6 Daly 1 | New York Court of Common Pleas | 1875
There was nothing to which the lien would attach. The notice to create the lien was filed on the 24th of November, 1871, and on the 14th of November, ten
It is, in my judgment, unnecessary to consider the point which the referee has discussed, whether the blowing down of the building was attributable to the fact that the plaintiff put on the roof before the walls on each part were sufficiently up. For all we know, or the referee knew, it might have blown down if the roof had not been on. Such things occur. It is therefore, in my judgment, immaterial whether the defendant Ruck desired that the plaintiff should go on with the roof in the state in which the walls then were. He was not bound to do so. He could not be required to do so until the walls were sufficiently up to enable him to attach the roof securely to them. That they were not was not his fault, as he was the carpenter, and if there was delay it was the delay of the mason. Without therefore going into the question 'at all, the point to be disposed of is, to what could the lien attach ? It is given on the building and the lot on which it stands. The ruins left are not the building, but the debris remaining after the building no longer exists, and it cannot attach to the lot, for it has no building upon it. This is a remedy in rem. It is a security which attaches to the building a/nd the lot on which it stands, for the benefit of the mechanic, laborer or material-man who has contributed to the erection of the building, and if there is no building there can be no lien.
The defendants are in no way answerable for the fall of the building. It was erected under a contract, and the loss arising from its having blown down falls upon the contractor, who must erect another or answer in damages for the non-performance of his contract (Trustee of Trenton v. Bennett, 3 Dutcher
J. F. Dalt and Eobinson, JJ., concurred.
Ordered accordingly.