278 P. 583 | Or. | 1929
IN BANC.
AFFIRMED. This is a suit by the State of Oregon on relation of the Attorney General and the members of the State Fish Commission to enjoin the defendant from diverting the waters of Herman Creek. The state owns and operates a fish hatchery on Herman Creek below the intake of defendant's pipe-line for the propagation of salmon, and claims the waters of said stream for use in said hatchery. The defendant is a public utility and owns and operates a hydro-electric plant on the Columbia River in Hood River County and near the mouth of said stream. It operates its plant by water-power, the water being diverted from Herman Creek through a flume and pipe-line about 2,500 feet in length, which furnishes to defendant's plant a head of about 375 feet. The amount claimed and used is fifteen second-feet, which water so used is not returned to the channel of Herman Creek. The communities served by defendant with electric light and power generated at said plant are on both sides of the Columbia River in Oregon and Washington. Defendant and its predecessors in interest have been engaged in operating a generating plant by means of the waters so diverted from Herman Creek and in the sale of electric light and power for about fifteen years prior to the commencement of this suit. Commencing with the year 1915, that being the year when it was first required to do so, and *477 each and every year thereafter, the defendant and its predecessors in interest have, pursuant to Sections 5803 and 5804, Or. L., filed in the office of the State Engineer an annual statement and report of its appropriation and use of the waters of Herman Creek and have paid to the State of Oregon an annual license fee in accordance with the provisions of said sections.
Defendant bases its right to its appropriation from Herman Creek upon the following facts: On July 25, 1908, defendant's predecessor in interest, Goodwin A. Young, posted a notice on Herman Creek at the point where the water is now being diverted, claiming an appropriation of fifty second-feet for power purposes, and caused the same to be recorded within ten days thereafter. On October 31, 1908, Young posted another notice at the same point, claiming an appropriation for the same quantity of water and stating that the water was to be diverted from Herman Creek by a pipe-line, the general course of which was to be in a westerly direction from said head-gate, and stating that the place of intended use of the water was in the SW. 1/4 of the NW. 1/4 of section 8, township 2 north, range 8 east, W.M., which notice was likewise recorded on November 9, 1908. Owing to an irregularity in the lines of the government survey — the north line of section 9 being one-fourth mile farther north than the north line of section 8 — Young, in his second notice, described the place of intended use as in section 8 when in fact he intended to describe the place of use as in the N. 1/2 of the SE. 1/4 of section 5 in said township and range. Shortly thereafter and during the same year, Young made a survey of his proposed pipe-line, following the line of its present location, and during the following *478 spring he sought and obtained permission from the United States Forestry officials to extend the pipe-line for a short distance over the Herman Creek ranger station, and also in March or April of that year commenced the construction of a flume to divert the water, and he also purchased and acquired title to the land on which the present power plant is located. During the following year, he extended the flume to a point about 900 feet below said point of diversion and there constructed, either in 1911 or 1912, a small power plant and a sawmill and turned about fifteen second-feet of water out of Herman Creek into the flume and conducted it through the flume to said power plant and used it for the development of electric power which in turn was used to operate the sawmill for the manufacture of lumber and ties and also to generate electric power for sale.
In addition thereto, he constructed a V-shaped flume from said sawmill down to a wagon-road below and turned water into said V-shaped flume to float and carry the lumber so manufactured. The water at that time not used in the V-flume was returned to Herman Creek. The section traversed by the pipe-line is on the brakes of the Columbia River and very precipitous and it was very expensive to construct the pipe-line over the divide from the point where the water was first used down to the place where the present plant is located and Young was short of funds. The lumber used in building the flume referred to had to be carried up a precipitous mountainside by man power, there being no road or trails that could be used for that purpose. During each year after the construction of the power plant and sawmill referred to, the water so appropriated was used to operate the same until the pipe-line and the present plant were *479 constructed and during each of said years construction work was carried on with reasonable diligence as the evidence clearly shows. While we were engaged in the World War, Young found it difficult to obtain labor for the construction of the pipe-line and the present plant where the water is now being used, but in 1918, or 1919, the date not being clear from the evidence, the present plant and pipe-line were completed and since that time the present plant has been operated by the water diverted from Herman Creek and before the completion of the present plant the appropriated water was used at the old plant without intermission between the two.
The state bases its claim to the use of the waters of Herman Creek upon the following facts: During the year 1914, the State Fish Commission commenced the construction of a hatchery on Herman Creek for the propagation of salmon. The hatchery was located upon leased lands which the state has since acquired by condemnation proceedings. Although the state made use of the waters of Herman Creek in the operation of its hatchery for the first time in 1915 and has continuously used the same since said time, it acquired no right to the water by appropriation because by an act of the legislative assembly, Chapter 36, Laws of 1915, now Sections 7113 and 7114, Or. L., the waters of certain streams flowing into the Columbia River, including Herman Creek, were withdrawn from appropriation and this prohibition was held to be applicable to the State Fish Commission in State ex rel. v.Hawk,
Defendant's right of appropriation was not defeated by its failure to file a map of definite location *481
upon completion of the pipe-line, although such failure might have the effect of preventing defendant's rights from relating back to the time when the notices were posted. Upon that point we express no opinion. The notices were posted and the first steps were taken to secure the appropriation before the enactment of the Water Code. The rights which defendant's predecessors in interest had acquired prior to the enactment of the Water Code were preserved by Section 5717, subdivision 7, Or. L. Prior to the enactment of the Water Code, a person desiring to appropriate water for a beneficial purpose had a choice of two methods. He could, without the posting or recording of any notice or claim, construct a ditch or other means to convey water and divert the water into such ditch and apply it to a beneficial use and when the water had been so diverted and used, the appropriation was perfected and the right related back to the time when work was first commenced, if reasonable diligence had been exercised in the prosecution of the work. Under such circumstances, the rule was "Although the appropriation is not deemed complete until the actual diversion or use of the water, still if such work be prosecuted with reasonable diligence, the right relates to the time when the first step is taken to secure it": 1 Niel on Water Rights (3 ed.), § 393, and authorities there cited; Cole v.Logan,
Prior to the enactment of the 1909 Water Code, the other method of appropriation was that provided by the Act of February 18, 1899 (Laws 1899, pp. 172-180). *482
That act provided that upon the posting and recording of a notice in writing, as provided in the act, and the filing of a map showing the general route of the ditch, the appropriator had six months from the date of the posting of the notice within which to commence the actual construction of his proposed ditch and, if work was so commenced and thereafter prosecuted with reasonable diligence until completion (Re Determination of Water Rights ofHood River,
We find no merit in any of the other objections urged for this reason. It was admitted upon the argument here and in the court below that the State Fish Commission acquired no right to the waters of Herman Creek until November 15, 1922, and it is *483
admitted that defendant's pipe-line and power plant had been completely constructed and placed in operation and the water diverted and used for the operation of the same for three or four years prior to the time when the rights of the state attached. The state, therefore, was in no position to complain because of the change of place of use. Hence, whether defendant's diversion and use of the water at the first plant in itself alone constituted a valid and completed appropriation of the water and was followed by a change in the place of use, or whether such diversion and use at the temporary plant was only a preliminary step in making an appropriation which contemplated the use of the water at the present plant, the state, since it had no legal right to the water, is in no position to complain of such change in the place of use, if there was a change, or of any delay. While it is true that the law does not permit a change in the place of use of appropriated water which injuriously affects third parties, it is only parties having legal rights who are affected by the change who can complain: Wimer v. Simmons,
For these reasons, the decrees of the lower court must be affirmed.
AFFIRMED.
BROWN, J., did not participate in this opinion.