Fоr nearly seventeen years, in litigation spanning two continents and numerous courtrooms, a group of Ecuadorian citizens (“Plaintiffs”) have sought relief for environmental devastation allegedly caused by defendant-appellee Texaco Petroleum Company’s (“TexPet”) oil exploration and drilling operations in the Ecuadorian rainforest. In 2001, the district court (Jed S. Rakoff, Judge) dismissed Plaintiffs’ initial action on Chevron’s forum non conveniens motion, and Plaintiffs refiled their claims in Lago Agrio, Ecuador, where they are currently being litigated.
Recently, Chevron Corporation 1 and TexPet (collectively, “Chevron”) invoked *388 the arbitration clause in Ecuador’s Bilateral Investment Treaty (“BIT”) with the United States, and initiated arbitration against Ecuador. See Treaty Between The United States of America and The Republic of Ecuador Concerning the Encouragement and Reciprocal Protection of Investments, U.S.-Ecuador, Aug. 27, 1993, S. Treaty Doc. No. 103-15 [hereinafter Bilateral Investment Treaty]. Chevron’s notice of arbitration asserted that Ecuador had improperly interfered in the Lago Agrio litigation and requested, among other things, a declaration that Chevron has no liability for environmental damage arising out of TexPet’s drilling operations in Ecuador.
Plaintiffs, who are not parties to the arbitration, responded by commencing this proceeding in the district court for a stay of the BIT arbitration, arguing that Chevron’s initiation of arbitration against Ecuador breached the promises that Texaco made to the district court in order to secure dismissal of Plaintiffs’ original action. Shortly thereafter, Ecuador also moved for a stay. The district court (Leonard B. Sand,
Judge)
assumed, without deciding, that it had the power to stay BIT arbitration, but declined to exercise that authority in this case.
See Republic of Ecuador v. Chevron Corp.,
Nos. 09 Civ. 9958, 10 Civ. 316,
BACKGROUND
Prior decisions of both this Court and the district court have thoroughly detailed the factual background and procedural history of this case.
See Aguinda v. Texaco, Inc.,
In 1993, residents of Ecuador’s Oriente region sued Texaco in the Southern District of New York “seeking extensive relief for vast devastation to that region caused by ... decades of oil exploration and extraction activities.”
Aguinda,
Shortly after that dismissal order, a new government came to power in Ecuador. Political change brought with it a shift in Ecuador’s view of this litigation, and the Ecuadorian government attempted to intervene in the lawsuit on Plaintiffs’ behalf. However, the district court denied Plaintiffs’ then-pending motion for reconsideration and Ecuador’s motion to intervene.
Jota,
On remand, Texaco provided that commitment by “unambiguously agree[ing] in writing to be[ ] sued ... in Ecuаdor, to accept service of process in Ecuador, and to waive ... any statute of limitations-based defenses that may have matured since the filing of the [complaint].”
Aguinda,
In September 2009, Chevron initiated BIT arbitration against Ecuador. Chevron’s notice of arbitration asserted two claims related to the Lago Agrio litigation. First, Chevron argued that any judgment issued against it would violate the terms of TexPet’s previous settlement agreement with Ecuador under which TexPet funded certain environmental remediation projects in exchange for what Chevron now characterizes as a release from liability for environmental impact falling outside the scope of that settlement. Second, Chevron argued that the Ecuadorian government improperly interfered with the Lago Agrio proceedings. In particular, Chevron claimed that “Ecuador’s executive branch has publicly announced its support for the plaintiffs, and it has sought ... to interfere with Chevron’s defense,” and that “Ecuador’s judicial branch has conducted the Lago Agrio Litigation in total disregard of Ecuadorian law, international standards of fairness, and Chevron’s basic due process and natural justice rights.... ”
In the BIT arbitration, Chevron Corporation and TexPet seek (1) a declaration that they “have no liability or responsibility for environmental impact ... or for performing further environmental remediation”; (2) a declaration that Ecuador has breached both the BIT and the terms of its release agreement with TexPet; (3) an order requiring Ecuador to inform the Lago Agrio court that Chevron has “been released from all environmental impact ... and that Ecuador and Petroecuador [Ecuador’s state-owned oil company] are responsible for any remaining and future remediation work”; (4) a “declaration that Ecuador or Petroecuador is exclusively liable for any judgment that may be issued in the Lago Agrio Litigation”; (5) an order “requiring Ecuador to indemnify, protect and defend [Chevron] in connection with the Lago Agrio Litigation, including payment ... of all damages that may be awarded against Chevron”; and (6) attorneys’ fees, litigation costs, arbitration costs, “moral damages,” and interest.
