Case Information
*2 Before BACHARACH, BALDOCK, and MURPHY , Circuit Judges.
_________________________________
BACHARACH , Circuit Judge.
________________________________
This рetition involves interpretation of an environmental regulation addressing the renewal of permits under Title V of the Clean Air Act. The statute and accompanying regulation allow renewal of these permits only if they ensure “compliance with” all of the “applicable requirements.” 42 U.S.C. § 7661c(a); 40 C.F.R. 70.7(a)(1)(iv). The term “applicable requirements” is defined in the regulation, but not the statute. Envtl. Integrity Project v. EPA , No. 18-60384, ___ F.3d ___, slip op. at 5–6 (5th *3 Cir. May 29, 2020). The Sierra Club interprets the regulatory definition to require compliance with all existing statutory requirements; the EPA interprets the regulatory definition more narrowly, arguing that the applicability of certain requirements is determined by the state permit issued under a separate part of the Clean Air Act (Title I).
We agree with the Sierra Club’s interpretation. The regulatory definition of “applicable requiremеnts” includes all requirements in the state’s implementation plan, and Utah’s implementation plan broadly requires compliance with the Clean Air Act. So all of the Act’s requirements constitute “applicable requirements” under the regulation. I. The Clean Air Act’s Requirements
To interpret the term “applicable requirements,” we must consider
the underlying statute (the Clean Air Act). Two of the statutory parts,
Titles I and V, bear on the meaning of “applicable requirements” under the
regulation.
See Romoland Sch. Dist. v. Inland Empire Energy Ctr., LLC
,
A. Title I
The Clean Air Act calls for federal and state cooperation.
Texas v.
EPA
,
These plans require many industrial sources of pollution to obtain preconstruction рermits through a process called “New Source Review” (NSR). Id. § 7475(a). The states conduct NSR under their implementation plans. Id . §§ 7410(a)(2)(C), 7471.
The required NSR differs for “major” or “minor” sources of pollution. See Envtl. Integrity Project v. EPA , No. 18-60384, ___ F.3d ___, slip op. at 3 (5th Cir. May 29, 2020) (“The substantive requirements for preconstruction permits differ markedly depending on whether the new source is deemed ‘major’ or ‘minor.’”). Major NSR is required if a new or modified source would emit pollutants above certain thresholds. 42 U.S.C. §§ 7475(a), 7479(1), 7502(c)(5); 40 C.F.R. §§ 51.165(a)(1)(iv)(A), (1)(v)(A), 51.166(b)(1)(i), (b)(2)(i). Only minor NSR is required if emissions would fall below the applicable thresholds. 42 U.S.C.
§ 7410(a)(2)(C); 40 C.F.R. §§ 51.160–51.164. Minor NSR entails “only the
barest of requirements.”
Luminant Generation Co. v. EPA
,
B. Title V
Title V is designed to enhance compliance and improve enforcement. See S. Rep. No. 101-228, at 346 (1993). Under Title V, the operating permit must include the various statutory limitations on emissions that *5 apply to a given source. 42 U.S.C. § 7661c(c). Some limitations mаy be self-executing; others may be source-specific and defined in other permits. Compare id . § 7411 (establishing New Source Performance Standards that are self-executing limitations on certain sources), with id . § 7475 (requiring certain sources to obtain a permit for Prevention of Significant Deterioration, which entails source-specific limitations). The Title V permit must include all applicable self-executing and source-specific limitations. Id . § 7661c(a); see Envtl. Integrity Project v. EPA , No. 18- 60384, ___ F.3d ___, slip op. at 4 (5th Cir. May 29, 2020) (stating that Title V permits must consolidate all of the information that the source needs to comply with the Clean Air Act).
States are responsible for issuing Title V permits. 42 U.S.C. § 7661a(b), (d). Before issuing a Title V permit, the state must propose the permit to the EPA. Id . § 7661d(a), (b). If the proposed permit does not comply with Title V’s “applicable requirements,” the EPA must оbject. Id. § 7661d(b)(1). If the EPA does not object, others can petition the EPA to compel it to object. Id. § 7661d(b)(2). If a petition is filed, the EPA must respond. Id. In responding, the EPA must object to the proposed permit upon a demonstration that the source failed to comply with the applicable requirements. Id.
Once Title V permits are issued, they are enforceable by the EPA and the public. Id. § 7413(a), (b) (by the EPA); id. § 7604(a)(1), (f)(4) (by the *6 public). The EPA may enforce a Title V permit either administratively or in federal court. Id. § 7413(a), (b).
II. The Hunter Plant’s Permit for Modifications
The parties’ dispute centers on the regulatory requirements for PacifiCorp’s modification of an industrial plant known as the “Hunter Plant.”
