136 Wash. 2d 1 | Wash. | 1998
Lead Opinion
Snohomish County seeks to reinstate a decision of the Snohomish County Hearing Examiner (Examiner) in which he decided that, although Rhod-A-Zalea and 35th, Inc. (Rhod-A-Zalea) established a nonconforming use under the county’s zoning code to peat mine on the subject property, it was separately subject to provisions of the county’s building code requiring it to obtain a grading permit for its ongoing excavation and fill activities. The trial court reversed the Examiner, finding that because Rhod-A-Zalea established a nonconforming use it was not required to obtain the grading permit. The Court of Appeals agreed. We reverse and reinstate the decision of the Snohomish County Hearing Examiner.
STATEMENT OF THE CASE
Rhod-A-Zalea owns property in Snohomish County on which it has conducted peat mining activities since at least 1961. In response to a complaint regarding excessive ponding on a neighboring property, the Snohomish County Department of Community Development (County) initiated an investigation resulting in issuance of a Notice and Order to Rhod-A-Zalea. The notice charged two code violations: (a) the excavation and processing of minerals without first obtaining a conditional use permit required under Snohomish County Code (SCC) 18.32.040 (the zoning code use matrix), and (b) grading without necessary permits and
A business attempting to establish a use prohibited by the zoning ordinance must obtain a conditional use permit unless it is a valid nonconforming use. A conditional use permit allows otherwise prohibited activities based on certain restrictions. At the hearing before the Examiner, Rhod-A-Zalea presented evidence that the peat mining operation had been conducted on the subject property since a date prior to the enactment of a zoning ordinance which prohibited the use in that area. The Examiner found RhodA-Zalea had established that it was a valid nonconforming use and that a conditional use permit was not required. This ruling was not challenged on appeal.
The Examiner further ruled that Rhod-A-Zalea was subject to police power regulations including the building code provisions regulating grading contained in Title 17 SCC. Under SCC 17.04.280, no one may conduct any grading (excavating and filling) without first obtaining a grading permit, with certain exceptions. Among other things, a grading permit application must include grading plans, grading quantities, erosion and sedimentation controls, and a drainage plan. SCC 17.04.295. The code sets forth operating standards for grading activities, including slope, erosion control, ground preparation, fill material, drainage, benches and terraces, and access roads. SCC 17.04.310. Also, the code specifies steps which must be taken upon completion of activities. SCC 17.04.320. Finally, fill placed on land adjacent to or under any stream or water body must be contained so as to prevent damage to other lands. SCC 17.04.330. When determining that Rhod-A-Zalea was subject to the grading permit requirement the Examiner explained:
Such prohibition of any requirement of a general use permit does not lift the requirement of specific operational activity*5 permits, such as the grading permit in question. Similarly, building construction in the continued operation of a nonconforming use requires a building permit; a change in the use of an existing building (without changing the overall nonconforming use, such as by relocating individual operational aspects within the nonconforming use to different structures, for example changing the location of explosives storage) would require a Certificate of Occupancy under the building code; and business license requirements are not lifted by virtue of the establishment of a nonconforming use under the zoning code.
Appellant’s Br. at 190; Snohomish County’s Return to Writ of Cert. at 190.
Rhod-A-Zalea appealed the Examiner’s decision by writ of certiorari and the superior court ruled in favor of RhodA-Zalea. The court determined that Rhod-A-Zalea had a vested right to continue the peat mining operation, and since the operation by its nature involved grading, excavating, and filling, it was not subject to the County’s grading regulations, which were enacted after the mining operation began. Snohomish County appealed the superior court’s decision.
The Court of Appeals agreed with the superior court stating that requiring Rhod-A-Zalea to obtain a grading permit would allow the county to regulate “virtually every aspect of the peat mining operation . . . .” Rhod-A-Zalea & 35th, Inc. v. Snohomish County, No. 36658-1-1, slip op. at 4 (Wash. Ct. App. July 22, 1996). The court found that a nonconforming use “carries with it the right to the exercise of those accessory uses which are considered customary and incidental to the principal use.” Id. at 5. The court dismissed other authority, including a Supreme Court decision which held that nonconforming uses are subject to later-enacted police power regulation. The Court of Appeals stated that
[t]hese cases come from states which have adopted a majority position approving retroactive application of new zoning or development legislation. Washington State adopted and maintains a strong minority position in recognizing vested*6 property rights and the protection of those rights against subsequently adopted development regulations. See Mercer Enterprises, Inc. v. [City of] Bremerton, 93 Wn.2d 624, 627, 611 P.2d 1237 (1980) (retroactive effect of later zoning regulations not recognized in Washington). Here, the building code that the County seeks to apply was adopted in 1985 long after this mining operation.