In December 2009, Ecuador petitioned the district court to stay the BIT arbitration, arguing that Chevron’s initiation of arbitration and pursuit of such broad relief violated the promises that Texaco previously made in order to secure a forum non conveniens dismissal of Plaintiffs’ action in the United States courts. Shortly thereafter, Plaintiffs moved to stay the arbitration “to the extent it would seek dismissal, nullification or avoidance of any judgment” in the Lago Agrio litigation. The district court (Leonard B. Sand, Judge) refused to stay the arbitration and granted Chevron’s motion to dismiss both actions.
Republic of Ecuador,
During the pendency of this appeal, the parties called our attention to two events that occurred after this case was briefed. *391 First, the arbitral panel issued an interim order directing Ecuador to “take all measures at its disposal to suspend or cause to be suspended the enforcement ... of any judgment against [Chevron Corporation] in the Lago Agrio Case.” Chevron Corporation v. The Republic of Ecuador, PCA Case No.2009-23 (Feb. 9, 2011). A few days later, the Lago Agrio court entered an $8.6 billion judgment against Chevron, from which both parties intend to appeal. While we recognize the potential importance of those events, they do not alter the basic question on appeal: whether the district court erred by refusing to stay the BIT arbitration based on the record before it.
DISCUSSION
I. Power to Stay Arbitration
The parties agree that BIT arbitration falls under the United Nations Convention on the Recognition and Enforcement of Foreign Arbitral Awards (“New York Convention”), which governs agreements that are “commercial and ... not entirely between citizens of the United States.”
Motorola Credit Corp. v. Uzan, 388
F.3d 39, 49 (2d Cir.2004) (internal quotation marks omitted).
6
The New York Convention “promote[s] the enforcement of arbitral agreements in contracts involving international commerce so as to facilitate international business transactions.... ”
Smith/Enron Cogeneration Ltd. v. Smith Cogeneration Int’l, Inc.,
Given that strong policy in favor of arbitration, and the lack of express authorization to stay arbitrations under the New York Convention, the FAA, or the BIT, Chevron asserts that courts lack the power to stay BIT arbitration. That is an open question in our Circuit.
See Westmoreland Capital Corp. v. Findlay,
II. Analysis
A. Ecuador’s Waiver and Estoppel Claims
Ecuador argues that Chevron, having previously agreed to litigate against Plaintiffs in Lago Agrio, is now “estopped from accepting, ha[s] waived [its] right to accept, or hа[s] otherwise rejected [its] *392 right” to arbitration under the BIT. If Ecuador is correct, then Chevron’s initiation of arbitration was invalid and the arbitral panel lacks jurisdiction over the claims now before it. Chevron, in addition to challenging the merits of Ecuador’s waiver and estoppel claims, argues that those claims should be decided by the arbitral panel. Because the parties have agreed to arbitrate threshold issues like estoppel and waiver, our precedent prevents us from addressing the merits of Ecuador’s claims; instead, we leave them to the arbitral panel in the first instance.
Ecuador moved to stay the BIT arbitration under the FAA. Section Two of the FAA states that “an agreement in writing to submit to arbitration an existing controversy ... shall be valid, irrevocable, and enforceable, save upon such grounds as exist at law or in equity for the revocation of any contract.” 9 U.S.C. § 2. That provision constitutes “a congressional declaration of a liberal federal policy favoring arbitration agreements.... The effect ... is to create a body of federal substantive law of arbitrability, applicable to any arbitration agreement within the coverage of the Act.”
Moses H. Cone Mem. Hosp. v. Mercury Constr. Corp.,
Under federal law, “arbitration is a matter of contract and a party cannot be required to submit to arbitration any dispute which he has not agreed so to submit.”
