is in keeping with this court’s concern with judicial efficiency.
Defendants’ point five (whether releases from the Mill and Meldrum Tunnel mine portals constitute federally permitted releases which are exempt from CERCLA liability) and point six (whether Newmont Mining may be held liable as an “owner and operator” and Newmont Services as an “operator”) do contain legal issues, however, our preliminary review of the district court’s factual findings and legal conclusions and the record on appeal convince us that the factual issues predominate and are best resolved on appeal from a final judgment. In the exercise of our discretion, we decline to review all points but those most directly related to the injunctive relief. Hence, we decide defendants’ points one and three at this time.
IV.
The State’s position concerning the authority of the district court to grant injunctive relief must be examined with reference to those courts which have considered this issue, legislative history and, most importantly, the language of the statute and its reasonable interpretation in light of CERCLA. CERCLA is a remedial statute and its provisions should be construed liberally, but with due regard for executive and legislative intent as reflected in the enactment process and the statute itself.
See Kayser-Roth,
A.
Prior to the amendment of CERCLA, several courts had rejected the position that injunctive relief was available to states and other non-federal plaintiffs. In
Shore Realty,
the Second Circuit rejected New York’s claim that a district court has inherent or implied power to grant injunctive relief under § 107 of CERCLA in view of the express injunctive authority and accompanying standard for injunctive relief contained in § 106.
Courts have adhered to the view that injunctions are not available to states and other non-federal plaintiffs under CERC-LA, even after the 1986 SARA amendments.
See Cadillac Fairview,
B.
The State argues that injunctive relief for states is now authorized by CERCLA § 121(e)(2), 42 U.S.C. 9621(e)(2) which provides in part:
A State may enforce any Federal or State standard, requirement, criteria, or limitation to which the remedial action is required to conform under this Act in United States district court for the district in which the facility is located.
Section 121 of CERCLA, added by SARA, deals with cleanup standards applicable to federal cleanup actions, and with the rights of the states to participate in such federal remedial activities. Section 121(e)(2) 4 allows a state to insure that a remedy of *1494 federal character will comply with substantive federal and state cleanup standards required of federal remedies under CERC-LA.
The district court referenced § 121(e)(2) and concluded that “injunctive relief also is available to the State under CERCLA.”
Idarado,
In a presentation that does not cultivate simplicity, the State reminds us that § 121(e)(2) allows a state injunctive relief “to enforce any requirement to which the remedial action is required to conform.” Appellee’s Brief at 6. According to the State, the standards, requirements, criteria, or limitations referred to in § 121(e)(2) include the requirements of CERCLA and the NCP, as well as applicable requirements of federal and state environmental law (ARARs). 5 Appellee’s Brief at 6 (citing CERCLA 121(d); 40 C.F.R. 300.68(i)(1) & 300.71(a)(4) (1989)). The State then argues that it was required to integrate all ARARs described in the NCP regulations into its plan pursuant to 40 C.F.R. § 300.71(a)(4), and, therefore, should be granted an injunction to enforce such requirements. Ap-pellee’s Brief at 9. The State further argues, relying upon 40 C.F.R. § 300.68(e)(1), that because its cost recovery action under CERCLA § 107 was required to be “not inconsistent with” the NCP, the State’s remedial action plan has incorporated NCP standards as well, and the State must be allowed injunctive relief to uphold NCP standards. Appellee’s Brief at 9-11. Next, the State argues that when the district court approved the State’s remedial action plan with minor modification, the State’s plan became an additional requirement to which the remedial action was required to conform and, consequently, in-junctive relief was available. Id. at 12-13. Finally, the State argues that the district court had inherent equitable authority to grant injunctive relief. Id. at 25-28.
C.
The State’s position is untenable because it ignores the scope of § 121 and fails to view the provision in the context of CERCLA, which still contains an express and limited grant of injunctive authority in § 106. Section § 121(e)(2) allows states to enforce requirements of remedial actions embodied in consent decrees under CERC-LA and describes requirements of such consent decrees. We may consult legislative history as a secondary source of a statute’s meaning,
Miller v. Commissioner,
States are given the authority to enforce requirements of consent decrees to which the remedial action must conform, in Federal district court. Consent decrees are to contain dispute resolution and enforcement provisions, and may include administrative enforcement. Consent decrees must contain stipulated penalties for violations of the decree of $25,000 per day, 6 enforceable by the President or the State.