PacifiCorp began the NSR preconstruction permitting process in 1997 in order to modify the plant. In considering PacifiCorp’s permit request, Utah determined that the modifications triggered only minor NSR requirements. This determination went unchallenged.
During the same time period, PacifiCorp was obtaining its initial Title V operating permit for the Hunter Plant. Utah ultimately issued the Title V permit in 1998, incorporating Utah’s determination that the modifications required only minor NSR. Renewal of the Title V permit was required in 2003 and every five years thereafter. Id . § 7661a(b)(5)(B).
In 2001 PacifiCorp applied to renew the Title V permit, but Utah waited roughly fourteen years to act on the application. [1] When Utah finally acted, it renewed PacifiCorp’s Title V permit, incorporating the *7 requirements from the minor NSR permit. Utah sent its proposed permit to the EPA, and the EPA did not object.
The Sierra Club filed a petition to compel the EPA to object, [2] arguing in part that the modifications from 1997 to 1999 should have triggered major NSR requirements.
III. The Hunter Order
The EPA denied the Sierra Club’s рetition in 2017. In denying the petition, the EPA did not decide whether the Hunter Plant’s modifications should have triggered major NSR requirements. The EPA instead focused on the meaning of the term “applicable requirements,” interpreting it as a general reference to the requirements stated in the prior Title I permit:
Where a final preconstruction permit has been issued, whether it is a major or minor NSR permit, the terms and conditions of that permit should be incorporated as “applicable requirements” and the permitting authority and EPA should limit its review to whether the title V permit has accurately incorporated those terms and conditions . . . .
Joint App’x at 19.
*8 Applying this definition, the EPA relied on Utah’s earlier refusal to apply major NSR requirements. [3] So the EPA denied the Sierra Club’s petition, finding that
the proposed permit had aсcurately incorporated the requirements stated in the minor NSR permit and any major NSR requirements were not considered “applicable requirements.”
The Sierra Club then sought review of the EPA’s decision, and PacifiCorp and the State of Utah intervened as respondents.
IV. Standing
As a threshold matter, PacifiCorp contends that the Sierra Club lacks
Article III standing. A similar contention was lodged in a previous appeal.
Sierra Club v. EPA
,
A. Necessity of Standing for Members
When an organization sues on behalf of its members, the organization must show that “its members would otherwise have standing to sue in their own right.” Friends of the Earth, Inc. v. Laidlaw Envtl. Servs., Inc. , 528 U.S. 167, 181 (2000). An organization’s members enjoy standing if (1) [they have] suffered an “injury in fact” that is (a) concrete and particularized and (b) actual or imminent, not conjectural or hypothetical; (2) the injury is fairly traceable to the challenged action of the defendant; and (3) it is likely, as opposed to merely speculative, that the injury will be redressed by a favorable decision.
Id. at 180–81.
B. Injury-in-Fact
In environmental suits, an injury-in-fact exists when the petitioner
“use[s] the affected area” and is a person “‘for whom the aesthetic and
recreational values of the area will be lessened’ by the challenged
activity.”
Id.
at 183 (quoting
Sierra Club v. Morton
,
The Sierra Club alleges that its members experience air pollution because they live and work near the Hunter Plant. Petitioner’s Opening Br. *10 at 26; see Decl. of Wayne Y. Hoskisson, Add. to Petitioner’s Opening Br. at 41–45; Decl. of Darrell Mensel, Add. to Petitioner’s Opening Br. at 46– 50. According to the Sierra Club, its members experience health risks and diminished visibility of nearby national parks and wilderness areas. Petitioner’s Opening Br. at 26. The alleged health risks and diminished visibility constitute an injury-in-fact. See Friends of the Earth , 528 U.S. at 181–83 (concluding that an injury-in-fact exists when declarants stated that a nearby river “looked and smelled polluted,” curtailing their ability to use the river for recreational purposes).
C. Causation
For causation, [5] the Sierra Club submits evidence that the Hunter Order contributes to the members’ alleged injuries. This evidence satisfies the element of causation.
1. The Link Between Regulation and Reduction of Emissions
The Sierra Club’s members provide sworn statements, tying the
physical and aesthetic injuries to PacifiCorp’s ability to skirt major NSR
requirements and avoid the need to use the best available control
*11
technology. If these sworn statements are credited, the EPA could have
alleviated the harms by requiring PacifiCorp to reduce emissions from the
Hunter Plant. These sworn statements thus satisfy the element of causation.
See WildEarth Guardians v. EPA
,
2. PacifiCorp’s Arguments
PacifiCorp argues that
the Sierra Club caused its own injuries by failing to petition for the EPA to object in 1997,
other industrial sources contribute to the alleged pollution, the Sierra Club links its injuries to unrelated modifications at the Hunter Plant in 2010, and
the Hunter Plant has decreased emissions since 1997.