Id.
Snohomish County’s motion for reconsideration was denied and it then petitioned this court for review.
DISCUSSION
It is undisputed that Rhod-A-Zalea operates a valid nonconforming use. The issue before this court is whether Rhod-A-Zalea’s nonconforming peat mining operation is subject to police power regulations subsequently enacted for the health, safety and welfare of the community. Specifically, we are asked to determine whether Rhod-A-Zalea must obtain a grading permit as required by SCC 17.04.280.
A nonconforming use is a use which lawfully existed prior to the enactment of a zoning ordinance, and which is maintained after the effective date of the ordinance, although it does not comply with the zoning restrictions applicable to the district in which it is situated. See 1 Robert M. Anderson, American Law of Zoning § 6.01 (Kenneth H. Young ed., 4th ed. 1996). The right to continue a nonconforming use despite a zoning ordinance which prohibits such a use in the area is sometimes referred to as a “protected” or “vested” right. See Van Sant v. City of Everett, 69 Wn. App. 641, 649, 849 P.2d 1276 (1993); Martin v. Beehan, 689 S.W2d 29, 31 (Ky. Ct. App. 1985); 4 Arden H. Rathkopf, The Law of Zoning and Planning § 51A.01 (Edward H. Ziegler ed., 1991). This right, however, refers only to the right not to have the use immediately terminated in the face of a zoning ordinance which prohibits the use. See 1 Anderson, American Law of Zoning § 6.01; Richard L. Settle, Washington Land Use and Environmental Law and Practice § 2.7(d) (1983).
*7 “The ultimate purpose of zoning ordinances is to confine certain classes of buildings and uses to certain localities. The continued existence of those which are nonconforming is inconsistent with that object, and it is contemplated that conditions should be reduced to conformity as completely and as speedily as possible with due regard to the special interests of those concerned, and where suppression is not feasible without working substantial injustice, that there shall be accomplished ‘the greatest possible amelioration of the offending use which justice to that use permits.’ ”
State ex rel. Miller v. Cain, 40 Wn.2d 216, 221, 242 P.2d 505 (1952).
The theory of the zoning ordinance is that the nonconforming use is detrimental to some of those public interests (health, safety, morals or welfare) which justify the invoking of the police power. Id. at 220. Although found to be detrimental to important public interests, nonconforming uses are allowed to continue based on the belief that it would be unfair and perhaps unconstitutional to require an immediate cessation of a nonconforming use. Id. at 218. A protected nonconforming status generally grants the right to continue the existing use but will not grant the right to significantly change, alter, extend, or enlarge the existing use. Id. Moreover, zoning ordinances may provide for termination of nonconforming uses by abandonment or reasonable amortization provisions. See Settle, Washington Land Use § 2.7(d).
While some states’ authority to terminate, alter, or extend nonconforming uses is expressly granted or withheld in zoning enabling acts, Washington’s enabling acts are silent regarding the regulation of nonconforming uses. See id. Instead, the state Legislature has deferred to local governments to seek solutions to the nonconforming use problem according to local circumstances. In Washington, local governments are free to preserve, limit or terminate nonconforming uses subject only to the broad limits of applicable enabling acts and the constitution. See id.
Thus, it is clear that local governments have the authority to preserve, regulate and even, within constitutional limitations, terminate nonconforming uses. Rhod-A-Zalea, however, argues that it is not subject to any police power regulations, including health and safety regulations, enacted after the existence of their facility. In particular, Rhod-A-Zalea argues that it is not subject to the grading
Rhod-A-Zalea’s argument is not supported by established land use jurisprudence and is contrary to Washington’s desired policy of phasing out nonconforming uses. Moreover, it is counterintuitive to conclude that nonconforming uses which are contrary to public interests, such as health, safety and welfare, would then be exempt from subsequently enacted public health and safety regulations.
