Plаintiff, SMR Technologies, Inc. (“SMR”) filed a motion for summary judgment in its breach of contract case against Defendant, Aerospace Products International, Inc. (“API”), formerly known as Aircraft Parts International Combs, Inc. The Court has jurisdiction over this case and controversy pursuant to 28 U.S.C. § 1332. For the following reasons, the Court grants SMR’s motion for summary judgment and orders API to pay SMR $94,969.06, which includes $77,295.00 for unpaid merchandise and $17,674.06 in interest. The Court denies API’s motion for mediation or arbitration.
I. Background Facts
Plaintiff, SMR, is a corporation duly organized and existing under the laws of Ohio with its principal place of business in Fenwick, West Virginia. SMR is a wholly-owned subsidiary of B.E. Aerospace (“BEA”), a corporation duly organized and existing under the laws of Ohio with its principal place of business in Wellington, Florida. SMR and BEA are in the business of manufacturing, distributing, marketing, and selling aircraft parts, including pneumatic products, propeller products, pneumatic de-icers and components, and other aircraft parts. Defendant, API, is a corporation duly organized and existing under the laws of Delaware with its principal place of business in Memphis, Tennessee. API is a distributor of aircraft parts.
In 1997, SMR allegedly received approval from the Federal Aviation Administration (“FAA”) to manufacture de-icing products for different types of aircraft. According to SMR, before this FAA approval, B.F. Goodrich was the only manufacturer of de-icing products in the general aviation market. (Pla. Statement of Undisputed Facts para. 2.) API was interested in entering the de-ice market and had allegedly attempted to become a distributor for B.F. Goodrich. (Pla. Statement of Undisputed Facts para. 4.) In early 1998, SMR and API began negotiations tо allow API to become a worldwide distributor of the SMR de-ice product line. These negotiations led to a Distributor Agreement between SMR and API, signed on June 3, 1998.
Under the Distributor Agreement, SMR appointed API as the distributor for its ice shield pneumatic de-icers and components, and ice shield propeller de-icers and components. The parties negotiated and agreed to the following performance figures.
A. Distributor [API] will be required to maintain inventory and sell products during the follows: term of the agreement as
Effective Date Min. Inventory Level Annual Sales Attainment at Distribution Cost
July 1,1998 125,000.00 n/a
December 31, 1998 250,000.00 1,000,000.00
December 31, 1999 500,000.00 4,000,000.00
According to the Distributor Agreement, SMR and API allegedly agreed that all invoices would be paid within thirty days and any invoices not timely paid would be subject to a late payment of one and one half percent per month, ie. eighteen percent annually. Additionally, API agreed to collaborate with SMR to develop an annual market plan and forecast for products under the Distributor Agreement.
Pursuant to the Distributor Agreement, SMR provided API with aircraft parts from June 3, 1998 through February 1, 2000. API paid for the products that it received between June 3, 1998 and November 1, 1999, but allegedly failed to pay for the products it received from November 8,
According to SMR, in the Fall of 1999, API allegedly reduced its efforts to promote actively and sell SMR products. By February 2000, API had entered into an agreement with B.F. Goodrich to distribute B.F. Goodrich’s de-ice product line. (Pla.’s Statement of Undisputed Facts para. 16.)
SMR and BEA brought breach of contract claims against API. 1 Pursuant to Federal Rule of Civil Procedure 13(a), API filed a counterclaim against SMR and BEA. API alleged that before executing the Distributor Agreement, API and SMR made mutual mistakes concerning the scope and depth of the market for replacement de-icing and propeller products and their ability to capture a market share in the short period of time provided for in the agreement. (Schlesinger Affidavit para. 5; Arnett Affidavit para. 5.) API also alleges that SMR failed (1) to collaborate with API in developing an аnnual marketing-plan and forecast for the territory and markets covered by the Distributor Agreement; (2) to provide API with sales literature, product specific literature, training material and other information; (3) to provide API with technical support and training to deal with customers; (4) to schedule dates for delivery of the products; (5) to jjrovide a certificate of insurance for product and general liability insurance; (6) to achieve FAA certification for the number, type, and kind of de-icing products to be used on specific aircraft (thereby limiting the number of aircraft for which API could sell de-icing replacement products); and (7) to refrain from direct competition with the API sales force. (Def.’s Counter-Complaint paras. 7, 8; Schlesinger Affidavit para. 6(a)(l)-(4)). As a result, in May 2000, API terminated the Distributor Agreement. 2 API seeks $500,000.00 in damages against SMR for lost sales and profits, lost marketing costs, lost inventory carrying costs, consequential “and/or” incidental damages. (Def.’s Counter-Complaint, Prayer for Relief, para. 2.)
