MEMORANDUM OPINION
The Republic of Argentina (“Argentina”), the petitioner in this case, seeks to vacate or modify an arbitral award (the “Award”) rendered against it and in favor of respondent BG Group PLC (“BG Group”) under the Federal Arbitration Act, 9 U.S.C. §§ 1-14 (2006) (the “FAA”). Petition to Vacate or Modify Arbitration Award (the “Petition” or “Pet’r’s Pet.”) ¶ 3. In response, BG Group filed a cross-motion to confirm the Award under the FAA and the Convention on the Recognition and Enforcement of Foreign Arbitral Awards, June 10,1958, 21 U.S.T. 2517, 330 U.N.T.S. 38,
available at
I. Background
During the late 1980s and early 1990s, Argentina undertook a “wide [economic] reformation process,” which included entering into numerous bilateral investment treaties with various foreign nations in the hopes of attracting foreign investors. Resp’t’s Cross-Mot. at 1; Pet’r’s Pet. ¶ 13. One of the treaties entered into during this period was the Agreement for the Promotion and Protection of Investments, Arg.-U.K., Dec. 11, 1990, 1765 U.N.T.S. 33 (the “Investment Treaty”), between Argentina and the United Kingdom. Resp’t’s Cross-Mot. at 1; Pet’r’s Pet. ¶ 13. Similar to other bilateral investment treaties, the Investment Treaty was designed to ensure foreign investors that they would be treated fairly and equitably, to provide them with “full protection and security,” and to restrict the host country “from expropriating the assets of such investors without just compensation.” Resp’t’s Cross-Mot. at 1. To address any disputes arising from these investments, Argentina and the United Kingdom agreed to a two-tiered system of dispute resolution in which the dispute could be submitted to a “competent tribunal” of the country “in whose territory the investment was made,” after which the matter could be referred to arbitration under certain conditions, or the dispute could be submitted directly to international arbitration. Investment Treaty, art. 8(2). 2
Also as part of its economic reforms, Argentina enacted several measures in an effort “to reduce inflation and the public deficit,” including “privatization of certain state[-]owned companies in many seetors[,] including the gas transportation and distribution industry.” Pet’r’s Pet. ¶ 15. As part of these efforts, Argentina divided its gas transportation and distribution industry, Gas del Estado, Sociedad del Estado, into two transportation companies and eight distribution companies. Id. ¶ 18. BG Group, a United Kingdom company, invested in one of the eight distribution companies, MetroGAS, through a consortium of investors known as Gas Argentino, S.A. Id. ¶20. Eventually, BG Group acquired a 54.67% interest in Gas Argentino, S.A., which in turn owned 70% of Metro-GAS. Id. ¶ 21.
In 2001, after a period of exceptional economic growth, Argentina began to experience an economic crisis. Pet’r’s Pet. at 6-7. In its efforts to respond to this predicament, Argentina enacted an emer *114 gency law in 2002, implementing regulatory measures that negatively impacted BG Group’s investment in MetroGAS. Id.; Resp’t’s Cross-Mot. at 2. Pursuant to the Investment Treaty, BG Group initiated international arbitration proceedings on April 25, 2003. 3 Resp’t’s Cross-Mot. at 2; Pet’r’s Pet. ¶ 6. An arbitral panel commenced proceedings in New York and Washington, D.C. beginning in July of 2006. Pet’r’s Pet. ¶ 4.
