Roscoe Moss Co. v. JenkinsRoscoe Moss Co. v. Jenkins
Plaintiff contracted to drill, case and test a water well for defendant upon his ranch in Santa Barbara County. According to the contract, which was in writing, it was to be drilled with a rotary outfit on a site selected by the owner and to a depth not in excess of 300 feet, the owner to have the privilege of stopping further work at or below 200, feet. Plaintiff was to furnish all labor, tools and machinery, and materials which included 100 feet of 16-inch casing and 150 feet of 12-inch casing, arc welded, and equipment necessary to install the casing properly in the well bore. The casing was to be perforated as directed by the owner and sand-pumped by the contractor after perforating. The agreement provided that, “The Contractor does not agree to find or develop water, but he does agree to drill any well called for herein in a good and workmanlike manner.” The contract price was to be $1,392.41 for drilling and reaming the bore and setting and perforating 100 feet of 16-inch and 150 feet of 12-inch casing; for any greater or lesser depth of well cased and drilled, $5.11 per foot was to be added or deducted from said price and the total amount earned was to ¡be paid on completion of the work.
The well was drilled by the rotary method at a location ¡selected by defendant, was stopped at 290 feet upon instructions of defendant, it was eased to 282 feet, the easing was perforated and the well was swabbed and sand-pumped. At -the request of defendant there were no perforations above -.the 132-foot level because defendant feared that perforations ¡above that level would draw water from a small domestic well mearby which was 140 feet deep and because it was desired to ¡avoid a stratum of fine, white sand which was above the 132-foot level; also because the owner considered that there was no water available above that level. When completed and sand-
The complaint alleged performance by plaintiff of its obligation under the contract. Defendant answered, alleging on information and belief that the well, if properly drilled, would have been capable of producing more than 1,200 gallons per minute at a pumping level of less than 50 feet “but that by reason of poor workmanship on the part of the plaintiff in drilling and working on said well, the said well failed and still fails to produce more than 600 gallons per minute at a pumping level of approximately 135 feet.” It was further denied that plaintiff drilled the well in a good or workmanlike manner and it was alleged that the failure of the well was due in part to the fact “that rotary drilling was not suited for the purpose of properly drilling said well on defendant’s land.” Defendant also filed a cross-complaint alleging, in his first cause of action, -generally, that plaintiff had failed to drill the well in a good and workmanlike manner and that by reason thereof defendant had lost a valuable lease on the property and had been damaged in the sum of $8,623.75 through loss of rental which would have been earned under the lease had the well been a successful one. In the second cause of action it was alleged that plaintiff “warranted and represented to defendant that a rotary type well was more efficient and more certain to produce a water well than any other method of drilling” and that plaintiff recommended rotary drilling and “that said failure of said well was due in part to the fact that rotary drilling was not the method of drilling suited or fitted for the purpose of properly drilling a water well on defendant’s land.” It was alleged that defendant had been damaged by breach of the warranty in the said sum of $8,623.75 through loss of the lease and rentals.
The case was tried before a jury and it was stipulated that if the verdict went for plaintiff it should be in the amount sued for. At the close of the evidence defendant abandoned the second cause of action of the cross-complaint and in reply
The sole question on the appeal is whether a verdict, had it been for defendant, would have found substantial support in the evidence. The only defense which remained for determination by the jury was that the well was not drilled in a good and workmanlike manner. There was not, as we shall show, any evidence or any permissible inference from the evidence, to sustain this defense. It will appear as we discuss the evidence that the conflicts therein on the material issue, as suggested by the defendant, do not exist and that the evidence was such that had the verdict been for defendant it would have been without support. In such a case an order granting a new trial solely on the ground of insufficiency of the evidence should be reversed. (De
la Falaise
v.
