37 N.C. App. 138 | N.C. Ct. App. | 1978
Duke made its application for a certificate of public convenience and necessity under G.S. 62-110.1. This regulatory statute was enacted in 1965 to help curb overexpansion of generating facilities beyond the needs of the service area. To this end, the General Assembly used the term “public convenience and necessity” to define the standard to be applied by the Utilities Commission to proposed facilities. In reviewing the Commission’s application of the standard in other regulatory actions, the Court has held that public convenience and necessity is based on an “element of public need for the proposed service.” State ex rel. Utilities Comm’n. v. Carolina Tel. & Tel. Co., 267 N.C 257, 270, 148 S.E. 2d 100, 110 (1966); see also State ex rel. Utilities Comm’n. v. Southern Coach Co., 19 N.C. App. 597, 199 S.E. 2d 731 (1973), cert. den., 284 N.C. 623, 201 S.E. 2d 693 (1974); State ex rel. Utilities Comm’n. v. Queen City Coach Co., 4 N.C. App. 116, 166 S.E. 2d 441 (1969). Moreover in 1975, an “act to establish an expansion policy for electric utility plants in North Carolina, to promote greater efficiency in the use of all existing plants, and to reduce electricity costs by requiring greater conservation of electricity” was enacted by the General Assembly, 1975 Sess. Laws Ch. 780. This act, codified as G.S. 62-110.1(c)-(f), directs the Utilities Commisssion to consider the present and future needs for power in the area, the extent, size, mix and location of the utility’s plants, arrangements for pooling or purchasing power, and the construction costs of the project before granting a cer
Upon appeal from orders of the Utilities Commission, the authority of this Court to reverse or modify an order of the Commission or to remand the matter for further proceedings is limited by G.S. 62-94. Where the Commission’s actions do not violate constitutional provisions or exceed its statutory authority, then appellate review is limited to errors of law, arbitrary action, or decisions unsupported by competent and substantial evidence. The Court must look to the findings of fact and conclusions of the Commission and determine if the Commission has considered the factors required by law and if the findings of fact necessary to support granting of the certificate are supported by substantial evidence in view of the whole record. See State ex rel. Utilities Comm’n. v. VEPCO, 285 N.C. 398, 206 S.E. 2d 283 (1974).
Appellant does not except to the Commission’s finding that the area served by Duke Power Company will need the additional generating capacity for its service area operation between 1985 and 1989. The Commission made this finding after “considering the possibility of available purchase power and pooling agreements.” Neither does the appellant except to the Commission’s approval of the construction cost, nor to findings that the construction will be consistent with the Commission’s plan for the expansion of electric generating capacity and that the proposed Perkins Nuclear Station is most appropriate in view of the area’s economic and social needs. Instead, appellant’s assignments of error relate to alleged flaws in the design and placement of the facility. The High Rock Lake Association contends that the Perkins Nuclear Station as projected will consume too much water and that it will pollute the Yadkin River or otherwise adversely affect the river below the power plant. We point out first that these concerns, though not at the heart of the regulatory process as the Utilities Commission decides on the application for a certificate of public convenience and necessity, were adequately considered by the Commission. The Commission,
Appellant’s brief speaks at great length on the questions of the legal rights of riparian owners. It is sufficient to say only that there has been no “taking” of property rights by the proceedings before the Commission. If there is an involuntary taking of any of the property rights of appellant’s members, the question of compensation is for the court under the statutes providing for the exercise of the power of eminent domain.
We have considered all of the arguments made by appellant. No error of law has been shown. The order of the Commission, therefore, must be affirmed.
Affirmed.