These arguments fail.
a. The Sierra Club’s Purported Infliction of Its Own Injury PacifiCorp argues that the Sierra Club caused its own injury by failing to act for over twenty years. We reject this argument.
PacifiCorp’s argument rests on the inability of parties to artificially
manufacture standing by “inflicting harm on themselves.”
Clapper v.
Amnesty Int’l. USA
,
The Sierra Club alleges that its members have experienced physical and aesthetic harm from the Hunter Plant’s emissions. Even if the Sierra Club cоuld have acted earlier, its delay did not break the chain of causation. The alleged injuries resulted from emissions allowed under PacifiCorp’s Title V permit. At most, the Sierra Club’s inaction allowed the pollution to continue unabated. But the Sierra Club’s inaction did not cause the pollution.
b. Other Contributors to the Pollution
PacifiCorp also argues that other sources contributed to the
pollution. But the existence of other contributors wouldn’t affect the Sierra
Club’s standing. Even with other contributors, standing would still turn on
whether the Sierra Club had adequately attributed the pollution at least
partly to the Hunter Order.
See Sierra Club, Lone Star Chapter v. Cedar
Point Oil Co.
,
PacifiCorp argues that the members are just speculating about pollution from the Hunter Plant. But the EPA has stated elsewhere that *13 “[a]ir emissions from [the Hunter Plant and another PacifiCorp plant] cause or contribute to visibility impairment” in nearby national parks. Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Partial Approval and Partial Disapproval of Air Quality Implementation Plans and Federal Implementation Plan; Utah; Revisions to Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze, 81 Fed. Reg. 2,004, 2,013 (Jan. 14, 2016). Given the EPA’s acknowledgment of visibility impairment from the Hunter Plant, we cannot disregard the members’ allegations of a causal connection.
c. Pollution from the 2010 Modifications PacifiCorp also observes that the Sierra Club complained about pollution from unrelated modifications that had been made in 2010. But those complaints do not affect the Sierra Club’s standing. The claim here links the injuries to the Hunter Plant’s failure to comply with major NSR requirements for the 1997–1999 modifications. A causal link would exist even if the 2010 modifications had exacerbated the pollution.
d. Decreases in Emissions
PacifiCorp also points to a reduction in the Hunter Plant’s emissions
since 1997. But the Sierra Club presented evidence that major NSR could
have lowered emissions even more.
See Sierra Club v. EPA
,
* * *
The Sierra Club has adequately established causation for standing. D. Redressability
The Sierra Club asserts that this Court can redress the alleged injuries by vacating the Hunter Order and remanding to the EPA to consider the applicability of major NSR requirements. We agree.
PacifiCorp again contends that the Hunter Plant has already reduced
its emissions since 1997. But the Sierra Club alleges that a favorable
determination could reduce emissions even more by requiring PacifiCorp to
use the best available control technology. None of the respondents rebut
that allegation or argue that the plant currently uses the best available
control technology. Absent such a rebuttal or argument, the potential for
further improvement satisfies the requiremеnt of redressability.
See Sierra
Club v. EPA
,
PacifiCorp argues that this analysis erroneously shifts the burden of
proof to the respondents to disprove standing. It is true that petitioners
bear the burden to establish standing.
Loving v. Boren
,
* * *
Given the evidence of an injury-in-fact, causation, and redressability, the Sierra Club has established standing.
V. Regulatory Definition of “Applicable Requirements”
The Sierra Group’s petition for review turns on the meaning of the term “applicable requirements.” The regulatory definition of this term unambiguously refers to all requirements in a state’s implementation plan, such as Utah’s requirement for major NSR.
*16 A. Judicial Review of Agency Action
To assess an agency’s interpretation of its own regulation, we
sometimes apply a form of deference known as “
Auer
deference.”
See Auer
v. Robbins
,
We apply
Auer
deference only if the regulation is genuinely
ambiguous.
Kisor v. Wilkie
,
B. Lack of Ambiguity in the Regulation We conclude that the regulation is not ambiguous. It unmistakably requires that each Title V permit include all requirements in the state implementation plan, including Utah’s requirement for major NSR.
The regulation provides:
Applicable requirement means all of the following as they apply to emissions units in a part 70 source . . . :
(1) Any standard or other requirement provided for in the applicable implementation plan approved . . . by EPA . . . . 40 C.F.R. § 70.2 (emphases added). Thе “applicable implementation plan” here is Utah’s, and Utah’s implementation plan requires major NSR. See *17 Utah Admin. Code r. 307-405-2 (2019). [7] Given the need to comply with Utah’s implementation plan, the regulatory definition of “applicable requirement” unambiguously includes major NSR requirements.
