Appellee, Save Our Community (“SOC”), 1 brоught suit challenging the draining of several ponds on the site of a proposed expansion of a 73-acre landfill (the “Skyline Landfill”) near the City of Ferris, Texas, operated by appellant Trinity Valley Reclamation, Inc. (collectively “Trinity”). 2 SOC 3 sought a preliminary injunction and a declaratory judgment that Trinity violated the Clean Water Act (“CWA”), 33 U.S.C. §§ 1251 et seq., by failing to obtain a permit pursuant to section 404 of the Act before starting to drain the ponds. SOC also sought a declaration that appellants the United States Army Corps of Engineers (“Corps”) and the United States Environmental Protection Agency (“EPA”) (collectively “Federal defendants”) either failed to perform a duty to enforce section 404 provisions or incorrectly interpreted the CWA by determining that draining is not a regulated activity under the Act. The district court held as a matter of law that the draining activity required a permit. It issued a permanent injunction. We reverse.
I. FACTS
Trinity- owns and operates the Skyline Landfill located near Ferris, Texas. In contemplation of expanding the landfill to encompass a total area of 340 acres, Trinity solicited an opinion from the Corps in May of 1987 as to whether the Corps had jurisdiction over-any portion of the proposed expansion area as constituting waters of the United States. The area included seven man-made ponds. The Corps determined that these ponds were waters of the United States, and, as such, were protected under the CWA. The EPA subsequently sent a letter to Trinity concurring in the Corps’ determination and advising it of the need for a permit if any discharge into these ponds was contemplated. 4
*1158 Since filling the ponds with landfill would violate the CWA, Trinity began draining the ponds by the use of a mechanical pump, utilizing the water extracted to irrigate the sod covering areas of the existing landfill. 5 According to Trinity, maintaining a proper sod cover over the existing landfill necessitated irrigation, and the ponds provided the only water available in the area. Moreover, Trinity, as well as the Corps, expressed a concern that the rubble dams creating the ponds were unstable, and thus were a risk to public safety, further necessitating the removal of water from the ponds. More important, Trinity planned to drain the ponds and utilize these areas for landfill purposes. 6 Unsure whether this pumping activity would ever fully drain the ponds, Trinity asserted, and the Corps concurred, that Trinity subsequently would seek another determination from the Corps as to whether these drаined areas still constituted waters of the United States prior to utilizing the areas for landfill purposes. 7
During the course of this pumping operation, the result of which had lowered the surface area of the ponds down from 20 to 10 acres, Trinity, in January 1989, applied to the Texas Department of Health (“TDH”) for a permit to expand the Skyline Landfill from 73 acres to 340.399 acres. The TDH referred along the application to the Fish and Wildlife Service of the United States Department of the Interior (“FWS”) *1159 for its review. FWS replied that there was “an apparent attempt to circumvent the regulations” on the part of Trinity, and recommended that “in the interest of fish and wildlife resources and wetland conservation ... the permit application be denied.” FWS expressed its concerns regarding the project and reрorted that it “noted a variety of wildlife using the ponds on our on-site visit including leopard frogs, beaver, and various birds.” FWS also drew Trinity’s attention to the depositing of fill material occurring in one of the ponds.
On April 2, 1990, claiming that the draining activity required a permit from the Corps pursuant to section 404 of the CWA, the City of Ferris and SOC filed their Original Complaint, Application for Temporary Restraining Order, and Application for Preliminary Injunction under the citizens’ suit provision of the CWA. They sought to enjoin the further removal of water from the ponds. The City of Ferris and SOC also asked for a declaration that the Corps and the EPA had either misinterpreted the CWA by concluding that Trinity did not require a section 404 permit to drain the ponds or had failed in their duties under section 404. The next day, citing the need to prevent further drainage of the ponds, the district court issued а TRO enjoining Trinity from draining or otherwise altering wetlands located on the Skyline Landfill property. 8
In the weeks that followed, the EPA and the Corps filed a Motion to Dismiss arguing that no permit was required for Trinity’s draining activity. Nonetheless, on May 3, 1990, the district court rendered its decision in a published opinion,
Save Our Community v. EPA,
In reaching this conclusion, the district court engaged in a policy-based analysis of the CWA — its legislative history, regulatory guidelines issued pursuant to it, аnd particular language excised from cases applying it. Focusing nearly entirely on the clearly destructive aspects of Trinity’s draining project, and offended by what it perceived to be a direct subterfuge of section 404 by permitting a landowner to drain a wetland and then claim “[pjermit for what wetland?”, the district court held:
[A]s a matter of law that pursuant to the Clean Water Act, its regulations, and relevant case law § 404(b) of the Act requires a permit where draining a wetland presents the threat of significant alteration or destruction of the wetland.