Argentina raised a number of objections at the outset of the arbitration. First, Argentina objected to the arbitral panel’s jurisdiction to entertain BG Group’s claims, arguing, inter alia, that the Investment Treaty authorizes recourse to arbitration “only where disputes have been submitted for 18 months to the competent tribunal of the State which hosts the decision,” i.e., a competent tribunal in Argentina. Award ¶ 140. Second, Argentina challenged the arbitral panel’s jurisdiction on the grounds that BG Group’s claims were derivative in nature, and such claims “are proscribed by international law and by [Argentine] corporate law.” Id. ¶ 191. Third, Argentina challenged the appointment of Albert Jan van den Berg to the arbitral panel, id. ¶ 8, alleging that Jan van den Berg had issued arbitrary and capricious rulings in previous arbitrations involving Argentina, Pet’r’s Pet. ¶ 75-76. Each of these objections was rejected. Award ¶ 157 (finding that BG Group’s claims were arbitrable); id. ¶ 205 (concluding that the arbitral panel “has jurisdiction to hear BG[ Group’s] claims as they relate to its indirect shareholding in Metro-GAS”); id. ¶ 11 (noting that the International Chamber of Commerce International Court of Arbitration (the “ICC Court”) “had decided to reject [Argentina’s] challenge [to] Professor Albert Jan van den Berg” to the arbitral panel). 4 Both parties then proceeded with the arbitration, and, on December 24, 2007, the arbitral panel unanimously ruled in favor of BG Group and issued an award in the amount of $185,285,485.85 plus costs, attorneys’ fees, and interest. Pet’r’s Pet. at 3. In its decision, the arbitral panel rejected numerous arguments raised by Argentina, one of which was its reliance on the “state of necessity” doctrine to exonerate it from liability. 5 Award ¶ 391. The arbitral panel then concluded that Argentina breached the Investment Treaty and awarded damages to BG Group based on the fair market value of its investment in MetroGAS. Id. ¶ 422.
Clearly unsatisfied with the outcome of the arbitration decision, Argentina filed its petition to vacate or modify the Award on March 21, 2008. In support of its prayer for relief, Argentina asserts the following arguments: (1) “[t]he [arbitrators exceeded their authority by disregarding [the] terms of [the] parties’ agreement,” Pet’r’s Pet. ¶ 41; (2) “[t]he [arbitral [t]ribunal misunderstood applicable law ... and failed to correctly apply [such law],” id. *115 ¶ 61; (3) “[t]he International Court of Arbitration exceeded its authority by failing to disqualify [Jan van den] Berg from serving as [an] arbitrator,” id. ¶ 69; (4) the award was procured by “corruption, fraud, or undue means,” id. ¶¶ 79-80; and (5) the arbitral tribunal imposed a disproportionate and unfair award, id. ¶ 107. BG Group, in turn, argues that Argentina’s claims are “without merit and must be dismissed.” Resp’t’s Cross-Mot. at 16. 6 BG Group also moves to have the Award confirmed pursuant to 9 U.S.C. § 9 and Article IV of the New York Convention. Id. at 36.
II. Standard of Review
The Court’s authority to vacate an arbitral award is governed by 9 U.S.C. § 10(a), which provides the following:
In any of the following cases the United States court in and for the district wherein the award was made may make an order vacating the award upon the application of any party to the arbitration—
(1) where the award was procured by corruption, fraud, or undue means;
(2) where there was evident partiality or corruption in the arbitrators, or either of them;
(3) where the arbitrators were guilty of misconduct in refusing to postpone the hearing, upon sufficient cause shown, or in refusing to hear evidence pertinent and material to the controversy; or of any other misbehavior by which the rights of any party have been prejudiced; or
(4) where the arbitrators exceeded their powers, or so imperfectly executed them that a mutual, final, and definite award upon the subject matter submitted was not made.
Additionally, the Court may modify or correct an arbitral award if (1) the movant can demonstrate that there “was an evident material miscalculation of figures[,] or an evident material mistake in the description of any person, thing, or property referred to in the award,” (2) the arbitrator has rendered a decision “upon a matter not submitted to [him], unless it is a matter not affecting the merits of the decision upon the matter submitted,” or (3) “the award is imperfect in matter of form not affecting the merits of the controversy.” 9 U.S.C. § 11. The Supreme Court has held that the grounds enumerated in Sections 10(a) and 11 of the FAA are the exclusive means for vacating, modifying, or correcting an arbitral award.
7
Hall St. Assoc.,
*116
LLC v. Mattel, Inc.,
In relying on these standards to determine whether vacatur or modification of the Award is warranted, the Court must remain mindful of the principle that “judicial review of arbitral awards is extremely limited,” and that this Court “do[es] not sit to hear claims of factual or legal error by an arbitrator” in the same manner that an appeals court would review the decision of a lower court.
