157 Mo. 23 | Mo. | 1900
This is an appeal from a judgment, of the circuit court of the city of St. Louis on a verdict in be
The substantive portion of the petition is as follows: “That a certain clause of the specifications, which were part of the contract, provided that ‘the first floor over the cellar to he laid with best quality white oak, two inches thick, tongued and grooved, flooring laid down level, with close joints, and securely spiked with twenty penny spikes to each joist; balance of first floor of factory and warehouse to be laid with two inches thick, best quality, white oak, dressed to an even thickness, all laid down level, with close joints, and well spiked with twenty penny spikes to each support; every joint of floor to be broken and flooring to be four and one-half inches wide and under.’
“Another clause required ‘all materials to he of the best of their respective kinds.’
“That defendants did erect the buildings so contracted for, but not in accordance with said plans and specifications, by not using the best materials of their respective kinds in constructing the five floors of the building- that, in laying the first floor over the cellar, they did not use the best quality of white oak, two inches thick, tongued and grooved flooring, nor lay the same down level, with close joints, and securely spiked with 20 penny spikes to each joist. That said floor was laid while green; has since shrunk and warped, so that it is rough, not level, and has cracks of great width and length; that, in the portion over the cellar, one can see through the floor, and all the balance of the first floor of the factory and warehouse is not laid with two inches thick, best quality of white oak, dressed to an even thickness, laid level, with close joints, well spiked with 20 penny spikes to each*28 support, but was laid while green, has warped and shrunk, leaving cracks and crevices, is rough and uneven, making inclines therein, and rendering it unfit for the purposes of its construction. That, on all the first floor, the ends project from the general level; •& large number of joints are not broken and many pieces are more than four and one-half inches wide, and not of even two-inch thickness after dressing. That these defects were latent, not visible, nor open to inspection, and could not have been known, nor were they known to plaintiff at the time of laying the floor, or completing said building, or making the final payment, but only became visible subsequently; that the building has never been accepted by the owner with knowledge of said defects, nor were the terms of the contract waived.”
Plaintiff also, alleged performance of the contract on its part, and prayed judgment on the bond for $3,000, on account of the alleged breach.
The answer to this amended petition admitted the execution of the bond and contract, but denied that the latter is fully set forth in the petition. Affirmatively, the answer averred, that, under said contract, all the work and materials to be furnished by defendant should be so furnished to the satisfaction of the superintending architect of plaintiff, who was by the contract made the agent of plaintiff in the erection of such improvements. That said superintendent was thereby expressly vested with full power and authority to reject any work or material which might not be in accordance with the letter and spirit of the contract, provided he should notify defendants of his objections at the time the work or materials were being furnished. That all work and material was furnished under the superintendence and direction of Gerhard Becker, plaintiff’s architect, including all the flooring now complained of. That all the flooring was dully submitted to the inspection and approval of said archi
Tbe reply admitted tbe contract as pleaded, but denied tbe legal effect as averred. Also denied approval of tbe material in question, and averred tbat tbe last payment was made by plaintiff, upon promise of defendants to make sucb additions, alterations or repairs as would be satisfactory to plaintiff if it was discovered later tbat tbe building was not erected according to contract. Tbe cause was tried before Judge Klein and a jury.
Tbe contract was read in evidence and contained tbe clauses set out in tbe petition, and among other provisions tbe following:
“Tbe entire balance of the work to be in accordance with tbe drawings, plans, elevations and specifications furnished by tbe superintending architect, and adopted for said building which are hereto annexed and made a part of this contract. And said superintending architect shall be tbe agent of the party of tbe first part in tbe erection of tbe building and improvements herein named.And tbe said superintendent shall have full power and lawful authority to reject the whole or any part or portion of said material or work which may not be in strict accordance with tbe letter and spirit of these presents; provided, tbe said superintendent notifies tbe parties of tbe second part of bis objections to tbe work and material at the time same are being furnished.Payments to be made as tbe work progresses, as follows: $5,000 when tbe first floor joist is laid and rubble masonry is completed; $5,000 when tbe second floor joist is laid; $5,000 when tbe third floor joist is*30 laid; $5,000 when the fourth floor joist is laid; $5,000 when the fifth floor joist is laid; $9,000 when the roof is on, and the balance of $12,000 when the buildings and all work connected with same is completed. And after the completion of said building, according to contract, if payment of the amount due from party of the first part to parties of the second part be not made within ton days after demand for same, then, in ease said parties of the second part shall have recourse to legal process to collect said amount due from said party of the first part, there shall be allowed by the court trying said cause a reasonable attorney’s fee in favor of parties of the second part.It shall be the duty of said superintendent, upon any payment becoming due said parties of the second part, to give orders on the owner for the payment of same, duly signed and sealed by the parties thereto.”
