48 Pa. Super. 84 | Pa. Super. Ct. | 1911
Opinion by
The plaintiff brings this action to recover damages for the partial destruction of her building resulting from an explosion of natural gas. The building was arranged to accommodate two tenants. The plaintiff herself had formerly occupied one portion of it, but at the time of the explosion was residing in a separate dwelling erected on the same lot. The entire building first mentioned had been piped by the owner so that its occupants could use natural gas for fuel or light or both, and gas had been thus used by
For some time prior to the explosion one side of the premises had been unoccupied, and at the time it became vacant the meter had been removed from the basement of that portion of the building and the gas shut off at the street main. A few days prior to October 25, 1907, the plaintiff had secured a new tenant, and on that day this tenant notified the defendant company of her occupancy and that she desired to have the gas turned into the premises. At about six o’clock in the evening of the day mentioned two of the defendant’s employees came to the house, bringing with them a new meter of standard design. Having duly set the meter in the place prepared for it and connected it with the service pipe and the house system, they turned on the gas at the street line as they had been requested to do. The gas in the street main was under a pressure of not more than six ounces. Had the system of pipes inside the house been free from leaks, it is manifest that only a sufficient amount of gas would pass through the meter to fill the house pipes with the same pressure of gas already mentioned. By watching the dial attached to the meter for that purpose, it almost immediately became manifest to the defendant’s employees that there was a leak somewhere in the house pipes. They at once shut off the gas at the meter and gave notice of the fact that there was a leak in the house pipes. According to the estimates given by the witnesses for the plaintiff, the time that elapsed between the opening of the street main and the shutting off of the gas did not exceed about two minutes.
Although the defendant was in nowise responsible for the condition of the house pipes and owed the plaintiff no duty either to find the leak or repair it, one of its employees volunteered to try and locate it. Having been provided with a lantern, at his request, he went to the second floor and at once discovered that a cap which should have pro
Thus far there can hardly be said to be any conflict in the testimony. Just how much gas actually did pass through the meter in the time indicated, the testimony leaves in serious doubt. The size of the pipe and the pressure of the gas are not matters in controversy. On the day following the accident it appears that the meter dial registered 140 feet. The great weight of the testimony tends to show that, given the size of the pipe, the pressure of the gas, and taking the estimate of time furnished by the plaintiff’s witnesses, no such amount of gas could have passed through the meter in that brief period. But if the verdict involves a finding by the jury that the meter was not touched by anyone after the defendant’s servants left it, and that, as a consequence, the amount of gas found to be registered must have passed through before they shut it off, we cannot say as matter of law, that such finding is without supporting evidence and therefore the plaintiff is entitled to the benefit of it.
Some little time after the happening of the occurrences thus noted — the exact time being left in doubt by the testimony-one of the occupants of the other side of the house went to his room on the third floor and struck a match. An explosion, and probably two explosions followed, resulting in the injury to the building for which the plaintiff now seeks to recover. To establish her right, her testimony must tend to show some negligent breach of duty on the part of the defendant or its servants which was the proxi
Whilst we have no decisions of the appellate courts of this state in which this precise question has been adjudicated, the conclusion is so manifestly supported by reason that its soundness cannot be doubted. And where, as here, the gas was turned on in response to an application from the property owner or her tenant, the defendant could fairly regard such application as an affirmative assertion by the owner that the interior system of pipes, constructed and maintained by the owner, was sufficiently secure to permit the gas to be introduced with safety.
There are at least two cases outside of Pennsylvania in which the appellate courts have recognized the correctness of the principle we have stated. In Chouteau v. St. Louis Gas Light Co., 47 Mo. App. 326, the court said: “It appears that changes may be made and are constantly being made in the arrangement and connection of gas pipes in the interior of buildings without notifying the gas company. So long as the service pipes are not interfered with, the gas company exercises no supervision. The service pipes lead from the street main into the building and connect with the meter. Beyond that point the gas company assumes no control.” In Schmeer v. Gas Light Co., 147 N. Y. 529, the defendant company had turned the gas into a large building occupied by many separate ten
As already stated, the explosion occurred, not on the side of the building in which the defendant had shortly before introduced the gas in the manner stated, but on the other side, occupied by an entirely different tenant. That side of the building had its own independent system of pipes, and as to their condition the testimony is silent. Assuming, however, that the jury could properly have found that the gas which actually exploded came from the side of the house into which it had just been introduced, and assuming further that the gas which thus found its way through the building passed through the defendant’s meter during the brief period while the defendant’s agents were controlling its flow, nevertheless, as we view it, the testimony unerringly points to the conclusion that the proximate cause of the injury was the leaky condition of the house pipes, which it was the duty of the plaintiff to maintain in proper condition. In our judgment, when the defendant’s servants had promptly discovered the existence of a leak and then shut off the gas and given notice to the plaintiff or her tenant, its duty was fully performed. It was not bound to take any steps to discover the location of that leak. That was the manifest duty of the plain
But it is argued the learned trial court was right in submitting to the jury for determination, as a material fact under the evidence, the question whether or not the defendant’s servants permitted more gas to flow through the meter than was necessary in order to determine the existence of the leak. We can discover nothing in the evidence upon which a verdict against the defendant on this ground could stand. It is first of all to be remembered that the defendant’s agents fairly had the right to assume in the outstart that the plaintiff’s system of house piping was so installed and maintained that it would receive the gas and hold it securely. The evidence furnishes no measure by which the jury could determine how much time persons of ordinary skill and prudence would have consumed in detecting the fact of a leak, and their finding that the time shown by the testimony to have been occupied was too great seems to have been the purest conjecture. Nor is there anything to warrant the assumption that if the gas admitted had been something less in quantity the explosion that followed would have been practically less injurious to the building. Certain it is that the plaintiff’s neg
Upon the entire record as it stood at the conclusion of the trial, we are of the opinion the learned court should have affirmed the first point submitted by the defendant praying for a directed verdict, or, failing in that, should thereafter have granted the defendant’s motion for judgment n. o. v.
Judgment reversed and the record is now remitted to the court below with direction to enter judgment for the defendant on its motion for judgment n. o. v.