Teamsters Local Union No. 61 v. United Parcel Serv., Inc.,
III. Legal Analysis
Before addressing the merits of the Petition, the Court must first assess whether it has subject-matter jurisdiction under the FAA to entertain this dispute. In the Petition, Argentina cites 9 U.S.C. § 203 as the basis for the Court’s jurisdiction over this matter,
see
Pet’r’s Pet. at 2 (“This court has jurisdiction over ... this Petition pursuant to 9 U.S.C. § 201 et seq.”), which confers jurisdiction on this Court to entertain “action[s] or proceeding[s] falling under the [New York] Convention,” 9 U.S.C. § 203 (2006). Although Argentina seemingly took the position in its jurisdictional statement that the Award falls within the ambit of the New York Convention, it has actually taken the opposite position in this litigation with regards to whether the Court has the authority to grant BG Group’s cross-motion for a prejudgment bond pursuant to Article VI of
*117
the New York Convention.
See, e.g.,
Pet’r’s 2d Supp. Mem. at 2. The Court suspects that Argentina merely intended to argue against the applicability of the Convention for the sole purpose of defeating BG Group’s efforts at securing a prejudgment bond, but in so doing, Argentina has also potentially undermined its own invocation of this Court’s subject-matter jurisdiction. This is because without recourse to Section 203, the Court is likely without any other basis to find that it has subject-matter jurisdiction, as the FAA does “not itself bestow[] jurisdiction on the federal district courts” under 28 U.S.C. § 1331,
Karsner v. Lothian,
A. The Jurisdiction of the Court to Entertain the Petition and Cross-Motion
As noted above, whether the Court has subject-matter jurisdiction over this dispute hinges on whether the Award is one that is covered under the New York Convention. Article 1(1) of the New York Convention provides the following:
This Convention shall apply to the recognition and enforcement of arbitral awards made in the territory of a State other than the State where the recognition and enforcement of such awards are sought, and arising out of differences between persons, whether physical or legal. It shall also apply to arbitral awards not considered as domestic awards in the State where their recognition and enforcement are sought.
New York Convention, art. I(1). Put differently, the first sentence applies to arbitral awards that are issued outside the territorial boundaries of the nation where enforcement is being sought, while the second sentence refers to awards that are issued within the borders of the nation where enforcement is sought, yet are sufficiently foreign in character as to not be considered “domestic awards” in that
*118
country.
8
The parties agree that the Award was issued in the District of Columbia and it therefore falls outside the bounds of the “extraterritorial” provision of Article 1(1).
See Bergesen v. Joseph Muller Corp.,
In support of its argument that the United States does not recognize the “non-domestic” provision of the New York Convention, Argentina relies on the United States’s invocation of a reservation contained in Article 1(3) of the Convention, Pet’r’s 2d Supp. Mem. at 2, which was aptly described by one of the Convention’s drafters as the “reciprocity clause,”
see, e.g.,
United Nations Conference on International Commercial Arbitration, May 20-June 10, 1958,
Adoption and Signature of the Final Act and Convention,
at 9, U.N. Doe. E/CONF.26/SR.23—E/CONF.26/L.60 (June 9, 1958). The clause maintains, in part, that “[t]he United States of America will apply the Convention, on the basis of reciprocity, to the recognition and enforcement of only those awards made in the territory of another Contracting State.”
9
New York Convention, Note by the Department of State, 21 U.S.T. 2517, 330 U.N.T.S. 38,
available at
Argentina’s reading of the reservation fails to comport with the well-known canon of statutory construction that a court must “give effect, if possible, to every word ... used,”
Reiter v. Sonotone Corp.,
Another defect present in Argentina’s interpretation of the “reciprocity clause” is that it directly conflicts with Congress’s *119 understanding of the New York Convention’s extensive reach to arbitral awards issued in the United States, as reflected in the language of 9 U.S.C. § 202 (2006), which provides that:
[a]n agreement or award arising out of [a commercial] relationship which is entirely between citizens of the United States shall be deemed not to fall under the Convention unless that relationship involves property located abroad, envisages performance or enforcement abroad, or has some other reasonable relation with one or more foreign states.