On October 16, 2000, API filed a motion to dismiss BEA’s claim for lack of subject matter jurisdiction according to Federal Rule of Civil Procedure 12(b)(1). On December 27, 2000, the Court granted API’s motion to dismiss BEA from the cause of action. On January 12, 2001, SMR filed a motion for summary judgment and submitted a statement of undisputed facts. API responded on March 5, 2001 with a memo
II. Standard
Summary judgment is proper “if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law.” Fed.R.Civ.P. 56(c). In other words, summary judgment is appropriately granted “against a party who fails to make a showing sufficient to establish the existence of an element essential to that party’s case, and on which that party will bear the burden of proof at trial.”
Celotex Corp. v. Catrett, 477
U.S. 317, 322,
The party moving for summary judgment may satisfy its initial burden of proving the absence of a genuine issue of material fact by showing that there is a lack of evidence to support the nonmoving party’s case.
Id.
at 325,
Facts must be presented to the court for evaluation.
Kalamazoo River Study Group v. Rockwell Int’l Corp.,
In evaluating a motion for summary judgment, all the evidence and facts must be viewed in a light most favorable to the nonmoving party.
Matsushita Elec. Indus. Co. v. Zenith Radio Corp.,
Once a properly supported motion for summary judgment has been made, the “adverse party may not rest upon the mere allegations or denials of [its] pleading, but ... must set forth specific facts showing that there is a genuine issue for trial.” Fed.R.Civ.P. 56(e). A genuine issue for trial exists if the evidence would permit a reasonable jury to return a verdict for the nonmoving party.
Anderson v. Liberty Lobby, Inc., 477
U.S. 242, 248,
III. Analysis
A. Choice of Law
Regarding the choice of law in a contractual dispute, Tennessee follows the rule of
lex loci contractus. Vantage Tech.,
In the instant case, the Distributor Agreement states, “All disputes, controversies, or differences which may arise between the parties, out of or in relаtion to or in connection with this Agreement, or the breach thereof, shall be finally settled under the Laws of the State of Delaware.” (Distributor Agreement para. 10.) API is organized under the laws of Delaware; therefore, the choice of law bears a material connection to the transaction and is not merely a sham or subterfuge. Furthermore, the parties offer no evidence that the choice of law provision was not executed in good faith or that Tennessee has a greater interest in having its law applied rather than Delaware’s. Therefore, the Court will honor the parties’ choice of law and apply Delaware law.
B. Uniform Commercial Code or Common Law
Before engaging in further analysis, the Court must determine whether to apply Article Two of the Uniform Commercial Code (“U.C.C.”), Del.Code Ann. tit. 6, §§ 2-101 to 2-725, or the common law. The U.C.C. governs contracts for the sale of goods, while the common law governs all other contracts. The U.C.C. and the common law are not always consistent, so applying one may yield different results from applying the other. In the instant case, the Court confronts a hybrid cоntract — one involving both the sale of goods and the provision of services.
Deciding whether to apply the U.C.C. or the common law, the majority of courts employ the “predominant purpose” test.
See, e.g., Bonebrake v. Cox,
Although distribution agreements involve more than sales of goods, most jurisdictions find their predominant purpose to be the sale of goods.