AT & T Techs., Inc. v. Commc’ns Workers of Am.,
At the outset, we note that Chevron is not a party to the BIT. Unlike the more typical scenario where the agreement to arbitrate is contained in an agreement between the parties to the arbitration, here the BIT merely creates a framework through which foreign investors, such as Chevron, can initiate arbitration against parties to the Treaty. In the end, however, this proves to be a distinction without a difference, since Ecuador, by signing the BIT, and Chevron, by consenting to arbitration, have created a separate binding agreement to arbitrаte.
The BIT provides that “an ‘agreement in writing’ for purposes of Article II of the ... New York Convention” is created when a foreign company gives notice in writing to a BIT signatory and submits an investment dispute between the parties to binding arbitration in accordance with Article VI of the Treaty. See Bilateral Investment Treaty, art. VI § 4(b). All that is necessary to form an agreement to arbitrate is for one party to be a BIT signatory and the other to consent to arbitration of an investment dispute in accordance with the Treaty’s terms. In effect, Ecuador’s accession to the Treaty constitutes a standing offer to arbitrate disputes covered by the Treaty; a foreign investor’s written demand for arbitration completes *393 the “agreement in writing” to submit the dispute to arbitration.
Here, Chevron complied with the requirements of Article VI by notifying Ecuador in writing and submitting the dispute to an arbitral panel “in accordаnce with the Arbitration Rules of the United Nations Commission on International Trade Law (UNCITRAL).” Id. art. VI § 3(a)(iii). Therefore, the parties formed an “agreement in writing” within the meaning of the New York Convention. Article II of the New York Convention, enforced in the United States through 9 U.S.C. § 201, requires the recognition of “an agreement in writing under which the parties undertake to submit to arbitration all or any differences which have arisen or which may arise between them.” Convention on the Recognition and Enforcement of Foreign Arbitral Awards art. 11(1), June 10, 1958, 21 U.S.T. 2517. Applying that provision to this case requires us to enforce the parties’ agreement according to its terms.
With the existence of a valid arbitration agreement established, we turn to the arbitrability of Ecuador’s waiver and estoppel claims. We must determine whether the parties intended for the arbitral panel or the courts to resolve those threshold issues. We will reaсh the merits of Ecuador’s claims only if they are fit for judicial determination.
We address the arbitrability of Ecuador’s waiver and estoppel claims “with a healthy regard for the federal policy favoring arbitration.”
Moses H. Cone,
The Supreme Court has “distinguished between ‘questions of arbitrability,’ which are to be resolved by the courts unless the parties have clearly agreed otherwise, and other ‘gateway matters,’ which are presumptively reserved for the arbitrator’s resolution.”
Mulvaney Mech., Inc. v. Sheet Metal Workers Int’l Ass’n, Local 38,
Both waiver and estoppel generally fall into that latter group of issues presumptively for the arbitrator. The Supreme Court has stated, in dicta, that “the presumption is that the arbitrator should decide ‘allegation^] of waiver.’ ”
Id.
at 84,
In this case, however, Ecuador charаcterizes its waiver and estoppel arguments as undermining the agreement itself, not merely as preventing Chevron from taking advantage of an admittedly binding arbitration clause. Ecuador claims that, under such circumstances, waiver and estoppel are presumptively for the courts. We need not reach that issue here because, even assuming Ecuador’s waiver and estoppel claims go to Chevron’s ability to initiate arbitration, and thus are fairly characterized as “questions of arbitrability,” there is “clear and unmistakable evidence” that the parties intended these issues to be decided by the arbitral panel in the first instance.
Bell,
By signing the BIT, Ecuador agreed to resolve investment disputes through arbitration under the UNCITRAL rules. Article 21 of those rules states that the arbitrator “shall have the power to rule on objections that it has no jurisdiction, including any objections with respect to thе existence or validity of the ... arbitration agreement.” UNCITRAL Arbitration Rules art. 21, para. 1, G.A. Res. 31/98, U.N. Doc. A/RES/31/98 (Dec. 15, 1976). 7 Therefore, Ecuador consented to sending challenges to the “validity” of the arbitration agreement to the arbitral panel. In this ease, Ecuador’s estoppel and waiver claims challenge the “validity” of the arbitration agreement because Ecuador argues that Chevron either waived its right to or is estopped from entering into a binding agreement to arbitrate. Because Ecuador’s waiver and estoppel claims go to the validity of the arbitration agreement, Article 21 requires that they be decided by the arbitral panel in the first instance.
