Tighter environmental regulations at times force businesses to try new methods and technologies to meet more stringent requirements. In this case, one of those technologies failed- — ceramic tubes made by Saint-Gobain Industrial Ceramics Inc. The tubes were used by Wellons, Inc. in high temperature heat exchanges, part of a new system to dry wood chips. In the ensuing litigation, Wellons was awarded some but not all of what it sought. Saint-Gobain, in turn, objects to the amount of Wellons’ prejudgment interest award. Consequently, we examine Massachusetts commercial law, particularly as to awards of prejudgment interest. We affirm the denial of Wellons’ claim for relief under Mass. Gen. Laws ch. 93A and reverse and remand on the prejudgment interest award.
I.
On November 14, 1997, Saint-Gobain filed for declaratory relief that it was not liable under warranties it provided in the contract selling the tubes to Wellons. Saint-Gobain claimed that the breakage was not caused by a defect in the tubes and that, in any event, Wellons had failed to make a demand for repair or replacement as required by the warranty. Wel-lons filed a counterclaim for breach of warranty and revocation of acceptance, seeking as damages over $1.9 million, the full purchase price of the ceramic tubes.
At trial, the jury returned a verdict in favor of Wellons on its warranty claim, finding that the limited repair and replacement remedy agreed to by the parties in the contract failed to fulfill its essential purpose. The jury awarded Wellons $650,000 in damages, not the full purchase price. The jury also ruled against Wellons on its revocation of acceptance claim. The district court denied Wellons’ claim that Saint-Gobain had violated Chapter 93A of the Massachusetts Consumer and Business *67 Protection Act, Mass. Gen. Laws ch. 93A, §§ 2, 11. The district court also awarded Wellons prejudgment interest from December 31, 1995, the date by which the parties agreed delivery of all the tubes was complete.
SainN-Gobain appealed the district court’s prejudgment interest award on the ground that such interest should be awarded from December 8, 1997, the date Wel-lons filed its claim, since the date of breach had not been found by the jury as required by statute. Wellons cross-appealed from the denial of its Chapter 93A claim.
II.
We describe the facts as found by the district court or as agreed to by the parties. Wellons is an Oregon-based company that designs and builds energy and drying systems for the forest products industry. In late 1992, in response to air emissions regulations, Wellons developed a new system for drying wood chips, which used high temperature air heaters, known as heat exchangers. Wellons contracted with Georgia-Pacific Corp. to build the energy and drying systems of two large prototype facilities that would manufacture a kind of building panel called oriented strand board. One facility was located in Mt. Hope, West Virginia, and the other in Brookneal, Virginia. Wellons agreed to supply heat exchangers as part of these systems.
Around April 1993, Mark Chenard, an engineer for Wellons, approached Kevin Coston, a senior applications engineer for Saint-Gobain, a ceramics manufacturer based in Worcester, Massachusetts. Che-nard asked Coston about the use of ceramic tubes for the heat exchangers Wellons had agreed to design. Chenard told Co-ston and other Saint-Gobain engineers that the ceramic tubes would be exposed to combustion gases with an operating range of temperatures between 1600 degrees Fahrenheit at the inlet to 1430 degrees Fahrenheit at the exit of the tube bank. He also said that the system would have an abort device to prevent temperatures from exceeding 1800 degrees.
Saint-Gobain initially recommended its silicon carbide product, CRYSTAR. Che-nard told Coston that CRYSTAR was too expensive and would put Wellons over-budget. Chenard asked, instead, about a less expensive product. Coston, after investigation, told Chenard about a nitride-bonded silicon carbide product known as ADVANCER that was typically used in roll form in roller hearth kiln applications. He cautioned that ADVANCER had not been previously used for heat exchanger tubes and that ADVANCER was more porous than CRYSTAR, making AD-VANCER more susceptible to oxidation. But Coston also suggested that refiring ADVANCER might result in improved resistance to oxidation. Ultimately, the heat exchanger design called for CRYSTAR tubes to be installed in the two rows of the heat exchangers where the highest temperatures were expected and for ADVANCER tubes to be installed in the remaining twenty-six rows. There were additional issues before the parties actually contracted for the purchase and sale of the tubes.