C. The EPA’s Three Arguments in Favor of Ambiguity The EPA argues that the regulatory language is ambiguous for three reasons:
1. The first item in the regulatory definition is a general catch-all narrowed by the second item;
2. the regulatory definition contains a qualifier (“as they apply”); and
3. the EPA intended Title V permits only as a convenient place to consolidate the requirements already imposed in other administrative proceedings.
These arguments clash with the regulatory text.
1. The Definition’s Second Item
The definition of “applicable requirement” includes thirteen separate requirements. The parties agree that only the first two requirements are at issue. Of these two, the EPA argues that when a preconstruction permit has been issued, the “general reference to [state-implementation-plan] requirements in part (1) should be read in consideration of the more specific part (2).” EPA’s Resp. Br. at 35. Part (2) is “[a]ny term or *18 condition of any preconstruction permits issued pursuant to regulations approved or promulgated through rulemaking . . . .” 40 C.F.R. § 70.2. This part supplies just one of the thirteen requirements, and the “applicable requirements” are defined as the combination of “all” of the thirteen requirements. 40 C.F.R. § 70.2. [8] So Part (2) does not limit any of the other twelve requirements.
Rather than limit the other requirements, Part (2) clarifies that terms in the preconstruction permits supply additional requirements. See Operating Permit Program, 57 Fed. Reg. 32,250, 32,276 (July 21, 1992) (“This definition was changеd in part to clarify that applicable requirements include terms and conditions of preconstruction permits . . . .” (emphasis added)).
For support, the EPA points to a canon stating that a specific provision prevails when it conflicts with a general provision. Antonin Scalia & Bryan A. Garner, Reading Law: The Interpretation of Legal Texts 183 (2012). But the requirements in Parts (1) and (2) do not conflict. Some requirements might not appear in a preconstruction permit, and those requirements could trigger Part (1) even if they’re not covered by Part (2). *19 The EPA contends that the Sierra Club’s interpretation would render Part (2) redundant unless it is read to constrain Part (1). But Part (2) is not redundant under the Sierra Club’s interpretation. Part (2) would retain independent meaning because requirements could appear in a Title I permit but not appear in the state’s implementation plan. See Operating Permit Program, 57 Fed. Reg. 32,250, 32,276 (July 21, 1992) (explaining that Part (2) was added to “clarify that applicable requirements include terms and conditions of preconstruction permits issued pursuant to [state implementation plans]” (emphasis added)). Those requirements could trigger Part (2) without triggering Part (1). So Parts (1) and (2) simply provide separate requirements for Title V permits. See Reyes-Vargas v. Barr , No. 17-9549, ___ F.3d ___, slip op. at 15 (10th Cir. May 14, 2020) (concluding that two provisions do not conflict or create an ambiguity because each provision applies within its own realm).
2. The Qualifier “As They Apply”
The EPA highlights the phrase “as they apply” in the opening of the definition: “Applicable requirement means all of the following as they apply to emission units in a part 70 source . . . .” 40 C.F.R. § 70.2 (emphasis added). The EPA argues that this language refers only to the conditions imposed in earlier preconstruction permits.
The EPA reads too much into the phrase “as they apply.” Part (2) of the definition clarifies that the term “applicable requirement” includes the *20 terms from a preconstruction permit. See p. 18, above. Nowhere does the regulation limit “applicable requirements” to the terms in earlier preconstruction permits. So the qualifier “as they apply” sheds little light on the meaning of Part (1).
3. The EPA’s Intent
The EPA also points to evidence of its intent when adopting the
regulation. But when the regulation was adopted, the EPA intended to
broadly use the term “applicable requirement,” referring to compliance
with all of the requirements in the state’s implementation plan. For
example, the EPA provided guidance to the states on how to implement the
new procedures for Title V permits. William G. Rosenberg, Envtl. Prot.
Agency, Guidance to States on Authority Necessary to Implement the
Operating Permits Program in Title V of the Clean Air Act Amеndments of
1990 (May 21, 1991). This guidance instructed state regulators that “each
permit” had to contain provisions for “applicable requirements,” defined as
“limits and conditions to assure compliance with all applicable
requirements
under the Act, including requirements of the applicable
implementation plan.
”
Id.
at 5 (cleaned up) (emphasis added).
[9]
*21
a. The EPA’s Reliance on Snippets from the Preamble
Despite this contemporaneous definition of the term “applicable
requirement,” mirrored in the regulatory text, the EPA relies on snippets
from the regulation’s preamble. The preamble cannot override the
unambiguous meaning of the regulatory language.