Despite a fact finding that “[s]ome minor discharges ha[d] occurred,” and ignoring the urging of amici curiae — the Environmental Defense Fund and the National Wildlife Federation — to “consider a supplemental basis for its ruling that takes into account discharges,” the district cоurt refused to consider the issue of discharge in making its decision: “Because the Court decides that the draining activities in this case require a § 404(b) permit, it need not rule on the issue of whether a de minimis discharge requires a permit.” Id. at 613 n. 11. Because the parties continued to refer to alleged discharges in subsequent proceedings, the court continued to mention them. But it always found them irrelevant to its decision:
On June 13, 1990, SOC moved for summary judgment and a permanent injunction, claiming that no genuine disputed issue of fact remained following the district court’s prior ruling. At this juncture, once again, Trinity and the Federal defendants *1160 contended that the district court lacked jurisdiction over the subject matter because Trinity’s draining activity did not require a section 404 permit. The district court, however, found jurisdiction and awarded summary judgment and a permanent injunction. It ordered that Trinity pay SOC’s аttorneys’ fee as well as costs. The court asserted that if Trinity’s activity is “viewed as a whole,” it unquestionably requires a permit. According to the court, “[t]o divorce the drainage of the wetlands from their subsequent filling with waste matter is to be blinded by abstractions and to ignore the actual controversy between the parties.”
On appeal, Trinity challenges the district court’s ruling that draining activities that significantly alter wetlands require a section 404 permit. Trinity also takes issue with the district court’s assessment of SOC’s attorneys’ fees, expenses, and court costs against it.
II. DISCUSSION
A. Standing 9
As a preliminary matter, Trinity challenges SOC’s Article III standing to sue as seeking enforcement of the CWA under the Act’s citizen suit provision.
10
Standing analysis focuses upon “[w]hether a party has a sufficient stake in an otherwise justi-ciable controversy to obtain judicial resolution of that controversy.”
Sierra Club v. Morton,
Trinity asserts that SOC’s individual members lack standing to pursue this suit on their own; consequently, SOC as an organization lacks standing. The Supreme Court in
Valley Forge Christian College v. Americans United for Separation of Church & State, Inc.,
[A]t an irreducible minimum, Art. Ill requires the party who invokes the court’s authority to “show that he personally has suffered some actual or threatened injury as a result of the putatively illegal conduct of the defendant,” ... and that the injury “fairly can be traced to the challenged action” and “is likely to be redressed by a favorable decision.”
In its complaint, SOC defined its raison d’etre as “promoting the protection of the wetlands in and around their communities.” Further, SOC supported with affidavits the assertion that its members resided in the vicinity of or owned property near the wet *1161 lands on the Skyline Landfill, and enjoyed “the wildlife, aesthetics, open space, ecological and other values of the wetlands, ... and [were] directly and beneficially interested in the continued protection, preservation, and enhancement of these values.”
We find that SOC has stated an injury sufficient to satisfy the first element of the standing requirement under
Valley Forge.
The Supreme Court held in
Morton,
As the district court noted, other Courts have consistently recognized this low threshold for sufficiency of injury.
