MEMORANDUM OPINION AND ORDER
Plaintiffs Kenton Smallwood (“Small-wood”), Catherine Christenson (“Christen-son”), Rahsaan Renford (“Renford”), and Berthil Ivarson (“Iverson”) (collectively “Plaintiffs”) filed this lawsuit on behalf of themselves and all other similarly situated persons against Defendant Illinois Bell Telephone Company (“Defendant” or “Illinois Bell”) alleging that Defendant misclassified Outside Plant Engineers as exempt from overtime pay in violation of the Fair Labor Standards Act (“FLSA”), 29 U.S.C. § 201
et seq.
and the Illinois Mini
Plaintiffs also seek this Court’s approval of a proposed 90-day opt-in period for putative claimants, as well as the form and content of their proposed judicial notice and two reminder notices. Finally, Plaintiffs move this Court to compel Defendant to produce a list of the putative collective class within 7 days of the Court’s order, including each individual’s name, address, employee identification number, and dates of employment as an Outside Plant Engineer.
An oral argument was held on April 27, 2010, at which time the Court delivered an oral ruling. This opinion provides further explanation. For the reasons given on April 27 and in this opinion, Plaintiffs’ motion for conditional certification and judicial notice pursuant to Section 216(b) is granted. The Court finds the suggested letter of notice provided by the Plaintiffs to be suitable, but finds that a 60-day opt-in period is more appropriate. The Court also holds that Plaintiffs may not send out any reminder notices. Finally, Defendant shall produce the necessary contact information on or before May 11, 2010.
I. BACKGROUND
A. Factual Background
Plaintiffs bring claims against Illinois Bell stemming from their employment as Outside Plant Engineers (“OSP Engineers”). 1 Dkt. 56, at l. 2 They are all currently employed by Defendant, and continue to work for Defendant under the general job description of “Manager OSP Planning and Eng Design,” in offices located in Elgin and Des Plaines, Illinois. Dkt. 68, Ex. A. They are joined by sixty-nine other “opt-in” Plaintiffs (“opt-in Plaintiffs”), who have joined the case by filing written consent forms with the Court. These opt-in Plaintiffs also work, or have worked, under the same job description as the named plaintiffs in a number of Illinois locations. 3
The Manager OSP Planning and Eng Design-2008 job description states in relevant part:
Job Description
Responsible for the planning, design and analysis of the outside plant facilities/network. This position supervises the detailed design and the preparation of engineering job orders and associated work prints which conform to approved long-range plans to meet the growth, modernization and replacement demands of the outside plant network. Conducts job costing activities. Requires full understanding for outside plant installation and maintenance technician activities. May include Loop Electronics Engineering/Coordination and Transmission Equipment Engineering. May be responsible for preparing construction budget and project management activities. May be responsible for right-of-way functions including investigating and acquiring easement interests in real property.
Dkt. 68, Ex. A.
Defendant is an Illinois corporation with its principal place of business located in Chicago, Illinois. It is wholly owned by AT & T Teleholdings, Inc., which in turn is wholly owned by AT & T, Inc. Defendant assigned one job key title to all of its OSP Engineers: Manager, Outside Plant Planning and Engineering Design. This job key, however, contains four different positions: Planner, Design Engineer, Right of Way Engineer (“ROW Engineer”), and Loop Electronics Engineer. Each of the four named Plaintiffs is currently a Design Engineer, and did not work under any of the other job titles during the relevant time period. Some of the opt-in Plaintiffs work, or have worked, under the job title of Design Engineer, while others work, or have worked, under the job titles of Planner, ROW Engineer, or Loop Electronics Engineer, within the broader job description.
Prior to approximately May 16, 2009, Defendant classified all OSP Engineers— including Planners, Design Engineers, ROW Engineers, and Loop Electronics Engineers — as exempt from the overtime requirements of the FLSA. On or about May 16, 2009, Defendant uniformly reclassified all OSP Engineers — including Planners, Design Engineers, ROW Engineers, and Loop Electronics Engineers-as nonexempt employees, thereby making them eligible for overtime payments. Prior to this reclassification, some or all of the named Plaintiffs and opt-in Plaintiffs routinely worked more than forty (40) hours per week and did not receive overtime pay.