It was further shown that the building has a front on the west line of Second street of 187 feet by 14-7 feet on Madison street. Under the corner of the building for a space of sixty feet each way was a cellar nine feet deep, the bottom of which was left in its natural state except a covering of cinders. Over the whole of this cellar was the tongued and grooved white oak flooring and in the corner an office about twelve feet square partitioned off and covered with oil cloth. The remainder of the first floor was composed of the ungrooved white oak plank, dressed on top, two inches thick and nailed to sleepers five inches square which lay next to the unexcavated ground, the spacing between the sleepers being filled with a mixture of cinders and cement.
With reference to the oak floor, plaintiff’s proof was that George Wiegand, the managing officer, was on the premises every day as well as the architect. That a shipment of oak flooring was received at the building, which, on examination by the architect, was rejected as not being of
On about May 5th, defendant Vollmer presented the Architect’s order for 'the final payment of $12,000, but Wiegand took the ten days’ grace allowed him by the contract to see if everything was all right. Some time before this, the building being substantially complete, plaintiff had begun to move into it with machinery and material. When Vollmer presented the order, Wiegand called his attention to a number of little things which were not complete, which were thereupon remedied at once. On May 15, the order was again presented for payment, and then Wiegand called Vollmer’s attention to some coverings over areas that he wanted made. On the latter’s promise to supply these, and the further statement, that “if anything goes wrong with the building, he would be very glad to finish it, or complete it,” the order was paid. Some months after that, the floor began to show signs of contraction and warping, and seams showed between boards, and the sides and ends curled up. The part not over the cellar is not all broken-] ointed. On prying up the ends of the boards, they were found not full two inches in thickness. In that part laid in the factory and ware-rooms, where heavy machinery is located or heavy goods piled, and heavy trucks are run, the floor has sunk in places from four to six inches. It is more difficult to work on the floor in its present condition. Some witnesses also testified
When the building was commenced, it was discovered that the portion nearest the corner of Second street was a filled-np quarry, and a great many piles had to be driven to furnish adequate foundations.
An ■ architect, examined for plaintiff, testified that, in his opinion, the lumber used was a first class quality, but not sufficiently seasoned when laid, thus causing the shrinkage and warping. He also testified that this unseasoned condi-dition might have been discovered by any one of a number of well known tests; and that any experienced person, and certainly an architect, should have been able to detect this unseasoned condition “if he had his wits about him.” This witness also stated that the portion of the floor in the office where covered with oil cloth, has stood very well, without shrinking, but that the entire floor resting on sleepers, has sunk somewhat, “due presumably to the weight which has been placed upon it.” The entire first cost of such a floor would be about $1,600.
■ For the defense, it was shown'that, under the larger part of this building, the soil was “made ground,” wet and soggy. That such dampness will arise through even cinders and cement, and will cause the lumber above it to curve and warp. That oak wood is especially susceptible to such influences, and that, with dry heat from above and dampness from below, this result is inevitable. That the oak necessary for covering the first floor arrived at the building, but, as it had been made out of two-inch lumber, which by dressing, was reduced to one and seven-eighths inches in thickness, the architect rejected it, and thereupon an entirely different lot was ordered, planed dowm from 2 1-2 inch material. When this arrived, it was exhibited to the architect,
Defendants further showed that the lumber was also ' examined and measured by Mr. G-runer of the firm through .whom the lumber was ordered, and it was found to be of first-class quality, two inches in thickness, and dry — having been dried by the process of nature; had been stacked at the mill for months. He had been in the business long enough to know by handling and lifting whether lumber is dry.
It was also shown that all joints in the first floor were •broken, whether made of flooring or planks. By the expression “flooring” is meant tongued and grooved flooring in the trade. And it was shown that at the time when defendant, Vollmer, presented the final order for payment, Wiegand made merely a specific request for the area covers. But Vollmer told him if there was anything else unfinished ho would complete it.
During the trial, the court indicated by its rulings that if the plaintiff, by its architect and proper officers, did inspect the material that went into this floor, and also inspected the floor during the laying thereof, and after its
At the close of the evidence, the court gave the following instructions in the case:
“1. If you find and believe from the' evidence that the oak floor over the cellar and in the remainder of the first story of the factory building constructed by the defendants, Hemminghaus and Vollmer, for the Standard Stamping Company, was not laid in the manner prescribed in the specifications read in evidence, or that the material, viz., the white oak, tongued and grooved, and white oak boards, of which the same was constructed, was not of the best quality for such flooring and boards as required by said specifications and the building contract read in evidence, and if you further believe from the evidence that the floor as laid was of less value on the 11th day of September, 1893, than it would have been if the samé had been laid in the manner and of the kind of materials required by the specifications and contract read in evidence, then you should find a verdict in favor of the plaintiff.