See Peabody Twentymile
Mining, LLC v. Sec’y of Labor
,
Even if we were to consider the preamble, it would not support the EPA’s narrow interpretation of the term “applicable requirements.” For example, the EPA points to the preamble’s statement that “title V generally does not impose substantive new requirements.” Operating Permit Program, 57 Fed. Reg. 32,250, 32,251 (July 21, 1992). PacifiCorp similarly points to guidance documents, arguing that Title V permits are intended to “record[] existing substantive requirements applicable to regulated sources.” Lydia N. Wegman, Envtl. Prot. Agenсy, EPA White Paper for Streamlined *22 Development of Part 70 Permit Applications 1 (July 10, 1995) (emphasis added).
But the requirement for an appropriate major NSR permit is not a “new” substantive requirement; the major NSR requirement had long existed in Title I and every state implementation plan. So compliance with the state’s implementation plan already existed as an applicable requirement:
Title V imposes no new requirements on sources. Rather, it consolidates existing air pollution requirements into a single document, the Title V permit, to facilitate compliance monitoring. Sources subject to Title V may not operate in violation of, or without, a Title V permit containing all applicable requirements. [State-implementation-plan] requirements are, of coursе, applicable requirements .
Sierra Club v. Leavitt
,
The EPA also points to the preamble’s admonition against second- guessing NSR determinations:
The primary intent of these “enhancements” of the NSR process is to allow the permitting authority to consolidate NSR and title V permit revision procedures. As stated in the May 10, 1991 proposal , it is not to second-guess the results of any State NSR determination.
Operating Permit Program, 57 Fed. Reg. 32,250, 32,289 (July 21, 1992) (emphasis added). The EPA argues that this language shows an unwillingness to “second-guess” states’ decisions about the applicability of major NSR requirements.
But the “second-guess” language is immediately followed by an example: that the EPA will not try to revise states’ analyses of the best available control technology, which is part of major NSR. Id . Given this example, the preamble is apparently referring to the requirements within an NSR permit (major or minor), which fall within the states’ discretion. The language does not refer to the need for major or minor NSR. [10]
Indeed, before issuing the Hunter Order, the EPA had repeatedly insisted that it could object to the omission of major NSR requirements without “second guess[ing] state decisions.” Conditional Approval of Implementation Plan; Indiana; 68 Fed. Reg. 9,892, 9,894–95 (Mar. 3, 2003) (Indiana’s major NSR rules); Approval and Promulgation of Implementation Plans; Ohio, 68 Fed. Reg. 2,909, 2,911 (Jan. 22, 2003) (Ohio’s major NSR rules); Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Virginia– Prevention of *24 Significant Deterioration Program, 63 Fed. Reg. 13,795, 13,796–97 (Mar. 23, 1998) (Virginia’s major NSR rules). Given its consistent usage of the phrase “second-guess,” the preamble appears to address how states implement the NSR requirements (like identifying a source’s best available control technology), not the threshold issue of whether major NSR requirements apply to a given source.
The EPA also highlights language that “[d]ecisions made under the NSR and/or PSD programs [e.g., best available control technology (BACT)] define certain applicable [state-implementation-plan] requirements for the title V source.” Operating Permit Program, 57 Fed. Reg. 32, 250, 32,259 (July 21, 1992) (some brackets in original). But that sentence includes qualifying language, stating that permitting decisions define certain applicable requirements rather than all of the applicable requirements. That sentence more naturally refers to Part (2) of the regulatory definition, not Part (1). This language in the preamble does not narrow the broad scope of the regulatory definition in Part (1). See pp. 17– 19, above.
b. Other Parts of the Preamble
We must consider these snippets along with the rest of the preamble, which shows a regulatory aim of enhancing compliance with the statutory requirements in Title I. Consider five examples from the preamble:
1. “The [title V] program will generally clarify, in a single document, which requirements apply to a source and, thus, should enhance compliance with the requirements of the Act .”57 Fed. Reg. at 32,251 (emphasis added).
2. “The title V permit program will enable the source, States, EPA, and the public to understand better the requirements to which the source is subject, and whether the source is meeting those requirements.” Id.
3. “Currently, many enforcement actions are hindered by disputes over which Act requirements apply. [11] Under the permit system, these disputes will no longer arise because any differences among the State, EPA, the permittee, and . . . the public as to which of the Act’s requirements apply to the particular source will be resolved during the permit issuance and subsequent review process.” Id. at 32,266 (emphasis added).
4. “Title V requires that operating permits assure compliance with each applicable standard, regulation, or requirement under the Act , including the applicable implementation plan. Thus, the permitting authority and EPA should clearly understand and agree on what requirements under the Act apply to a particular source.” Id. at 32,275 (emphasis added).
5. “The proposal defined ‘applicable requirements’ as the substantive requirements arising under other sections and titles of the Act .” Id. (emphasis added). [12]
*26 These excerpts suggest that the phrase “applicable requirements” encompasses all requirements under the Clean Air Act—not just the requirements already included in permits that are issued under Title I.
c. The EPA’s Longstanding Interpretation of the Term “Applicable Requirements”
Finally, the EPA contends that the preamble supplies evidence of a
“contemporaneous” interpretation of the regulation. EPA’s Resp. Br. at 41–
49. A contemporaneous construction could shed light on ambiguous
language because the drafters usually occupy a “better position [to]
reconstruct” meaning.
