ELAINE ROMINGER et al., Plaintiffs and Appellants, v. COUNTY OF COLUSA et al., Defendants and Respondents; ADAMS GROUP INC., Real Party in Interest and Respondent.
No. C073815
Third Dist.
Sept. 9, 2014.
229 Cal. App. 4th 690
Kronick, Moskovitz, Tiedemann & Girard, Jonathan P. Hobbs, Mona G. Ebrahimi and Leslie Z. Walker for Plaintiffs and Appellants.
Stoel Rives, Timothy M. Taylor, Kristen T. Castanos and Juliet H. Cho for Defendants, Respondents and Real Party in Interest.
OPINION
ROBIE, J.—In this mandamus action under the California Environmental Quality Act (CEQA;
On the Romingers’ appeal, we conclude the trial court erred in determining the proposed subdivision was not a CEQA project, even though the proposal did not include any specific plans for development. On our independent review of the Romingers’ other complaints, however, we find merit in only one. Specifically, we conclude that the Romingers adequately showed there is substantial evidence in the record that the subdivision may have a significant unmitigated impact on traffic at a particular intersection adjacent to the
FACTUAL AND PROCEDURAL BACKGROUND
The present action pertains to four adjacent parcels in Colusa County consisting of a total of just over 159 acres that are bordered by County Line Road to the south, Grevie Road to the east, the Southern Pacific Railroad right-of-way to the west, and agricultural land to the north. (We will refer to the four parcels jointly as the Adams subdivision or the project site.) County Line Road intersects Interstate 5 just to the west of the property.
In 2001, the county approved an amendment to its general plan changing the general plan‘s land use designation for the Adams subdivision from agricultural-industrial to industrial and an amendment to its zoning ordinance changing the zoning designation from exclusive agriculture to industrial. In connection with that action, the county certified a mitigated negative declaration. Gerald Rominger challenged the county‘s action under CEQA, and the parties eventually settled that lawsuit while it was on appeal, with the county agreeing to prepare, circulate, and adopt a revised initial study/mitigated negative declaration incorporating supplemental mitigation.
On May 26, 2009, real party in interest Adams Group Inc. filed an application for approval of a tentative subdivision map to divide the four existing parcels into 16 parcels ranging in size from 1.19 acres to 30.80 acres “for future expansion where separate financing may be needed.”2 At the time of the application, 93 acres were in agricultural production with the remaining 66 acres of the site occupied by agricultural-related light industrial uses and ancillary undeveloped land, including a 11.44-acre detention pond at the northeast corner of the site. The existing agricultural-related light industrial operations were accessed by a paved road extending into the site from Grevie Road.
The subdivision application indicated that no specific plan for future expansion was then available and that the intention was to continue the existing use of the property at that time. An attachment to the application described the property as “currently devoted [to] agriculture related industry,” with “a portion of said property devoted to agriculture production,” and the surrounding properties as “devoted to agriculture production with one homesite and shop to the north and Interstate 5 to the west.”
In July 2010, the county noticed a public hearing for September 13 regarding adoption of the mitigated negative declaration, following a public comment period from July 12 to August 11. During the public comment period, the Romingers submitted comments requesting that the county proceed by way of an EIR rather than a mitigated negative declaration. The Romingers contended the mitigated negative declaration was “legally deficient in a number of areas, including an inadequate project description, a failure to recognize conflicts with the County‘s General Plan, and a failure to properly analyze and mitigate for impacts to areas such as agricultural resources, traffic, odor, noise, and water supply.” Among other things, the Romingers complained that “no future use [wa]s analyzed” and “even if the exact use is yet to be determined, the County must analyze the potential impacts of the operations based on the most reasonable significant impacts. [Citation.] Since the types of permissible uses in the Industrial zoning designation have been specified in the County‘s Municipal Code, it is both reasonable and feasible for the County to analyze environmental impacts from these activities.” The Romingers further argued that the county‘s “fail[ure] to consider the environmental effect of the foreseeable future industrial use and development” would result in the improper “‘piecemeal[ing]‘” of the project.
As a result of the Romingers’ comments, the county determined that a water supply assessment was needed. Accordingly, the county cancelled the public hearing on the original mitigated negative declaration. Thereafter, in September 2010, the Romingers submitted additional comments on the proposed mitigated negative declaration, asserting that it “failed to adequately analyze air quality, odors, greenhouse gas emissions, and noise.”
A revised initial study was completed by August 2011. Like the original study, the revised initial study recommended proceeding by way of a mitigated negative declaration. The study determined that the project would potentially have significant environmental impacts on air quality, cultural resources, and hydrology/water quality, but those impacts could be mitigated to less than significant through mitigation measures.
On August 1, 2011, the county noticed a public hearing before the planning commission on the proposed revised mitigated negative declaration for
As later explained in an agenda report for the board of supervisors, the revised initial study and mitigated negative declaration “evaluate[d] the impacts of potential development that m[ight] be triggered by the subdivision[], including development to facilitate access to and drainage for the newly created parcels, and potential future development of a reasonable development scenario.” The report took the position that because “[t]he future development scenario [wa]s presented for analysis only, and [wa]s not currently proposed,” “the analysis . . . completed by the County . . . actually [wa]s not required by CEQA.” The report further explained as follows: “Based upon available building permit evidence, grading permit record, and visual evidence along the I-5 corridor, it is reasonable to expect that agriculture-related industries will develop on the project site. This projection is based on: a) existing industrial development on the project site is agriculturally related; [and] b) County Planning staff performed a records search, zoning map review, and field survey of properties along the I-5 corridor, and found that development on industrially zoned properties consists of agriculture-related industries. Although a range of non-agriculture industrial uses are permitted in the M zone, the establishment of these uses is considered unlikely due to the geographical location of Colusa County, the building permit history and pattern, the location of natural resources, and market locations. For each of these reasons, a reasonable future development scenario that assumes agriculturally-related industrial development is analyzed in the County‘s [mitigated negative declaration].”
During the public comment period, the Romingers submitted a letter that reiterated the concerns they had previously expressed, asserted defects in the notices of the public hearing and in the close of public comment period, and also detailed additional complaints about the proposed mitigated negative declaration.
Notwithstanding the Romingers’ complaints, the planning commission voted to approve the revised mitigated negative declaration for the project. The Romingers appealed that determination to the board of supervisors. The board of supervisors heard the Romingers’ appeal in February 2012. The board denied the appeal and in March 2012 adopted a resolution approving the project and the revised mitigated negative declaration.
