Saini v. Tonju AssociatesSaini v. Tonju Associates
Order, Supreme Court, Bronx County (Louis Benza, J.), entered June 13, 2001, which denied defendant Expert Boiler Repair & Welding, Inc.’s motion for summary judgment dismissing the complaint and Loyalty’s cross claim against it, unanimously modified, on the law, and the motion granted to the extent of dismissing the complaint as against that entity, and otherwise affirmed, without costs. The Clerk is directed to enter judgment in favor of defendant Expert Boiler Repair & Welding, Inc., dismissing the complaint as against it.
On April 9, 1997, then six-year-old Gurdit Saini was scalded by water from a bathroom faucet in the apartment where he lived with his family in the building designated as 94-06 34th Avenue, Jackson Heights, New York (the building). Approximately one month prior, the owner of the building, defendant Loyalty Realty, Inc. (Loyalty), determined that the boiler in the building had to be replaced and hired defendant Expert Boiler Repair & Welding, Inc. (Expert) to do the work. On or about March 12, 1997, Expert forwarded an agreement to Loyalty which delineated the costs of installing a temporary boiler, and the trailer to house it, which was necessary to ensure that the building would continue to have heat and hot water while the old boiler was replaced. The agreement, executed by the president of Expert and subsequently agreed to by Loyalty, provides that “[a] 11 work will be performed in a neat manner and fully covered by insurance for your protection.”
Although the chronology is somewhat puzzling, there appears to be no dispute that defendant Mobil Steam Boiler Rental Corp. (Mobil), which was hired by Expert, brought a temporary boiler to the building on March 6, 1997, and housed it in a trailer outside. Mobil then isolated the existing boiler and connected the temporary unit in its place by “cutting into pipes” and directly connecting to the heat exchanger, which heats water for the residents’ use. Mobil contends that after the installation of the temporary boiler was complete, a Mobil supervisor tested the temperature of the hot water by running it over his hand in a slop sink located in the boiler room. The superintendent of the building, who was employed by Loyalty, maintains that he complained to Mobil on three separate occasions, beginning immediately after the temporary boiler was installed, that the water was too hot. There is no testimony that Expert was informed of these complaints and Expert denies any knowledge of them.
As a general rule, a principal is not liable for the acts of an independent contractor because, unlike the master-servant relationship, principals cannot control the manner in which independent contractors perform their work (Chainani v Board of Educ. of City of N.Y.,
Respondents herein primarily advance the argument that issues of fact exist as to the degree of control and the level of supervision Expert maintained over Mobil while it performed its work, and while the temporary boiler was in operation. The record, however, belies respondents’ contentions. The deposition testimony of Jeffrey Moskowitz, a principal of Mobil, clearly establishes that Mobil personnel exclusively installed and maintained the temporary steam system and there is no evidence that Expert performed any work on it at all. Respondents refer to a log book which indicates that Expert personnel were in the boiler room, on various occasions, while the temporary boiler was in operation, but the mere presence of Expert’s personnel on the premises is not, in our view, sufficient to raise an issue of fact as to whether they supervised or controlled Mobil’s work, or as to whether Expert had actual notice of the dangerous condition.
Respondents also rely on a second exception to the general rule in that they claim that the work for which Mobil was hired by Expert was inherently dangerous. In Chainani v Board of Educ. of City of N.Y. (
In this matter, the exception does not apply as the danger is not inherent in the nature of the contract work, i.e., the installation of a temporary boiler, but, rather, was the result of “ ‘more or less usual negligence’ ” (MacDonald v Heuer,
To the extent that the motion court, sub silentio, denied that branch of Expert’s motion which sought the dismissal of Loyalty’s cross claim for indemnification pursuant to their written agreement, the dismissal of that claim was unwarranted as it appears that Expert, at the very least, was required to provide insurance for Mobil’s work, or was required to ensure that Mobil provide such coverage. Concur — Williams, P.J., Nardelli, Andrias and Marlow, JJ.