As one commentator has explained:
[a] lawful existing nonconforming use or structure may continue to be operated by virtue of the protection afforded by statutory or ordinance provisions or by constitutional vested rights doctrines. However, this protection is limited. Nonconforming uses generally are held to be subject to later police power regulations imposed by statute or local ordinances regulating the manner or operation of use. These regulatory restrictions often take the form of licensing or special permit requirements.
Arden H. Rathkopf, The Law of Zoning and Planning § 51 A.02 (citations omitted); see also 1 Anderson, American Law of Zoning § 6.78 (“[a] nonconforming use is amenable to municipal ordinances which regulate similar uses, conforming or nonconforming.”).
Courts have consistently recognized that nonconforming uses are subject to subsequently enacted reasonable police power regulations. See Goldblatt v. Town of Hempstead, 369 U.S. 590, 82 S. Ct. 987, 8 L. Ed. 2d 130 (1962); Miller & Son Paving, Inc. v. Wrightstown Township, 42 Pa. Commw. 458, 401 A.2d 392 (1979); Watanabe v. City of Phoenix, 140 Ariz. 575, 683 P.2d 1177 (Ct. App. 1984), Dock Watch Hollow Quarry Pit, Inc. v. Township of Warren, 142 N.J. Super. 103, 361 A.2d 12 (1976). Only where the regulation would immediately terminate the nonconforming use have courts found the regulation to be invalid as applied to the nonconforming use. See Township of Orion v. Weber, 83 Mich. App. 712, 269 N.W.2d 275 (1978); Incorporated Vil
The leading case from the Supreme Court recognizing that a nonconforming use is subject to later enacted regulations is Goldblatt. Goldblatt, 369 U.S. 590. In Goldblatt, a local jurisdiction adopted an ordinance regulating dredging and pit excavations. Id. at 592. The owners of a nonconforming sand and gravel mining operation challenged the ordinance which allegedly would have involved an outlay of one million dollars. Town of Hempstead v. Goldblatt, 9 N.Y.2d 101, 172 N.E.2d 562, 565, 211 N.Y.S.2d 185 (1961). The owners argued that the regulation was not a bona fide safety measure and was instead designed to force the discontinuation of the use. Id. In a unanimous opinion, the Supreme Court found the regulation was reasonably related to the health, safety and welfare of the community and upheld the application of the ordinance to the nonconforming use even though it conceded the “ordinance completely prohibits a beneficial use to which the property has previously been devoted.” Goldblatt, 369 U.S. at 592. The Court explained that “every regulation necessarily speaks as a prohibition. If this ordinance is otherwise a valid exercise of the town’s police powers, the fact that it deprives the property of its most beneficial use does not render it unconstitutional.” Id.
Other courts have also recognized the authority of local government to regulate the operations of a valid nonconforming use. In Watanabe v. City of Phoenix, landowners challenged an ordinance requiring that any lot used for parking of three or more motor vehicles be paved for dust control. Watanabe, 683 P.2d 1177. The landowners, who had graveled the lots for dust control, argued that the city
The court reasoned that the principle underlying the protection of nonconforming uses was merely to avoid the injustice of requiring their immediate termination, and, thus, while nonconforming uses could not be prohibited under new zoning ordinances, they were still subject to reasonable regulations under the city’s police power to protect the public health, safety and welfare. Id. The court also emphasized that the regulation would not affect their ability to continue the nonconforming use and that the appellants did not argue that the regulation would make their business economically unfeasible. Id.; see also Miller & Son Paving, Inc., 401 A.2d 392 (the court found that a nonconforming quarry was subject to an ordinance requiring the construction of a fence around the property, noting that the ordinance was passed to safeguard the public and that it would not interfere with the owner’s right to quarry the land).
Another similar case is Dock Watch Hollow Quarry Pit, Inc. v. Township of Warren, where the issue as framed by the court was “the extent to which a municipality may regulate by ordinance adopted pursuant to the police power a previously declared nonconforming use of land.” Dock Watch, 361 A.2d at 15. The court found that although the quarry’s status as a nonconforming use “may protect it from later zoning restrictions, its status as such does not render it immune from reasonable regulations pursuant to the police power in the interest of the public health, welfare and safety,” including “those designed for the preservation of the environment and the protection of ecological values.” Id. at 20 (citations omitted).