“But, although you may find the facts to be as above supposed, if you find and believe from the evidence that a controversy had previously arisen between Mr. Becker, the plaintiff’s architect, and the contractors, Hemminghaus & Vollmer, in regard to the white oak, tongued and grooved flooring, and the white oak boards to be used in said floor according to the terms of said contract and specifications, and that the- architect had rejected the flooring first delivered at said building for first floor, and that thereupon the contractors procured other white oak flooring and boards to be delivered at said building for the construction of said first floor, and that before the same was used and laid, the attention of the architect and of Mr. "Wiegand, the general*35 manager of tbe plaintiff company, was called to examine the same, and that they, in the presence of Mr. Hemminghaus, inspected the same, or had the opportunity to inspect the ■same, and that the architect then and there said that the flooring and boards were all right and just as they wanted, and Mr. Wiegand heard the statement and made no dissent or objection thereto, and that thereupon the contractors used the same in laying said floor, then the plaintiff can not now complain about said flooring or boards with regard to anything or any defect which could be seen, or which could be discovered by the use of precautions or tests known to architects of ordinary skill and experience in this locality.
“Hence, though you should believe from the evidence that the lumber laid in the first floor of plaintiff’s building was not seasoned or dry when laid, yet if you also believe from the evidence that plaintiff’s architect inspected and approved the same before laid, and that by the use of precautions known to architects of ordinary skill and experience, in this locality, such architect would have discovered that such lumber was not seasoned or dry; and that the defendants, Hemminghaus & Yollmer, did not know of any wet or unseasoned condition of the lumber, then plaintiff can recover no damages which may have been caused by the fact that the lumber was not seasoned and dry.
“Hence, also, if you find from the evidence that such inspection was made by the architect as above supposed, then plaintiff can not in this case recover anything against the defendants upon the ground that the flooring lumber on the first floor of plaintiff’s factory building was not four and one-half inches in width, or less than two inches in thickness, even though you should believe from the evidence that the same is more than four and one-half inches in width, or less than two inches thick.
“And so, though you may believe that the floor in*36 question may, after tbe laying thereof, have shrunk and warped, and become otherwise defective, yet if you also believe from the evidence that such result was brought about by .causes other than the condition of the flooring when laid, or by the manner of laying the same, then plaintiff can not recover herein any damages by reason of such defects in the floor.
“2. If you believe from the evidence that the white oak tongued and grooved flooring and white oak boards used in the construction of the floor of the first floor of said factory building was not well seasoned when used, and that this, was a defect in said material which could not be discovered by an architect of ordinary skill and experience by the use of such tests or means known to architects of ordinary skill and experience in this locality; and if you further believe from the evidence that the floor in question, by reason of the fact that such flooring and boards were not well seasoned (if you find such to be a fact), became uneven, warped and separated and so was of less value than it would have been had the lumber been well seasoned, then your verdict should be for the plaintiff.
“3. If, under the foregoing instructions, you find in favor of the plaintiff, you should so find in the penalty of the bond sued on in this case, viz., in the sum of forty-six thousand dollars, and you should assess the plaintiff’s damages at such sum as you may find and believe from the evidence to be the fair and reasonable difference in value between the floor as laid, and in the condition the same was in on the 11th day of September, 1893, and the same would have been in if the floor in question had been constructed in the manner and of the kind and quality of materials called for in the specifications and contract read in evidence^ with interest at the rate of six per cent per’ annum from that date (September 11, 1893) to this date.
*37 “4. And, in arriving at tbe plaintiff’s damages, you may take into consideration tbe difference (if you bélieve from tbe evidence 'that there is any difference) between tbe lasting and wearing qualities of tbe floor as laid, and tbe lasting and wearing qualities of a floor laid in accordance with tbe contract and specifications read in evidence.
“But in no event is tbe plaintiff entitled to recover any damages in tbis case on account of any defect in tbe floor wbicb was brought about by causes other than tbe condition of tbe flooring when laid, or by tbe manner of laying of tbe same.”
“5. On tbe other band, if, under tbe evidence and tbe foregoing instructions you find in favor of tbe defendants, you need merely state in your verdict that you find the issues joined in tbis cause in favor of tbe defendants.”
Under tbe instructions and tbe evidence tbe jury returned a verdict for tbe defendants.
After proper steps tbe cause was appealed to tbis court.