Kisor v. Wilkie
,
Before the Hunter Order, the EPA had consistently applied the Sierra Club’s interpretation in Title V permitting procedures. Joint App’x at 11– 13 (Hunter Order); see also In the Matter of Pac. Coast Bldg. Prods., Inc. , 1999 EPA CAA Title V LEXIS 12, at *13 (E.P.A. Dec. 10, 1999) slip op. at 16 (5th Cir. May 29, 2020). But the Fifth Circuit did not discuss any of the other passages in the preamble that are quoted above in the text. See id. , passim . Nor did the Fifth Circuit discuss the EPA’s previous references to the “second-guess” language when the EPA was embracing the Sierra Club’s interpretation of the regulatory definition. See p. 24, above.
(“[A]pplicable requirements include the requirement to obtain preconstruction permits that comply with preconstruction review requirements under the Act, EPA regulations, and [state implementation plans].”); In the Matter of Roosevelt Reg’l Landfill Reg’l Disposal Co. , 1999 EPA CAA Title V LEXIS 10, at *14–15 (E.P.A. May 4, 1999) (virtually identical language). The EPA does not point to any prior petitions or cases applying its allegedly “original construction.” Oral Arg. at 26:45–27:25. [13]
For these reasons, we conclude that the preamble does not support
the EPA’s interpretation or create ambiguity in the regulation.
See
Callahan v. U.S. Dep’t of Health and Human Servs. through Alex Azar II
,
4. The Fifth Circuit’s Opinion in Environmental Integrity Project v. EPA
The EPA argues that its interpretation of “applicable requirements” was recently embraced by the Fifth Circuit in Environmental Integrity Project v. EPA , No. 18-60384, ___ F.3d ___ (5th Cir. May 29, 2020). There the Fifth Circuit Court of Appeals concluded that the EPA’s interpretation does not conflict with the Clean Air Act. Envtl. Integrity Project v. EPA , No. 18-60384, ___ F.3d ___, slip op. at 12 (5th Cir. May 29, 2020). In reaching this conclusion, the Fifth Circuit didn’t consider whether the EPA’s interpretation conflicted with the regulatory definition of “applicable requirements.” Id. at 10 n.6. The court reasoned that the EPA had not claimed deference based on its regulatory interpretation. Id. The court acknowledged that the Hunter Order had rested on how the EPA interpreted its regulatory definition of “applicable requirements.” See id. (“We note that the Hunter Order itself and EPA’s order in this matter both claim to interpret not § 7661c(a) but instead § 70.2.”). But the parties didn’t present an argument on interpretation of the regulation, so the Fifth Circuit relied on its interpretation of thе statute (§ 7661c(a)) rather than the regulatory definition of “applicable requirements.” See, e.g. , id. at 15 (“We conclude EPA has the better reading of § 7661c(a).”).
Though the Fifth Circuit interprets the statute, rather than the regulation, the court refers several times to the regulations. For example, the court states that it finds the Hunter Order’s “reasoning persuasive as a construction of the relevant provisions of Title V and its implementing regulations.” Envtl. Integrity Project v. EPA , No. 18-60384, ___ F.3d ___, slip op. at 11 (5th Cir. May 29, 2020). The court also says that it asks “whether EPA’s interpretation of Title V and its implementing regulations in the Hunter Order is persuasive.” Id. at 12. And the court notes that it analyzes the Hunter Order as a construction of not only the regulation but also of the Clean Air Act. Id. at 12 n.7. Despite these references to the regulation, the opinion elsewhere makes clear that the court is interpreting only the statute. For example, the court acknowledges that in opposing the petition for review, the EPA relied solely on the statute and made no argument involving the regulations. Id. at 10 n.6.
In our case, the Sierra Club also argues that the EPA’s interpretation
conflicts with the Clean Air Act itself. But in the order being reviewed, the
EPA relied on its interpretation of the regulation.
See Envtl. Integrity
Project v. EPA
, No. 18-60384, ___ F.3d ___, slip op. at 10 n.6 (5th Cir. May
29, 2020) (“We note that the
Hunter
Order itself and EPA’s order in this
matter both claim to interpret not § 7661c(a) but instead § 70.2.”). We thus
“judge the propriety” of the Hunter Order “solely by the grounds invoked
by the agency”: interpretation of the term “applicable requirements” in the
*30
regulation.
SEC v. Chenery Corp.
,
* * *
We conclude that the EPA’s interpretation of the regulation conflicts with its unambiguous language.