Because oxidation was a concern, that topic was discussed in July 1993 among Saint-Gobain, Wellons, and Georgia-Pacific representatives. Coston had provided Chenard with SainN-Gobain technical literature about oxidation of silicon carbide materials like CRYSTAR at temperature ranges between 1560 degrees Fahrenheit and 2010 degrees Fahrenheit, but not with any such literature about oxidation of nitride-bonded silicon carbide materials like ADVANCER or refired ADVANCER.
*68 SainG-Gobain wanted to perform additional tests on the tube materials, and at the July 1993 meetings it was agreed that sample tubes would be inserted in the ductwork at an existing Georgia-Pacific plant in Skippers, Virginia. The energy system had been installed by Wellons but did not employ the same heat exchanger technology contemplated for the Mt. Hope and Brookneal facilities. Saint-Gobain was told that the conditions in the ducts at Skippers were equivalent to or more severe than what could be expected at the Mt. Hope and Brookneal facilities. The first stage of testing at Skippers was concluded in late 1993, and the tubes, after removal, showed no visible signs of deterioration (although Wellons asserts that they did show alkali metal deposits, i.e., sodium and potassium compounds).
Georgia-Pacific and Wellons also made their own investigation of the proposed use of ADVANCER in the system, hiring Dr. Charles E. Semler, a former university professor and past president of the American Ceramics Society. Dr. Semler’s report dated February 18, 1994, indicated satisfaction with the tube material selections for the normal anticipated operating temperatures, but warned that the tubes could fail if exposed to temperatures above the normal expected range (1080-1300 degrees Fahrenheit air temperatures and 1430-1600 degrees Fahrenheit exhaust gas temperatures), especially as the temperatures approached 1800 degrees Fahrenheit, or if exposed to rapid decreases of temperature caused by exposure to ambient air while the tubes were still hot (also known as thermal shocking).
On March 10 and 21, 1994, Wellons issued purchase orders to SainWGobain for ceramic tubes to be installed in the Mt. Hope and Brookneal facilities. The purchase orders included warranties proposed by Saint-Gobain and specifically negotiated by the parties. Saint-Gobain warranted that the ceramic tubes would operate without failure for a period of one year from the date of Georgia-Pacific’s acceptance of the tubes or eighteen months from the date of completed installation, whichever was sooner. The warranty provided that in the event of breach Saint-Gobain’s sole obligation was to replace the tubes. However, the warranty also provided that Saint-Gobain would not be responsible for total or partial failure resulting from occurrences such as improper operation, operating conditions beyond those for which the plant was designed, acts of god, etc. Saint-Gobain also reserved the right to review operating data and/or employ the services of an expert third party to determine whether proper operating procedures were followed during the warranty period and to be given the opportunity to make any repairs or replacement it deemed reasonable and appropriate to meet the terms of the warranty-
The Mt. Hope facility began operation in July 1995 and the Brookneal facility in December 1995. At a meeting on February 29, 1996, Georgia-Pacific representatives informed Chenard and James Lash-brook, a Senior Applications Engineer for SainWGobain, that increasing incidents of breakage of ADVANCER tubes had occurred: broken pieces of the tubes, cracked and with holes, were showing up in the ash hoppers at both sites. In the Spring of 1996, the ceramic tubes began to fail in substantial numbers. By June of 1996, SainWGobain recognized that a tide of failures had occurred.
From March until early June 1996, Saint-Gobain employees visited the facilities, inspected the heat exchangers and failed tubes, interviewed Georgia-Pacific employees about operating conditions and any unusual occurrences, and took tube *69 samples back to Worcester for analysis. Saint-Gobain’s laboratories reported inconclusive results as to the causes of the failure of the tubes. Its marketing manager informed Chenard that SainNGobain still did not know what was causing the tubes to fail.
There was conflicting expert testimony as to the causes of failure. Wellons’ expert witness opined that sodium and potassium compounds in the combustion gases oxidized the material. In contrast, Sainri-Gobain’s expert witness found the cracking patterns in the tubes to be consistent with thermal shocking and the cris-tobalite levels to be consistent with exposure to temperatures in excess of 1800 degrees Fahrenheit — the anticipated top potential temperature of the systems.