GaumontBritish P. Corp.,
(1940)
As far as we can determine from the record and from defendant’s brief it would appear.,that a new trial was granted upon an erroneous theory of procedure as to the duty of going forward with the proof. Defendant contends that the new trial was properly granted because plaintiff failed to
It was necessary, of course, for plaintiff to allege and, if it was denied, to prove ■ performance of the contract on its part. Section 457 of the Code of Civil Procedure reads as follows: “In pleading the performance of conditions precedent in a contract, it is not necessary to state the facts showing such performance, but it may be stated generally that the party duly performed all the conditions on his part, and if such allegation be controverted, the party pleading must establish, on the trial, the facts showing such performance.” Since the contract price was payable on completion of the work, performance was a condition precedent to payment and to be alleged and proved as such. We have seen that there was a general allegation of performance by plaintiff and a denial in general terms that there had been such performance, although there was an express admission that the well was drilled to a depth of 282 feet. If we treat this denial as sufficient, as the trial court did, plaintiff was required under the section to establish on the trial the facts showing such performance. It is clear from the record that plaintiff did show performance on its part. Among the witnesses for plaintiff was the man who drilled the well and whose day by day reports of the operations were placed in evidence. It appeared from his testimony and that of other witnesses that the materials were furnished as agreed and that the usual practices in the drilling of rotary water wells and in the removal of drilling mud by swabbing and sand-pumping were followed. Defendant contends that plaintiff’s proof did not go far enough and that it should have shown in detail not only each step take'n in the progress of the work but that each such step was taken and each operation of the drilling process waS done in a good and workmanlike manner. This contention, which apparently prevailed in the trial court on motion for new trial, is unsupported by any authority cited by counsel or by any rule of law which our investigation has disclosed. We are satisfied that under section 457 of the Code of Civil Procedure plaintiff was not obliged to go any further with its prOof than it did go in proving performance. The answer as well as the cross-cbm
Defendant makes the error of placing too much reliance upon the stipulation in the contract that the work would be done in a good and workmanlike manner. The error is illustrated by the argument advanced in its support. Under the contract plaintiff was required to furnish, among other things, “all required adapter rings, shoes and landing clamps to properly install above easing,” and defendant asks, “Where is there any evidence that this covenant was performed?” Defendant further says, in discussing rotary drilling, “The purpose of the rotary mud circulating under pressure down through the drill stem and up through the hole outside the drill stem is to form a mud casing in the hole as the drilling progresses.” Counsel then proceed to propound questions, saying that they could fill page after page with such questions, which only an expert could answer. These questions relate to the consistency of mud which should be used, the speed of rotation of the drill stem, how rapidly the drill stem should be dropped through different formations, how far the mud should be allowed to penetrate the surrounding formation, what pressure should be on the mud pumps, and finally they remark, “Undoubtedly there is a method of preventing excessive quantities of the rotary mud from being forced back into the water-bearing formation so far as to block it off permanently. What are those methods ? ’ ’ The contention is that
The provision in the contract that the work would be done in a good and workmanlike manner did not place the plaintiff under a duty to prove the exact procedure that was followed in each detail of the operations, except as such evidence might be required to- meet evidence produced by defendant that the work in certain specific operations failed in specific respects to meet the requirements of good workmanship.
The provision of the agreement that the work would be done in a good and workmanlike manner added nothing to plaintiff’s obligations under the contract. Plaintiff corporation was and had been for many years in the business of drilling water wells. Mr. Moss, manager of the company, testified that it drilled from 150 to 200 wells a year and that the company possibly drills more feet of water well hole than any other company in the United States. It uses both the cable tool and rotary methods. Before contracting for the well defendant negotiated with plaintiff’s superintendent, who was an experienced driller, thoroughly familiar with the use of rotary equipment. Admittedly plaintiff held itself out as a company skilled, competent and experienced in the drilling of water wells with rotary equipment. There was evidence that the superintendent recommended the drilling of a rotary well, was fairly familiar with local water conditions, and disclosed to defendant his knowledge of the work. Under these circumstances and in view of defendant’s reliance upon plaintiff’s knowledge and skill, which reliance was shown, plaintiff’s undertaking to drill the well carried with it an implied obligation to do the work in a good and workmanlike manner.