In particular, two regulations were upheld even though evidence was presented that the restrictions would reduce the quarry’s potential excavating material by half, costing
Thus, courts agree that nonconforming uses, although protected from zoning ordinances which immediately terminate their use, are subject to later-enacted regulations enacted for the health, safety and welfare of the community. See, e.g., Mt. Bethel Humus Co. v. Department of Envtl. Protection & Energy, 273 N.J. Super. 421, 642 A.2d 415 (1994) (nonconforming use subject to reasonable zoning restrictions which do not require the immediate cessation of such use); Renne v. Township of Waterford, 73 Mich. App. 685, 252 N.W.2d 842 (1977) (nonconforming use required to abandon septic tanks in favor of a public sewer system); State ex rel. Keener v. Serr, 53 Ohio App. 2d 143, 372 N.E.2d 360 (1976) (nonconforming junkyard must comply with ordinance requiring list of material held in the yard); Zoning Comm’n of Town of Groton v. Tarasevich, 165 Conn. 86, 328 A.2d 682 (1973) (nonconforming use required to obtain a license); Clouatre v. Town of St. Johnsbury Bd. of Zoning Adjustment, 130 Vt. 189, 289 A.2d 673 (1972) (nonconforming use subject to later-enacted regulation to protect the public welfare); City of Rutland v. Keiffer, 124 Vt. 357, 205 A.2d 400 (1964) (nonconforming use subject to licensing requirements); City of Chicago v. Miller, 27 Ill. 2d 211, 188 N.E.2d 694 (1963) (nonconforming use subject to later-enacted ordinance requiring improvements to the defendant’s property); City of Akron v. Klein, 171 Ohio St. 207, 168 N.E.2d 564 (1960) (nonconforming use subject to time restrictions); Hantman v. Township of Randolph, 58 N.J. Super. 127, 155 A.2d 554 (1959) (nonconforming use subject to regulations restricting the number of months during which a business can operate); Lyman G. Realty Corp. v. Gillroy, 5 A.D.2d 520, 172 N.Y.S.2d 907 (1958) (nonconforming use subject to ordinance requiring a permit for roof sign).
Courts, however, have been alert to the possibility that a
Rhod-A-Zalea does not argue, nor does the record indicate, that obtaining a grading permit would terminate Rhod-A- Zalea’s nonconforming right to peat extraction. Although Rhod-A-Zalea and amicus Pacific Legal Foundation offer arguments regarding potential economic impacts, these concern only the cost of applying for a permit. They note that the ordinance imposes a plan review and inspection fee of $0.33 per cubic yard of earth movement and limits the overall fee to no more than $23,000. SCC 17.02.110(1)(d),(f),(2),(3). Also, they state that these costs do not include the expense of conducting soil engineering and geology reports required by chapter 70 in the appendix of the Uniform Building Code.
Rhod-A-Zalea, however, makes no particularized argument concerning economic impact. For instance, Rhod-A-Zalea does not indicate how much earth on average it moves and, therefore, how much the fee would be, nor does it provide any estimates concerning how much the additional studies would cost. Moreover, there is no evidence concerning the relative value of the business and, therefore, no way to know how, for example, a maximum fee of $23,000 would impact its ability to continue the peat mining operation. Although Rhod-A-Zalea indicates the permitting requirements would be costly, it never argues that the regulation would have the effect of terminating the exist
It is also clear that Snohomish County’s grading permit is a reasonable exercise of its police powers. In 1985, Snohomish County amended its building code and required mining operations to obtain a grading permit. SCC 17.04.280. There is no dispute that Rhod-A-Zalea’s excavation and fill activity constitutes “grading” as defined in SCC 17.04.290. The stated purpose of the grading and excavating regulations is “to safeguard life, limb, property and the public welfare by regulating grading on private property.” Uniform Building Code, ch. 70, § 7001 (1976). Title 24 SCC, the county drainage code, which is made applicable to grading permits by operation of SCC 24.16.120(1)(e) also indicates its intent to:
promote sound practical and economical development policies and construction procedures which respect and preserve the county’s watercourses; to minimize water quality degradation and control the sedimentation of creeks, streams, rivers, ponds, lakes and other water bodies; to protect the public from storm-water runoff originating on developing land; ... to maintain and protect valuable groundwater resources; to minimize adverse effects of alterations in groundwater quantities, locations and flow patterns; . . . and to decrease drainage-related damage to public and private property.