On June 26, 1996, Chenard informed Saint-Gobain that all the ceramic tubes in the units at Mt. Hope and Brookneal would be replaced with metal tubes and demanded a refund to Wellons of more than $1.9 million, the full purchase price of the tubes. Removal of the tubes began later that year.
III.
Saint-Gobain appeals the district court’s decision to award Wellons prejudgment interest from December 31, 1995, the date by which delivery of all the tubes was complete. Wellons cross-appeals the dismissal of its claim of unfair or deceptive business practices under Mass. Gen. Laws ch. 93A.
A. Prejudgment Interest Under Mass. Gen. Laivs ch. 2S1, § 6C
The district court awarded Wellons prejudgment interest from the date of delivery of the tubes (December 31, 1995), which the district court equated with' the date of breach of warranty, rather than from the date Wellons filed its claims in this action (December 8,1997). We review the district court’s legal conclusions de novo.
See, e.g., Industrial Gen. Corp. v. Sequoia Pac. Sys. Corp.,
The district court applied the Massachusetts prejudgment interest statute, Mass. Gen. Laws ch. 231, § 6C, 1 which provides that
In all actions based on contractual obligations, upon a verdict, finding or order for judgment for pecuniary damages, interest shall be added by the clerk of the court to the amount of damages, at the contract rate, if established, or at the rate of twelve per cent per annum, from the date of the breach or demand. If the date of the breach or demand is not established, interest shall be added by the clerk of the court, at such contractual rate, or at the rate of twelve per cent per annum from the date of the commencement of the action....
Mass. Gen. Laws ch. 231, § 6C. The statute requires that where the date of the breach or demand “is not established” prejudgment interest must be awarded from the date the claim was filed. Here, Wel-lons never sought a jury determination on the date of breach. The district court concluded, however, that “the date of breach can be established from the undisputed facts.”
Saint-Gobain Indus. Ceramics Inc. v. Wellons, Inc.,
SainWGobain argues that the district court erred because the Massachusetts Supreme Judicial Court’s decision in
Deerskin Trading Post, Inc. v. Spencer Press, Inc.,
In
Deerskin,
the SJC affirmed an award of prejudgment interest to Spencer Press on its counterclaim from the date that the counterclaim was filed since the date of breach or demand had not been established at trial.
Id.
The SJC held that establishing the date of breach or demand “is a determination for the trier of fact, and, where trial has proceeded before a jury, neither the judge nor an appellate court can make such a determination.”
Id.
The SJC concluded that there had been no finding as to the date of breach or demand, nor had Spencer Press objected to the judge’s failure to instruct the jury to so find.
Id.; see also Karen Constr. Co. v. Lizotte,
Wellons argues that here, in contrast to
Deerskin
where the date of demand seemed to be in dispute,
see
In
Deerskin,
the SJC established a bright-line rule mandating an award of prejudgment interest under the statute from the date of commencement of the action where “the demand of breach or demand is
not established.”
While Massachusetts may one day choose to adopt the U.C.C. rule that the date of breach of warranty is the date of delivery of the goods for purposes of awarding prejudgment interest under section 6C, it has yet to do so. And we, as a federal court, will not depart from Deerskin to craft such a new rule, 3 a decision that involves competing policy considerations better left to the state. We outline some of those competing considerations.
Section 2-725(2) of the U.C.C. provides in relevant part that “[a] breach of warranty occurs when tender of delivery is made, except that where a warranty explicitly extends to future performance of the goods and discovery of the breach must await the time of such performance the cause of action accrues when the breach is or should have been discovered.” U.C.C. § 2-725(2); Mass. Gen. Laws ch. 106, § 2-725(2) (adopting U.C.C. § 2-725(2)). Assuming arguendo that the section applies, this provision describes when a breach of warranty claim accrues for statute of limitations purposes.
See Wilson v. Hammer
Holdings,
Inc.,
Furthermore, making the date of delivery the date of breach for prejudgment interest purposes would, at least in some instances, contravene section 6C’s intent to avoid windfalls to plaintiffs to the extent they have not actually incurred a loss. In
Sterilite Corp. v. Continental Cas. Co.,
The district court relied on the pre-
Deerskin
decision in
United California Bank v. Eastern Mountain Sports, Inc.,
The district court erred in awarding Wellons prejudgment interest from the date of delivery (December 31, 1995), and prejudgment interest should be awarded from the date Wellons filed its counterclaim (December 8,1997).
