148 Wis. 261 | Wis. | 1912
In tbe fall of 1906 tbe plaintiff built a cburcb at Stanley, Wisconsin, tbe defendant having tbe subcontracts for tbe construction of tbe slate roofing and of tbe gutters and cornices. Before final payment was made, tbe defendant gave tbe following guaranty to tbe building committee of tbe cburcb:
“G-ENtlemeN : We hereby guarantee tbe slate roofing which we put on your cburcb against any leaking caused by defective workmanship on our part for a period of five (5) years.”
. This is an action for damages under this guaranty.
Tbe tower of tbe cburcb, tbe roof over that part of tbe cburcb called tbe sanctuary, and tbe roof over tbe main body of tbe cburcb were covered with slate. The rafters in tbe roof over tbe main body of tbe cburcb are placed horizontally, parallel with the ridge of tbe roof, and are supported by three trusses. The sheathing on this roof of tbe cburcb is of birch and is nailed onto these rafters at right angles to them and runs from tbe ridge of tbe roof to tbe side walls. This birch was not of uniform width and was not matched. Tbe sheathing on tbe tower and over tbe sanctuary is of hemlock and pine and tbe rafters in these roofs are so arranged that tbe sheathing is horizontal, unlike tbe sheathing on tbe main roof.
Tbe roofer’s specifications provided that tbe first row of slate above tbe gutters should be laid in slater’s cement. Tbe evidence shows that this is to prevent water which might accumulate in tbe gutters, because of ice, snow, or other ob
That water leaks through the roof into the church is not disputed. There was evidence tending to show that there were a number of places on the ceiling of the church and of the sanctuary which showed stains from water leaking through the roof. There was evidence tending to show that the worst leak in the building came from water backing up in one of the gutters, and that the next worst leak was caused by the falling out of some of the counter-flashing.
The evidence showed that the defendant made repairs on the roof in 1908. There was evidence in plaintiff’s behalf tending to show that the slate was nailed upon the roof by inexperienced boys and in an unskilful and unworkmanlike manner; that the slate had not been sorted according to thickness, and that the failure to so sort would leave an open space under part of a slate placed over a crack where slates of uneven thickness were placed together, into which snow and rain might be blown, and that the snow and rain on freezing might break the sheet of slate above it; that no slater’s cement was placed under the layer of slate next to the gutter as provided by the specifications; that felt had not been placed under the slate as provided by the specifications, or that it had been torn because of poor workmanship; that the counter-flashing had been fastened with nails and had not been wedged in and fastened to the projections above the roof by lead, as good workmanship required; that the counter-flashing did not cover the flashing properly; that slate which was
The court held that any damages caused by reason of defective gutters or cornices were not covered by the guaranty. There was evidence in defendant’s behalf to the effect that the proper construction for the under roof for slate was such that the rafters would run from the ridge of the roof to the walls; that the main roof of the church had settled because of the improper construction, and that this was the cause of the widening of the cracks between sheets of slate in some places and of their being shoved together in others and of the breaking and falling of slates; that birch as sheathing under slate was liable to warp, and by pressing up against the sheets of slate cause them to break; that the trusses supporting the main roof were weak and insufficient; that by reason of the sheathing running with the pitch of the roof, many of the sheets of slate were of necessity nailed upon two boards, and that a shrinking and warping took place under these conditions which would cause cracking and breaking of the slate; and that the counter-flashing had become loose and fallen out because poor mortar had been used in the mason work.
The evidence of the plaintiff’s witnesses upon the subject of the construction of the main roof of the church was to the effect that the construction provided in this case was not the best, but was probably all right.
The jury returned the following verdict:
“(1) Is the leaking through the slate roof of the plaintiff’s church caused by defective workmanship on the part of the defendant % A. Yes.
“(2) If you answer question No. 1 ‘Yes,’ then is it necessary in order to repair such defects to remove the entire slating and relay it? A. No.
*265 “(3) If you. answer question No. 2 ‘Yes,’ then what would be the reasonable cost of removing the present slating and relaying it, using all the old slating as is suitable for such purpose ? A. -.
“(4) If you answer question No. 1 'Yes’ and question No. 2 ‘No,’ then what would be the reasonable cost of repairing the defects occasioning such leaking ? A. $495.”
The court upon defendant’s motion ordered the answer to the first question changed from “Yes” to “No,” and gave judgment for the defendant upon' the verdict as so changed.
The appellant contends that the court erred in setting aside the finding of the jury in answer to the first question of the special verdict, whereby it was found that the leaking of the slate roof was caused by the defective workmanship of the defendant in constructing it. Erom°the foregoing statement of the case it appears that the evidence is undisputed that the roof has leaked in many places from the time it was built, that the slate was not sorted as required to make an even and smooth surface, and that slates broke at various times from its completion to the time this action was commenced. There seems to be no dispute that some of the flashing was in an imperfect condition. It however is not clear that this caused water to leak into the building. The witness Staples, who was called as an expert, testified that the'sorting of the slate was so imperfect as to leave the roof in so uneven a condition as to permit water and ice to collect between the sheets of slate and cause them to be displaced. He also gave it as his opinion that the breaking of slate as observed by him could be caused by imperfectly nailing the slate too tight. It also appeared that two inexperienced workmen assisted in laying the slate and that such work required skill and knowledge for a proper execution of this work. In the light of this evidence it cannot be said as matter of law that there was no evidence permitting of the inference, as the jury found, that the leakage in the roof was caused by defective workmanship. We must therefore hold that the court erred in changing the
The record shows that the defendant also moved the court, in addition to the motion asking the court to change the answer to the first question, that if this motion should he denied a new trial he granted, and, in the event of the denial of the motion for a new trial, that the damages he reduced. The court having granted the defendant’s first motion, changed the verdict, and thereon awarded defendant judgment on the verdict as changed, it of course follows that the court did not pass on the motion for a new trial nor on the one for a reduction of the amount of the damages found. Since the action of the court pursuant to the defendant’s first motion must now be reversed and this motion stand denied, it is proper that the cause he remanded to the trial court with directions that it consider and determine defendant’s other motions before judgment is awarded.
By the Oowrt. — Judgment reversed, and the cause remanded for further proceedings as indicated in the opinion.