See, e.g., United States v. Metropolitan St. Louis Sewer District (MSD),
With the first element of the
Valley Forge
test satisfied, we turn now to the second factor — whether the injuries suffered by SOC’s members are “fairly traceable” -to Trinity’s alleged failure to obtain a permit. Trinity acknowledges that its activities on the Skyline Landfill have reduced the total acreage of the ponds by half, and that the FWS has reported that, “[b]ecause the upper ponds have been drained, they now have considerably less value for wildlife.” Further, as the Third and Fourth Circuits have suggested, the “fairly traceable” element does not require that the plaintiffs “show to a scientific certainty that defendant’s effluent, and defendant’s effluent alone, caused the precise harm suffered by the plaintiffs.”
Powell Duffryn,
To meet the third requirement, SOC’s members must demonstrate that their injuries are “likely to be redressed by a favorable decision.” The redressability factor focuses upon the connection between the plaintiff’s injury and the judicial relief sought.
Allen v. Wright,
We conclude that the district court held properly that SOC, as a representational organization, had standing to bring this suit. SOC has shown more than a mere “general interest in environmental preservation.” 11
*1162 B. Statutory Coverage
SOC maintains that because Trinity’s continued draining of, discharging into, and ultimate filling of the wetlands without a permit is a violation of sections 301 and 404 of the CWA, there is also federal question jurisdiction. Trinity contends that because section 505, the citizen’s suit provision, refers to a violation of an effluent standard, limitation, or order, SOC is precluded from bringing suit against Trinity for failure to seek a permit. Trinity argues that without a discharge of effluent no violation exists, and no jurisdiction is created.
Passed in 1972 with the stated objective of restoring and maintaining the integrity of the waters of the United States, the CWA seeks to achieve this goal “by the application of increasingly more stringent ‘effluent limitations’ designed to reduce gradually the amount of pollutants discharged into waterways.”
Sierra Club v. Shell Oil Co.,
[A]ny citizen may commence a civil action on his own behalf — (1) against any person ... who is alleged to be in violation of (A) an effluent standard or limitation under this chapter or (B) an order issued by the Administrator or a State with respect to such a standard or limitation. ...
33 U.S.C. § 1365(a). Thus, the CWA “intertwines the jurisdiction of the district court with the grounds for relief in a citizen enforcement action.”
Sierra Club,
In interpreting the statute to determine whether it covers a violation as recognized by the district court, “we begin, of course, with the words of the statute.”
Phillips v. Marine Concrete Structures, Inc.,
By its clear and unambiguous terms, the CWA proscribes “the discharge of any pollutant by any person” into the waters of the United States. 33 U.S.C. § 1311(a) (emphasis added). It then specifically requires a permit, with exceptions irrelevant in this case, “for the discharge of dredged or fill material” into these waters. 33 U.S.C. § 1344(a) (emphasis added). The conclusion is inescapable. The existence of discharge is critical. The discharge must be of effluent or dredged or fill material. The discharge of effluent is not, as SOC urges, merely an aggravating factor when addressing whether or not a section 404 permit is required. On the face of the statute, it is the requirement for statutory coverage.
The plain language of a statute cannot be wholly bypassed on the way to an interpretation of its more indeterminate legislative history. “Where the statute is so lucid, we need not look to the legislative history for further guidance.”
Phillips,
Throughout the course of this case, the EPA and the Corps have vigorously agreed with the conclusion that the CWA only addresses discharges of effluent. The unequivocal language found in their own regulations and guidelines promulgated pursuant to section 404(b) of the Act bolsters this contention:
The purpose of these Guidelines is to restore and maintain the chemical, physical, and biological integrity of waters of the United States through the control of discharges of dredged or fill material.
40 C.F.R. 230.1(a);
These Guidelines have been developed ... under section 404(b)(1) of the Clean Water Act (33 U.S.C. 1344). The Guidelines are applicable to the specification of disposal sites for discharges of dredged or fill material into waters of the United States.
40 C.F.R. 230.2(a). See also 33 C.F.R. 320.-2(f) (describing the Corps’ authority pursuant to section 404 of the CWA “to issue permits, after notice and opportunity for public hearing, for the discharge of dredged or fill material into the waters of the United States at specified disposal sites”). Further, 33 C.F.R. 323.1 describes the Corps’ program as the regulation of “discharge of dredged or fill material into waters of the United States”.