B. Chapter 9SA Claim
Wellons appeals the district court’s determination that Saint-Gobain did not commit unfair or deceptive business practices under Chapter 93A. 6
*73
We review the district court’s findings of fact for clear error and its conclusions of law de novo.
See, e.g., Commercial Union Ins. Co. v. Seven Provinces Ins. Co.,
Section two of Chapter 93A makes it unlawful to engage in “[u]nfair methods of competition and unfair or deceptive acts or practices in the conduct of any trade or commerce.” Mass. Gen. Laws ch. 93A, § 2. Section 11 extends section 2’s general protection to commercial parties.
Id.
ch. 93A, § 11. “The objectionable conduct must attain a level of rascality that would raise an eyebrow of someone inured to the rough and tumble world of commerce.”
Cambridge Plating Co. v. Napco, Inc.,
A breach of warranty alone does not necessarily give rise to a Chapter 93A violation. “Rather, the question of liability under [Chapter 93A], when a breach of warranty is alleged to be an unfair or deceptive act, must be resolved by reference to general principles of liability under § 11 [of Chapter 93A], which are discussed in [Massachusetts case law].”
Knapp Shoes, Inc. v. Sylvania Shoe Mfg. Corp.,
The district court concluded that Saint-Gobain had not violated Chapter 93A, notwithstanding the jury’s breach of warranty determination. The district court acknowledged that Massachusetts courts have found inducement to purchase goods of “dubious reliability for the intended purpose” a violation of Chapter 93A,
VMark,
Wellons now argues that SainWGobain twice violated Chapter 93A: first, by inducing Wellons to buy a product about which SainNGobain had grave doubts by concealing those doubts and by giving a performance warranty; and second, by repudiating the limited relief it had promised to give if and when the product failed, instead “stringing Wellons along” until Wellons’ customer demanded removal of all ceramic tubes, requiring Wellons to incur the cost of replacement and forcing Wellons into court for any recovery. Wel-lons’ main argument is that even if the district court was correct in all of its factual findings, 7 those findings compel a conclusion that Saint-Gobain violated Chapter 93A.
1. Concealment of Doubts about Refired ADVANCER
Wellons argues that the Massachusetts Appeals Court’s decision in
VMark, supra,
requires, based on the existence of ten elements, a finding of Chapter 93A liability here. We have carefully reviewed these arguments and reject them. This case is factually distinguishable from
VMark.
There, VMark had, inter alia, failed to mention past problems with the software it was licensing to EMC when that software was used with the particular hardware contemplated by EMC.
See
Here, in contrast to
VMark,
Saint-Gobain never made glowing or unqualified recommendations about the ability of the tubes to perform in the prototype facilities. Uncertainties — which Saint-Gobain raised at the outset — were openly discussed and were well-known to Wellons and to Georgia-Pacific. Saint-Gobain told Wellons from the beginning that refired ADVANCER had not previously been used for heat exchangers, let alone the type anticipated at the Mt. Hope and Brookneal facilities.
Cf Underwood v. Risman,
Wellons also stresses Saint-Gobain’s refusal to acknowledge concerns raised by Dr. Semler about ADVANCER’S ability to survive in a wood-combustion atmosphere containing alkali metals at the predicted temperatures, particularly after the tested tubes showed alkali metal deposits. Unfortunately, the district court did not make any findings on this issue. This court, viewing the record in the light most favorable to the ruling,
see Arthur D. Little,
2. Replacement of the Tubes Upon Failure
We also reject Wellons’ argument that Saint-Gobain violated Chapter 93A by repudiating its promise to replace the tubes when they failed and instead “stringing Wellons along” until Georgia-Pacific demanded removal of all ceramic tubes. The facts amply support the district court’s contrary conclusion. The record reflects the existence of a legitimate dispute about what caused the tubes to fail. The jury’s verdict that Saint-Gobain was responsible for their failure — a verdict reached after weighing a great deal of technical evidence, including conflicting testimony from expert witnesses for each side — neither establishes the absence of a legitimate dispute nor dictates an independent finding of Chapter 93A liability.