That conclusion is supported by this Court’s interpretation of similar language in other arbitration agreements. Our decision in
Contec Corp. v. Remote Solution Co.,
We then determined that the parties had a “sufficient relationship to each other and to the rights created under the agreement ... to permit Contec Corporation to compel arbitration even if, in the end, an arbitrator were to determine that the dispute itself [was] not arbitrable because Contec Corporation [could not] claim rights under the [agreement].” Id. at 209. Importantly, Remote Solution, the party seeking to avoid arbitration, had signed the agreement, which broadly covered the business relationship at issue and delegated questions of arbitrability to the arbitrator. Id. at 209-11. That “indicator of Remote Solution’s expectation and intent” enabled us to “conсlude that as a signatory to a contract containing an arbitration clause and incorporating by reference the AAA Rules, Remote Solution [could] not ... disown its agreed-to obligation to arbitrate all disputes, including the question of arbitrability.” Id. at 211.
Ecuador is now in the same situation. As a signatory to the BIT, Ecuador has consented to arbitrating disputes arising out of investment projects like TexPet’s drilling operations in Ecuador. That agreement also incorporated by reference the UNCITRAL rule delegating questions of arbitrability to the arbitral panel through language nearly identical to the AAA provision at issue in Contec. Therefore, Ecuador cannot now “disown its agreed-to obligation to arbitrate ... the questions] of arbitrability” it has raised as defenses to arbitration in this Court. Id.
Chevron, too, has consented to sending those threshold issues to the arbitrator. It invoked the UNCITRAL rules when filing its notice of arbitration and has argued that questions of arbitrability are for the arbitral panel. Because both parties have consented to having questions of arbitrability, including Ecuador’s waiver and estoppel claims, determined by the arbitral panel in the first instance, we do not reach their merits here. Nor can we stay arbitration on those grounds.
B. Enforcing Previous Judgments
Plaintiffs argue that Chevron is using BIT arbitration to undermine the Lago Agrio litigation and deprive them of a forum capable of resolving those claims previously dismissed by the district court on forum non conveniens grounds. According to Plaintiffs, Chevron has breached the promises that Texaco made in order to secure that dismissal by pursuing BIT arbitration, and a stay of the arbitral proceedings is necessary in order to hold Chevron accountable to those promises.
Plaintiffs moved to stay the BIT arbitration on judicial estoppel, equitable estoppel, and collateral estoppel grounds. Although thоse doctrines have somewhat different purposes and applications, in each case “the party who is to be estopped ... must have asserted a fact or claim, or made a promise, that another party relied on, that a court relied on, or that a court adjudicated” and then later attempted to take a contradictory stance in that or an
*396
other proceeding.
Maitland v. Univ. of Minn.,
Plaintiffs’ estoppel claims rest on four statements that Texaco made to the district court in order to secure dismissal of Plaintiffs’ action. The first three statements concern Texaco’s submission to Ecuadorian jurisdiction. In
Jota,
we made clear that a forum non conveniens dismissal wоuld be appropriate only if Texaco were “to submit to the jurisdiction of the Ecuadoran courts.”
Initially, we note that there is no inherent conflict between BIT arbitration and the Lago Agrio litigation. Those two proceedings involve different parties and distinct claims. BIT arbitration is designed to settle investment disputes between foreign investors and the host government. See Bilateral Investment Treaty, art. VI. It is limited to the resolution of disputes “between a Party [to the BIT] and a national or company of the other Party arising out of or relating to ... an investment agreement between that Party and such national or company ... [or] an alleged [breach] of any right conferred or created by [the BIT] with respect to an investment.” Id. Chevron’s claims are now pending in BIT arbitration precisely because they deal with allegations of Ecuador’s improper behavior with respect to Texaco’s investment in the region. However, Plaintiffs are not parties to the BIT, аnd that treaty has no application to their claims; their dispute with Chevron therefore cannot be settled through BIT arbitration. Instead Plaintiffs have exercised them right under the forum non conveniens dismissal to litigate their claims against Chevron in Lago Agrio. That litigation continues to this day. The existence of those parallel proceedings — one in which Chevron asserts wrongdoing on the part of Ecuador and another in which Plaintiffs assert wrongdoing on the part of Chevron— makes clear that the Lago Agrio litigation can coexist with BIT arbitration.