SCC 24.04.080.
With regard to Rhod-A-Zalea’s property, the County’s enforcement officer testified that the County’s main concern was that Rhod-A-Zalea was not using acceptable fill material. The County’s investigation of the site indicated that Rhod-A-Zalea was using a mixture of rock, wood, plastic, and other miscellaneous unidentifiable materials. The enforcement officer noted that the area is quite large, perhaps half the size of a football field. Another neighboring property owner testified that water is running onto his property because the backfill used by Rhod-A-Zalea does not absorb as much water as the peat does.
Thus, it is clear the ordinance is reasonable and serves to safeguard the health, safety and welfare of the community. Furthermore, it appears that Rhod-A-Zalea’s property is being operated in derogation to these interests and that requiring a grading permit would solve these problems.
To accept Rhod-A-Zalea’s arguments and find that this later enacted regulation does not apply to their peat operation because it is a nonconforming use would have serious repercussions for all local governments attempting to regulate property. Rhod-A-Zalea does not adequately speak to this concern. From their position it follows that a nonconforming restaurant would not be subject to later-enacted health codes or business license provisions; a nonconforming factory would be exempt from later-enacted noise or pollution regulations; a nonconforming animal kennel would be exempt from later-enacted licensing or health requirements; and a nonconforming adult entertainment facility would be exempt from later-enacted licensing or public health regulations. Such a result would not be in the public interest and is contrary to law. Also, to allow nonconforming uses to continue exempt from all subsequently enacted health and safety regulations would be devastating to the community’s land use planning. Finally, such an exemption would give those nonconforming uses an undeserved and substantial competitive advantage against their “conforming” competitors who are required to comply.
We find that the Court of Appeals and the superior court erred in their decisions that Rhod-A-Zalea is not subject to
Under Washington’s “vested rights doctrine” developers who file a timely and complete building permit application obtain a vested right to have their application processed according to the zoning and building ordinances in effect at the time of the application. See West Main Assocs. v. City of Bellevue, 106 Wn.2d 47, 51, 720 P.2d 782 (1986). The purpose of the “vested rights doctrine” is to determine or “fix” the rules that will govern land development with reasonable certainty. Id. This immunity from regulations adopted subsequent to the time of vesting pertains only to the right to establish the development. See Settle, Washington Land Use § 2.7.
Thus, pursuant to the “vested rights doctrine” a permit is considered under the rules in effect at the time of the permit application. This situation is not before the court. Here, the court is concerned with whether a nonconforming use is exempt from later-enacted police power regulations.
The Court of Appeals and the superior court also indicate that because grading is intrinsic to the nonconforming use
Additionally, case law does not support such a distinction. In Goldblatt, the Court required a nonconforming sand and gravel operation to obtain a later enacted permit which regulated dredging and pit excavation. Goldblatt, 369 U.S. 590. Under our Court of Appeals’ analysis these activities would be intrinsic to their operations.
The Court of Appeals and the superior court further imply that because Rhod-A-Zalea was not required to obtain a conditional use permit that it should not then be subject to the grading permit requirement. The Court of Appeals states that “Snohomish County cannot regulate indirectly what it has conceded is not regulable directly,” Rhod-A-Zalea, No. 36658-1-I, slip op. at 2, and that the County was seeking to regulate “through the back door, by applying the building code, that which it cannot regulate through the front door by applying the zoning code . . . .” Id. at 4-5. However, just because Rhod-A-Zalea was not required to obtain a general conditional use permit (because it is a valid nonconforming use) does not mean that it is exempt from all other specific permitting requirements, even if they regulate some of the same operations.