See
Debra L. Goetz et al.,
Article Two Warranties in Commercial Transactions: An Update,
72 Cornell L.Rev. 1159, 1329 (1987). Therefore, the majority of courts treat distributor agreements as governed by Article Two of the U.C.C. See,
(e.g., Corenswet, Inc. v. Amana Refrigeration, Inc.,
The situation in Wang is very different from the instant case. Wang involved a statute of limitations issue, where the U.C.C. statute of limitations was four years and the non-U.C.C. statute of limitations was three years. Thus, in Wang there was a direct conflict between the U.C.C. and the non-U.C.C. Because of the direct conflict, the Court was forced to choose which statute of limitations applied. In the instant case, however, there are aspects of the Distributor Agreement that are not covered whatsoever by any provisions of the U.C.C. For instance, unlike SMR’s claims, API’s claims do not relate to the sale of goods but to SMR’s concomitant duty to render services to API. Without guidance from non-U.C.C. law, the Court would be unable to analyze API’s claims against SMR. Therefore, the Court will apply the U.C.C. where the U.C.C. governs, but the Court will look to non-U.C.C. law for guidance in those areas which the U.C.C. falls silent.
C. Integrated Contract
The Court must first determine each parties’ legal obligations under the contract and then determine whether any of these obligations whеre breached. Containing a merger clause, the Distributor Agreement is the central depository of both parties’ legal obligations to one another. (Distributor Agreement para. 13.) Where the parties have made a contract and have expressed it in a writing to which they have both assented as the complete and accurate integration of that contract, the obligations under that written contract will not be varied by evidence of antecedent understandings or negotiations. Del. Code Ann. tit. 6, § 2-202(b);
Husband (P.J.O.) v. Wife (L.O.),
B. Defendant’s Breach
The Distributor Agreement states that “all sales made by the Company [SMR] to the Distributor [API] shall be governed exclusively by the Company’s terms and conditions of sale contained in Appendix D.” (Distributor Agreement para. 6B.) According to Appendix D, API was to pay for products with U.S. dollars, net thirty days, and subject to a late payment charge of one and one half percent per month (eighteen percent annually). (Distributor Agreement, App. D.) In the event of a mаterial breach of the Distributor Agreement not cured within sixty days of giving notice, the non-breaching party may terminate the Distributor Agreement. (Distributor Agreement para. 7(C).) Upon termination of the Distributor Agreement, API shall pay SMR, in full, all amounts owed to SMR. (Distributor Agreement para. E(4).)
SMR alleges that API failed to pay for the parts it received from November 8,
Undеr § 2-607(1), the buyer must pay at the contract rate for any goods accepted. Failing to pay for goods accepted provides the seller with the right to cancel the contract and retain any remedy for breach of the whole contract or any unperformed balance. Del.Code Ann. tit. 6, §§ 2-106(4), 2~703(f). Before attempting to cure, API sent a letter to SMR in May 2000 terminating the Distributor Agreement. 4 Both API’s failure to pay for the products and its termination of the Distributor Agreement without cause constitute material breaches for which API is liable.
C. Plaintiff s Breach
Conversеly, API argues that its termination was justified because SMR materially breached the Distributor Agreement. According to API, SMR failed (1) to collaborate with API in developing an annual marketing plan and forecast for the territory and markets covered by the Distributor Agreement; (2) to provide API with sales literature, product specific literature, training material and other information; (3) to provide API with technical support and training to deal with customers; (4) to schedule dates for delivery of the products; (6) to provide a certificate of insurance for product and general liability insurance; (6) to achieve FAA certification for the number, type, and kind of de-icing products to be used on specific aircraft (thereby limiting the number of aircraft for which API could sell de-icing replacement products); and (7) to refrain from direct competition with the API sales force. (Def.’s Counter-Complaint paras. 7, 8; Schlesinger Affidavit para. 6(a)(l)-(4)). For these alleged reasons, API terminated the Distributor Agreement. API attempts to rely upon the common law principle that the first party to commit a material brеach of contract cannot complain if the other party subsequently refuses to perform.
