Plaintiff (Seagrove) brought this action against defendant property owners for breach of a restrictive covenant with a prayer for injunctive relief. The trial court issued the injunction and awarded plaintiff costs and attorney fees. Defendants appeal. We review de novo and affirm.
Seagrove is a planned development, and all lots are sold subject to a series of covenants, conditions and restrictions. The restrictions at issue in this case require all lots to have a garage, all buildings to have a 7.5-foot setback from each lot line and buildings on neighboring lots to be at least 15 feet apart. Defendants purchased an unimproved lot in March, 1989, intending to place a manufactured home on it. They hired a contractor to lay out the site for the home and the garage. Defendants pointed out to the contractor an exposed metal pole, which they assumed was the corner of their lot. The pole was, in fact, a telephone ground rod.
The contractor laid out the building site, apparently without measuring the lot to find the true corners. Sometime during pouring of the footings and erecting of the stringers for the garage, the contractor discovered that he had used an erroneous corner marker. He then contacted a representative of the Design Committee (Committee), which had responsibility for enforcing the restrictions. The representative told the contractor to cease construction until defendants had approval from the Committee. At that time, defendants or the contractor could have measured the distance from the planned garage and the planned location of their neighbor’s home and discovered that the two structures were only 13.6 feet apart. Additionally, the garage was only 4.1 feet from the true property line and 7 feet from the erroneous line.
At trial, defendants conceded that there was a setback violation. However, they argued that the Committee gave them permission to complete the garage and then waived enforcement of the covenant by waiting 6 months before ordering defendants to remove it. The trial court found that there was no credible evidence that anyone on the Committee gave defendants approval to continue with a construction project that clearly violated the Seagrove development rules or waived enforcement of those rules.
Defendants also argue that the benefit to Seagrove from the enforcement of the rules is outweighed by the harm to them if they are required to comply with the setback requirement. Therefore, they argue, relying on Tauscher v. Andruss,
In Swaggerty v. Petersen,
Defendants also appear to argue that, because the Committee had approved other setback variances, both immediately before and after the construction of defendants’ garage, the reason that plaintiff sought the injunction is not because the setback regulations are important, but because defendants failed to get permission before constructing their garage. That argument is without merit. Defendants have not shown that other violations are so general and pervasive as to result in a change in the nature of the development justifying a finding that the general plan embodied in the restrictions has been abandoned. See Swaggerty v. Peterson, supra,
Affirmed.
Notes
The trial court stated in its opinion:
“There is strong disagreement as to whether [the representative from the Committee] gave approval for [defendants’ contractor] to go ahead and complete the structure even though it was in clear violation of * * * the [development’s covenants]. The court finds there is no credible evidence that [the Committee representative] or anyone else ever gave permission for the construction to proceed. The * * * [development’s covenants] all clearly indicate any changes had to be approved in writing by the Design Committee. Although [the defendants’ contractor] may have misunderstood what [members from the Committee] stated, there is no believable evidence that [the contractor] was told to go ahead with construction in clear violation of the Seagrove development rules. [The contractor], as well as [defendants], knew that any request for a variance from a plot plan had to be approved by the Committee and be in writing.”
Defendants also appeal the court’s award of attorney fees but concede that plaintiff is entitled to the fees if we affirm on the merits.