There is also no conflict between Texaco’s promises to the district court and Chevron’s initiation of a contemporaneous challenge to Ecuador’s conduct with re *397 spect to the Lago Agrio litigation. Texaco expressly conditioned its promises on a reservation of its rights under New York’s Recognition of Foreign Country Monеy Judgments Act. See N.Y. C.P.L.R. 5304. 8 Chevron has thus reserved its right to challenge any judgment issued in Lago Agrio on the grounds that the Ecuadorian judicial system “does not provide impartial tribunals or procedures compatible with the requirements of due process of law,” that the judgment itself “was obtained by fraud,” or that “the proceeding in [Lago Agrio] was contrary to an agreement between the parties.” Id. Nothing in that reservation of rights purports to restrict the kind of forum or type of proceeding in which Chevron can raise those defenses. Nor did Texaco promise to wait until after a judgment was issued to challenge the fairness of the Lago Agrio litigation. Having reserved the rights conferred by N.Y. C.P.L.R. 5304, Chevron remains free to enforce them whenever and wherever it chooses, limited only by the scope of the statute and the availability of a forum prepared to address its claims. It is against that backdrop that wе consider Plaintiffs’ estoppel claims.
1. Judicial Estoppel
The purpose of judicial estoppel “is to protect the integrity of the judicial process by prohibiting parties from deliberately changing positions according to the exigencies of the moment.”
New Hampshire,
Chevron’s notice of arbitration raised two claims that Plaintiffs assert are contrary to the positions that Texaco took in order to secure the dismissal of Plaintiffs’ action on forum non conveniens grounds. Chevron’s first claim is that “Ecuador has engaged in a pattern of improper and fundamentally unfair conduct” with respect to the Lago Agrio litigation that has undermined the impartiality of the Ecuadorian courts. Plaintiffs properly characterize that claim as an assertion that “Chevron’s due process rights [have been] violated in Ecuador.” Texaco, however, reserved its right to challenge any judgment as “rendered under a system which does not provide impartial tribunals or procedures compatible with the requirements of due process of law.” N.Y. C.P.L.R. 5304(a)(1). Therefore, Chevron can raise its due process claims in BIT *398 arbitration without contravening Texaco’s prior positions in the district court.
Chevron’s second claim is that a prior agreement between TexPet and Ecuador releases it “from any further liability for environmental impact.” According to Chevron, Ecuador has violated that agrеement by refusing to “indemnify, protect and defend [Chevron’s rights] in connection with the Lago Agrio Litigation” and by failing to accept responsibility for the environmental impact of TexPet’s drilling operations. On that basis, Chevron has requested that the arbitral panel issue an “order and award requiring Ecuador to inform the court in the Lago Agrio Litigation that [Chevron] ha[s] been released from all environmental impact” and a declaration that Ecuador “is exclusively liable for any judgment that may be issued in [that] Litigation.”
We conclude that Chevron may also raise its release claim in BIT arbitration. As we have previously explained, there is a binding agreement between Chevron and Ecuador to arbitrate investment disputes arising out of TexPet’s drilling operations, and Chevron’s release claim is related to that activity. If Chevron believes that the terms of the release agreement obligate Ecuador to take certain actions with respect to the Lago Agrio litigation, nothing in Texaco’s promises to the district court prevents Chevron from using BIT arbitration to attempt to hold Ecuador accountable to those alleged obligations. 9 The very purpose of BIT arbitration is to provide an impartial venue for the resolution of investment disputes like Chevron’s release claim.
A promise to submit to the jurisdiction of the Ecuadorian courts and to pay a resulting judgment is not incompatible with a request for an arbitral order requiring Ecuador to intervene in the Lago Agrio litigation. In dismissing Plaintiffs’ action on forum non conveniens grounds, the district court placed no conditions on Ecuador’s right to participate in any litigation instituted by Plaintiffs in Ecuador. Nor could it have, since Ecuador refused to waive its sovereign immunity in the district court and was not a party to Plaintiffs’ original action against Texaco.