Hudson v. D. & V. Mason Contractors, Inc.,
To determine whether a breach is material, the Court may cоnsider the following factors: (1) the extent to which the injured party will be deprived of the benefit which he reasonably expected; (2) the extent to which the injured party can be adequately compensated for the part of that benefit of which he will be deprived; (3) the extent to which the party failing to perform or to offer to perform will suffer forfeiture; (4) the likelihood that the party
1. SMR’s Explicit Contractual Responsibilities
The Distributor Agreement sets forth SMR’s responsibilities as follows:
A. Company [SMR] shall, from time to time, provide Distributor [API] with sales literature, product specification literature, training material and such technical and other information, which, in the Company’s judgment, may be helpful to Distributor in dealing with customers. Company will provide to Distributor technical support and training reasonably requested by Distributor in dealing with customers. The written materials which Company may furnish to Distributor shall, upon written request and upon the expiration or termination of this Agreement be rеturned to Company by Distributor....
B. Company shall provide Distributor with certificate of insurance for product and general liability insurance, ....
(Distributor Agreement paras. 5(A), 5(B)). According to the Distributor Agreement, SMR shall supply literature, product specification literature, training material, or other technical information only “from time to time,” and only “which in Company’s judgment, may be helpful.” (Distributor Agreement para. 5(A)). SMR’s affirmative duty to supply information is a weak one, as evidenced in the clause, “The written materials which Company may. furnish to Distributor ...” (Distributor Agreement parа. 5(B)) (emphasis added). The Court finds that SMR’s alleged failure to supply API with literature, product specification literature, training material, or other technical information did not touch the fundamental purpose for the Distributor Agreement and therefore was not a material breach. API also argues that SMR breached the contract by failing to collaborate with SMR to develop an annual market plan and forecast of products. The Court finds that the Distributor Agreement delineates different responsibilities for SMR and API. Significantly, the duty to collabоrate is not mentioned within SMR’s list of “Responsibilities,” but rather it is listed within API’s list of “Responsibilities.” Omitting the responsibility of collaborating from SMR’s list of contractual duties, evidences an understanding that it is primarily an API responsibility. Therefore, the Court refuses to find SMR’s alleged failure to collaborate a material breach. Likewise, the Court does not find SMR’s alleged failure to provide API technical support and training a material breach. Any omission might constitute a breach, but to justify terminating a contract, a breach must be material, ie. deprive a party of the benefit it rеasonably believed it would receive under the contract and one that touches the fundamental purpose of the contract.
2. Parol Evidence
After parties reduce an agreement to writing, neither party may introduce
API argues that SMR misrepresented its intentions to acquire FAA certification, thus leaving API with a limited number of products to sell. FAA certification might have been a fundamental assumption to the execution of the Distributor Agreement, and API claims that it was induced to enter into the agreement by fraud. Nevertheless, API continued to perform under the contract after it realized that the initial representations of FAA certification were false. Conduct, treating the contract as binding after full knowledge of a fraud is a waiver of the right to avoid the contract on that basis.
Tri State Mall
Assocs.
v. A.A.R. Realty Corp.,
API argues that SMR sold directly to clients, in abrogation of the Distributor Agreement. Although the Distributor Agreement does not expressly state that SMR cannot sell directly to purchasers, API argues that thе concept of “distributorship” means sole distributorship, excluding all competition including SMR. According to § 2-202, parol evidence can be used to explain a term of a contract by course of dealing, trade usage, or course of performance. Del.Code Ann. tit. 6, § 2-202. Whether or not “Distributorship” means sole distributorship, excluding the manufacturer from selling directly, could be proved by examining the course of dealing, trade usage, or course of performance. Nevertheless, much of API’s evidence offered to support this claim is hearsay. For instance, Jerry Schlesinger’s
5
statement that he “learned from comments made by API employees whom I [Schlesinger] supervise and other executives to whom I report and from executives of the Plaintiffs, SMR and BE Aerospace, Incorporated, and from customers of API, that SMR was engaging in direct competition with the field sales organization of API,” is hearsay. (Schlesinger Affidavit para. 4.) Also, an e-mail from Greg Holder to Don Cox, dated December 7, 1999, indicated that Jeff Snyder, the Vice-President and General Manager of SMR, made it very clear that SMR would no longer sell direct. The Court found no evidence that any alleged direct selling
3. Mutual Mistake
Finally, API argues that the present case and controversy is a result of “all parties entering into an Agreement based upon mutual mistake.” (Def.’s Memo, in Opposition at 11.) Specifically, API alleges that the parties entered into the Distributor Agreement with a misunderstanding of the scope and depth of the market for de-icing equipment and API’s and SMR’s ability to capture a market share in the short period of time provided for in the Agreement. (Def.’s Memo, in Opposition at 29.) Although API never instructs the Court for what reason it makes such an argument, the Court assumes it is API’s attempt to avoid their contractual obligations. Regardless of the purpose for making such an argument, fluctuating market conditions and the changing financial situations of the parties do not justify the avoidance of contract obligations under the rules governing mistakе. Restatement (Second) of Contracts § 152 cmt. b, at 386 (2d ed.1981). Although API may have demonstrated poor judgment in making the contract, the Court will not entertain any such arguments of mutual mistake. Restatement (Second) of Contracts § 151 illus. 2, at 384 (2d ed.1981). The Court allocates such risk to both contracting parties because it is reasonable for the parties to assume that they are mis-evaluating their ability to succeed in a given market in a given time. Restatement (Second) of Contracts § 154 cmt. d, at 404 (2d ed.1981).