We accord substantial weight to these interpretations, as “[a]n agency’s construction of a statute it is charged with enforcing is entitled to deference if it is reasonable and not in conflict with the expressed intent of Congress.”
United States v. Riverside Bayview Homes, Inc.,
*1164
Recognition of the “discharge” requirement as the triggering mechanism for section 404 coverage is by no means novel. Courts have consistently applied section 404 only after finding that discharges of effluent into navigable waters were involved.
See, e.g., Riverside Bayview Homes, Inc.,
The cases relied upon by the district court in ruling that a discharge is
not
required to trigger the coverage of section 404 belie the court’s conclusion.
See Save Our Community v. EPA,
Next, the district court construed our decision in
Save Our Wetlands, Inc. v. Sands,
Thus, in these cases and all the other cases upon which the district court relied, the holdings were based upon a finding of a discharge of pollutants. We must conclude that without the existence of an effluent discharge of some kind, there is no coverage under section 404. There is no jurisdiction for the agencies or the courts to act. We must remind again that the federal government has not taken upon itself to resolve all environmental issues which arise in the United States.
Save Barton Creek Ass’n v. Federal Highway Administration,
*1165 Determining whether a discharge of effluent occurred in this case, therefore, becоmes crucial. The activity at issue here involved the draining of wetlands via the use of a mechanical pump. Trinity utilized the water pumped to irrigate the sod cover on the landfill. While filling activity was indisputably contemplated after the draining had caused the area to lose its wetlands characteristics, Trinity undertook to avoid any and all discharges of fill, or other material, during the draining phase. Both the EPA and the Corps assured Trinity that if no discharges were involved, then the removal of water from the ponds did not constitute a regulated activity under the CWA, and thus did not require a section 404 permit.
Few cases involve the narrow issue of whether the removal of water from wetlands constitutes a discharge and requires a permit from the Corps. The dearth of case law on this issue is not surprising. We have found no suit in which the Corps undertook to prevent the removal of water from wetlands. In a case solidly controlling, we held that the deliberate draining of a swamp is not a discharge of fill material. In
Orleans Audubon Society v. Lee,
Orleans further argued that section 404(f)(2) (related to dredged or fill material only) prohibited the drainage of the water from the C.I.T. tract. The drainage, Orleans maintained, was “incidental to an activity which is intended to bring about the conversion of a wetland, the C.I.T. swamp, into non-wetland area which can then be developed into a residential area without governmental approval.” Id. n. 16. We found that, although cognizant of this possibility, as was the Corps, we could not require an exercise оf nonexistent jurisdiction. We said that “Section 404(f)(2) applies only when dredged or fill material has been discharged, and water is simply not dredged or fill material. Orleans’ assertion that vegetation from the tract (which, it argues, constitutes a pollutant) was also being removed through the culverts was not supported by the record.” 15 Id. (emphasis in original).
The district court undertook to distinguish
Orleans’
pivotal holding. Our finding in the body of the opinion was that, absent a finding of discharge, draining ac
*1166
tivity that converts a wetland does not trigger section 404 jurisdiction requiring a permit. Instead, the district court focused upon our dismissal of Orleans’ claim that section 404(f)(2) applied. This limitation of the scope of
Orleans
led the district court to the conclusion that “the
[Orleans
] court restricted its discussion to the limiting clause of § 404(f), which provides for very narrow exceptions to the permit requirement.”
Save Our Community,
As an alternative argument to its assertion that drainage alone requires a permit, SOC contends that even if draining without a discharge is not regulated under the CWA, discharging pollutants certainly is. According to SOC, the district court made a finding of fact that there were some “minor” discharges.
Save Our Community,
Pumped water has been discharged into a makeshift ditch resulting in significant erosion above the ditch’s outfall to Pond F and subsequent deposition of fill material in Pond F.
