Changes to the environmental laws in 1990 reduced the allowable levels of ozone pollution and set deadlines for attainment. Clean Air Act Title I, Part D, subpart 2, 42 U.S.C. §§ 7511 to 7611f. The St. Louis metropolitan area, initially classified as a “moderate” nonattainment zone, had until November 15, 1996, to comply. 42 U.S.C. § 7511(a)(1). A moderate jurisdiction that missed this deadline was to be reclassified automatically as a “serious” nonattainment area, 42 U.S.C. § 7511(b)(2)(A). That change requires additional costly anti-pollution steps. One of the principal differences between the 1990 legislation and its predecessor was this mandatory reclassification; the legislation leaves the EPA less discretion with respect to ozone than other pollutants. See
Whitman v. American Trucking Associations, Inc.,
While the proceedings that led to our 2002 decision were under way, St. Louis finally met the ozone standards. It asked the EPA for a formal decision that it satisfies the requirements for ozone. Before designating any area as in compliance, the EPA must make five determinations:
The Administrator may not promulgate a redesignation of a nonattainment area (or portion thereof) to attainment unless—
(i) the Administrator determines that the area has attained the national ambient air quality standard;
(ii) the Administrator has fully approved the applicable implementation plan for the area under section 7410(k) of this title;
(iii) the Administrator determines that the improvement in air quality is due to permanent and enforceable reductions in emissions resulting from implementation of the applicable implementation plan and applicable Federal air pollutant control regulations *539 and other permanent and enforceable reductions;
(iv) the Administrator has fully approved a maintenance plan for the area as meeting the requirements of section 7505a of this title; and
(v) the State containing such area has met all requirements applicable to the area under section 7410 of this title and part D of this subchapter.
42 U.S.C. § 7407(d)(3)(E). The EPA made all of these findings in 2003 for the St. Louis metropolitan area (which spans the border between Missouri and Illinois, and hence requires consideration of multiple state plans). See 68 Fed.Reg. 25418 (May 12, 2003) (Missouri), 68 Fed.Reg. 25442 (May 12, 2003) (Illinois). The Sierra Club asks us to set aside these decisions. It does not contest the agency’s finding that the St. Louis area now meets the national ambient air quality standard for ozone. Nor does it challenge the vital third finding: that “the improvement in air quality is due to permanent and enforceable reductions in emissions”. But it insists that St. Louis lacks a proper “applicable implementation plan for the area under section 7410(k)” (requirement (ii)) and that the area’s maintenance plan (requirement (iv)) does not meet all requirements of § 7505a. We start with the challenge to the maintenance plan.
A maintenance plan must take into account the sort of things, such as population growth and changes to the industrial base, that might cause existing pollution-control measures to become inadequate in the future even if they served well in the past. Ozone at or near ground level comes principally from chemical reactions involving its precursors, nitrous oxides (NOx) and volatile organic compounds. Both implementation plans and maintenance plans thus must provide for controls on the emission of these precursors. But what emissions are likely in the future, and what steps could reduce them by the required amount? Accurate projections depend on supplying good data to good models. All concrete requirements of § 7505a, to which requirement (iv) refers, have been satisfied. But a maintenance plan serves' as an amendment to the local implementation plan, and 42 U.S.C. § 7511a(e)(2)(A) and (j)(l) thus may affect it. These subsections require both multi-state areas and serious nonattainment areas to “use photochemical grid modeling or any other analytical method determined [by the EPA], in [its] discretion, to be at least as effective.” Missouri and Illinois have not promised to use photochemical grid modeling as part of their maintenance endeavors. The Sierra Club insists that all multi-state areas must use photochemical grid modeling as long as their maintenance plans are in effect. The EPA thinks that other tools can suffice — and the Sierra Club does not dispute this at the factual level. It contends, rather, that photochemical grid modeling is essential no matter how thorough and rigorous the maintenance plan may be. Unless the EPA makes a formal determination that some other modeling system is “at least as effective” — and the EPA did not make such a finding, even though it appears to believe that the St. Louis region’s methods are at least as effective — then the method named in the statute is indispensable.