H.R.Rep. No. 99-962, 99th Cong., 2d Sess. 249 (1986). Our job in construing statutes is to effectuate the intent reflected in the language of the enactment and the legislative process, however, neither the text of § 121(e)(2) nor the relevant legislative history supports the State’s expansive interpretation.
By its express terms, § 121(e)(2) limits a state’s enforcement authority to “any Federal or State standard, requirement, criteria, or limitation to which the remedial action is required to conform under this Act [CERCLA].” We agree with amicus United States and the defendants that the term *1495 “the remedial action” for purposes of § 121(e)(2) pertains to the remedial action encompassed by § 121. Section 121 unquestionably envisions a remedial action selected by the federal government or its delegates.
Section 121 provides a general description of the criteria, methods, and procedures which EPA must follow in the selection of a remedial action. Section 121 begins:
(a) Selection of remedial action. The President shall select appropriate remedial actions determined to be necessary to be carried out under section 104 or secured under section 106 which are in accordance with this section and, to the extent practicable, the national contingency plan, and which provide for cost effective response....
Section 121 pertains to remedial actions selected by the President through EPA. Not only in § 121(a), but also in §§ 121(c) and (d)(2)(A), § 121 refers to remedial actions under §§ 104 and 106, which are remedies selected by the federal government or its delegates. Section 121(d) likewise refers to “[Remedial actions selected under this section or otherwise required or agreed to by the President under this Act_” Thus, the term “remedial action” in § 121(e)(2) means a remedial action which is selected by the federal government or its delegates. The remedial action plan developed by the State of Colorado was not undertaken by the EPA pursuant to CERCLA §§ 104 or 106. 7
To adopt the State’s interpretation would defeat the intended scope of state involvement as contained in § 121(f). Section 121(f) provides a mechanism for state involvement in the selection and adoption of remedial actions which are federal in character. 42 U.S.C. § 9621(f)(l)-(3). For example, states must be given a “reasonable opportunity for ... review and comment” on investigations, feasibility studies, and planned remedial actions. 42 U.S.C. § 9621(f)(1)(E). Prior to entry of a federal consent decree in which the EPA waives a federal or state standard (ARAR), under § 121(d)(4), a state is given an opportunity to concur in the remedial action and, if it does not, the state may intervene as of right. 42 U.S.C. § 9621(f)(2)(A) & (B). If the court upholds EPA’a waiver of a standard, the state may seek to have the standard incorporated into the remedial plan, provided the state pays the additional costs. 42 U.S.C. § 121(f)(2)(B). When the EPA has determined that a particular standard or requirement is an ARAR for a particular remedial action, § 121(e)(2) merely allows a state to enforce that standard or requirement as an ARAR contained in a federal remedial action and implemented by a consent decree.
To allow a state to select a plan independently and then to commence an abatement action under § 121(e)(2) would render these provisions irrelevant.
Akzo Coatings,
It is of no moment that such circumstances will not occur in this case because the federal government is not involved in the remedial plan. Peculiar consequences would result from allowing a state to use § 121(e)(2) to compel performance of its *1496 remedial plan when that plan was developed without federal involvement. Most significantly, the states would enjoy greater injunctive authority than the federal government, because the federal government must make a showing of “imminent and substantial endangerment to the public health or welfare” when it seeks injunctive relief under § 106; no such showing is necessary under § 121(e)(2). Finally, construing § 121(e)(2) to authorize injunctive relief in these circumstances, but relegating states challenging federal consent decrees to the procedures in § 121(f)(2)(A) & (B) would amount to pure judicial legislation.
D.
Apart from these problems, we also must reject the State’s arguments that conforming its plan to the NCP and federal and state standards (ARARs) automatically meant that its independently selected and financed remedial plan was required to conform to those criteria within the meaning of § 121(e)(2). Even if the State could overcome the hurdle that § 121(e)(2) identifies a remedial action selected by the federal government or its delegates, the State would have to identify standards with which CERCLA requires a state to comply as a prerequisite to selecting a plan. To be sure, several advantages accrue to the State from compliance with CERCLA § 121 and the NCP, see NCP Proposed Rule, 53 Fed.Reg. 51,394, 51,458 8 (Dec. 21, 1988). But § 121(d)(2), with exceptions contained in § 121(d)(4), (f)(2) & (3), requires remedial plans selected by the federal government or its delegates to conform to federal and state standards, requirements, criterion, or limitations, regardless of whether response costs are sought. The same cannot be said with respect to remedial plans selected independently by the State, which developed this plan to be “not inconsistent with” the NCP and with attention to § 121, in order to accrue certain advantages, including cost recovery. See supra n. 8.
