The order of the court below, refusing 'to transfer the cause to the United States circuit court, does not come within any of the subdivisions of Gen. St. c. 8(1, § 8, and is not appealable. The appeal from it is, therefore, ■dismissed.
Where a party to a suit complies in proper time with the ■requirements of the law of congress regulating removals from state to the federal courts, the state court at once loses jurisdiction of the cause. No order of the state court is necessary. Should the state court proceed to trial and .judgment after that has been done, its judgment will be reversed for that reason. The application for removal must be made, and the law of congress be fully complied with, by the part3q before trial. This means before the trial has begun. ' When a cause has been called for trial in its order, 'and a jury has been called to try the cause, the trial has been begun, even though the jury has not been sworn. 'The calling of the jury is a part of the trial. In this case, when the trial commenced, the defendant had not complied with the law of congress. It had filed its petition and ■affidavit, but had not offered its surety, within the moaning--of the law. The security required must be actually produced and presented for the approval of the court.
The complaint alleges, among other things, the corpo
This brings us to the merits of the case. In the- fall of' 1872, the city of Minneapolis then having in contemplation the construction of two bridges across the Mississippi river-within its limits, the board of directors of the plaintiff1'passed, this resolution : “ Resolved,, that, for the purpose of facilitating the construction, of the two bridges, across the Missis-, sippi river provided for in the union charter, an.d to connect, the same with the streets in the East Division.,, the Saint., Anthony Ealls "Wator-power Company will, donate to the city the right of way, eighty feet wide, through any of its land between Main street and the river, reserving to itself' the right at all times to construct canals and railroads across or under such right of way. Provided the city will so construct such bridge as to give spans o.f not less, than 135 feet, in length over any of th.e east-side channels,, and,will bridge, said canals.”
Soon after this the city made a contract with defendant,, by which defendant agreed to construct said bridges, and “ to furnish all the labor of every kind and nature, and all of the materials o.f every kind, and description.,, necessary for-
One of the bridges was located so that the way between it and Main street passed over plaintiff’s land, and it appears that to locate the bridge seat, at that end, it was necessary to quarry a considerable amount of rock; but it does not appear that the city established any grade over this way, ' or in any manner determined upon the necessity of reserving any of the material along it, unless at the bridge seat, either for the purpose of grading, or for use in the bridge, or any part of the way or its connections. After this contract ivas made, the defendant made a contract with plaintiff, by which defendant ivas permitted to quarry and take from plaintiff’s land all the rock it might want in building that bridge, and defendant agreed to pay plaintiff;for the rock taken, at the rate of forty cents a perch. .The defendant quarried and took from plaintiff’s land, and used in constructing the bridge, a large quantity of rock, a part of which was taken from the way we have mentioned.
The controversy is as to plaintiff’s right to recover, at the contract price, for the rock taken from this way, the defendant claiming that, by virtue of its contract with the chy, and the plaintiff’s dedication of the land for a street, it had the right to quarry and take, without paying for it, for use in constructing the bridge, all rock necessary for that purpose ; the plaintiff denying this proposition. The charge of the court distinctly presents the proposition, and instructs the jury in accordance Avith plaintiff’s víoav of it.
There can be no doubt that, upon a dedication of land for a highway, although the fee remains in the dedicator, the public acquires the right of “digging the soil, and using the timber and other materials found Avithin the space of the road, in a reasonable manner, for the purpose of
As the case ivas submitted to the jury, their verdict includes a finding (and it is fully sustained by the evidence) that there was a contract between plaintiff and defendant, by which the latter agreed to pay the former, at a specified rate per perch, for all the stone which defendant should take from plaintiff’s laud, irrespective of the part of the
Under the contract so found plaintiff ivas entitled to a verdict for the whole of the rock taken by defendant, at the contract price. This ivas the verdict rendered. And, although the charge of the court ivas incorrect, so far as it denied the abstract right of the defendant, under the authority of its contract with the city, to take any part of the rock, such error could not affect the rights of the parties; for, upon the contract found by the jury, the plaintiff' ivas entitled to the verdict, whether the proposition of the court were true or not.
Order affirmed.