In April 2012, the Romingers commenced the present action by filing a petition for writ of mandate asserting that the county had violated CEQA by
The trial court determined that even though the county had treated the activity as a project for purposes of CEQA by preparing a mitigated negative declaration, that did not preclude the court from determining that the project was not a project for purposes of CEQA. The court then proceeded to make that determination, as follows:
“Here, the same tract was previously the subject of a general plan revision and rezoning. At the time those actions were taken the [Romingers] brought legal action under CEQA to challenge the agency process. That prior dispute resolved by formal agreement between the parties after which time the current zoning and general plan provisions were put in place.
“Now, [the Romingers] challenge the partition of that same property on the basis that the partition will negatively impact the environment by rendering more likely the ultimate development of the tract in question. The record provides no substantial evidentiary support for such a conclusion. [The Romingers‘] position that reduced parcel size will lead to accelerated development and development of a more intensive character is sheer speculation. One could as easily posit that a larger industrial tract would be more attractive to development since industrial complexes often require substantial acreage to accommodate their purposes.
“Accordingly, this court finds that County‘s action in approving the subdivision map was not a project for CEQA purposes and that no review beyond the preliminary review stage was required.”
From the resulting judgment denying their mandamus petition in March 2013, the Romingers timely appealed.
I
The County Is Not Barred from Asserting That the Adams Subdivision Is Not a CEQA Project or Is Subject to the Commonsense Exemption from CEQA
The Romingers argue that because the county treated the Adams subdivision as a CEQA project at the administrative level—approving a mitigated negative declaration that identified potential environmental impacts—the county should be “barred” from asserting in court that the subdivision is not a CEQA project or is subject to the commonsense exemption from CEQA. We disagree because the Romingers’ argument is based on a false premise.
Although the county, in approving a mitigated negative declaration for the subdivision, acted under the provisions of CEQA, the county always took the position that what it was doing was not required by CEQA. Specifically, the board of supervisors found that “[t]he environmental analysis was conducted to provide public information about impacts that could occur if a reasonable development scenario were to be pursued,” but “[t]he analysis is informational and not required pursuant to CEQA or local statute.” Thus, it was the county‘s position that it was gratuitously conducting a CEQA analysis of the subdivision when the law did not actually require it, because the subdivision either did not qualify as a CEQA project or was subject to the commonsense exemption from CEQA. When the county‘s arguments are viewed in this light, it can be seen that the county is not arguing that what it did at the administrative level was wrong, just that it was not legally required by CEQA.3
The Romingers have offered us no persuasive reason why the county should be barred from asserting that the environmental review it conducted was more than what was legally mandated. In fact, if the county were correct on this point, it would serve no purpose for the courts to spend valuable time and resources reviewing whether a purely voluntary environmental review complied with legal provisions that did not actually mandate that review. The task of the courts under CEQA is “‘to review the agency‘s actions to determine whether the agency complied with procedures required by law.‘” (Davidon Homes v. City of San Jose (1997) 54 Cal.App.4th 106, 113 [62 Cal.Rptr.2d 612], italics added.) The county‘s argument here is that its actions
II
The Adams Subdivision Qualifies as a CEQA Project
“CEQA and its implementing administrative regulations . . . establish a three-tier process to ensure that public agencies inform their decisions with environmental considerations. [Citation.] The first tier is jurisdictional, requiring that an agency conduct a preliminary review to determine whether an activity is subject to CEQA. [Citations.] An activity that is not a ‘project’ as defined in the Public Resources Code (see
“Whether an activity constitutes a project subject to CEQA is a categorical question respecting whether the activity is of a general kind with which CEQA is concerned, without regard to whether the activity will actually have environmental impact. Thus, for CEQA‘s purposes, ‘“[p]roject” means an activity which may cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and which is any of the following: [¶] (a) An activity directly undertaken by any public agency. [¶] (b) An activity undertaken by a person which is supported, in whole or in part, through contracts, grants, subsidies, loans, or other forms of assistance from one or more public agencies. [¶] (c) An activity that involves the issuance to a person of a lease, permit, license, certificate, or other entitlement for use by one or more public agencies.’ [Citation.] Whether an activity is a project is an issue of law that can be decided on undisputed data in the record on appeal.” (Muzzy Ranch, supra, 41 Cal.4th at pp. 381–382.)
Here, the Romingers contend the trial court erred in finding the Adams subdivision was not a CEQA project. In a CEQA case, however, “we review the agency‘s action, not the trial court‘s decision.” (Muzzy Ranch, supra, 41 Cal.4th at p. 381.) Thus, the question for us is not whether the trial court erred, but rather whether the subdivision qualifies as a CEQA project as a
The Romingers contend the Adams subdivision qualifies as a CEQA project because
Subdivision (a) of
The answer to the county‘s response largely lies in the Supreme Court‘s recognition in Muzzy Ranch that “[w]hether an activity constitutes a project subject to CEQA is a categorical question respecting whether the activity is of a general kind with which CEQA is concerned, without regard to whether the activity will actually have environmental impact.” (Muzzy Ranch, supra, 41 Cal.4th at p. 381, italics added.) In essence, by enacting subdivision (a) of
Our Supreme Court‘s conclusion in Muzzy Ranch that an activity can qualify as a CEQA project because it is of the sort that may cause environmental effects but can, in turn, be exempt from CEQA because, in fact, it will not cause any such effects supports our conclusion here that whether the approval of the Adams subdivision qualifies as a CEQA project must be determined by looking at the activity categorically. Because the Legislature has determined in
III
The Commonsense Exemption Does Not Apply
“The second tier [of the CEQA process] concerns exemptions from CEQA review. The Legislature has provided that certain projects, such as ministerial projects and repairs to public service facilities of an emergency nature, are exempt. [Citations.] In addition, pursuant to the Legislature‘s command [citation], the CEQA Guidelines list categorical exemptions or ‘classes of projects’ that the resources agency has determined to be exempt per se because they do not have a significant effect on the environment. [Citations.]
Here, the county contends the Adams subdivision is exempt from CEQA under the commonsense exemption because it is “a map approval that merely establishes new parcel lines” and therefore there is an “absence of any possible effect on the environment.” We disagree.
In applying for approval of the tentative subdivision map, the Adams Group stated that its objective was to “[d]ivide [the] existing parcels into 16 separate parcels for future expansion where separate financing may be needed.” Thereafter, in response to comments by the Romingers, the county itself explained that ”[t]he purpose of the project is to separate the existing uses on the project site and create lots for lease or sale.” (Italics added.) Thus, the record establishes that the purpose of the subdivision was to make the property more amenable to development by creating smaller parcels on which it would be easier to obtain financing than the existing, larger parcels.