See Aguinda,
Similarly, nothing in Texaco’s promises to submit to Ecuadorian jurisdiction and satisfy any Ecuadorian judgment prevents the arbitral panel from issuing a declaration regarding Chevron’s liability for Tex-Pet’s drilling operations. 10 If the arbitral panel issues such a declaration before any Ecuadorian judgmеnt becomes final, then the Ecuadorian courts, applying Ecuadorian law, will determine what impact that *399 declaration has on Plaintiffs’ case. If the pending Lago Agrio judgment is overturned on appeal — whether as a result of Ecuador’s intervention or for any other reason — Chevron will have complied with its obligation to litigate the matter in Ecuador and to pay any resulting judgment; in that case, it would simply have won in the Ecuadorian courts, and there will be no judgment to pay.
A conflict may arise if the Ecuadorian courts do issue a final judgment, and the arbitrators subsequently enter an award that is inconsistent with that judgment. Any such conflict, should it arise, could be resolved in any resulting proceedings to enforce the judgment. In such a proceeding, Plaintiffs would be free to argue that Chevron is estopped from refusing to pay that judgment based solely on the force of its release claim. New Yоrk’s Recognition of Foreign Country Money Judgments Act, which is the sole reserved route for Chevron to challenge any final judgment resulting from the Lago Agrio litigation, provides only limited ways to attack a judgment based on a prior agreement. Under that Act, a judgment “need not be recognized” if “the proceeding in the foreign court was contrary to an agreement
between the pa/rties
under which the dispute in question was to be settled otherwise than by proceedings in that court.” N.Y. C.P.L.R. 5304(b)(6) (emphasis added). But that provision appears only to apply when the parties to the foreign litigation act contrary to a prior agreement — usually a forum selection
clause
— between
those same parties. See Attorney Gen. of Barb. v. Fitzpatrick Constr. Ltd.,
No. 87 Civ. 4714,
At this point, however, we need not address the merits of any such argument. Any conflict between the outcomes of the BIT arbitration and the Lago Agrio litigation remains purely hypothetical. 11 The Ecuadorian courts have not issued' — and may never issue — a final judgment against Chevron, and the arbitral panel has yet to rule on the merits of Chevron’s claims, or even on whether it should reach the merits in light of Ecuador’s waiver and estoppel arguments. Under these circumstances, there is no reason for us to forestall or resolve any entirely hypothetical conflicts between as-yet-nonexistent rulings by enjoining Chevron from commencing arbitration. 12
*400 2. Equitable Estoppel
Equitable estoppel is properly invoked “where the enforcement оf the rights of one party would work an injustice upon the other party due to the latter’s justifiable reliance upon the former’s words or conduct.”
Kosakow,
Assuming arguendo that Plaintiffs can show this reliance, they have failed to demonstrate any misrepresentation by Chevron that would justify applying equitable estoppel in this case. As we previously explained, Chevron has thus far honored Texaco’s promises to the district court. As long as Chevron’s actions remain consistent with those promises, Plaintiffs’ equitable estoppel claims should be denied.
See Towers Charter & Marine Corp. v. Cadillac Ins. Co.,
3. Collateral Estoppel
Collateral estoppel bars relitigation of “an issue that has already bеen fully and fairly litigated in a prior proceeding.”
Bank of N.Y.,
The application of the collateral estoppel doctrine is improper here because there is no identity of issue between the BIT arbitration and the previous litigation in the district court. While Chevron would be collaterally estopped from relitigating issues already decided by the district court in granting Texaco’s motion to dismiss, nothing in the record demonstrates that Chevron has asked the arbitral panel to decide any issues identical to those previously decided by the district *401 court. Accordingly, collateral estoppel does not apply.
CONCLUSION
We have considered all of the parties’ arguments and have found in them no basis for reversal. For the foregoing reasons, the judgment of the district court is AFFIRMED.
Notes
. Chevron Corporation merged with TexPet’s parent company, Texaco, in 2001 to form *388 ChevronTexaco, Inc. In 2005, ChevronTexaco changed its name back to Chevron Corporation.