I. Learned counsel for plaintiff have cited numerous authorities to establish that tbe defendants were bound by their contract to furnish material of tbe kind required by their contract, and that their ignorance that tbe flooring was unseasoned will not excuse them altboxigb they acted in good faith; that tbe mere acceptance of a building without more, is not a waiver of defects, if latent; that an architect has no power to change tbe contract between tbe owner and tbe builder, and can not exceed tbe powers vested in him by tbe contract.
After a careful scrutiny of tbe evidence and tbe instructions of tbe court, it seems to us tbis appeal does not call for a discussion of these several propositions.
TVu must go to tbe pleadings in tbe first instance, to determine what was tbe issue in tbe circuit court. After tbe averment of tbe execution of tbe contract, and tbe portion as to wbicb a breach is alleged, plaintiff proceeded to
The defendants in their answer joined issue on this-proposition and averred that before said white oak flooring •was laid in said building it was fully inspected by the president and managing officer of plaintiff, and the architect who had full power to reject any and all material that should not be in strict accordance with said contract, and was accepted by them, and thereupon was incorporated into said building at great expense, and after said building was completed the whole was accepted.
On the trial, the evidence tended very strongly to sustain the answer, and the court framed its instructions with a view to the issue made and the testimony. The instructions-concede that the contractors were bound to furnish the white oak flooring in accordance with the specifications and contract, but told the jury that if prior to the laying of said floor a controversy had arisen as to the character of the white oak flooring about to be used, and the architect- exercising his right rejected it, and thereupon the defendants procured other white oak flooring for said building, and before using it submitted it to the inspection of Mr. Wiegand, the general manager of the plaintiff corporation, and to its architect, and that they in the presence of the defendants inspected it and then and there pronounced it all right, and just what they wanted, and thereupon the contractors, the defendants herein, used it in the making of said floor, then plaintiff can not now complain of anything or any defect in said lumber-
As we understand the ruling of the circuit court, it was not that the architect could change plaintiff’s contract to its detriment, but that it was entirely competent for plaintiff and said architect to determine that certain material offered to go into said building was just what the contract required, and having seen it and had the fullest opportunity of testing it, and it being material capable of being tested in various ways, all those defects which were visible or <?ould when offered for inspection have been ascertained by an architect of ordinary skill in that vicinity, were waived by the acceptance of plaintiff and its architect.
The evidence tended to prove that the white oak flooring was first class material in every respect, save and except it is contended by plaintiff that it was not seasoned and hence it warped when it became dry. On the other hand, the lumber merchant who testified to twenty-five years experience in handling this character of timber, said it was seasoned and by natural process; that he could tell it by weight. Plaintiff’s expert architect detailed a number of very simple tests that could have demonstrated whether thp timber had been seasoned, and that the architect in charge of the building could have told it was unseasoned if in fact it.was, “if he had had his .wits about him.” Under these circumstances, we think the circuit court announced the true rule. If the defects were visible and plaintiff saw them or he and his architect by the exercise of ordinary skill could have de
The doctrine of waiver is a very familiar one, and we think it applies to the facts found in this case. Williams v. Railroad, 153 Mo. 487; Bishop on Contracts (1887), sec. 792.
Unquestionably plaintiff was entitled to have its factory built of the material for which it contracted, but with this right secured to it, and with full knowledge of the material defendants offered for the flooring, it saw fit, not negatively but affirmatively, to approve the lumber offered, and thus led defendants to place it in the floor under the belief that it fully satisfied the requirements of .the contract.
It was not a case' of mere silence, leaving defendants at their peril to perform their contract, but plaintiff and its expert asserted and assumed the right to inspect and reject the material, and having rejected the first installment, expressly approved this. We think the court’s first instruction fully guarded plaintiff’s rights, and correctly defined the relative fights of both plaintiff and defendant.
The learned counsel for plaintiff, moreover, is at fault in the premise that the architect alone accepted the flooring. The evidence is conclusive that the president of- plaintiff accompanied the architect and the two together in the presence of one of defendants after examination of the second invoice of flooring, and before it waS used, said it was the very lumber they wanted. So that it will not' do to argue on this point, that the architect could not vary the contract.
The plaintiff and the chosen architect were authorized to reject any material which in their judgment was not up to the contract stipulations and by the same token they were authorized to accept a specific material as being fully up to the standard, if its defects were patent or by the exercise
We have set forth the instructions in full, and deem it unnecessary to discuss each one separately. They announce correct principles of law, and were based upon the evidence.
The testimony justified the jury in finding that the lumber was seasoned, and its subsequent warping was the result of atmospheric conditions for which defendants are not responsible. Given a damp soil beneath and the artificial heat above, and it is not hard to produce the warp in white oak lumber shown by this testimony.
We think the verdict was for the right party, and the judgment is affirmed.