For the commonsense exemption to apply, the county would have to show as a factual matter, based on the evidence in the record, that there is no possibility that the approval of the Adams subdivision may result in a significant effect on the environment, i.e., that despite the subdivision of the property into smaller parcels to facilitate lease or sale, there is no possibility that purpose will be achieved and the creation of the smaller parcels will not lead to the development of those parcels and to resulting significant environmental effects. The county did not make that showing. On the record before us, it remains an eminently reasonable possibility that the creation of smaller parcels that are easier to finance will lead to development that might not otherwise occur, and to attendant significant effects on the environment. Thus, the commonsense exemption does not apply.
The County Abused Its Discretion in Failing to Provide a Full 30-day Public Review Period for the Mitigated Negative Declaration, but No Prejudice Has Been Shown
The Romingers contend the county failed to provide the mandatory 30-day public review period for the mitigated negative declaration and this failure constituted a prejudicial abuse of discretion. We agree the county failed to comply with CEQA in this regard, but we also conclude that no prejudice from the noncompliance has been shown and therefore the noncompliance provides no basis for overturning the county‘s decision.
“The public review period for a proposed negative declaration or proposed mitigated negative declaration may not be less than 20 days. If the proposed negative declaration or proposed mitigated negative declaration is submitted to the State Clearinghouse for review, the review period shall be at least 30 days . . . .” (
“A notice of intent to adopt a negative declaration or mitigated negative declaration shall specify . . . [¶] . . . [¶] (2) [t]he starting and ending dates for the review period during which the lead agency will receive comments on the proposed negative declaration or mitigated negative declaration. This shall include starting and ending dates for the review period.” (
On August 1, 2011, the county issued a notice of public hearing and intent to adopt a mitigated negative declaration for the Adams subdivision that stated the public comment period would be “from August 7, 2011 to September 5, 2011 at 5:00 p.m.” The notice was posted on a bulletin board at the Colusa County Courthouse on August 5 and published in the local newspaper on August 6. On August 4, the county issued a public notice of availability/notice of intent identifying the same public comment period. That notice was mailed to various interested parties on August 5.
The Romingers complain that the public review period the county specified in its notices was only 29 days long, not the 30 days required by CEQA, because the last day of the period—September 5, 2011—was the Labor Day holiday, and under
The county questions the authority for applying
We begin with the question of whether
Latinos Unidos involved the CEQA requirement that “[a] notice of determination [NOD] filed with the county clerk shall be available for public inspection and shall be posted within 24 hours of receipt for a period of at least 30 days.” (
It is true the statutory command at issue here (“the review period shall be at least 30 days . . . .” (
In a case like Latinos Unidos, where the time period in question runs from the performance of a specific act—i.e., posting a notice—
That does not mean, however, that the county complied with CEQA, because it remains true that the last three days of the 30-day public review period of which the county gave notice fell on the Labor Day weekend. Because the county offices were closed on those three days, the Romingers are correct that the county effectively truncated the public review period by three days. No one could have gone to the county offices on September 3, 4,
Obviously, we are not concluding that the lead agency‘s offices must be open, so that inspection may occur or comments may be submitted, each and every day of the 30-day public review period. Weekends and other holidays falling in the middle of the public review period still count toward the 30 days required. However, the end of the public review period cannot fall on a day when the lead agency‘s offices are closed without effectively making the period shorter than CEQA requires. Thus, while the counting begins with the starting date described in the notice pursuant to
The county‘s arguments that it complied with CEQA because “both notices indicating the [mitigated negative declaration] was available for review were published more than 30 days before the identified close of the comment period on September 5, 2011” and “the public review remained open through the close of the Planning Commission hearing on September 12, 2011” are to no avail because
In a CEQA case, our review extends “only to whether there was a prejudicial abuse of discretion. Abuse of discretion is established if the agency has not proceeded in a manner required by law or if the determination or decision is not supported by substantial evidence.” (
“‘Noncompliance with CEQA‘s information disclosure requirements is not per se reversible; prejudice must be shown.‘” (Sunnyvale West Neighborhood Assn. v. City of Sunnyvale City Council (2010) 190 Cal.App.4th 1351, 1384–1385 [119 Cal.Rptr.3d 481].) “[N]oncompliance with the information disclosure provisions of [CEQA] which precludes relevant information from being presented to the public agency . . . may constitute a prejudicial abuse of discretion within the meaning of
Under the foregoing authorities, the Romingers are correct in asserting that traditional “‘harmless error analysis is inapplicable‘” here. They are incorrect, however, in asserting that just “[b]ecause the County failed to comply with a mandatory requirement of CEQA, . . . ‘the error is prejudicial’ as a failure to proceed as required by law.” Saying that traditional harmless error analysis does not apply means only that the Romingers do not have to show that the county would have reached a different conclusion regarding the project if the county had provided a 30-day public review period rather than the 27-day review period actually provided. At the same time, however, it is clear that because “there is no presumption that error is prejudicial” (
On the record here, we conclude no prejudice has been shown from the truncated public review period. The Romingers point to no evidence in the record that anyone who wanted to was prevented from reviewing the pertinent documents or from submitting comments on those documents
because the last three days of the public review period coincided with the Labor Day weekend. Certainly no one appeared at the public hearing to complain that this coincidence prevented them from participating in the review and comment process. At best, the Romingers assert that they “have no idea what would have occurred had the County provided the required notice.” This necessarily means it is possible that nothing different would have occurred if the county had noticed the end of the public review period for September 6—the day after Labor Day—rather than for September 5. To conclude under these circumstances that the county‘s error justifies overturning the county‘s decision would amount to presuming prejudice, which we cannot do.
On the record before us, we conclude that the county‘s error in setting the public review period for the proposed mitigated negative declaration was not prejudicial and does not provide a basis for relief in this action.
V
The Romingers Have Failed to Show That Any Other Defects in the County‘s Notices Were Prejudicial
The Romingers contend the county‘s notices were defective because they were confusing, misleading, and contained incorrect hearing times, and these defects were prejudicial as a matter of law. We conclude that even if the county abused its discretion in any of these regards, the Romingers have failed to show prejudice and therefore are not entitled to any relief as a result of any such defects.
The notice of public hearing and intent to adopt a mitigated negative declaration for the Adams subdivision that the county issued on August 1, 2011, and that was published in the local newspaper on August 7 specified that “Colusa County Planning Commission will conduct a public hearing on September 12, 2011, at 9:00 a.m. in the Board of Supervisors Chambers in the Historic Courthouse, located at 547 Market Street, Colusa, and will make a recommendation to the Board of Supervisors.” (Boldface omitted.) The public notice of availability/notice of intent the county issued on August 4 and mailed to various interested parties on August 5 specified that the time of the hearing was 1:30 p.m. On September 6, however, the county mailed a corrected public notice of availability/notice of intent showing the time of the hearing as 9:00 a.m.