The State has not identified “any Federal or State standard, requirement, criteria, or limitation to which [its] remedial action is required to conform under [CERCLA]” see CERCLA § 121(e)(2) (emphasis added), within the meaning of § 121(e)(2). The State’s reliance upon 40 C.F.R. § 300.71(a)(4) 9 (1989) is misplaced. The State must comply with “all otherwise legally applicable or relevant and appropriate Federal, State, and local requirements, including permit requirements” id., not as a condition to selecting its plan, but to recover its costs under § 107. This interpretation is supported by the preamble accompanying the 1985 NCP: "§ 300.71 does set out the requirements that a private party or State must meet for a response to be ‘consistent [or not consistent] with the *1497 NCP’ to recover its costs from a responsible party pursuant to CERCLA section 107.” NCP Final Rule, 50 Fed.Reg. 47,912, 47,934 (Nov. 20, 1985). The EPA explained that “[t]o be consistent with the NCP for the purposes of cost recovery under CERC-LA, non-Fund-financed responses must_ comply with all otherwise applicable or relevant and appropriate Federal, State and local requirements.” Id. at 47935.
Nor can the State take comfort from its citation of 40 C.F.R. § 300.68(i)(l) 10 (1989), requiring selection of a remedial plan that complies with federal ARARs. Section 300.68(i)(l) by its terms applies to a “lead agency” which is defined in § 40 C.F.R. 300.6 11 (1989) to include only federal agencies and their delegates. The State is not a lead agency under the regulation.
E.
The State also contends that its remedial actions were required to comply with the NCP and other standards by virtue of § 107(a). But merely because § 107(a) allows cost recovery for response costs “not inconsistent with” the NCP does not mean that the State's actions were required by § 107(a) and now may enforced by injunc-tive relief under § 121(e)(2). An action for state cost recovery is permissive, not mandatory. To adopt the State’s approach would mean that entitlement to injunctive relief under § 121(e)(2) would turn on whether a state seeks response costs. Building on this argument, however, the State offers the following tautology: once the district court found that the State’s plan was “not inconsistent with” the NCP, the elements of the plan became requirements “to which the remedial action is required to conform under CERCLA.” That the plan must conform to itself is circular, but putting that problem aside, the district court’s finding that the plan is “not inconsistent with” the NCP merely allows the State response costs on remand (should it choose to implement the plan), not injunc-tive relief. Neither the State nor anyone else is required under CERCLA to implement this specific plan.
F.
The State’s last argument is that the district court had inherent equitable authority to issue the injunction. However, application of a district court’s equitable power is not appropriate when the statute carefully limits injunctive relief as a remedy.
Transamerica Mortgage Advisors, Inc. v. Lewis,
V.
As part of the remedial action plan, the district court thought itself empowered to order the defendants to relocate permanently the month-to-month tenants of the Pandora Trailer Park, so that the State could implement its remediation plan.
Idarado,
Defendants argue that the district court’s action conflicts with CERCLA § 101(24), which in defining “remedial action” provides in pertinent part:
The term includes the cost of permanent relocation of residents and businesses and community facilities where the President determines that, alone or in combination with other measures, such relocation is more cost-effective than and environmentally preferable to the transportation, storage, treatment, destruction, or secure disposition offsite of hazardous substances, or may otherwise be necessary to protect the public health or welfare; ....
42 U.S.C. § 9601(24) (emphasis added). As an initial matter, we note that the statute refers to the “cost of permanent relocation,” so § 101(24) does not empower the district court to grant injunctive relief to implement the State’s permanent relocation plan. Continuing, however, the district court looked to the purpose of the relocation in deciding that a Presidential order was not a prerequisite for such permanent relocation costs. It determined that because the State was
“not
attempting to relocate the persons to a new area to isolate them from exposure to toxic waste,” but rather to implement its remediation plan for the Idarado facility as a whole, the requirement of a Presidential order contained in § 101(24) did not apply.