This same argument was made and rejected by the Supreme Court in Goldblatt. “A successful defense to the imposition of one regulation does not erect a constitutional barrier to all other regulation. The first suit was brought to enforce a zoning ordinance, while the present one is to enforce a safety ordinance.” Goldblatt, 369 U.S. at 597. Similarly, the fact that Rhod-A-Zalea does not have to obtain a conditional use permit does not operate as a shield to the grading permit requirement.
Rhod-A-Zalea also argues that Snohomish County’s zon
SCC 18.71.010 of the Snohomish County zoning code provides that any nonconforming use may continue “subject to the provisions of this chapter.” Focusing on the words “subject to the provisions of this chapter,” Rhod-A-Zalea argues that SCC 18.71.010 does not authorize the application of the grading permit requirement contained in SCC 17 to valid nonconforming uses.
Rhod-A-Zalea is incorrect. The zoning code specifically contains a provision which requires compliance with other applicable laws and regulations. SCC 18.13.020 provides:
Any development or activity regulated herein must also comply with all other requirements of county code and of all applicable laws and regulations administered and enforced by other jurisdictions.
Additionally SCC 18.13.010 states that “[t]he provisions of this title shall be held to be the minimum requirements necessary for the promotion of public health, safety, morals, and general welfare.” Only where the provisions of the zoning code impose greater restrictions upon the use of buildings or land than is imposed by other ordinances will the provisions of that Chapter govern. SCC 18.13.010.
Thus, Title 18 of the zoning code directs nonconforming uses to comply with all other applicable regulations and laws.
Finally, we must address the superior court’s determina
We find the superior court’s decision in this regard was premature as the issue is not ripe for review. A constitutional challenge to a land use regulation is ripe when the developer has received a final decision regarding how the regulation at issue will be applied to the particular land in question. See Herrington v. County of Sonoma, 857 F.2d 567 (9th Cir. 1988). Rhod-A-Zalea has not applied for the grading permit and, therefore, this court cannot determine if the ordinance as applied to Rhod-A-Zalea violates its substantive due process rights. See Guimont v. City of Seattle, 77 Wn. App. 74, 89, 896 P.2d 70 (1995) (the court could not hear the appellant’s substantive due process claim regarding a relocation report requirement because the appellant had not submitted the required report).
Additionally, there has been no argument by Rhod-A-Zalea
CONCLUSION
In conclusion, we find that Rhod-A-Zalea’s nonconforming use is subject to the grading permit requirement contained in SCC 17.04.280. Nonconforming uses have only a vested right not to have the use immediately terminated in the face of a zoning ordinance which prohibits the use. The case law overwhelmingly holds that nonconforming
We reverse the superior court’s and the Court of Appeals’ decisions and reinstate the decision of the Hearing Examiner that Rhod-A-Zalea is subject to the grading permit requirement contained in SCC 17.04.280. Additionally, we reverse the superior court’s determination that the grading permit violates Rhod-A-Zalea’s substantive due process rights because the issue is not ripe for adjudication.
Durham, C.J., and Smith, Guy, Johnson, Alexander, and Talmadge, JJ., concur.
Even if the “vested rights doctrine” were at issue in this case, it would not allow a business to operate exempt from later-enacted police power regulations. The “vested rights doctrine” protects only a permit applicant from regulations enacted after a permit application has been completed and filed and serves only to fix the rules that will govern a particular land use permit application. See West Main Assocs. v. City of Bellevue, 106 Wn.2d 47, 51, 720 P.2d 782 (1986). Once the development is established, it must then comply with later-enacted police power regulations which are limited only by constitutional safeguards. See Richard L. Settle, Washington Land Use and Environmental Law and Practice § 2.7(c)(vi) (1983).
Rhod-A-Zalea also cites Uniform Building Code section 104 as prohibiting later-enacted police power regulations from applying to nonconforming uses. Section 104(c) provides:
Buildings in existence at the time of the adoption of this code may have their existing use or occupancy continued, if such use or occupancy was legal at the time of the adoption of this code, provided such continued use is not dangerous to life.
Rhod-A-Zalea has not argued in its briefs to this court that the grading permit requirement violates its substantive due process rights.