Thus we have a straightforward issue: must every multi-state area use photochemical grid modeling continually (at least until a formal equivalence finding has been made)? The EPA’s view does not contradict the statute: § 7511a does not refer to maintenance plans at all, and it is only through the back door (because the maintenance plan amends the implementation plan) that this section enters the picture. What is more, § 7511a deals with
*540
pre-attainment
requirements. This is the foundation of the agency’s view that an area need not use photochemical grid modeling as part of a maintenance plan. That is not an inevitable reading of the statute, but the EPA receives the benefit of deference under
Chevron U.S.A. Inc. v. Natural Resources Defense Council, Inc.,
Nor are we persuaded by the Sierra Club’s argument that the maintenance plans fail to describe all contingency measures that may be applied if problems arise. The statute does not call for any particular degree of precision in the period after attainment (contrast § 7502(c)(9), which demands “specific measures” in the pre-attainment period), so again the EPA (and the affected states) had choices to make, choices that may be gainsaid only if obviously misguided. Intelligent decisions may depend on the nature of future developments. Missouri and Illinois have committed themselves to action; that they have reserved some discretion about the means does not spoil them plans. See
Greenbaum v. EPA,
Let us turn, then, to requirement (ii): that “the Administrator has fully approved the applicable implementation plan for the area under section 7410(k) of this title”. This mentions § 7410(k), but the cross-reference is unilluminating. It does not answer one vital question: what kind of implementation plan is “applicable”? Although the parties have disputed many technical issues, most of their disagreement boils down to a single question: Is an “applicable” plan the same as the area’s pre-attainment plan (as Sierra Club contends), or is it limited to those measures that have proved to be necessary to achieve compliance (the EPA’s view)? The Sierra Club contends that
every
attainment plan for an area at the serious level must specify the implementation of all reasonably available control measures (though the D.C. Circuit disagrees, see
Sierra Club,
In a nutshell, the EPA’s view is that the “applicable” plan requires an area to continue doing whatever worked, and *541 nothing more. In other words, the EPA wants the plan to contain all provisions that required some set of controls to be in place before the date the area met the national standard. Here’s a concrete example, and a principal bone of contention between the parties. Moderate nonattainment areas must ensure that every source of more than 100 tons (annually) of precursor chemicals takes prescribed steps to curtail their emission. For serious nonat-tainment areas, the threshold falls to 50 tons. 42 U.S.C. § 7511a(c). Our 2002 decision concluded that St. Louis must be treated as a serious nonattainment area— although it was classified as a moderate area in 2000, when it filed the application to be reclassified as an attainment area. Even the plan applicable to a serious non-attainment area would allow newly covered sources some lead time to limit their emissions. 42 U.S.C. § 7511(a)(1), (a)(5). Before that time arrived, St. Louis met the national ozone standard. Sierra Club believes that businesses in the 50 to 100-ton range still must implement controls; the EPA believes that an “applicable” implementation plan need not require this. The Sierra Club’s definition of “applicable,” by contrast, is “whatever should have been in the plan at the time of attainment” rather than “whatever actually was in the plan and already implemented or due at the time of attainment.”
Because the statute does not define “applicable,” there is no ineluctable basis for a choice between these options. See
Wall, swpra,
Under the Sierra Club’s view, compliance does not have a payoff: the residents and businesses of St. Louis must take the same costly steps that would be required had the area been less successful. As the reason to take additional steps was to achieve an adequate reduction in ozone, it would be odd to require them even when they turned out to be unnecessary. Some parts of the Clean Air Act forbid cost-benefit analysis, see
Union Electric Co. v. EPA,
Much of the Sierra Club’s argument assumes that reclassification of St. Louis to serious nonattainment was some sort of punishment that its residents should not be allowed to escape. Not at all. “The St. Louis region” is an abstraction, a convenient collective phrase for millions of people whose own lives and fortunes are at issue. Reclassification was a combination of (a) goad (clean up or suffer expensive measures), and (b) palliative (sterner measures expedite compliance). Once an area has meet the national air quality standard, neither rationale calls for extra stringency; indeed, the statutory system would not be much of a goad if the tighter controls must continue even after attainment. It is not as if neighborhood bakeries and other smallish point sources were themselves blameworthy and in need of 20 lashes for transgressions.
One final subject requires brief comment. While the EPA was considering St. Louis’s request for designation as an attainment area for ozone, the D.C. Circuit vacated some elements of the EPA’s national regulations for the control of nitrous oxides (known as the NOx SIP Call). See
Michigan v. EPA,
The petitions for review are denied.