*1102 Opinion
Thе County of Marin (the County) approved appellant Joshua Hedlund’s construction of a house within a riparian area designated by the County as an environmental resource of critical concern. In approving the project, the County concluded that the project was categorically exempt from review under the California Environmental Quality Act (CEQA) (Pub. Resources Code, § 21050 et seq.) because it entailed construction of a single-family residence. (Cal. Code Regs., tit. 14, § 15303, subd. (a).) The County did not make express findings on the specific regulatory exception prohibiting categorical exemption for projects that “may impact on an environmental resource of . . . critical concern,” but found generally that аny adverse environmental impacts were eliminated by mitigation measures adopted as conditions for project approval. (Cal. Code Regs., tit. 14, § 15300.2, subd. (a).)
The trial court issued a writ of mandate commanding the County to set aside its approval of the project. The trial court found that the County erred in relying upon mitigation measures to grant a categorical exemption from CEQA. We affirm the lower court’s order. Only those projects having no significant effect on the environment are categorically exempt from CEQA review. (Pub. Resources Code, §§ 21080, subd. (b)(9), 21084, subd. (a).) If a project may have a significant effect on the environment, CEQA review must occur and only then are mitigation measures relevant.
(Azusa Land Reclamation Co. v. Main San Gabriel Basin Watermaster
(1997)
FACTS
The County general plan governing land use recognizes riparian systems as “irreplaceable” and valuable for water quality, fish and wildlife, recreation, aesthetics, erosion control, and human health. To protect ripаrian systems, the general plan designates natural watercourses and adjacent riparian habitat as stream conservation areas. Protective polices for stream conservation areas are implemented through the County’s permit review process and adoption of specific ordinances.
One such ordinance requires discretionary review of any development adjacent to anadromous fish streams, even construction of single-family *1103 homes. Anadromous fish, like salmon, migrate upriver from the sea to breed in fresh water. In adopting the ordinance, the County Board of Supervisors found that a discretionary permit process was necessary to protect riparian habitats and their threаtened coho salmon and steelhead trout populations from unconstrained development. The ordinance was in response to studies finding that there were approximately 160 undeveloped riparian lots that were conventionally zoned and thus capable of receiving ministerial building permits without review to ensure environmental protection. Almost all of these undeveloped riparian lots are in the San Gerónimo Valley, where the majority of the County’s coho salmon and stealhead trout spawn. Appellant Hedlund’s property is one of these undeveloped lots along San Gerónimo Creek, and it was his request for a building permit that prompted a County agency to initiate the zoning amendment that now mandates discretionary review of development in sensitive riparian areas.
In June 2002, Hedlund submitted a design review application to the County for permission to build a four-bedroom house of 3,649 square feet, with a garage of 768 square feet, on a 7.26-acre parcel abutting San Gerónimo Creek and within a designated stream conservation area. The house would be within 40 feet of the creek’s bank, and the creek setback for the parking area would be just 20 feet. Respondents Salmon Protection and Watershed Network (SPAWN) and Tómales Bay Association (collectively, SPAWN), among others, objected to the proposed development.
The County Community Development Agency (CDA) approved the project in October 2002, subject to conditions meant to minimize “adverse physical effects on the natural environment.” The conditions included detailed construction limitations and incorporation of a riparian protection plan prepared by an engineering firm. The riparian protection plan acknowledged that runoff from new rooftops and driveways can erode stream banks, and proposed drainage features for erosion and sediment control. The CDA concluded that the project was categorically exempt from CEQA because it entailed construction of a single-family residence with no potentially significant impacts on the environment.
In March 2003, the County Planning Commission likewise approved the project, over SPAWN’S оbjections, after imposing additional mitigation measures. The Planning Commission found that the project “as conditioned incorporates numerous provisions reducing to insignificance the possibility that the project would harm coho salmon or steelhead trout.” SPAWN appealed the project approval to the County Board of Supervisors, which rejeсted *1104 the appeal in April 2003. The Board of Supervisors affirmed the project’s exemption from CEQA as a single-family residence without adverse environmental impacts. The board observed that one constraint upon development of the site was potential “adverse impacts on the habitat of threatened or endangered species,” but found that “[рjossible disharmonies with the creek have been adequately addressed” by the riparian protection plan and other conditions of approval. The board found that the project, as conditioned and mitigated, would not have significant adverse environmental effects.