The Romingers complain that the August 1 notice was “misleading” because the planning commission did not actually make a recommendation to the board of supervisors but instead “took action to approve the [mitigated
We need not determine whether the “defects” the Romingers have purported to identify in the two notices amounted to an abuse of discretion by the county, because even if they did, we conclude the Romingers have failed to show that any such abuse of discretion was prejudicial. We have explained already that noncompliance with CEQA‘s information disclosure requirements is not presumed prejudicial. The authorities the Romingers cite for the contrary proposition are not persuasive here. Plaggmier v. City of San Jose (1980) 101 Cal.App.3d 842 [161 Cal.Rptr. 886], in which the appellate court treated an error in the direct mailing of notice as prejudicial without directly discussing the issue of prejudice (see id. at pp. 856-857), predates the enactment of
Finally, the Romingers cite Horn v. County of Ventura (1979) 24 Cal.3d 605, 617 [156 Cal.Rptr. 718, 596 P.2d 1134], which (as relevant in this case) holds only that “where, as here, prior notice of a potentially adverse decision is constitutionally required, that notice must, at a minimum, be reasonably calculated to afford affected persons the realistic opportunity to protect their interests.” The Romingers fail to show how the minor “defects” they have identified in the two notices issued here deprived any affected persons the realistic opportunity to protect their interests. The closest the Romingers come to making such a showing is their argument that “at least one member of the public ... missed the Planning Commission meeting by appearing at 1:30 p.m., when the meeting had already started at 9:00 a.m. and concluded that morning.” The evidence the Romingers cite, however, shows that this individual communicated to the board of supervisors, in advance of the hearing on the Romingers’ appeal, the information he indicated he would have presented to the planning commission. The Romingers assert that “[t]here is no way to know what impact [this individual]‘s testimony might have had on the Planning Commission or what would have occurred had the
VI
The Mitigated Negative Declaration Did Not Fail to Analyze the “Whole” of the Project
The Romingers contend that by failing to consider various reasonably foreseeable activities that could occur as a result of the development of the subdivided property, the county improperly failed to analyze the “whole” of the project. We disagree. The mitigated negative declaration analyzed the reasonable scenario that agriculturally related industrial development will occur on the subdivided property. To the extent the Romingers complain that certain specific “permitted uses“—including “food or plastic processing plants or truck terminals“—“could develop on the newly subdivided land without any environmental review” and thus the county‘s failure to analyze those particular uses amounted to a prejudicial abuse of discretion, we find no merit in that complaint. The question is whether the unanalyzed uses are a “‘reasonably foreseeable consequence‘” of the Adams subdivision and whether “‘the future ... action will be significant in that it will likely change the scope or nature of the initial project or its environmental effects.‘” (Berkeley Keep Jets Over the Bay Com. v. Board of Port Cmrs. (2001) 91 Cal.App.4th 1344, 1360 [111 Cal.Rptr.2d 598].) But the Romingers do not point to any evidence in the record that these particular uses are a reasonably foreseeable consequence of the subdivision, nor do they show how the impacts of these uses would vary significantly from the general agriculturally related industrial development the mitigated negative declaration analyzed. Under these circumstances, no impermissible piecemealing of the project has been shown.
VII
A Mitigated Negative Declaration Was Inappropriate Here Because There Is Substantial Evidence in the Record to Support a Fair Argument That the Project May Have Significant Unmitigated Impacts on Traffic
“CEQA excuses the preparation of an EIR and allows the use of a negative declaration when an initial study shows that there is no substantial evidence that the project may have a significant effect on the environment. [Citation.]
“If the initial study identifies potentially significant effects on the environment but revisions in the project plans ‘would avoid the effects or mitigate the effects to a point where clearly no significant effect on the environment would occur’ and there is no substantial evidence that the project as revised may have a significant effect on the environment, a mitigated negative declaration may be used. [Citation.] As the state Office of Planning and Research discussion following Guidelines section 15070 explains: ‘A Mitigated Negative Declaration is not intended to be a new kind of document.... [¶] [It] provides efficiencies in the process where the applicant can modify his project to avoid all potential significant effects. The applicant can avoid the time and costs involved in preparing an EIR and qualify for a Negative Declaration instead. The public is still given an opportunity to review the proposal to determine whether the changes are sufficient to eliminate the significance of the effects.‘” (San Bernardino Valley Audubon Society v. Metropolitan Water Dist. (1999) 71 Cal.App.4th 382, 389-390 [83 Cal.Rptr.2d 836].)
“‘A trial court ... reviews an agency‘s decision to adopt a negative declaration using the “fair argument” test. Under this test, the agency must prepare an EIR whenever substantial evidence in the record supports a fair argument that a proposed project may have a significant effect on the environment. [Citations.] “If such evidence is found, it cannot be overcome by substantial evidence to the contrary.“’ [Citation.] ‘“Stated another way, the question is one of law, i.e., “the sufficiency of the evidence to support a fair argument.” [Citation.] Under this standard, deference to the agency‘s determination is not appropriate and its decision not to require an EIR can be upheld only when there is no credible evidence to the contrary. ...’ Thus, the applicable standard of review appears to involve a question of law requiring a certain degree of independent review of the record, rather than the typical substantial evidence standard which usually results in great deference being given to the factual determinations of an agency.“’ [Citation.] Thus, we conduct our review independent of the trial court‘s findings.” (Baldwin v. City of Los Angeles (1999) 70 Cal.App.4th 819, 841-842 [83 Cal.Rptr.2d 178].)
A
Agriculture
In determining that the Adams subdivision will not have a significant impact on agricultural farmland, the county applied the following standard of significance:
“The loss or conversion of agricultural land within Colusa County shall be determined to be significant if the following conditions are met:
“• The land is designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance AND is designated by the Colusa County General Plan OR Colusa County Zoning Ordinance as Agricultural land.
“• The land is under an active Williamson Act Contract.”