Idarado,
The legislative history on this point indicates that on-site remediation normally is preferred because it is significantly less expensive. S.Rep. No. 848, 96th Cong., 2d Sess. 55-56. Even among off-site remedial alternatives, permanent relocation is one “of the most costly possible actions.” Id. “To assist the President in determining the appropriate remedial action, specific criteria are included in the definition of remedy for” permanent relocation. See id. at 55. The Senate Report on the bill from which this provision originated continues:
The term “remedy” includes the cost of permanently locating residences, businesses, or community facilities when relocation would be more cost-effective than, an [sic] environmentally preferable to, other off-site remedial actions. In addition to these considerations, a decision to provide permanent relocation may be based, at least in part, on findings from epidemiological or other health effect studies which, in the opinion of the President, demonstrate that a) there is a substantial probability that exposure to hazardous substances from the site has caused or is likely to cause or contribute to adverse health effect; b) even after remedial actions are taken, persons remaining in the vicinity of the site would be exposed to hazardous substances; and c) such exposure has a significant likeli *1499 hood of causing or contributing to adverse health effects or exacerbating existing conditions.
Id. This legislative history confirms that permanent relocation ordinarily would be permissible only upon a Presidential finding that on-site and other off-site cleanup alternatives would not be as cost-effective or environmentally sound as permanent relocation. See 40 C.F.R. 300.6 (1989) (definition of “remedy or remedial action”).
Thus, the Presidential determination requirement applies when permanent relocation is to protect residents from exposure to hazzardous substances. Given the overriding concern for efficient use of remediation resources, the requirement also should apply when the land on which they reside is to be used for constructing remedial facilities. The statute is broad enough to encompass the latter situation; the President could make a finding that such action “was otherwise necessary to protect public health and welfare,” 42 U.S.C. § 9601(24); 40 C.F.R. 300.6 (1989). Merely because the legislative history addresses the most common (and potentially serious) situation does not mean that § 101(24) does not apply to other permanent relocation proposals. The purpose of requiring a Presidential determination for the alternative of permanent relocation is to inform and control discretion concerning the very costly alternative of permanent relocation; our holding serves these purposes. We note that “temporary evacuation and housing of threatened individuals” is within the definition of a removal action under CERCLA § 101(23). 42 U.S.C. § 9601(24);
Lutz v. Chromatex, Inc.,
Moreover, the district court’s decision requiring defendants to bear the costs of permanently relocating the tenants would diminish defendant Idarado’s rights under Colorado law, in the likely event that Idara-do chooses to cease renting its property so that the property may be used in the cleanup effort. Under Colorado law, a month-to-month tenancy may be terminated on thirty days notice. Colo.Rev.Stat. § 38-12-202(1)(d) (1989 Supp.);
Hurricane v. Kanover, Ltd.,
REVERSED and REMANDED. Upon remand, the district shall VACATE its mandatory injunction requiring the defendants to perform the State’s cleanup plan (as modified) and VACATE its prohibitory injunction concerning the relationship between Idarado and its tenants in the Pandora Trailer Park..
Notes
. The State’s amended complaint also included pendent state law claims, but these were dismissed by the district court. The State also sought monetary recovery for damage to natural resources pursuant to CERCLA § 107(a)(4)(C). See 42 U.S.C. § 9607(a)(4)(C). Idarado filed third-party claims for contribution under CERCLA § 113(f), against certain other owners of mining facilities in the Red Mountain Valley. See 42 U.S.C. 9613(f). With the consent of the parties, the district court bifurcated the trial into two consecutive phases: a remedy/response cost phase and a natural resource damage phase. See Fed.R.Civ.P. 42(b); State of Colorado v. Idarado, No. 83-C-2385, Order Bifurcating Trial at 1-2 (D.Colo. filed Apr. 20, 1987). The district court also severed Idarado’s third-party claims for contribution. The natural resource damage phase and the contribution phase have yet to take place.
. In interlocutory appeals under 28 U.S.C. § 1292(b) and Fed.R.Civ.P. 54(b), the district court retains jurisdiction to act on matters not involved in the appeal. 9 J. Moore, B. Ward & B. Lucas,
Moore’s Federal Practice
¶203.11 (2d ed. 1990);
Garcia v. Burlington N. R.R. Co.,
Here, the interlocutory appeal under 28 U.S.C. § 1292(a)(1) is from the district court's grant of a mandatory injunction, thus, “the district court retains power to act on the case pending appeal.” 16 C. Wright, A. Miller, E. Cooper & E. Gressman, Federal Practice and Procedure § 3921 at 26 (1977). And the district "court in its discretion may suspend, modify, restore, or grant an injunction during the pendency of the appeal.” Fed.R.Civ.P. 62(c). Accord 9 Moore's Federal Practice ¶ 203.11 (appeal from the grant or denial of a preliminary injunction does not "divest the district court of jurisdiction to proceed with the action on the merits.’’).
