Riley v. A Cargo of Iron Pipes

40 F. 605 | S.D.N.Y. | 1889

Brown, J.

The contract being silent on the subject of demurrage, tbe burden of proof, in order to recover for demurrage, is upon the libelant to show that the consignee is chargeable with some negligence in unloading the vessel, or that he exceeded some customary period which, by implication, is a part of the contract. A Cargo of Lumber, 23 Fed. Rep. 301; The Z. L. Adams, 26 Fed. Rep. 655; The John Cottrell, 34 Fed. Rep. 907; Railroad Ties, 38 Fed. Rep. 254. bio customary period is proved in the present case, and the testimony is conflicting as to the precise timo necessary to unload the cargo. If it was improper that more than one boat should be sent at a time to Robb’s Ferry, the libelant who took them there is as much chargeable with blame as the respondent. His own acts preclude him from claiming damages on that account. His objections to unloading at the steam-boat wharf prevent any account of the delay in going to the upper wharf. The weight of evidence is that six days were a reasonable time for unloading two boats like those in which cross-beams created some delay. There yvould remain one day’s demurrage, to which the libelant might have been entitled; but bis unreasonable conduct in interrupting the delivery for a considerable period, to the loss of the respondent, before the delivery was completed, more than balances the one day’s demurrage; so that nothing is equitably due him; and as the weight of evidence against the libelant’s testimony is that no notice of any claim or lien for demurrage was made at the time of the delivery of the cargo, nor before the commencement of this suit, some timo after, no action in rem against the cargo can be sustained. Bags of Linseed, 1 Black, 108; The Giulio, 34 Fed. Rep. 909, 912. The libel is therefore dismissed, hut without costs.

midpage