VI. The Intervenors’ Other Arguments
Two intervenors, the State of Utah and PacifiCorp, present other arguments [15] relating to
the merits of the Sierra Club’s petition for the EPA to object and
the issue of timeliness. But the Sierra Club’s petition for review does not involve the merits of the petition to object and the time bars do not apply. [16]
*31 A. The Merits of the Sierra Club’s Petition for Review We reject the efforts by PacifiCorp and the State of Utah to defeat the petition for review based on the merits of the Sierra Club’s underlying challenge to renewal of the Title V permit.
1. Waiver
PacifiCorp argues that the Sierra Club waived its challenge by failing
to prove the merits (the applicability of major NSR requirements). We
disagree. The EPA didn’t reach the merits of the Sierra Club’s petition to
object, relying instead on the meaning of the regulatory term “applicable
requirements.” Given this reliance, the Sierra Club focused on the EPA’s
reasoning and had no reason to argue the merits of the underlying petition.
We thus reject PacifiCorp’s assertion of a waiver.
See Indus. Union Dep’t
v. Am. Petroleum Inst.
,
We have held that parties intervening as petitioners cannot raise new
issues.
See Arapahoe Cty. Public Airport Auth. v. FAA
,
an agency’s determination must be judged on the basis of the agency’s stated reasons for making that determination.”).
2. Failure to Demonstrate Emissions Triggering Major NSR Requirements
PacifiCorp and the State of Utah also argue that the Sierra Club
failed to demonstrate that emissions would have exceeded the threshold for
major NSR.
See
42 U.S.C. § 7661d(b)(2) (requiring petitioners to
demonstrate that proposed Title V permits do not comply with the Clean
Air Act). But this argument again overlooks the EPA’s reasons for
rejecting the petition. The EPA rejected the petition based on the meaning
of the term “applicable requirements,” not a failure to demonstrate
emissions triggering major NSR requirements. And our review is confined
to the EPA’s reasons for its decision.
See Motor Vehicle Mfrs. Ass’n v.
State Farm Mut. Auto. Ins. Co.
,
B. Timeliness
We also reject the intervenors’ arguments as to timeliness. 1. Statutory Time-Bar
Title V provides that if the EPA does not object to a Title V permit within 45 days, “any person may petition the Administrator within 60 days after the expiration of the 45-day review period.” 42 U.S.C. § 7661d(b)(2). *33 The Sierra Club filed a petition within the 60-day period. But PacifiCorp and Utah argue that the relevant time period had expired in 1998 (when Utah issued the original Title V permit). We reject this argument because
we are to review only the EPA’s reasons for denying the petition to object and
the Sierra Club’s petition to object was timely.
First, the EPA denied the petition to objeсt based on the meaning of
the term “applicable requirement”—not timeliness. And we review only the
EPA’s reason for denying the petition to object.
Motor Vehicle Mfrs. Ass’n
v. State Farm Mut. Auto. Ins. Co.
,
Second, the Sierra Club did timely object to the 2016 Title V Permit, and the EPA must object to a Title V permit if it does not include all “applicable requirements.” 42 U.S.C. § 7661d(b)(1).
PacifiCorp relies on
Sierra Club v. Otter Tail Power Co.
, 615 F.3d
1008 (8th Cir. 2010). According to PacifiCorp,
Otter Tail
said that absent
clear evidence to the contrary, the court would conclude that Congress had
not intended to “allow plaintiffs to raise issues resolved during the
permitting process long after that process is complete.”
The situation here is the opposite, for the Sierra Club is doing what was not done in Otter Tail : objecting during the Title V permitting process. In Otter Tail , the Eighth Circuit reasoned that the failure to object during the permitting рrocess tanked a later objection because the Title V permitting process was the only way to obtain review of the EPA’s failure to object. Id. at 1020; see 42 U.S.C. § 7661d(b)(2). So Otter Tail does not suggest that the Sierra Club waited too long to act.
2. Laches
PacifiCorp also invokes the doctrine of laches. This doctrine bars
relief when the petitioner’s unreasonable delay prejudiced the respondent.
Jicarilla Apache Tribe v. Andrus
,
This disfavored defense is unavailable here. The Clean Air Act requires the EPA to object to a Title V permit if a petitioner demonstrates that the permit doesn’t comply with the Clean Air Act. 42 U.S.C.
§ 7661d(b)(1), (b)(2). This requirement cannot be displaced through
laches.