A general statement is found in
Section 457 of the Code of Civil Procedure, in placing upon a contractor the burden of proving the facts showing performance, where the allegation of performance is controverted, cannot be construed properly as requiring his proof to go so far as to negative any possible claim of breach of warranty.
Plaintiff was entitled to recover upon proof of substantial compliance with its contract.
(Bavin & Burch Co.
v.
Bard,
(1927)
It is not suggested here, nor was it suggested upon the trial, that the materials were not furnished as agreed or that they were not of first-class quality. The well was cased, pumped and tested, and in the absence of other evidence this was sufficient to prove that the materials were furnished as agreed.
Where the evidence of performance is so complete, as it was here, that it admits of no inference of a failure to perform according to contract without assuming bad faith, willful breach of duty or negligence on the part of the contractor, such evidence is sufficient to shift to the owner the duty of going forward with his proof to show that the contract has been breached. When it is shown that the work agreed to
While it appears from defendant’s brief that he places his main reliance upon the point already discussed, it is suggested rather than argued that there was a conflict in the evidence as to whether plaintiff’s work was done in a good and workmanlike manner. We find no such conflict. There was testimony that plaintiff’s superintendent McIIardie, who was not living at the time of trial, expressed the opinion to defendant that a 2,000-gallon well could be brought in from the sand and gravel encountered above the 282-foot level. On the basis of this testimony it is suggested that the work must have been defective, as Mr. McHardie’s prediction was not realized. It is argued further, although without basis in the evidence, that the rotary mud might have been negligently forced into the sand and gravel in such quantities as to shut off the supply of water. All of the evidence on the subject was to the effect that the intrusion of the mud into the formation is relative to the porosity of the formation and that
An effort was made at the trial to cast doubt upon the efficiency of plaintiff’s work by proof that other wells drilled in the vicinity, one before and one after the drilling of plaintiff’s well, were large wells, the first one of them producing 1,000 gallons a minute from a pumping level of 38 feet, and the other in excess of 2,000 gallons a minute from a depth of 75 feet. The first well, which was drilled in 1921 or 1922, was located about 1,000 feet from the well drilled by plaintiff. There was no evidence as to the depth of that well. The other one was drilled by cable tools immediately after the drilling of plaintiff’s well and defendant calls our attention to these facts from which it is suggested that an inference could properly be drawn that plaintiff’s work must have been done in a negligent or inefficient manner. But defendant does not direct our attention to the fact that there was no evidence as to the depth of the first well and that the pther well, which was called the Longwell well, was shown to have been drilled to a depth of 406 feet. Upon the trial there was much testimony relative to the latter well and the formation through which it had been drilled. An attempt was made to prove by a so-called expert tester of wells that if plaintiff’s
Great latitude was allowed defendant in proving the productive capacity of the two other wells. The unanimous verdict in plaintiff’s favor conclusively shows that the jury believed (as we do) that the capacity of a well 1,000 feet away from plaintiff’s well, of an unknown depth, and the capacity of another well drilled 250 feet away from plaintiff’s well and 124 feet deeper, was no proof at all that the failure of the well in question was due to any fault of plaintiff’s. Undoubtedly the jury saw, as we see, a convincing inconsistency in defendant’s contentions. They may well have asked themselves the question why it was considered necessary to drill a well to a depth of 406 feet with cable tools if a well drilled with cable tools to 282 feet would have produced the 2,000 gallons per minute which defendant sought. The obvious answer was, we think, that the well drilled by plaintiff should
Had the jury upon the record now before us returned its verdict in favor of defendant, we should have found it necessary to reverse the judgment for insufficiency of the evidence. It is therefore our duty to reverse the order granting a new trial.
The order granting a new trial, is reversed.
Schauer, P. J., and Bishop, J. pro tern., concurred.
Respondent’s petition for a. hearing by the Supreme Court was denied December 28,1942. Traynor, J., voted for a hearing.