B. Procedural History
Plaintiffs filed this action against Illinois Bell on June 9, 2009 in the Circuit Court of Cook County, Illinois. (Dkt. 1). Defendant removed this action to this Court on July 7, 2009. Id. Plaintiffs allege Illinois Bell violated both the FLSA’s and IMWL’s overtime wage provisions by improperly classifying them as exempt from federal and state overtime laws and failing to compensate them for hours worked for Defendant in excess of forty (40) hours per week. On February 16, 2010, Plaintiffs filed the current motion, requesting this Court to (1) conditionally certify this action as a collective action for purposes of notice and discovery pursuant to § 216(b) of the FLSA, (2) authorize Plaintiffs’ counsel to mail judicial notice to all putative plaintiffs, (3) approve the form and content of Plaintiffs’ proposed judicial notices and reminder notices, (4) order Defendant to produce to Plaintiffs’ counsel the contact information for each putative plaintiff, and (5) authorize a 90-day notice period for putative plaintiffs to join this action. The parties entered a limited consent pursuant to 28 U.S.C. § 636(c)(1) with respect to this motion. Dkt. 59.
C. Plaintiffs’ Proposed Class for Conditional Certification and Notice
In connection with Plaintiffs’ FLSA claims, Plaintiffs propose that the Court conditionally certify and authorize judicial notice to the following class: “All persons who are or have been employed by Illinois Bell Telephone Company as Outside Plant Engineers, or otherwise held the job title ‘Manager, Outside Plant Planning and Engineering Design’ from [three years back from the date the Court orders conditional certification] to May 16, 2009.” Dkt. 56, at
II. LEGAL STANDARDS
Under Section 216(b) of the FLSA, employees may bring a collective action on behalf of themselves and other “similarly situated” employees against employers who violate the Act’s minimum wage or overtime provisions. 29 U.S.C. § 216(b). District courts use their discretion in managing collective actions because the FLSA does not detail the specific procedures for granting collective action notices.
Hoffmann-La Roche, Inc. v. Sperling,
First, a court issues a “conditional certification” of the collective action if the plaintiffs show there are similarly situated employees who are potential claimants.
Russell v. Ill. Bell Tel. Co.,
III. DISCUSSION
A. Conditional Certification is Appropriate
Plaintiffs’ motion seeks solely to obtain conditional certification for the purpose of sending notice to potential class members. As such, this Court is only concerned with the first step of the previously stated legal standard; that is, whether the Plaintiffs are “similarly situated.” This issue was recently considered by the court in
Witteman v. Wisconsin Bell, Inc.,
Furthermore, although the issue is not of ultimate import at the first step of
Defendant argues that Plaintiffs “cannot establish, even preliminarily, that they are similarly situated to the putative class they seek to represent.” To support this argument, Defendant details a number of alleged differences amongst the job duties of the putative class. Defendant emphasizes that the general OSP Engineer job key actually encompasses four specific jobs: Planner, Design Engineer, ROW Engineer, and Loop Electronics Engineer, and presents a number of distinctions amongst these four positions.
The factual grist for Defendant’s argument is that, while the named Plaintiffs and the entire putative class might be classified under the umbrella OSP Engineer title, their specific jobs are, in fact, quite different. For instance, according to Defendant, the Planner position generates plans for new OSP jobs, while Design Engineers implement these plans; the ROW Engineers are responsible for acquiring and maintaining rights of way for Illinois Bell’s facilities, while Planners and Design Engineers lack this particular responsibility; a Loop Electronics Engineer spends a significant portion of her working hours making field visits to help determine what equipment is necessary for delivering service, while the other three specific positions primarily occupy their time with different tasks.
Although the job descriptions provided by the named and opt-in plaintiffs in their signed declarations are somewhat “boilerplate,” there are differences among the declarations, and these variations do acknowledge some of the differences in job duties noted by Defendant. For example, Mr. Walter Zdon notes that, while employed as an OSP Engineer, he “spent the majority of [his] workday inside the office reviewing data on [his], computer and using manuals to draw up plans for jobs” and “occasionally drove to locations where service was needed in order to observe the location of existing equipment and/or future construction.” Dkt. 56, PX 4, Declaration of Walter Zdon. The declaration of Mr. Terrance Wasik, on the other hand, notes that he spends “approximately thirty-five percent” of his workday inside the office performing the aforementioned duties and “sixty-five percent” on-location. Dkt. 56, PX 4, Declaration of Terrance Wasik.
However, whether these discrepancies will become important down the road does not affect the current question of conditional certification.
Gambo v. Lucent Tech., Inc.,
Defendants rely on a passage from
Morisky v. Pub. Serv. Elec. & Gas Co.,
At this juncture, “conditional certification” is appropriate if the named plaintiffs make a “modest factual showing sufficient to demonstrate that they and potential plaintiffs together were victims of a common policy or plan that violated the law.”
