Upon the trial, the court, to aid in the construction of the contracts, admitted testimony offered by the plaintiffs, tending' to show the facts and circumstances surrounding the parties at the time the contracts were made; and also to show the practice of the parties thereunder for several years, as illustrative of the construction they mutually placed thereon. This testimony, however, was not permitted to go to the jury, but was expressly excluded from them. In our view, the contracts would receive the same construction either with or without the testimony; or, in other words, the testimony does not affect the true construction, and therefore no prejudice has resulted to either party by its admission, and the errors assigned thereon by the defendants cannot be sustained.
The Dubxxque & Sioux City railroad has its eastern terminus on the west bank of the Mississippi river, in the city of Dubuque, and extends thence westward. At Farley, a town about twenty miles west from Dubuqxxe, the Dubxxque Soxxthwestern railroad forms a junction with the Dubuque & Sioux City railroad, and runs soxxth-westei'ly therefrom. The elevator building was erected on the lands of the Dubuque & Sioux City Nail-
The original contract between the Dubuque & Sioux City Nailroad company, and the Dubuque Elevator company contains, in substance, these respective stipulations or covenants: By the railroad company: first, to lease the ground; second, to secure the elevator company in tlie .exclusive and peaceable possession of the same, so long as they abide by, and perform their covenants of the lease; third, that they will not erect a similar building; and fourth, that they will not lease to any' other party for the erection of such a building. By the elevator company: first, that they will erect an elevator building for handling all grain received by the ears of the railroad company, not otherwise consigned, and add to it as business may require; second, that they will pay five dollars yearly rent; third, that they will conduct business upon the same terms, and charge the same rates as is clone in Chicago from time i,o time; fourth, that they will, at the option of the railroad company, accept a renewal of the lease for fifteen years, or the appraised value of their building and appurtenances.
From this analysis of the contract, it is readily seen that the railroad company did not hind itself to furnish any grain whatever to the elevator company; nor did the elevator company bind itself to make provision for handling any grain except that “not otherwise consigned.” It was therefore apparent, when the supplemental contract was made, that the elevator company had a large smn invested in a building, fixtures, and appurtenances,
Four months and two days after the original contract was made, we accordingly find the parties making a supplement to their manifestly defective original contract. In view of the shortness of the time, and the magnitude of the structure, it is highly probable that the elevator had been completely ready for operation only a very short time prior to the making of the supplemental contract. By the supplement the parties respectively stipulated as follows: The elevator company: first, that they would receive and discharge all through grain, — that is, in addition to or instead of their original covenant to provide buildings, etc., for handling all grain not otherwise consigned, they now agree to provide buildings, etc., and to receive and discharge all through grain; second, that they will only charge one cent a bushel f<4? handling, nothing for storage for first ten days, one cent a bushel for the next ten or fraction thereof, and one-half eont for every additional ten days or fraction thereof. The railroad company: first, that the elevator shall have the handling of all through grain; second, that the railroad company would pay the stipulated price for handling and storage. And they mutually agree that the supplement shall continue in force as long as the original contract.
Taking this analysis, and the rule of construction, about which the opposing counsel do not differ, that the whole of the covenants or instruments shall be taken and con
So, also, as to the term quoted last above from the supplement, the grain is to be received and discharged “ for the Dubuque and Sioux City Railroad company.” It can make no difference as to whose cars the grain may be transported in, whether it is in the cars owned by that company, or by one of the railroad corporations with which it may connect or have running arrangements.
Secondly, what is meant by “ all through grain ” ? It is said that the word “ through ” may have, in this connection, three different meanings, to wit: through to the end of the line of the Dubuque and Sioux City railroad, which is simply to Dubuque; or, through Dubuque to soine other point beyond, ultimately, although consigned to Dubuque for the present; or, through Dubuque to some point beyond, by the terms of shipment. Taking the term in its most natural signification as applied to
We are now prepared to state succinctly the construction to be given to the whole contract. The plaintiffs are entitled to handle in their elevator all grain coming over defendants’ railroad, whether in its own cars or the ears of the Dubuque Southwestern railroad, or any other-connecting road, primarily shipped .for points beyond or other than Dubuque, and to have therefor the price stipulated from the defendants.
This is the construction given to the contract by the District Court, except that court held that the plaintiffs were not entitled to handle the grain coming over the road from and in the cars of the Dubuque Southwestern railroad. Thus holding, the District Court required the plaintiffs to rebate from the verdict the amount manifestly allowed by the jury for grain transported by defendants over their road in the cars of the Dubuque Southwestern railroad. The plaintiffs duly excepted to such holding and ruling, and appealed therefrom, assigning the same as error. The plaintiffs’ appeal is, therefore, sus
The court then gave to the jury its instructions upon the subject of damages, to so much of which as here follows the defendant duly excepted: “ If the plaintiffs were prepared to handle the grain, and had hands ready for that purpose, and power in operation, so that they could have handled the grain they were entitled to, without any additional cost over and above what they were at in keeping themselves in readiness to handle the same, according to contract, then the price fixed by the contract might be a fair criterion of the damages ; but, if not, then so much from such price should be deducted as would cover the actual cost of such handling bjr the plaintiffs, the balance of the price fixed, over such actual cost, being the damages.”
As above remarked, we have not all the evidence before us, and cannot, therefore, know what evidence this instruction was based - upon. There is, however, in the transcript, evidence tending to show that during the time the defendants were running the grain in controversy through, without using the elevator, they were also using the elevator for other grain not in controversy, and it also appears that the plaintiffs were at all times prepared and in readiness to pass the grain in controversy through the elevator. But, regardless of this, since we have not all the evidence before us, we would be bound, nothing appearing to the contrary, to presume that there was proper and sufficient evidence upon which to base the instruction given by the court.
Most unquestionably, the true measure of damages in this case, is the difference between the cost of handling the grain in the elevator and the price stipulated to be
There was no error, therefore, in the instructions upon the measure of damages.
As to the other instructions given and refused, they were based upon the construction given the contract as hereinbefore shown, and the errors assigned thereon have been disposed of in settling the true construction of the contract. It follows that there was no error to defendant’s prejudice, and their appeal is, therefore, not sustained.
As to plaintiff’s appeal the judgment is
Reversed.
As to defendant’s appeal, the judgment is
Affirmed.
Concurrence Opinion
— In concurring, after some hesitation and doubt, in that portion of the opinion relating to the instructions given and refused as to the rule of damages, I desire to add that I do so in view of the state of the record, and to say that I do not understand the opinion as holding that the rule therein stated would necessarily be the true rule under a different state of facts. For instance,
If, without such a notice, there shall be a distinct breach of the contract by the defendant, whether the plaintiffs may bring a distinct action for each car load of grain that they are wrongfully prevented from handling, or whether they can sue but once, and in that suit must claim damages for the entire space of time covered by the contract, is also a question not involved even incidentally in the present appeal, and upon which, as I understand, no opinion of the court is given or is to be inferred.