See Knapp,
This was not a case where the seller continued to withhold material information after the buyer was experiencing serious problems with the product it had purchased.
Cf. Cambridge Plating,
Wellons also argues that SaintGobain’s offer to sell a test batch of CRYSTAR at a discounted price was extortionate. The district court made no finding as to this offer or its implications, and so again we view the record in the light most favorable to the ruling. We conclude that Saint-Gobain’s offer reflected an attempt to reach some agreement in light of the situation and of Saint-Gobain’s rights under the contract. That is not extortion. 10
IV.
We vacate the district court’s decision to award prejudgment interest to Wellons as of December 31, 1995, and remand for entry of an amended judgment awarding Wellons prejudgment interest as of December 8, 1997, and affirm the district court’s dismissal of Wellons’ Chapter 93A claim.
So ordered.
Notes
. In a diversity action, such as the present one, state law must be applied in determining "whether and how much pre-judgment interest should be awarded.”
Fratus v. Republic Western Ins. Co.,
. Wellons argues that Saint-Gobain admitted the date of breach in its pleadings to the district court, and should be held to that admission under the principles and policies governing the Federal Rules of Civil Procedure. All Saint-Gobain admitted, however, was the date of delivery; what Wellons calls Saint-Gobain's "admission” as to the date of breach could more accurately be described as Wellons' own conclusion of law, which we do not adopt.
. Wellons relies on
Liberty Mutual Ins. Co. v. Continental Cas. Co.,
.The Official Comment to U.C.C. § 2-725 states that its purpose is "[t]o introduce a uniform statute of limitations for sales contracts, thus eliminating the jurisdictional variations and providing needed relief for concerns doing business on a nationwide scale.” U.C.C. § 2-725, cmt.
. Here, awarding Wellons prejudgment interest from the date of delivery risks the type of windfall cautioned against in Sterilite. For example, it is unclear exactly when Wellons incurred the costs of replacing the ceramic tubes, though it is clear that Wellons did not incur those costs until sometime after delivery. In addition, the record does not indicate what portion of the cost of replacing the tubes was payed by Wellons and what portion was paid by Georgia-Pacific under their allocation agreement. Although Wellons claims its "loss” of the money occurred when it decided to purchase the original tubes, and not when it later paid for replacement tubes, it does not necessarily follow that this was the "loss” the jury compensated Wellons for in its damage award. Indeed, if the loss the jury had in mind was the original purchase price of over $1.9 million — the amount of damages sought by Wellons — the jury's award presumably would have reflected as much. Instead, the jury awarded Wellons $650,000, a sum much closer to the $620,000 it was estimated to have cost to replace the defective tubes.
. Wellons seeks only that this court reverse the district court's dismissal of its Chapter 93A claim and remand for determination of *73 an award of attorneys’ fees and costs under section 11 of Chapter 93A.
. Wellons says two of the district court's findings are not supported by the evidence. We disagree. Those two findings relate to the amount of time Georgia-Pacific actually waited before opening the access doors to the ceramic tube bank section, whether that time was too short, and whether such conduct could have led to thermal shocking of the tubes. Even if wrong, the findings would not alter the outcome on the Chapter 93A claim since they relate primarily to the question of Saint Gobain’s liability on the breach of warranty claim rather than to the allegations of deceptive or unfair conduct under Chapter 93A.
. The first stage of those tests — tests Saint-Gobain was told involved conditions that were not identical to but that were equivalent to or more severe than those expected at the Mt. Hope and Brookneal facilities — revealed no signs of tube deterioration upon removal of the tubes.
. In fact, Saint-Gobain maintains that it was in the process of manufacturing replacement tubes to fill a request by Georgia-Pacific to replace failed tubes, but that the order was cancelled before it was complete, and that thereafter Wellons told Saint-Gobain that no solution involving replacement ceramic tubes — whether CRYSTAR or ADVANCER— would be accepted.
. We do not reach Saint-Gobain’s contention that its conduct did not occur "primarily” and "substantially” in Massachusetts as is required to establish Chapter 93A liability. Mass. Gen. Laws ch. 93A, § 11;
see Arthur D. Little,