Flores v. Lifeway Foods,
Furthermore, the primary cases cited by Defendant are distinguishable from the present case. In
Mike v. Safeco Ins. Co. of Am.,
the named Plaintiff did not provide a “common thread” with the putative class and “expressly disavowed” the shared job description.
Following discovery and the opt-in process, the Court will be required to reevalu
In sum, Plaintiffs have made the necessary factual showing for their claims under the FLSA at this conditional certification stage. Thus, Plaintiffs are authorized to send notices of a collective action pursuant to Section 216(b) to all persons who are or have been employed by the Illinois Bell Telephone Company under the job description “Manager OSP Planning and Eng Design” for the three-year period pri- or to April 27, 2010, and who started working at Illinois Bell prior to May 16, 2009.
B. Notice
Accompanying Plaintiffs’ motion for conditional certification is a proposed class notice, Dkt. 56, PX 5, as well as two proposed “reminders,” Dkt. 56, PX 6, to be sent out to putative class members. Plaintiffs ask this Court to authorize a 90-day opt-in period. Defendant argues that Plaintiffs’ proposed plan regarding notice, and the subsequent sending of reminders, is inappropriate for three reasons.
First, Defendant argues that Plaintiffs’ notice could be perceived by a non-lawyer as a judicial endorsement of Plaintiffs’ claims. This objection pertains not to the wording of the notice, but the placement of the following disclaimer at the conclusion of the notice: “The court has made no decision in this case about the merits of Plaintiffs’ claims or Defendant’s defenses.” Dkt. 56, PX 5. Defendant believes this statement should be placed at the beginning of the notice, where it might be more readily viewed. However, the Court does not find that such relocation is necessary. Since the disclaimer is prominently featured in bold type and capital letters, it is sufficiently prominent.
Second, Defendant argues that the notice period should be limited to 30 days. Defendant has not, however, presented any specific reason why, in this particular case, a 30-day notice period would be more appropriate than the 90 days suggested by Plaintiffs. In response, Plaintiffs suggest that a 90-day period is more common than a 30-day period, and better accounts for the “varying delivery times for first class mail, let alone the issues associated with returned mail.” Dkt. 68, at 11. This Court finds a 60-day period is a fair period that provides ample opportunity for prospective class members to opt in.
See Witteman,
Finally, Defendant opposes Plaintiffs’ proposal to send the putative class members two reminder letters. The Court agrees with the
Witteman
court that a “reminder is unnecessary and potentially
IV. CONCLUSION
For the foregoing reasons, the Court grants Plaintiffs’ motion for conditional class certification and the issuance of Section 216(b) notices. Defendants are to provide necessary contact information no later than May 11, 2010. No reminder notices shall be permitted. The conditional class shall consist of all current or former employees under the job description: Manager OSP Planning and Eng Design who worked for Illinois Bell within the last three years prior to April 27, 2010, and who started working prior to May 16, 2009.
Notes
.. Plaintiffs refer to the general position of "Manager, Outside Plant Planning and Engineering Design” as "Outside Plant Engineer” while Defendant refers to the same general position as "Outside Plant Manager.” Although each party has strategic reasons for their choice of terminology, the linguistic distinction is not integral to any argument, nor has it affected the findings of this Court. Therefore, for the sake of the clarity in this opinion, the general job title will herein be referred to as Outside Plant Engineer ("OSP Engineer”).
. Dkt. 4 refers to Plaintiffs' complaint. Dkt. 54 refers to Plaintiffs' motion for conditional certification and notice of collective action. Dkt. 56 refers to Plaintiffs' memorandum in support of their motion. Dkt. 65 refers to Defendant’s response. Dkt. 68 refers to Plaintiffs' reply brief.
. Arlington Heights, Barrington, Blue Island, Centralia, Champaign, Chicago, Collinsville, Decatur, Des Plaines, Elgin, Joliet (two locations), Oak Brook, Peoria, Rock Island, Rockford, Springfield, Wheaton and Woodstock. Dkt. 56, at 3.
. In fact, Morisky explicitly notes that, at the notice stage, the § 216(b) “determination is made using a fairly lenient standard, and typically results in 'conditional certification' of a representative class.” Ill F.Supp.2d 493, 497.
. "The pending motions ... relate to the second step in the § 216 certification process ... Since the court has substantial information upon which to base its decision, a stricter standard of proof is applied at the second step in deciding whether the opt-in plaintiffs are
