delivered the opinion of the court:
This is a mechanic’s lien proceeding brought in the circuit court of Henry county by appellees, against appellants, under the Mechanic’s Lien law of 1903. Appellees testified that on March 15, 1907, they made an oral contract with appellant Swan A. Anderson, whereby they agreed to install gas fittings, electric wiring, plumbing, heating apparatus and make the.sewer connections for four houses to be erected upon four separate lots in Kewanee owned and possessed by said Anderson, for $2550. The claim for said lien was filed May 14, 1908, and this proceeding was instituted in the circuit court January 9, 1909. The decree of the circuit co'urt found that said four buildings had been completed and that there was still due and unpaid to appellees under said contract $1505.80, with interest from March 14, 1908,—a total of $1751.95,—and that appellees have a lien on all four buildings therefor. From that decree this appeal has been prayed directly to this court on the ground that if the Mechanic’s Lien statute be construed as it is necessary to construe it in order to uphold the decree of the trial court, said statute is unconstitutional.
It is first contended by appellants that the trial court improperly construed the Mechanic’s Lien statute. Parts of section 7 (paragraph 21) which are necessary to be considered (in connection with other portions of the statute) read as follows: “No contractor shall be allowed to enforce such lien against or to the prejudice of any other creditor or encumbrancer or purchaser, unless within four months after completion, or if extra or additional work is done or material is delivered therefor within four months after the completion of such extra or additional work or the final delivery of such extra or additional material, he shall either bring suit to enforce his lien therefor or shall file * * * a claim for lien: * * * Provided further, that in the event that the contract relates to two or more buildings on two or more lots or tracts of land, then all of said buildings and lots or tracts of land may be included in one statement of claim for a lien.” (Hurd’s Stat. 1909, p. 1431.)
The evidence shows that one of the houses was situated on Division street, two on Prospect street, and one (a double house) on East Oak street; that all four houses were completed and all of the work performed on them, whether extra or otherwise, by the middle of November, 1907, excepting the Oak street house; that the last work was performed on the Oak street house March 14, 1908. The two houses on Prospect street and the one on Division street were sold and deeds delivered and recorded and possession taken before November 15, 1907. The Oak street house was sold and possession taken about September 23, 1907. The claim for lien and the bill filed in this proceeding do not designate which portion of the work or material was furnished for any special house, nor the time when such work was performed or the material furnished for each house. The only statement they contain on those points is that the first work was performed and material furnished about April 1, 1907, and the last March 14, 1908.
Previous to the passage of said act of 1903 a contractor could not file a single claim for lien for the whole amount due him for labor and materials for the erection of houses on lots which were not adjoining or adjacent to one another, even though all labor was performed or materials were furnished under one contract. (See Aurand v. Martin,
Had this claim for lien stated specifically as to when the last work was performed or material furnished on each of the .separate houses, then, if the labor was performed or material furnished, in accordance with said statement, on any particular house within four months of the time the claim was filed, a claim for such labor and material furnished on that house could have been enforced as a lien thereon, even though the labor or material for any of the other houses was shown to have been performed or furnished more than four months before the claim was filed. As mechanics’ liens were not recognized by the common law or in equity but exist only by virtue of Statutes creating them and providing a method for their enforcement, such statutes must be strictly construed with reference to those requirements upon which the right depends. (Turnes v. Brenckle,
In view of the conclusion we have reached that the court by its decree did not construe the statute correctly, it is unnecessary for us to pass on the question whether the statute as construed by the trial court would be unconstitutional as authorizing the taking of property without.due process of law.
The conclusion that we have reached malees it impossible for any recovery to be had in this proceeding. The decree of the circuit court will therefore be reversed.
Decree reversed.