Second, it cites other FWS correspondence to Trinity on February 22, 1990, reiterating similar contentions:
Regarding siltation, the most prominent example noted by our staff in a site-visit on March 14, 1989, was the deposition of recently eroded soil in Pond F resulting from water pumped from Pond A into a make-shift ditch.
Trinity counters first by stating that by the district court’s own admission, whether minor discharges have occurred or not was declared to be irrelevant to the district court’s decision. The only basis for the court’s prohibition against draining was its determination that draining is a regulated activity under section 404.
16
Second, it asserts that the district court’s finding concerning discharge is clearly erroneous. Under
State of Missouri ex rel. Ashcroft v. Department of the Army, Corps of Engineers,
Trinity also urges that a genuine dispute concerning material facts remains on the issue as to whether any discharge at all occurred. At the district court level, Trinity disputed the factual accuracy of the discharges finding by proffering an affidavit from Trinity’s Environmental Engineer Manager-Texas stating that Trinity would not discharge any dredged or fill material into the pond areas without a determination that those areas were not jurisdictional *1167 waters, or if they were, a section 404 permit would be obtained from the Corps.
First, we emphаsize that it is not contested that the district court relied exclusively on its finding of draining, not discharge, to find section 404 jurisdiction. The Federal defendants urge and even Trinity concedes that denial of the summary judgment and the remand is necessary to resolve this disputed factual issue. As to Trinity’s second assertion, SOC seeks to characterize the siltation alleged as redeposited wetlands material. It cites to
Avoyelles III,
Third, SOC maintains that contrary to Trinity’s contentions, the discharges observed by FWS are subject to section 404 jurisdiction, even if they constitute de min-imis discharges. A de minimis exception is not explicitly mentioned under section 404. But it is recognized in regulations exempting from section 404’s permit requirement those activities involving only de minimis discharge. The Corps’ current definition of “discharge of dredged material,” at 33 C.F.R. 323.2(d), provides that “de minimis, incidental soil movement occurring during normal dredging operations” is not considered to be within this regulatory definition. Further, the EPA’s regulations contain a similar definition with the same exclusion. See 40 C.F.R. 232.2(e). 17 Because it is unclear from the record the extent of or if any prohibited discharge has occurred, we need not now consider the issue of the extent to which de minimis discharges require permits under section 404 of the CWA.
C. Attorneys’ Fees
The district court awarded SOC attorneys’ fees, expenses, and court costs as the prevailing party in this lawsuit.
See
33 U.S.C. § 1365(d). Since we determine that the district court erred in finding that Trinity’s activities required a permit under section 404, the award of attorneys’ fees to SOC was not justified.
See Chemical Manufacturers Ass’n v. United States EPA,
III. CONCLUSION
We hold that the wetlands draining activity per se does not require a section 404 permit under the CWA, as only activities involving discharges of effluent necessitate obtaining such a permit. Consequently, we dissolve the injunction. Further, viewing the evidence and drawing all inferences in the light most favorable to Trinity, the non-moving party, we conclude that there are disputed issues of material fact regarding the existence of the exact nature of a discharge alleged.
Bozé v. Branstetter,
INJUNCTION DISSOLVED, SUMMARY JUDGMENT REVERSED. REMANDED.
Notes
. This case originally proceeded on behalf of SOC and the City of Ferris. In the district court’s grant of the application for preliminary injunction, the court found that while SOC had standing, the City of Ferris was not an appropriate party to the suit.
Save Our Community v. EPA,
. Trinity Valley Reclamation, Inc. is a wholly-owned subsidiary of Waste Management of North America, Inc., which is in turn a wholly-owned subsidiary of Waste Management, Inc. In the proceedings below, the Waste Management entities were collectively referred to as Waste Management by both SOC and the court. However, because the Waste Management entities refer to themselves as Trinity on appeal, to alleviate confusion, we likewise do so.