The county explained that “[a]lthough a portion of the proposed project site is designated as Prime Farmland by the California Department of Conservation it is not designated by the Colusa County General Plan or Colusa County Zoning Ordinance for agricultural use. The County previously analyzed the impacts of designating the project site and surrounding vicinity from Exclusive Agriculture (E-A) to Industrial (M) in the Mitigated Negative Declaration prepared for the project, ‘Ratification of Amendments to the Colusa County General Plan (#00-10-1) and Zoning Ordinance. (#00-10-1)‘, State Clearinghouse #2004129037. In the previously adopted document, the County determined the impacts of redesignating the land to industrial uses as less than significant because the redesignation resulted in a loss of 0.00016 percent of the Prime Farmland in Colusa County. Additionally the proposed project site is not under an active Williamson Act Contract.” The county then concluded as follows: “Although the proposed project site is partially designated as Prime Farmland, it is not under a Williamson Act Contract, or designated by the Colusa County General Plan or Colusa County Zoning
The Romingers’ challenge to this aspect of the mitigated negative declaration has two aspects. First, they question the county‘s right to apply a standard of significance different from the standards found in the sample checklist for an initial study contained in appendix G of the Guidelines. Second, they contend the county cannot rely on its prior analysis as part of the 2004 general plan amendment and rezoning. Essentially they contend that notwithstanding the application of what they characterize as the county‘s “artificially low threshold” of significance, and notwithstanding the county‘s earlier analysis in the mitigated negative declaration for the general plan amendment and rezoning, the Adams subdivision may have a significant impact on agricultural resources because the development of the property will “likely result in the conversion of up to 113 acres of Prime Farmland to non-agricultural use.”
We begin with the Romingers’ challenge to the county‘s standard of significance. Effectively, the county‘s standard treats the loss or conversion of agricultural land within the county as significant only if the land is designated as prime farmland, unique farmland, or farmland of statewide importance and is designated by the Colusa County general plan or the Colusa County zoning ordinance as agricultural land, or the land is under an active Williamson Act (
The Romingers effectively contend that the county abused its discretion by using its own standard of significance because that standard is (in the Romingers’ eyes) inconsistent with the standard of significance on the same subject contained in appendix G of the Guidelines. “[A]ppendix G of the Guidelines, ‘Environmental Checklist Form’ ... along with appendix H ‘Environmental Information Form,’ is designed to be used as an initial study to determine if a project may have a significant effect on the environment. (See Guidelines, § 15063, subds. (a) & (f).) The checklist consists of sample questions divided into categories of potential physical impacts a project may have....” (Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal.App.4th 1099, 1110 [11 Cal.Rptr.3d 104].) The first question in the checklist under the heading “Agricultural Resources” (some capitalization omitted) asks whether the project would “Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use.”
The Romingers’ argument is flawed for several reasons. First, the Guidelines make clear that the checklist form in appendix G is “only suggested, and public agencies are free to devise their own format for an initial study.” (Guidelines, § 15063, subd. (f).) Furthermore, “CEQA grants agencies discretion to develop their own thresholds of significance (CEQA Guidelines, § 15064, subd. (d)).” (Save Cuyama Valley v. County of Santa Barbara (2013) 213 Cal.App.4th 1059, 1068 [153 Cal.Rptr.3d 534].) “To require any deviation from [the standards of significance in appendix G] to be documented and justified ... is to elevate Appendix G from a suggested threshold to the presumptive threshold. This flatly contradicts both CEQA‘s description of Appendix G as only suggested and CEQA‘s mandate that agencies have the power to devise their own thresholds.” (Save Cuyama Valley, at p. 1068.)
The Romingers try to discount Save Cuyama Valley by asserting that “[t]he question addressed in th[at] case[] was whether the EIR‘s conclusions were supported by substantial evidence, not whether there was substantial evidence of a fair argument of an impact in the context of a negative declaration.” In other words, the Romingers suggest that a lead agency‘s discretion to adopt its own standards of significance is more restricted if the agency uses its own standard “to support a decision not to prepare an EIR“—at least when application of a corresponding standard of significance from appendix G would mandate the contrary decision. But the Romingers offer no authority, or even any reasoning, supporting their assertion that the county‘s right to adopt its own standard of significance was more limited here because of the context in which the county used that standard. Absent such support, the Romingers’ assertion is unpersuasive.
Moreover, the Romingers’ argument rests on a fundamental misunderstanding of appendix G and the sample questions set forth in the checklist therein. “The person filling out the form [in appendix G] can check one of four boxes in response to each question: potentially significant impact, potentially significant unless mitigation incorporated, less than significant impact, and no
As for the Romingers’ argument that the county cannot rely on its prior analysis of this land as part of the 2004 general plan amendment and rezoning, we do not perceive that the county‘s mention of this prior analysis was material to its conclusion that the Adams subdivision would not have a significant effect on agricultural resources because applying its standard of significance as it did, the county would have found no significant effect regardless of the prior analysis.
The Romingers contend that “even if a lead agency has discretion in setting thresholds of significance, if evidence is presented tending to show an actual environmental impact, despite the adopted significan[ce] standard, the agency cannot ignore the impact.” In this regard, the Romingers are correct. (See Protect the Historic Amador Waterways v. Amador Water Agency, supra, 116 Cal.App.4th at pp. 1109-1111.) A lead agency cannot avoid finding a potentially significant effect on the environment by rotely applying standards of significance that do not address that potential effect. (See id. at p. 1111.) But the Romingers point to no evidence that that happened here. Here, the county applied a standard of significance under which the conversion of prime farmland to nonagricultural use is considered less than significant if that land has already been designated for nonagricultural use in the county‘s general plan or zoning regulations. If the Romingers could point to substantial evidence in the record that the conversion of the specific 113 acres at issue here might constitute a significant effect on the environment notwithstanding the county‘s standard of significance, then it is true that the county could not avoid its obligation to prepare an EIR by rotely relying on its standard. But the Romingers fail to point to any such evidence. Instead, in the end, the Romingers’ argument rests solely on their misapplication of appendix G and the mistaken proposition that the conversion of any prime farmland
The question here is whether, notwithstanding the county‘s application of its standard of significance regarding the conversion of prime farmland to nonagricultural use, the Romingers have raised a fair argument based on substantial evidence that the change in the use of the land at issue here may constitute a significant effect on the environment, given the evidence that the land is already zoned for industrial use and that the amount of farmland at issue is very small when viewed on a countywide basis.8 We conclude that the Romingers have not raised any such argument. Accordingly, their challenge to the agricultural resources element of the mitigated negative declaration is without merit.
B
Traffic
The initial study analyzed “potential transportation and circulation impacts resulting from ultimate development of the proposed project site” and concluded that those impacts would be less than significant. The traffic study focused on four intersections in the vicinity of the proposed subdivision, including the intersection of Old Highway 99 West and County Line Road, which lies at the southwest corner of the proposed project.