See SCA Hygiene Prods. Aktiebolag v. First Quality Baby Prods.,
LLC
,
3. Characterization of the Petition as a Collateral Attack Utah also argues that its state implementation plan requires use of state permitting procedures, preventing the Sierra Club from invoking the Title V proceedings to collaterally attack the minor NSR permit issued in 1997. [17] But Congress has prescribed the administrative procedure for objections to Title V permits. Under this procedure, the EPA must object when the Title V permit omits an applicable requirement. 42 U.S.C. § 7661d(b)(1), (b)(2). And the applicable requirements include the appropriate form of NSR. See pp. 15–30, above. So if the Sierra Club demonstrates the applicability of major NSR requirements, the EPA must object to the Title V permit even if the Sierra Club’s petition could be viewed as a collateral attack on Utah’s permitting decision in 1997. [18]
* * *
*36 We conclude that the EPA’s interpretation of “applicable requirements” in the Hunter Order conflicts with the unambiguous regulatory definition. We thus vacate the Hunter Order and remand to the EPA for further consideration of the petition.
Notes
[1] Utah acted on the application only after the Sierra Club sought mandamus relief.
[2] The Sierra Club had also objected in state court to renewal of PacifiCorp’s Title V permit, and Utah opposed the objections.
[3] The EPA explained that the state permitting process was not dispositive for enforcement actiоns. Joint App’x at 20–21. The EPA thus asserted authority to enforce major NSR requirements even when a state has issued a minor NSR permit. Id.
[4] The D.C. Circuit ultimately dismissed the appeal for improper venue.
[5] PacifiCorp’s brief contains separate sections on “Traceability” and
“Causation.” We consider both sections here because traceability
constitutes part of the inquiry on causation.
See Comm. to Save the Rio
Hondo v. Lucero
,
[6] PacifiCorp contends that a new Title I permit in 2008 reduced the emission limits and required installation of new pollution-control equipment. But PacifiCorp does not suggest that these changes in 2008 maximized the possible reduction in emissions.
[7] Every state implementation plan must include the requirements for major NSR. See 42 U.S.C. §§ 7410(a)(2)(c), 7471, 7502(c)(5) (requiring state implementation plans to include major NSR requirements).
[8] The list also conjoins the twelfth and thirteenth items with “and,” creating a syndeton , which is equivalent to including “and” between each item. 40 C.F.R. § 70.2; see Antonin Scalia & Bryan A. Garner, Reading Law: The Interpretation of Legal Texts 118 (2012).
[9] We take judicial notice of this document, which is published on the
EPA’s website.
See Sierra Club v. EPA
,
[10] The preamble also refers to proposed regulations, which had similar
language:
[A]ll applicable requirements under the Act includes the
requirements imposed in any NSR permit. Any requirements
established during the preconstruction review process also apply
to the source . . . . If the source meets the limits in its NSR
permit, the title V operating permit would incorporate these
limits without further review. The intent of title V is not to
second-guess the results of any State NSR program.
[11] The EPA regards the term “disputes” as referring only to “the problem of confusion” arising from multiple permits containing various requirements. EPA’s Resp. Br. at 41. But the sentence refers to “disputes over which Act requirements apply.” Operating Permit Program, 57 Fed. Reg. 32, 250, 32,266 (July 21, 1992). The sentence does not suggest that the regulation’s sole focus was to consolidate requirements sprinkled among multiple permits.
[12] The Fifth Circuit recently analyzed a related issue. In evaluating the EPA’s interpretation of the accompanying statute, the Fifth Circuit reasoned in part that the “second-guess” language in the regulatоry preamble disavowed an intent to add any substantive requirements to the Clean Air Act. Envtl. Integrity Project v. EPA , No. 18-60384, __ F.3d __,
[13] The EPA draws support from a guidance document issued in the late 1990s. Oral Arg. at 27:00. That document states that the EPA “generally will not object to the issuance of a title V permit due to concerns over BACT [best available control technology and similar determinations] made long ago during a prior preconstruction permitting process.” Letter from John S. Seitz, Envtl. Prot. Agency, to Robert Hodanbosi & Charles Lagges, STAPPA/ALAPCO (May 20, 1999). But the document also explains that the EPA “may object to or reopen a title V permit in response to a public petition showing that title I preconstruction permitting requirements have not been met.” Id . This explanation applies here: The Sierra Club is insisting that the EPA object to PacifiCorp’s Title V permit based on a failure to satisfy the requirements in Title I.
[14] The Sierra Club also argues that the EPA’s interpretation of “applicable requirements” was arbitrary and capricious. We need not address this argument.
[15] The amicus raises other issues. But the amicus is not a party, and we
ordinarily decline to consider arguments raised only by an amicus.
See
Kerr v. Hickenlooper
,
[16] The Sierra Club contends that the intervenors cannot raise new
issues.
See Ass’n of Battery Recyclers v. EPA
,
[17] The EPA also presents a similar argument.
[18] Utah also asserts the importance of finality in its permitting
processes. But the importance of finality constitutes a policy argument
against an open-ended Title V permit renewal process. This policy
argument cannot override unambiguous regulatory language.
See In re
Sweeney
,