Dissenting Opinion
(dissenting) — The majority concedes RhodA-Zalea has a valid vested right to continue its peat mining operation as a nonconforming use. Majority at 6. But Snohomish County argues, and the majority concludes, the County seeks not to deny Rhod-A-Zalea its right to mine, but only to properly utilize its local police power prerogative to regulate the manner in which the mining is conducted to protect the public health and safety. Supplemental Br. of Snohomish County at 6; Majority at 19-20.
The Court of Appeals, however, disagreed, writing:
We cannot improve on the trial court’s answer to this argument.
In this instance, application of the grading permit provisions of the county building code constitutes such pervasive regulation of the peat mining operation that it effectively*21 abrogates Rhod-A-Zalea’s vested property rights in maintaining the nonconforming use.
Rhod-A-Zalea & 35th, Inc. v. Snohomish County, No. 36658-1-I, slip op. at 6 (Wash. Ct. App. July 22, 1996) (quoting Trial Court’s Amended Mem. Decision at 4), review granted, 131 Wn.2d 120, 937 P.2d 1102 (1997). Nor can I better the observation of the trial court and would, therefore, affirm the Court of Appeals.
Rhod-A-Zalea seeks neither to expand its nonconforming use nor restart its operation after a hiatus. Rather it seeks to mine peat, an activity that, by the definition adopted by the county, is “grading.” See Clerk’s Papers (CP) at 322 (Snohomish County Decision of the Deputy Hearing Examiner (hereinafter “Hearing Examiner”) (Sept. 18, 1992)). In the words of the learned trial judge: “[T]he grading taking place on the property is not merely an activity component of the mining process. It is the mining process.” CP at 41 (Trial Court’s Amended Mem. Decision at 5).
The County, as the lower courts discerned, seeks to “ ‘regulate through the back door, by applying the building code, that which it cannot regulate through the front door by applying the zoning code, due to the existence of a valid nonconforming use.’ ” Rhod-A-Zalea & 35th, Inc. v. Snohomish County, No. 36658-1-I, slip op. at 4-5 (quoting Trial Court’s Amended Mem. Decision at 4-5).
The majority opines it would be “counterintuitive to conclude that nonconforming uses which are contrary to public interests, such as health, safety and welfare, would then be exempt from subsequently enacted public health and safety regulations,” Majority at 9; noting “[t]he theory of the zoning ordinance is that the nonconforming use is detrimental to some of those public interests (health, safety, morals or welfare) which justify the invoking of the police power,” but not immediately. Majority at 7.
Such approach ignores the fundamental proposition that “[a] valid nonconforming use carries with it the right to the exercise of those accessory uses which are considered customary and incidental to the principal use.” Ferry v. City of Bellingham, 41 Wn. App. 839, 844, 706 P.2d 1103, review denied, 104 Wn.2d 1027 (1985). In Ferry the court found the addition of a crematory to a funeral home (which had a nonconforming use right in a residentially zoned area) did not constitute any enlargement of the nonconforming use and, thus, could not be precluded because of a zoning regulation. Id. Here, Rhod-A-Zalea seeks nothing more than to continue the very use of the land it has rightly enjoyed for over 30 years.
In an analogous case a rock mining and crushing business was protected in its continuation of its vested nonconforming use without submitting to a permitting requirement that encompassed potential termination of the nonconforming use. Missouri Rock, Inc. v. Winholtz, 614 S.W.2d 734, 739-40 (Mo. Ct. App. 1981). The authority to permit implies the power to prohibit.
As the Hearing Examiner noted, “[t]he subject excavation and fill constitutes ‘grading’ as such term is defined” in the Snohomish County Code. CP at 332 (Hearing Examiner at 11, conclusion 20). The subject excavation and fill is, of course, the peat mining. See CP at 324 (Hearing Examiner at 3).
The majority drags the red herring of undercooked food across the table where it uses this analogy: “[Rhod-A-Zalea’s] reasoning . . . leads to illogical results. For example, a nonconforming restaurant would not be subject
By the majority’s reasoning a valid nonconforming restaurant use could, under the guise of a police power regulation, be regulated out of existence, or at least burdened, through the prohibition of stoves, ovens, or normal restaurant fare. Cooking facilities to prepare food are intrinsic to a restaurant; however, service of contaminated food is not. This distinction is the heart of the case.