. SOC is an unincorporated association of individuals organized and existing to oppose expansion of the Skyline Landfill. Members of SOC reside in the-cities of Ferris, Dallas, and Palmer, and in rural areas in Ellis and Dallas Counties. SOC seeks to promote the protection of the wetlands in and around its members’ communities. SOC’s members assert that they enjoy the wildlife, aesthetics, open space, ecological and other values of the wetlands, which have been and may or will be drained and/or filled, and are directly and beneficially interested in the continued protection, preservation, and enhancement of these values.
. The Corps and the EPA jointly administer the CWA section 404 regulatory program. The CWA confers broad authority to the Corps and the EPA to regulate activities involving a discharge of dredged or fill material into the nation’s waters, including wetlands. 57 Fed.Reg. 26894 (1992) (to be codified at 33 C.F.R. pts. 323 & 328 and 40 C.F.R. pts. 110, 112, 116, 117, 122, 230, 232, and 401) (proposed June 16, 1992). Under the Memorandum of Agreement between *1158 the EPA and the Corps delineating jurisdictional authority under the CWA with regard to standard permit applications, the Corps makes most of the jurisdiction decisions though it must abide by EPA guidance. A tracking system is also provided whereby the Corps supplies the EPA with a record of all its jurisdictional determinations to enable the EPA to review decisions. See Memorandum of Agreement Between the Department of the Army and the Environmental Protection Agency Concerning the Determination of the Geographic Jurisdiction of the Section 404 Program and the Application of the Exemptions Under Section 404(f) of the Clean Water Act (Jan. 19, 1989).
. According to a recent commentary, draining a wetland without attaining a section 404 permit has emergеd as a common vehicle to destroy wetlands. Comment, Pumping With the Intent to Kill: Evading Wetlands Jurisdiction Under Section 404 of the Clean Water Act Through Draining, 40 DePaul L.Rev. 1059, 1080 (1991). In essence, the draining is accomplished, as in the instant case, through the installation and use of a mechanical pump or other dewatering device. Consequently, the water is drained out of the wetland, destroying the water, soil, and vegetation conditions necessary to characterize the area as "waters of the United States,” subject to protection by the CWA.
. After Trinity was advised that the ponds, in their present condition, were jurisdictional waters fringed with wetlands, Trinity met with officials from the Corps, the EPA, and the Fish and Wildlife Service ("FWS”) on several occasions to discuss Trinity’s plans to drain these ponds. All three agencies advised Trinity that no permit was required for Trinity's draining activities as long as Trinity did not discharge any pollutants into any jurisdictional waters of the United States.
Trinity maintains that it is committed to wetlands protection and preservation. It is cognizant that its plan to de-water the ponds will result in some loss of wetland habitat (arguably all), and, consequently, has sought voluntarily to propose to replace the ponds with a high-quality wetlands wildlife habitat elsewhere on Trinity's property in an area adjacent to Ten Mile Creek. Trinity has submitted its proposed Wetlands Development Plan to the Corps, the EPA, and the FWS for their review and comment. According to Trinity, it has been verbally advised by representatives from these agencies that the new proposed wetlands wildlife habitat "will be superior to the existing water-filled pits [ponds]."
.On May 30, 1991, Trinity applied to the Corps for a permit for the draining of the ponds at issue in the instant case, the destruction and removal of the rubble dams, and the creation of new replacement wetlands elsewhere. The permit application anticipates that the discharge of "dredged or fill material for this project will include discharges resulting from the pumping of water, removal of the rubble dams and dredging of the benthic soils from existing im-poundments A-F.”
According to the Federal defendants, though the SOC, the amici curiae, the Environmental Defense Fund ("EDF"), and National Wildlife Federation ("NWF”) appear to take the application as an indication that the draining of the ponds requires a permit, the application and notice do not support the inference. Although Trinity may drain the ponds without a permit if no discharge occurs, it would be easier for Trinity if the project would progress without the need to prevent discharges. Further, as Trinity also concedes, it is unclear whether Trinity will be able to drain the ponds completely or whether the pond sites will cease to be wetlands regardless of Trinity’s careful draining. Thus, the Corps suggests that it was wise to apply early for a permit.
