State Ex Rel. Union Limestone,. Inc. v. BumgarnerState Ex Rel. Union Limestone,. Inc. v. Bumgarner
This is an action instituted in this-court for a writ of mandamus to command the respondent, as Millereek Township Zoning Inspector, to issue a zoning certificate to permit the relator to construct a new office building and scales on premises owned by relator in Millereek Township in Union County. The facts are not in dispute. It appears that at the time of the adoption of a township zoning resolution in 1957, and at all other times herein pertinent, the relator’s tract of land, consisting of approximately
47
acres, was being used by relator exclusively for the mining, quarrying and processing of lime
It also appears that when respondent refused to issue a zoning certificate the relator made application to the township board of zoning appeals under the variance provisions of the resolution for permission to construct the office building and scales, which permission the board likewise refused. However, since the board of zoning appeals is not a party respondent to this action and as relator claims it is entitled to a zoning certificate as a matter of right and not as a matter of variance, we do not consider the application for variance or the denial thereof as being in any respect pertinent to this action.
We also note that an appeal is provided by statute to the board of zoning appeals from an order of a township zoning inspector denying an application for a zoning certificate, and that for such reason consideration should be given to whether the extraordinary writ of mandamus should be refused when a remedy at law exists. However, we have concluded on the authority of State, ex rel. Cubbon, Jr., v. Winterfeld, 1.04 Ohio App., 260, 148 N. E. (2d), 523, of which holding we approve, that the legal remedy which was available to relator would not be adequate and should not, merely by reason of its existence, prevent the issuance of a writ of mandamus on the facts of this case.
The only issue argued by the parties is whether the relator
The zoning resolution purports to permit a number of specified uses of land located in the residential district, none of which specified uses include the mining, quarrying and processing of limestone. To this extent, at least, the mining, quarrying and processing of limestone by relator in the residential district constitute a nonconforming use. In the section of the zoning resolution dealing solely with the residential district it is provided that “the set back lines shall not be less than fifty (50) feet measured from the edge of right-of-way of highway.” In the section of the zoning resolution dealing solely with the commercial district there is no provision as to setback lines.
In pertinent parts the zoning resolution also provides as follows:
“If at the time of enactment of this zoning resolution any lot, building, or structure was being used in any manner, character or purpose which does not conform to the provisions of the resolution, such use may continue to be made of such lot.
C í %
“No excavation shall be commenced or structure started except for agricultural purposes until a zoning certificate has been obtained from the Millcreek Township Zoning Inspector.
í ( ^
“For the purpose of this resolution certain terms and words herein used shall have the same meaning as defined below: .
( l * # #
“Lot—A parcel of land occupied or to be occupied by one building, accessory buildings and uses, and including the open spaces required under this resolution. A lot may be land so recorded on a plat of record or considered as a unit of property and described by metes and bounds * # (Emphasis added.)
By specific provision of the zoning resolution hereinbefore quoted, any nonconforming use of any “lot” at the time of the enactment of the resolution may continue to be made of such “lot.” Ergo, the nonconforming use as to the entire 47 acres may continue to be made of the entire 47 acres. The nonconforming use of the land for the mining, quarrying and processing of limestone included the erection of structures necessary or reasonably incidental thereto without reference to any setback line, and such use may continue without conforming to the setback line provided for the residential zone.
A writ of mandamus commanding the respondent to issue a zoning certificate permitting the construction of the office building and scales in the manner set forth in relator’s application for same will, therefore, issue.
Writ allowed.