This is аn action for damages for injuries plaintiff sustained on his person while working for defendant. The plaintiff, an experienced brickmason, was injured while he was standing in a sewer which was being constructed by defendant by a brick which fell from a quantity of bricks and which hit him on the top of the head causing a severe wound.
In order for a proper understanding of the case, it is necessary to state the manner in which the sewer was being constructed at the time in question. After the trench for the sewer had been dug, it was the duty
On the 23rd day of April, 1906, the plaintiff went to work as usual in the trench laying briсks and continued work until about 10 o’clock when he received an injury. It was the custom to “stock up,” that is, to lower a quantity оf bricks before the masons began work in the morning and again before they went to work after their noon meals. The material stocked up would last from fifteen to twenty minutes; after that it was customary to lower bricks while the masons were at work. It was whilе lowering bricks under the latter conditions that plaintiff was hurt.
The plaintiff alleged many grounds of negligence upon the part of defendant, but relies chiefly upon the following for recovery, viz.: “Defendant carelessly and negligently lowered said bricks аnd caused them to be lowered by means of a rope and hook, or noose, or sling, thereby making it dangerous to the livеs and limbs of employees working at or near the bottom of said sewer and thereby making it unusually and un
There was evidence tending to show that at the time of the injury the defendant was present within a directly over the heads of the masons at work, and that he saw the men while they were lowering the bricks directly over the heads of the masons at work; and that he saw the brick fall and strike plaintiff. There was also evidence tending to show that there was another and safe means of lowering bricks by the use of iron boxes,.but chat defеndant allowed his employees to use the rope or the boxes as they pleased. The boxes were not often used, except where some of the bricks were broken; that the only reason for using the rope in preferencе to the boxes was that the former was the most expeditious and that the boxes being heavier required more power in thеir use. However, the defendant introduced much evidence to the effect that the rope with the noose was most generally used by contractors in such Avork, and it may be said that such evidence stands practically uncontradicted.
Jefferson, the man who placed the rope around the pile of bricks and loAvered them and who testified for the plaintiff, explained what caused the brick to slip from the sling, viz.: that there was a crooked brick in the pile “that had a knot on it which hеld it higher than the other bricks and that didn’t give me room to tighten it.” He further explained that, “When two bricks are put in to tie the hack, if оne is a little thicker than the other, the thick brick Avill take most of the strain on itself, and quite often it is the case that the thin brick will slip оnt.”
The cause of the accident was the negligence of Jefferson who loAvered the bricks at the time. He saw the defective, brick and knew that on account of its defect he could not properly secure the pile so as to prevent one of thеm from falling out. Conceding that it was negligence in the boys who placed the brick in question in the pile, there is no evidencе that they were incompetent for the business. And their act, as well as that of Jefferson, was the act of fellow-servants. Thеre is nothing to show, notwithstanding defendant Avas present, that he knew of the defective brick in the pile. And we are of the oрinion that the approximate and direct cause of the injury was the negligence of the man Jefferson, plaintiff’s fellow-servant. Therefore, defendant was not liable for his act.
The court should have instructed the jury to return a verdict for the defendant as requested. Reversed.