. See State's Answer Brief at 5; Plaintiff's Memorandum in Opposition to Defendants’ Motion to Dismiss Plaintiff's Claims for Injunctive and Declaratory Relief to Enforce or Approve Its Remedial Action Plan at 9, No. 83-C-2385 (D.Colo. filed May 14, 1987), incorporating Plaintiff’s Trial Memorandum § XIII at 150-51 (D.Colo. filed Apr. 20, 1987).
. The section provides:
A State may enforce any Federal or State standard, requirement, criteria, or limitation to which the remedial action is required to conform under this Act in United States district court for the district in which the facility is located. Any consent decree shall require the parties to attempt expeditiously to resolve disagreements concerning implementation of the remedial action informally with the appropriate Federal and State agencies. Where the parties agree, the consent decree may provide for administrative enforcement. Each consent decree shall also contain stipulated penalties for violations of the decree in an amount not to exceed $25,000 per day, which may be enforced by either the President or the State. Such stipulated penalties shall not be construed to impair or affect the authority of the court to order compliance with the specific terms of any such decree.
42 U.S.C. § 9621(e)(2).
. These other federal and state requirements are commonly designated as "applicable or relevant and appropriate requirements,” and abbreviated as ARARs.
. Section 121(e)(2) as enacted allows for penalties "in an amount not to exceed $25,000 per day.”
. The State's Record of Decision (ROD) puts the matter this way:
The remedial action in this case is not undertaken pursuant to section 104 or 106 of ... CERCLA, as amended by ... SARA, 42 U.S.C. sec. 9604 and 9606 (1986), respectively. Therefore, the remedial action selection process set out in section 121 of SARA, 42 U.S.C. sec. 9621 (1986), is not strictly applicable.
ROD, pi. ex. 168A at 73, reproduced in Appellants’ Addendum of Exhibits at A-l. The State indicates that notwithstanding it has determined cleanup levels in general conformity with § 121 and the NCP.
. 53 Fed.Reg. at 51,458 provides in part:
Subpart F does not require that States select remedies for non-Fund-financed State-lead enforcement sites in conformance with CERCLA section 121 and the remedy selection process specified in the NCP. However, where a State-selected remedy does not so conform, States and or PRPs may be at risk in several ways, including but not limited to the following: (1) EPA will not concur with the recommended remedy; (2) EPA may refuse to designate the State as lead agency for any subsequent response activities; (3) States and PRPs may be deprived of the assurance that EPA will find it necessary later to seek to compel further response actions; (4) EPA may be unable to delete a site from the NPL and/or (5) State cost recovery efforts may be hindered.
Failing to comply with CERCLA § 121 and the NCP selection process would appear to carry far more significant consequences than amicus United States and the defendants are willing to admit.
. 40 C.F.R. § 300.71(a)(4) (1989) provides:
Persons performing response actions that are neither Fund-financed nor pursuant to action under section 106 of CERCLA shall comply with all otherwise legally applicable or relevant and appropriate Federal, State, and local requirements, including permit requirements.
This regulation was superseded by a new NCP effective April 9, 1990. EPA, National Oil and Hazardous Substances Pollution Control Contingency Plan, 55 Fed.Reg. 8,666-8,865 (March 8, 1990). The new NCP provides that "[a]ny person may undertake a response action to reduce or eliminate a release of hazardous substance, pollutant or contaminant," and also sets forth prerequisites for § 107(a) cost recovery, including consistency with the NCP and compliance with ARARs. Id. § 300.700(a)-(c), 40 Fed.Reg. 8,858-59.
. 40 C.F.R. § 300.68G) (1989) provides:
Selection of remedy. (1) The appropriate extent of the remedy shall be determined by the lead agency's selection of a cost-effective remedial alternative that effectively mitigates and minimizes threats to and provides adequate protection of public health and welfare and the environment. Except as provided in § 300.68(i)(5), this will require selection of a remedy that attains or exceeds applicable or relevant and appropriate Federal public health and environmental requirements that have been identified for the specific site.
. 40 C.F.R. § 300.6 (1989) provides in pertinent part:
Lead agency means the Federal agency (or State agency operating pursuant to a contract or cooperative agreement executed pursuant to section 104(d)(1) of CERCLA) that has primary responsibility for coordinating response action under this Plan.