The distinction is of kind, not degree. Although a regulation banning black pepper might cost that restaurant only one customer a month, such regulation would be most problematic as it strikes at the heart of restauranteering, which is the preparation of wholesome, tasty food. One need not put the restaurant out of business to compromise its vested nonconforming use.
To support the County’s asserted right to impose its will upon Rhod-A-Zalea, the majority relies upon the “purpose” of the Uniform Building Code’s grading regulations: “ ‘to safeguard life, limb, property and the public welfare by regulating grading on private property.’ ” Majority at 14 (quoting Uniform Building Code, ch. 70, § 7001 (1976)). However the Uniform Building Code specifically exempts mining from the grading permit requirements it sets out and, therefore, by its original terms does not purport to justify any regulation whatsoever of peat mining. Uniform Building Code 1-508, app. ch. 33, § 3306.2(6) (1994).
The majority, with near religious fervor, also invokes the spirit of Goldblatt v. Town of Hempstead, 369 U.S. 590, 82 S. Ct. 987, 8 L. Ed. 2d 130 (1962), to justify its conclusion that the County may apply its grading permit requirements to Rhod-A-Zalea. See Majority at 5, 8, 9, 10, 15, 16, 17. Yet, as one commentator has rightly noted, what Goldblatt really does is “underline the difficulty of determining whether a particular regulation, onerous to a user, is an unlawful attempt to destroy the use, or a legitimate means of regulating it.” 1 Robert M. Anderson, American Law of Zoning 3d § 6.78, at 680 (1986).
The majority notes courts “have been alert to the pos
Placing this requirement of a “particularized argument” upon Rhod-A-Zalea is exactly what we should not do. If the regulation is consistent with the vested nonconforming use, it is valid no matter how prohibitory (assuming it satisfies due process); whereas, if it is inconsistent with the vested use, it is invalid no matter how slight its burden.
In any case the burden of proof properly rests on the County to establish that its regulation does not burden a vested nonconforming use but rather is a legitimate effort to protect from a recurring harm not incident to the very nature of the nonconforming use. See State v. Thomasson, 61 Wn.2d 425, 428, 378 P.2d 441 (1963) (requiring facts that establish a nuisance or “circumstances showing a condition substantially detrimental to the public health, safety, morals or welfare” before a municipality may attempt to abolish existing nonconforming use without violating due process of law). See also Township of Orion v. Weber, 83 Mich. App. 712, 269 N.W. 2d 275, 278-79 (1978) (nonconforming vested sand and gravel business not subject to retroactive burdensome regulation).
While the majority requires a “particularized argument” from Rhod-A-Zalea, the majority adopts the opposite view
The trial court and the Court of Appeals correctly discerned the distinction between that which is intrinsic to the privileged use and that which is not. However the majority overlooks it. I therefore dissent.
Dolliver, J., concurs with Sanders, J.
Reconsideration denied November 16, 1998.
See 1 Robert M. Anderson, American Law of Zoning 3d § 7.03, at 690 (1986).
The 1994 Uniform Building Code is substantially different from earlier versions in terms of organization, but the relevant content remains effectively the same. The exemption for mining, for example, was present in earlier versions as section 7003(6).
The Supreme Court has recently criticized Goldblatt, noting that the case assumed that when examining property regulations, the standards for takings challenges, due process challenges, and equal protection challenges are identical. “[T]hat assumption is inconsistent with the formulations of our later cases.” Nollan v. California Coastal Comm’n, 483 U.S. 825, 835 n.3, 107 S. Ct. 3141, 97 L. Ed. 2d 677 (1987).
See also 1 Anderson, supra, section 6.06 at 462 (Noting general disapproval of retroactive zoning regulations: “Thus, one court . . . remarked: ‘Retroactive legislation is so offensive to the Anglo-Saxon sense of justice that it is never favored.’ ” (quoting Appeal of Sawdey, 369 Pa. 19, 22, 85 A.2d 28 (1951))).
Rhod-A-Zalea did, in fact, argue both the general impact and the specific impact that imposition of the grading permit would have on its operations. See generally Resp’t’s [Rhod-A-Zalea] Br. to the Court of Appeals Division One at 34-38 (discussing due process implications of County’s action) and 38-40 (discussing specific damages to Rhod-A-Zalea from imposition of grading permit).