. Chevron has twice moved to supplement the record with thousands of pages of documents and numerous compact discs containing material irrelevant to the specific issue currently before us. Both motions were denied. After the initial denial, Chevron began submitting similar materials under the guise of Federal Rule of Appellate Procedure 28(j). But, as Chevron's experienced appellate counsel is certainly well awarе, that rule only permits parties to submit
"pertinent
and
significant
authorities.”
See
Fed. R.App. P. 28(j) (emphasis added). It is not to be used as a vehicle to bombard this Court with distracting and irrelevant documents.
Cf. United States v. Bortnovsky,
. Chevron Corporation claims, without citation to relevant case law, that it is not bound by the promises made by its predecessors in interest Texaco and ChevronTexaco, Inc. However, in seeking affirmance of the district court’s forum non conveniens dismissal, lawyers from ChevronTexaco appeared in this Court and reaffirmed the concessions that Texaco had made in order to secure dismissal of Plaintiffs’ complaint. In so doing, ChevronTexaco bound itself to those concessions. In 2005, ChevronTexaco dropped the name "Texaco" and reverted to its original name, Chevron Corporation. There is no indication in the record before us thаt shortening its name had any effect on ChevronTexaco’s legal obligations. Chevron Corporation therefore remains accountable for the promises upon which we and the district court relied in dismissing Plaintiffs’ action.
Throughout this Opinion, we use the various corporate names that Chevron Corporation has employed during the course of this litigation only for purposes of clarity. In so doing, we do not attribute any legal significance to the nomenclature used.
. While the district court did not include Texaco’s promise to satisfy any Ecuadorian judgment in its stipulation and order, an express adoption of the prior inconsistent position is not required. The court need only adopt the position "in some manner, such as by rendering a favorable judgment.”
Mitchell v. Washingtonville Cent. Sch. Dist.,
. Chevron's contention that the Lago Agrio litigation is not the refiled Aguinda action is without merit. The Lago Agrio plaintiffs are substantially the same as those who brought suit in the Southern District of New York, and the claims now being asserted in Lago Agrio are the Ecuadorian equivalent of those dismissed on forum non conveniens grounds.
. Although dicta in
International Shipping Co. v. Hydra Offshore, Inc.
suggests that the New York Convention is enforceable only where the party invoking its provisions seeks "either to compel arbitration or to enforce an arbitral award,”
. The UNCITRAL rules were revised in 2010, and jurisdictional issues are now governed by Article 23. However, this dispute arises under the rules in place prior to the 2010 revision. See UNCITRAL Arbitration Rules art. 1, G.A. Res. 65/22, U.N. Doc. A/RES/65/22 (Jan. 10, 2011).
. N.Y. C.P.L.R. 5304 provides, in pertinent part:
(a) ... A foreign country judgment is not conclusive if ... the judgment was rendered under a system which does not provide impartial tribunals or procedures compatible with the requirements of due process of law....
(b) ... A foreign country judgment need not be recognized if ...
3. the judgment was obtained by fraud ... [or]
6. the proceeding in the foreign court was contrary to an agreement between the parties under which the dispute in question was to be settled otherwise than by proceedings in that court....
. We of course express no view on the merits of this, or any of the other claims that Chevron has presented in the BIT arbitration.
. Again, we express no view on whether such an award would be appropriate. We consider this scenario only to examine whether the potential effect of any arbitral award supports Plaintiffs' claims of estoppel. Of course, if the arbitral panel rules in favor of Ecuador, the arbitration would have no effect at all on Plaintiffs’ Ecuadorian litigation.
. Given the extent and fluidity of this dispute, we do not suggest that the possibilities discussed above are the only moves that the parties can or will make, nor do we express any views on how a court should respond to these potential arguments. Recently, indeed, a district court overseeing a related matter issued a preliminary injunction restraining any attempt by Plaintiffs’ lawyers to enforce the Lago Agrio judgment outside of Ecuador.
See Chevron Corp. v. Donziger,
No. 11 Civ. 0691,
. Insofar as Ecuador argues that the district court erred by not staying the BIT arbitration through its inherent power to protect its previous judgments, that argument fails for the same reason we reject Plaintiffs' judicial estoppel claim: Chevron has not violated the conditions of the forum non conveniens dismissal.