Part of the traffic analysis included “project trip generation.” As explained in the traffic impact study on which the initial study relied, “[p]roject trip generation is a process for estimating the amount of vehicular traffic the proposed project would have on the surrounding roadway networks.” The traffic impact study explained that “[t]he proposed project trip generation information was based on the proposed action information provided by the applicant regarding the tentative subdivision map and an adjusted trip generation rate based on the existing agriculture/industrial uses on the proposed project in lieu of those traditionally found in the Institute of Transportation Engineers (ITE) Trip Generation, 8th Edition.” An adjacent table showed that the proposed project trip generation rate used in the traffic analysis was 7.2 trips daily per acre, with a trip rate of .60 in the morning peak hour and a rate of .63 in the evening peak hour.
In support of comments they submitted on the initial study, the Romingers produced a letter from a traffic engineer, Daniel Smith, who asserted that the
Smith explained that “[t]rip generation for the 114+ acres of current agricultural use on the site that would presumably be redeveloped to industrial use or uses permitted in industrial zoning would be vastly greater if compiled according to the rates in Trip Generation, 8th Edition rather than those in the [initial study/mitigated negative declaration] estimates based on the purported generation of the existing agricultural support industry already on site.” Pursuant to the “authoritative publication,” “trip generation rates for the category ‘general light industry’ are roughly 10 times higher than those assumed in the ... traffic impact study on a daily basis and 15 times higher on [a morning or evening] peak hour basis. The same rough proportions, 10 times higher on a daily basis and 15 times higher on [a morning or evening] peak hour basis, [are] also indicated for the category ‘industrial park.‘”
Smith went on to explain that the greater traffic generated under the projections from the trip generation publication could potentially have a significant impact on the intersection of County Line Road and Old Highway 99 West (also known as State Highway 99 or SR 99). According to Smith, “there is a railway grade crossing immediately to the east [of the intersection]. ... Because the limits of the railroad grade crossing of County Line Road are only about 150 feet from the limits of [its] intersection with SR 99, there is only stacking space for about six passenger vehicles when the grade crossing is blocked by trains, and for even fewer vehicles when heavy trucks are in the mix, before traffic backs up into the SR 99 intersection. Because the agricultural processing facilities between SR 99 and the rail line obscure sight distance to the grade crossings for vehicles approaching northbound or
In responding to the foregoing comments, the county‘s staff and consultant asserted that “[i]t is impossible and would be inaccurate to attempt to quantify all potential future development on the project site” and that “[i]f specific development proposals are presented which are more intensive than what was analyzed in the [mitigated negative declaration] (e.g. would produce traffic trips in excess of those calculated in the [traffic impact study]) then the individual project would be subject to its own independent CEQA review, and possibly further traffic impact analysis.”
On appeal, the Romingers contend, “The record contains substantial evidence of a fair argument of unanalyzed traffic impacts in the form of the expert opinion by a qualified traffic engineer who based his conclusions on the [mitigated negative declaration] and supporting traffic study” and therefore “[t]he [mitigated negative declaration] should be set aside in favor of an EIR.” On this element of the mitigated negative declaration, we agree.
The question here, essentially, is whether Smith‘s opinion amounts to substantial evidence supporting a fair argument that the Adams subdivision may have a significant impact on the environment because of the potential impact of the project on traffic at the intersection of Old Highway 99 West and County Line Road, as detailed above. In large part, the county fails to address this question. For example, the county contends that because the landowner “did not initiate any specific development plans associated with [the] project application ..., the County properly (and in good faith) relied on the existing agricultural/industrial uses on the proposed project site to ascertain a trip generation rate.” This is the equivalent of arguing that there was substantial evidence to support the county‘s conclusion that the project would not have a significant impact on traffic in the area. In fact, the county actually goes on to expressly argue that its “assumptions regarding trip generation are supported by substantial evidence.” But that is not the issue before us. Whatever the evidence may have been that supported the county‘s conclusions, we are concerned here with whether there was substantial evidence to support a fair argument that the county was wrong and that the project may have a significant impact on traffic in the area. As we have previously suggested, we can uphold the county‘s decision not to require an EIR only if there is no credible evidence that the project may have a significant impact. (Baldwin v. City of Los Angeles, supra, 70 Cal.App.4th at p. 842.)
To the extent the county addresses the question before us, the county asserts that the Romingers’ “conjecture that a different trip generation
C
Odor
The initial study addressed potential odors from the project as follows:
“The proposed project site is located in a rural area of unincorporated Colusa County. The proposed project will [sic] consists of agricultural related industrial developments of similar nature to the existing industrial developments located within boundary of the proposed project site. The proposed uses are not expected to generate significant odorous emissions that could expose a substantial number of people to objectionable odors. Nonetheless, because the project‘s future land uses are undetermined, there is the potential that the project could cause a significant impact. If a proposed project is determined to result in potential odor problems, mitigation measures should be identified. For some projects, add-on controls or process changes, such as
carbon absorption, incineration or an engineering modification to stacks/vents, can reduce odorous emissions. “The potential for odor impacts from the project is potentially significant.”
Based on this analysis, the initial study proposed the following mitigation measure (3.3.8): “If a future project use will generate odorous emissions or is a type of operation identified in Table 2-2 of the Butte County APCD CEQA Air Quality Handbook, prior to issuance of building permits the applicant shall consult with the CCAPCD and Colusa County Environmental Health Department to determine what type of engineering controls or other odor-reduction measures can be implemented. The odor-reduction measures shall be installed in accordance with accepted engineering practice.”
As ultimately adopted by the county, mitigation measure 3.3.8 provides in full as follows: “Prior to issuance of building permits, the project applicant shall consult with the Colusa County Air Pollution Control District and the Colusa County Environmental Health Department to determine if their project operations would result in an odor source locating next to potential receptors within distances indicated in Table 2-2 of the Butte County Air Quality Management District‘s CEQA Air Quality Handbook. The CCAPCD and Colusa County Environmental Health Department shall recommend feasible odor mitigation measures, including but not limited to: add-on controls or process changes, such as carbon absorption, incineration or an engineering modification to stacks/vents that are applicable to the specific project operations. Applicable mitigation measures recommended by the CCAPCD and the Colusa County Environmental Health Department shall be installed in accordance with accepted engineering practice. Prior to issuance of final Certificate of Occupancy, the project applicant shall provide evidence demonstrating that recommendations from the CCAPCD and Colusa County Environmental Health Department have been incorporated into the project plans. Furthermore, for projects that cannot fully mitigate their impacts with odor mitigation measures as determined by the CCAPCD and Colusa County Environmental Health Department, additional environmental review shall be required.”