On May 7, 2003, SPAWN filed a petition for a writ of mandate to compel the County to set aside its approval of the Hedlund project. SPAWN alleged, among other things, that environmentаl review of the project was required under CEQA. The trial court denied SPAWN’S request for a preliminary injunction to stop construction, and SPAWN petitioned this Court to reverse the trial court’s order.
On October 9, 2003, we denied SPAWN’S writ petition but directed the trial court’s attention to two issues for its consideration at the hearing on the merits. We observed that the Hedlund project appеars to be in a County-designated area of “critical concern,” thus implicating an exception to categorical exemption from CEQA. (Cal. Code Regs., tit. 14, § 15300.2, subd. (a).) We also questioned whether the categorical exemption finding, which considered potential environmental impacts, was made without reference to proposed mitigation measures. (Azusa, supra, 52 Cal.App.4th at pp. 1199-1201.)
Following a hearing on the merits, the trial court granted SPAWN’S petition for a writ of mandate and issued an order commanding the County to set aside its approval of the Hedlund project. The court found that the County “erred procedurally and substantively” in finding the project categorically exempt from CEQA review. The project was within a stream conservation area and had the potential to impact a County-designated environmental resource of critical concern, thus disentitling the project to CEQA exemption. (Cal. Code Regs., tit. 14, § 15300.2, subd. (a).) The County erred, the trial court concluded, in finding that Hedlund was nevertheless entitled to a categorical exemption because the project’s adverse impacts could be mitigated. The trial court noted that eligibility for a categorical exemption must be determined without reference to mitigation measures. (Azusa, supra, 52 Cal.App.4th at pp. 1199-1200.) Hedlund appealed the trial court’s order.
*1105 DISCUSSION
A. CEQA requirements.
“CEQA is a comprehensive scheme designed to provide long-term protection to the environment,” and must be “interpreted ‘to afford the fullest possible protection to the environment within the reasonable scope of the statutory language.’ ”
(Mountain Lion Foundation v. Fish & Game Com.
(1997)
Certain “classes of projects are ‘categorically exempt’ from CEQA pursuant to administrative regulation because they do not have a significant effect on the environment.” (Mountain Lion Foundation v. Fish & Game Com., supra, 16 Cal.4th at pp. 112-113; Pub. Resourcеs Code, §§ 21080, subd. (b)(9), 21084, subd. (a).) Single-family homes are categorically exempt from CEQA. (Cal. Code Regs., tit. 14, § 15303, subd. (a).)
Categorical exemptions, however, are subject to important exceptions based on factors such as location, cumulative impact, or unusual circumstances. (Cal. Code Regs., tit. 14, § 15300.2.) A categorically exempt project, like a single-family residence, loses its exempt status “where the project may impact on an environmental resource of . . . critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies.” (Cal. Code Regs., tit. 14, § 15300.2, subd. (a).) A CEQA exemption is also inapplicable “when the cumulative impact of sucсessive projects of the same type in the same place, over time is significant.” (Cal. Code Regs., tit. 14, § 15300.2, subd. (b).) Nor may a categorical exemption “be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances.” (Cal. Code Regs., tit. 14, § 15300.2, subd. (c).)
*1106
“An agency should decide whether a рroject is eligible for a categorical exemption as part of its preliminary review of the project” without reference to or reliance upon any proposed mitigation measures.
(Azusa, supra,
52 Cal.App.4th at pp. 1199-1200.) “ ‘In categorical exemption cases, where the agency establishes that the project is within an exempt class, the burden shifts tо the party challenging the exemption to show that the project is not exempt because it falls within one of the exceptions’ ” listed in the regulatory guidelines.
(Fairbank
v.
City of Mill Valley
(1999)
B. The County erred in finding the Hedlund project categorically exempt from CEQA.
Single-family homes are categorically exempt from CEQA, except (1) when they “may impact on an environmental resource of . . . critical concern”; (2) “when the cumulative impact of successive projects of the same type in the same place, over time is significant”; or (3) “where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances.” (Cal. Code Regs., tit. 14, § 15300.2, subds. (a)-(c).) SPAWN maintains that all of these exceptions аpply here.