From the record, the Court infers an attempt by API to wriggle free of its cоntractual obligations with SMR so as to assume the B.F. Goodrich distributorship. Although SMR most likely did not fully comply with the Distributor Agreement, any omissions on its part did not rise to the level of a material breach, justifying API’s termination of the agreement. Conversely, API’s retaliatory termination becomes an actionable uncured material breach.
IV. Remedies
The Court orders API to pay SMR damages for the material breach of the Distributor Agreement. This award is not subject to any set-off, because paragraph F(l) of the Distributor Agreement specifically limits SMR’s duty to repurchase to brеaches committed by SMR.
6
Additionally, finding neither bad faith nor contractual or statutory authority supporting an award of litigation costs, the Court does not award SMR any attorney’s fees.
See Ostrow v. Bonney Forge Corp,
No. Civ. A. 13270,
V. Conclusion
For the reasons stated herein, the Court GRANTS SMR’s motion for summary judgment and awards SMR $94,969.06 plus interest. The Court DENIES API’s motion for mediation or arbitration.
Notes
. BEA also sold aircraft parts and products to API, though it is not clear what agreement governed the dealings between BEA and API. BEA alleged that API failed to pаy the $19,637.72 balance on its account.
. SMR stated that API terminated the Distributor Agreement in May 2000, which API admitted in its "Opposition to Plaintiff SMR's Statement of Undisputed Facts.” However, in an undated letter, (Golden Ex. 14), API stated that the termination was effective as of June 30, 2000. Additionally, in a separate letter, dated June 29, 2000, API gave notice of its termination. The Court ultimately relies on both parties' assertions that API terminated the Distributor Agreement in May 2000.
As part of its June 29, 2000 letter, API offered to enter into settlement with SMR. API admitted to owing SMR $77,295.00 for SMR products. In response SMR denied that it had breached thе Distributor Agreement in any way. Specifically, SMR mentioned meetings in May 1998 and July 1999, where SMR and API representatives met to collaborate on market plans and forecasts for products covered by the Distributor Agreement. (Golden Ex. 15.)
. SMR does not offer evidence specifying the dates those invoices actually became due.
. Although API does not deny that it sent a letter terminating the Distributor Agreement in May of 2000, API adds that it terminated with cause. (Def.’s Opposition to Pla.’s Statement of Undisputed Fact para. 18.)
. Jerry Schlesinger is president and chief executive officеr of API.
. The Distributor Agreement reads as follows: F. Upon termination of this agreement by Company [SMR], prior to December 31, 2001, for any reason:
1. Company shall repurchase from Distributor [API] at Distributor's cost less a 15% restocking charge, any or all Products sold by the company to Distributor and not by the Distributor as of the date of termination. 2. Any amounts owed by the Distributor to the Company shall be offset by any inventory returned to the company by Distributor for which Distributor shall retain such right for a period of sixty (60) days following termination.
(Distributor Agreement paras. F(l), F(2)) (emphasis added).
. Interest as calculated by the SMR as of February 1, 2001. API argues that it does not owe any amount and does not offer a different amount.