The Romingers contend the proposed mitigation measure contained in the initial study “is inadequate for two reasons.” First, they contend “there is no indication that the amorphous ‘engineering controls or other odor-reduction measures’ will even be available or reduce odor impacts to less-than-significant.” Second, they contend that “requiring the applicant to ‘consult’ with CCAPCD and CCEHD impermissibly defers a formulation of an actual mitigation to a future date and fails to include any meaningful performance standard.” In support of both arguments, the Romingers cite a letter from
As the Romingers recognize, the operative question here is whether the record contains substantial evidence supporting a fair argument that the Adams subdivision may have significant odor impacts notwithstanding the mitigation measure the county adopted in approving the mitigated negative declaration. With this in mind, we conclude the most significant problem with the Romingers’ arguments is that the letter from their air quality consultant on which those arguments are based is too vague to amount to substantial evidence supporting a fair argument of significant odor impacts notwithstanding the mitigation measure to which the county has committed itself. The consultant generally concludes that the installation of emissions control technology may not be sufficient to reduce the impact of the project to less than significant because “[i]n some instances, adequate emissions control technology may not be available.” The consultant does not identify what types of odors cannot be adequately mitigated with emissions control technology, nor does the consultant explain what land uses—other than “some land uses associated with agricultural production“—might occur in the Adams subdivision that could produce such odors. Absent such specifics, we are unable to conclude that substantial evidence in the record supports a fair argument that the project may result in significant odor impacts notwithstanding the adopted mitigation measure.
To the extent the Romingers complain that mitigation measure 3.3.8 is inadequate because it amounts to “[u]nenforceable, deferred mitigation,” we disagree. Contrary to the Romingers’ assertions, the mitigation measure not only requires the applicant to consult with various agencies so that the agencies can “recommend feasible odor mitigation measures,” it provides that
D
Noise
Although the Romingers’ arguments on the issue of noise appear under a heading that asserts, “The record contains substantial evidence of a fair argument of potentially significant environmental impacts,” the main thrust of their arguments on the issue of noise is actually a challenge to the adequacy of the discussion contained in the initial study that supported the mitigated negative declaration. For example, they assert that the mitigated negative declaration‘s “noise discussion“—which appears in the initial study—“is flawed because it omits the data or analysis necessary to support the conclusion that noise impacts will be less-than-significant.” In support of this assertion, they cite Citizens Assn. for Sensible Development of Bishop Area v. County of Inyo (1985) 172 Cal.App.3d 151, 171 [217 Cal.Rptr. 893], where the court stated that “although an initial study can identify environmental effects by use of a checklist [citation], it must also disclose the data or evidence upon which the person(s) conducting the study relied. Mere conclusions simply provide no vehicle for judicial review.”
What the Romingers fail to acknowledge is that this passage from Citizens was qualified by the same court in Gentry v. City of Murrieta (1995) 36 Cal.App.4th 1359, 1377-1379 [43 Cal.Rptr.2d 170]. In Gentry, the plaintiff argued that “under Citizens, an initial study must disclose sufficient evidence to support each and every one of its findings.” (Gentry, at p. 1378.) The court expressly disagreed, explaining as follows:
“In Citizens, we required an initial study to disclose the evidence upon which it is based in order to afford a basis for judicial review. However, we did not hold that the failure of an initial study to disclose the evidence supporting particular findings would necessarily be fatal to the resulting negative declaration. There is ‘no authority ... that an initial study is inadequate unless it amounts to a full-blown EIR based on expert studies of all potential environmental impacts. If this were true, the Legislature would not have provided in CEQA for negative declarations.’ [Citation.]
“‘The agency [will] not be allowed to hide behind its own failure to gather relevant data. ... CEQA places the burden of environmental investigation on government rather than the public. If the local agency has failed to study an area of possible environmental impact, a fair argument may be based on the limited facts in the record. Deficiencies in the record may actually enlarge the scope of fair argument by lending a logical plausibility to a wider range of inferences.’ [Citations.] “However, the ultimate issue is not the validity of the initial study, but rather the validity of the lead agency‘s adoption of a negative declaration. Even if the initial study fails to cite evidentiary support for its findings, ‘it remains the appellant‘s burden to demonstrate by citation to the record the existence of substantial evidence supporting a fair argument of significant environmental impact.’ [Citation.] ‘An absence of evidence in the record on a particular issue does not automatically invalidate a negative declaration. “The lack of study is hardly evidence that there will be a significant impact.” ’ ” (Gentry v. City of Murrieta, supra, 36 Cal.App.4th at pp. 1378-1379, fn. omitted.)
We have reviewed the Romingers’ noise argument with the foregoing principles in mind, and we do not find anywhere where the Romingers adequately assert that there is substantial evidence in the record to support a fair argument that the Adams subdivision may have a significant environmental impact in the area of noise. They vaguely refer to their “expert[‘s] opinion of the probable future consequences of the Project,” but they do not directly inform us what that opinion was or how that opinion supports a fair argument that the project may have a significant impact on noise levels. A page earlier, they refer to “evidence” from which the county should have concluded, based on “the noise generated by the proposed Project,” that “noise levels at the nearest residence ... would exceed the County‘s applicable daytime and nighttime maximum allowable noise standards.” This evidence may be the “expert opinion” the Romingers later refer to, but that is not clear from their brief, and it is not for us to construct a sufficient argument for them from the disparate parts of the argument they chose to put together themselves, which focuses on the asserted inadequacy of the initial study rather than on the existence of substantial evidence in the record to support a fair argument that the project may have a significant environmental impact. Accordingly, we conclude the Romingers’ challenge to the noise element of the mitigated negative declaration is without merit.
E
Air Quality
The initial study supporting the mitigated negative declaration concluded that projected construction activities for the Adams subdivision would result in estimated daily emissions of NOx (nitrogen oxides) that would be potentially significant, so mitigation measures (measures 3.3.2 and 3.3.3) were proposed to address that issue. At the same time, the initial study concluded that estimated daily emissions of ROG (reactive organic gases) and PM10 (particulate matter) would not exceed the applicable thresholds of significance.
The Romingers first take issue with the latter conclusion, contending they offered expert evidence based on different data showing that estimated daily construction emissions of ROG and PM10 would exceed the applicable thresholds of significance. We need not consider this argument in detail, however, because even if the Romingers are correct on this point, it appears the mitigation measures proposed to address the excess emission of NOx during construction (measures 3.3.2 and 3.3.3) would also cover any excess emissions of ROG and PM10.9 At the very least, the Romingers have made no attempt to point to any evidence supporting a fair argument that those mitigation measures would be insufficient to reduce potential emissions of ROG and PM10 to below the threshold of significance.