The County did not expressly address these regulatory exceptions but did make a general finding that the project was exempt from CEQA “because the construction of one single-family residence on a legal lot would not create adverse environmental impacts,” and also found “no reasonable possibility of any significant impacts.” The County’s еxemption finding is contrary to the evidence. The first exception to CEQA exemptions, where a project “may impact on an environmental resource of . . . critical concern” is the dispositive regulation here. (Cal. Code Regs., tit. 14, § 15300.2, subd. (a).) It is undisputed that the project site is adjacent to a protected anadromous fish stream and within a stream conservation area. The County itself conceded in the lower court that the project is within an area of “critical concern” of its own designation. (Cal. Code Regs., tit. 14, § 15300.2, subd. (a).) The relevant issue is thus reduced to whether the project “may impact” on that environmental resource of critical concern.
Appellant Hedlund claims there is no potential for an adverse environmental impact, but the County’s own findings prove otherwise. The County Board of Supervisors remarked that one constraint on development of the project site was the possible “adverse impacts on the habitat of threatened or endangered species,” and also found “[pjossible disharmonies with the *1107 creek.” Even Hedlund’s own engineering consultаnt acknowledged, in a riparian protection plan submitted to the County, that runoff from new rooftops and driveways can erode stream banks, and proposed extensive drainage features for erosion and sediment control. The board’s ultimate conclusion that the project would not result in adverse effects was expressly founded on “dozens of conditions that have been applied to enhance mitigations and reduce to a minimum the possibility of any adverse environmental impacts.”
As the trial court properly found, the County erred in relying upon mitigation measures to grant a categorical exemption from CEQA. Only those projects having no significant effect on the environment are categorically exempt from CEQA review. (Pub. Resources Code, §§ 21080, subd. (b)(9), 21084, subd. (a).) “[A]n activity that may have a significant effect on the environment cannot be categorically exempt.”
(Mountain Lion Foundation v. Fish & Game Com., supra,
In Azusa, an agency authorized the continued disposal of municipal waste at a landfill and declared the project exempt from CEQA as the operation or minor alteration of an existing facility. (Azusa, supra, 52 Cal.App.4th at pp. 1176, 1193.) The trial court reversed the agency’s determination and concluded that CEQA applied because the project would have a significant effect on the environment. (Id. at p. 1176.) The appellate court agreed that the significant effect exception precluded categorical exemption from CEQA. (Id. at pp. 1197-1201.)
In granting the categorical exemption, the agency in
Azusa
had acknowledged that pollutants were leaking from the landfill but had relied upon evidence that mitigation measures could prevent further pollution.
(Azusa, supra,
*1108
As the
Azusa
court observed, there are sound reasons for precluding reliance upon mitigation measures at the preliminary stagе of determining eligibility for a categorical exemption. Regulatory guidelines dealing with the environmental review process under CEQA “contain elaborate standards—as well as significant procedural requirements—for determining whether proposed mitigation will adequately protect the environment and hence make an EIR unnecessary; in sharp contrast, the Guidelines governing preliminary review do not contain any requirements that expressly deal with the evaluation of mitigation measures.”
(Azusa, supra,
Appellant Hedlund argues that Azusa does not preclude an agency from relying upon proposed mitigation measures in deciding whether a project is eligible for a categorical exemption, provided that the mitigation measures, like his riparian protection plan, are included in the initial project application. The argument is untenable. The determination of whether a project may impact a designated environmental resource must be made without reference to or reliance upon any proposed mitigation measures (Azusa, supra, 52 Cal.App.4th at pp. 1199-1200.) Reliance upon mitigation measures (whether included in the application or later adopted) involves an evaluаtive process of assessing those mitigation measures and weighing them against potential environmental impacts, and that process must be conducted under established CEQA standards and procedures for EIR’s or negative declarations.
The County made a premature and unauthorized environmental evaluation at the preliminary stage of considering eligibility for a сategorical exemption. The County Board of Supervisors’s findings that the Hedlund project had possible “adverse impacts on the habitat of threatened or endangered species,” and created “[pjossible disharmonies with the creek” disqualified the project for a categorical exemption. The possibility of impacts on a County-designated rеsource of critical concern necessitates review under CEQA, at which time mitigation measures may be considered in evaluating the actual environmental impact of the project.
*1109 DISPOSITION
The order is affirmed.
Kay, P. 1, and Rivera, J., concurred.