In February, 1916, there was filed with the board of county commissioners of Snohomish county, pursuant to ch. 176, Laws 1913, p. 611 (Bern. Code, §4226-1 et seq.), the petition of Paulson and others asking for the formation of a drainage improvement district to consist of a main ditch'about four miles in length with six laterals. The exact boundaries of the lands to come within that district were not given, but it was stated in the petition that the district was intended to benefit about 3,500 acres. The commissioners appointed a special engineer and attorney for the proposed district, and authorized the engineer to go over the lines of the proposed improvement and make a report in writing as to the feasibility of the project. This was done. In the report the engineer shortened the main ditch by about one mile and suggested the omission of certain laterals and recommended others be included, and, referring to the feasibility of the project, pointed out that an exact survey would be necessary before the topography of the land could be ascertained, and when this survey should have been made, other modifications might be required. The commissioners entered an order directing the engineer to make a further survey and prepare the necessary maps, etc., of the proposed district. The project was then designated “Proposed Drainage District Number Five.” The engineer proceeded, under the direction of the board, to make such further survey and rendered his estimate of the cost of the district. In this second report the engineer determined that a
The special engineer’s work for the district then ceased, the work being taken over by the county engineer under ch. 130 of the Laws of 1917, p. 517, which was an amendment to the act under which the proceedings had theretofore been conducted. Thereafter appraisers apportioned the amount of costs and expenses on the lands according to the benefits derived, and filed their schedule according to law. The board of county commissioners then gave notice of hearing on the schedule. Prior to that hearing, the respondents applied to the superior court for an alternative writ of mandate. In their application they stated certain irregularities in the proceedings before the board of county commissioners, and alleged that the final order of the board was, in legal effect, a rejection of the original petition, and asked that the fees of the special engineer and the special attorney be disallowed, and that the board of county commissioners be ordered to strike the amount of such fees from the schedule.
The respondents claim that the present district of 1,800 acres should not bear the entire expense of the special survey affecting about 4,000 acres, for the reason that most of the improvements petitioned for originally, or as included in the reports of the special engineer, even if made according to the original petition and reports, would not have benefited the 1,800 acres of the district as created, and also that no portion of the ditches were actually dug according to the plans of the special engineer.
Upon the trial the court struck the special engineering expense, but refused to strike the special attor
Under § 10 of the act of 1913 (Laws 1913, p. 617; Rem. Code, §4226-10), the board of county commissioners is empowered to change boundaries, to revise estimated costs, to make changes and modifications in engineer’s reports, and to reject his work, if necessary, and have the work done by some one else, or to reject the whole proceeding. But this does not give the board the right to allow, as engineer’s expense, such expenses as were not incurred in connection with the preparation of plans, specifications, and profiles substantially as recommended in his report, and the district cannot be charged with such expenses as were incurred in a plan which was the substantial abandonment of that originally designed or that favorably reported on, and the district cannot be charged with the expense of making plans, specifications, profiles and estimated costs on ditches situated in locations which were independent of the district as originally petitioned for and favorably reported on.
The district, however, cannot be relieved of such portion of cost as was necessarily incurred in the preparation of the district as it was finally adopted. The entire record is conclusive that the only question properly before the court, in so far as the special engineer’s charg’es are concerned, is as to the apportionment of that expense. It would seem that the special engineer is not entitled to the entire sum of $1,678.95, but the services which he rendered were of value to the district, as finally adopted, in the sum of $900, and an order will be made that this amount be included in the cost of the district.
Passing to the consideration of the special attorney’s costs, there is no claim that the amount, i- e., $750, is excessive or unreasonable, the services having extend
As to the refusal to strike the item in regard to the cost of ditch number two, the testimony shows that the construction of two ditches was more feasible, economical and serviceable than to have constructed ditch number two according to the original plan. We do not feel called upon, under these circumstances, to interfere with the judgment of the trial court.
The judgment will be affirmed except as indicated in the foregoing in regard to the special engineer’s costs. An application for a writ of mandate does not compel this court to either grant or reject it in toto. Such is the holding in State ex rel. Brown v. McQuade, 36 Wash. 579, 79 Pac. 207; State ex rel. Barto v. Board of Drainage Com’rs, 46 Wash. 474, 90 Pac. 660; State ex rel. Wolfe v. Parmenter, 50 Wash. 164, 96 Pac. 1047, 19 L. R. A. (N. S.) 707; State ex rel. Maltbie v. Will, 54 Wash. 453, 103 Pac. 479, 104 Pac. 797.
Holcomb, C. J., Parker, Maiw, and Mitchell, JJ., concur.