. Ultimately, after a four-week hearing in April, and after voluminous post-hearing briefing by all parties, TDH denied Trinity’s landfill expansion permit application on August 8, 1990. Trinity’s motion for rehearing was denied on February 20, 1991.
. As a peripheral argument, SOC contends that the Federal defendants lack standing to appeal because the district court declined to grant relief against them. In order to have standing to appeal, a party must be aggrieved by the judicial action from which it appeals.
See Deposit Guаranty National Bank, Jackson, Mississippi v. Roper,
Because the resolution of this issue has no bearing on the substantive casе, we need not explore it further.
. The CWA confers standing to the limits of the Constitution. Under the CWA, “any citizen may commence a civil action.” 33 U.S.C. § 1365(a). A "citizen" is “a person or persons having an interest which is or may be adversely affected.” Id. § 1365(g).
. Our standing analysis need not apply the reasoning recently employed by the Supreme Court in
Lujan v. National Wildlife Federation,
. The term "discharge of a pollutant” is defined by the statute as constituting "any addition of any pollutant to navigable waters from any point source_” 33 U.S.C. § 1362(12). The CWA then, in turn, defines "pollutant” as the following:
The term "pollutant" means dredged spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt and industrial, municipal, and agricultural waste discharged into water.
33 U.S.C. § 1362(6).
. Dividing authorizing jurisdiction between the EPA and the Corps, the CWA allocates responsibility to the Corps to issue permits for the discharge of dredged or fill material into navigablе waters pursuant to section 404 (33 U.S.C. § 1344). The EPA, on the other hand, is responsible for issuing permits for all other discharges of pollutants under section 402 (33 U.S.C. § 1342).
. Specifically, "[t]he Corps’ on-site investigator reported that he found ‘no evidence of any discharges regulated under section 404 of the Clean Water Act.’”
. At oral argument, SOC contended that the recapture provision in section 404(f)(2) should be read broadly, in essence, to apply outside of the context of section (f)(1). According to SOC, the recapture provision states that "[a]ny discharge of dredged or fill material into the navigable waters incidental to any activity" that converts a wetland requires a permit. Thus, since Trinity’s drainage operation has as its purpose changing the use of the subject waters where “the reach of such waters” may be reducеd, compliance with CWA via a permit is necessary. Under this interpretation, any discharge, even if
de minimis,
requires regulation. Although we need not decide this issue today, we point out that the argument contrasts with our decisions in
Avoyelles III,
. The Federal defendants express a similar concern. They assert that the district court did not rely on the existence of a discharge as the basis for its permanent injunction, and in fact made it clear that such a discharge was immaterial to its decision. Further, since the district court's finding of a discharge was based solely on two letters from the Fish and Wildlife Service, this can "hardly form a firm basis” for a conclusion that discharge has in fact occurred. They assert, nonetheless, that if this Court accepts the argument that the CWA requires permits only for discharge of a pollutant, the appropriate remedy would be to remand to the district court for reconsideration under a correct interpretation of the CWA — potentially, whether a discharge has occurred.
. Proposed rules concerning a de minimis discharge are in the commentary phase. In the commentary, the Corps and the EPA note that the de minimis exclusion serves in part "to avoid duplicative regulation of dredging itself in waters within the jurisdictional scope of the Rivers and Harbors Act.” As the Corps and the EPA concede, however, "[o]ver the years, application of this 'de minimis’ language hаs become problematic, especially when applied to activities which did not involve dredging for the purposes of maintaining navigation in traditionally navigable waters.” 57 Fed.Reg. at 26895. Under its proposed rules, the new language would undertake to clarify by providing:
[A]part from the exclusion for "normal dredging operations,” the term "discharge of dredged material” includes any discharge, i.e., addition or redeposition, of excavated material into waters of the United States which is incidental to any activity, including mechanized landclearing, ditching, channelization, or other excavation, which has or would have the effect of destroying or degrading any area of the waters of the United States. The term "discharge of dredged material” does not include de minimis soil movement incidental to activities which do not or would not have such an effect.”
Id.