The Romingers next argue that the mitigated negative declaration “contains unenforceable and deferred mitigation for air quality impacts.” First, they take issue with a passage in the initial study that provides as follows: “[F]uture development within the proposed subdivision will comply with the [Colusa County Air Pollution Control] District‘s Rules and Regulations including the payment of an Indirect Source Review Fee (Rule 4.8).10 Development subject to the [district] permitting requirements will obtain an Authorization to Construct from the [district], which will ensure that the operation of any facility within the proposed subdivision considered a stationary source will not interfere with the attainment or maintenance of ambient air quality standards.”11 The Romingers complain that “[a]lthough worded as a feature of the Project, th[ese] requirement[s] [are] not part of the Project description, and the applicant is not required through any legally binding instrument to comply with [them]. Therefore, the requirement[s] [are]
Next, the Romingers take issue with mitigation measure 3.3.1, which provides that “[p]rior to issuance of grading permits for the project site, and at the County‘s discretion, the applicant shall prepare and submit a fugitive dust control plan for review and approval to the [district].” The Romingers complain that “[t]his mitigation measure is unenforceable because it contains no standards to ensure its adequacy. There is no mandate requiring the applicant to do anything; it is left to the County‘s ‘discretion.‘” It is true that a public agency that adopts a mitigated negative declaration must “provide that measures to mitigate or avoid significant effects on the environment are fully enforceable through permit conditions, agreements, or other measures.” (
F
Greenhouse Gas Emissions
The initial study concluded that “the project would achieve a 35 percent reduction in business-as-usual [greenhouse gas] emissions through compliance with regulatory measures.” The Romingers complain that the mitigated negative declaration is “inadequate” because it does not “quantify[] the baseline ... emissions, or compar[e] the proposed Project‘s ... emissions to the baseline ... emissions.” As we have explained already, however, the appellant‘s burden in challenging the adoption of a negative declaration is to “‘demonstrate by citation to the record the existence of substantial evidence supporting a fair argument of significant environmental impact.‘” (Gentry v. City of Murrieta, supra, 36 Cal.App.4th at p. 1379.) The Romingers fail to carry that burden here. They do not cite any evidence in the record or offer
The Romingers also complain that the mitigated negative declaration “improperly presumes that statewide mitigation measures will reduce [greenhouse gas] emissions for the Project to less-than-significant.” The Romingers acknowledge that “a condition requiring compliance with regulations is a common and reasonable mitigation measure, and may be proper where it is reasonable to expect compliance.” (Oakland Heritage Alliance v. City of Oakland (2011) 195 Cal.App.4th 884, 906 [124 Cal.Rptr.3d 755].) They assert, however, that “we have no reason to expect such compliance here, particularly in light of the fact that no Project condition requires such compliance and the [mitigated negative declaration] contains no other evidence of the County‘s proposed method to ensure such compliance.”
This argument fails in part because the “‘compliance with regulatory measures‘” on which the initial study relies is not limited to compliance by the applicant or the ultimate user of the land at issue here. As the county explains, some of the reduction in greenhouse gas emissions “will result from newly applied standards, not [from] the County or the Real Party in Interest‘s own actions.” To the extent, however, that the “regulatory compliance” at issue here is compliance by the applicant or by the ultimate land user, the Romingers offer no evidence to suggest that it would be unreasonable to expect such compliance here. Accordingly, the Romingers’ challenge to the greenhouse gas emissions element of the mitigated negative declaration is without merit.
G
Water Supply
In the area of hydrology and water quality, the initial study concluded (among other things) that, with the adoption of mitigation measures addressing “well spacing and water management best practices,” the project would not substantially deplete groundwater supplies. This conclusion was based on a water supply assessment that was appended to the initial study.
The Romingers complain that the “[w]ater supply and demand figures [in the water supply assessment] are not properly supported.” More specifically, they assert that the assessment “underestimate[s] the Project‘s potential demand by assuming the future use of the Project site will mirror the existing partially developed agricultural operations, and ignoring the reasonably foreseeable development allowed under the County‘s Code (e.g., food processing and manufacturing) as compared to existing uses.” They also complain that
Addressing the very last point first, it is important to note that the fact that only 23 acre-feet per year are currently used on the project site has no bearing on the sustainable yield of the existing wells, at least not without some evidence that the wells are being operated at or near capacity. Absent such evidence, it is reasonable to assume that the existing uses on the project site simply do not require the wells to produce all (or anywhere near all) of the water they could produce. Thus, the Romingers’ reliance on the current use of the wells is to no avail.
We also note that the water supply assessment specifically states that its conclusion that the existing wells can sustainably yield 679 acre-feet per year is “based on the results of pump test activities described in Section 2” and “[b]ased on aquifer characteristics.” The Romingers make no effort to explain why these bases are not sufficient to support the conclusion drawn.
Turning to the Romingers’ water supply arguments more broadly, we find it dispositive that, beyond complaining about supposed deficiencies in the water supply assessment, the Romingers make no effort to demonstrate that the record contains substantial evidence supporting a fair argument that the Adams subdivision may have a significant impact on groundwater supplies notwithstanding the county‘s conclusion to the contrary. Instead, they simply follow up their list of supposed deficiencies in the water supply assessment with the bald assertion that the record contains such evidence. And in support of that assertion, they cite 13 pages of the administrative record without making an attempt to explain what is contained in those pages or why it is relevant. As it turns out, those pages consist of a five-page letter from a consultant purporting to evaluate the adequacy of the county‘s groundwater analysis, along with an eight-page curriculum vitae for the consultant. And while the Romingers’ failure to explain the significance of this letter is by itself sufficient to defeat their arguments—because, as we have previously explained, it is not for us to construct a sufficient argument for them—we note that even the consultant states in his letter that his “review of the groundwater analysis is based on whether [the initial study/mitigated negative declaration] provides adequate substantial evidence to support its conclusions that groundwater resource impacts can be mitigated to less than significant
For the foregoing reasons, the Romingers have failed to carry their burden of demonstrating by citation to the record the existence of substantial evidence supporting a fair argument that the project will have a substantial impact on groundwater. Accordingly, the Romingers’ challenge to the water supply element of the mitigated negative declaration is without merit.
DISPOSITION
The judgment is reversed, and the case is remanded to the trial court with instructions to enter a new judgment granting the Romingers’ mandamus petition with respect to the traffic element of the mitigated negative declaration only, as detailed above. The parties shall bear their own costs on appeal. (
Raye, P. J., and Butz, J., concurred.
A petition for a rehearing was denied September 29, 2014.