While it is clear that arbitral awards “between citizens of the United States” that maintain “some ... reasonable relationship] with one or more foreign states” are covered by the New York Convention pursuant to Section 202, Congress did not explicitly state whether Section 202 applies to arbitral awards rendered abroad, awards issued domestically, or both. But in reading Section 202 in pari materia, with the New York Convention, it is evident that Congress did not intend for this provision to relate to arbitral awards issued outside of the territorial jurisdiction of the United States, as an award rendered under that circumstance falls within the explicit language of the “extraterritorial” provision of Article 1(1) of the Convention. See New York Convention, art. I(1); Albert Jan van den Berg, When Is an Arbitral Award Nondomestic Under the New York Convention of 1958, 6 Pace L.Rev. 25, 39 (1985) (“[T]he New York Convention always applies to the recognition and enforcement of an arbitral award made in another state.”). Thus, Congress must have intended for Section 202, and the provisions of the New York Convention, to apply to arbitral awards issued within the territorial boundaries of the United States, i.e., awards covered under the “non-domestic” provision of the Convention. Accordingly, Section 202 debunks any argument that Congress, in ratifying the New York Convention, understood the “reciprocity clause” to limit the reach of that treaty to only those arbitral awards issued extraterritorially.
As for whether the Award constitutes a “non-domestic” award under the New York Convention, the starting point in resolving that question is the Convention itself. As the plain text of Article 1(1) states, each individual signatory to the Convention determines what constitutes a “non-domestic” award.
See
New York Convention, art. 1(1) (applying the Convention to “arbitral awards not considered as domestic awards in the State where their recognition and enforcement are sought”). And, as noted above, Congress intended to “spell[ ] out its definition of’ a “non-domestic” award in Section 202 of the FAA, and that in doing so, it did not exclude from its definition arbitral awards involving two foreign parties.
Bergesen,
B. The Merits of the Petition and Cross-Motion
Turning to the merits of the Petition, Argentina relies on several provisions un
*121
der 9 U.S.C. §§ 10(a) and 11 in support of its request for vacatur or modification of the Award. Specifically, Argentina argues that the Award should be vacated for the following reasons: (1) the arbitral panel exceeded its authority under the Investment Treaty, 9 U.S.C. § 10(a)(4); (2) the arbitral panel acted “in manifest disregard of the law,”
LaPrade,
1. Whether the Arbitral Panel and ICC Court Exceeded Their Authority
Argentina proffers several arguments in support of its position that the Court should vacate the Award pursuant to Section 10(a)(4) of the FAA. First, Argentina contends that the ICC Court exceeded its authority by failing to disqualify Jan van den Berg from serving on the panel. Pet’r’s Pet. ¶ 69. Second, Argentina asserts that the Court must vacate the Award under Section 10(a)(4) because the arbitral panel improperly “permit[ed] BG [Group] to arbitrate its claims” before seeking recourse in the Argentine courts. Id. ¶ 60. Third, Argentina contends that the arbitral panel acted outside the bounds of its authority by allowing BG Group to “bring[] a derivative claim on behalf of MetroGAS.” Id. And fourth, Argentina argues that the arbitral panel wrongfully rejected “the discounted cash flow method” in calculating the amount of the Award. Id. ¶ 105.
In order for Argentina to prevail in its efforts to vacate the Award under Section 10(a)(4), it must demonstrate that the “arbitrator strayfed] from interpretation and application of the agreement and effectively dispense[d] his own brand of industrial justice.”
Stolh-Nielsen S.A. v. AnimalFeeds Int’l Corp.,
— U.S. -, -,
On the question of whether the ICC Court exceeded its authority by failing to unseat Jan van den Berg from the arbitral panel, the claim is without merit. Nowhere in its Petition does Argentina dispute the ICC Court’s authority under the Investment Treaty or the UNCITRAL arbitration rules to entertain its objection to Jan van den Berg’s appointment to the arbitral panel. And, to the extent that Argentina argues that the ICC Court exceeded its authority by allowing a partial and biased arbiter to sit on the panel, that argument must be rejected because Argentina has failed to provide any evidence establishing partiality on the part of Jan van den Berg. See infra pp. 124 - 25. Argentina has simply provided no basis from which the Court could vacate the Award based on the ICC Court’s exercise of authority.
Likewise, Argentina has not met its burden of showing that the arbitral *122 panel exceeded its authority by entertaining BG Group’s claims without requiring that recourse first be sought in the Argentine court system. The panel concluded that BG Group need not seek recourse in the Argentine court system before arbitrating this dispute because “[a]s a matter of treaty interpretation, ... Article 8(2)(a)(i) cannot be construed as an absolute impediment to arbitration” where “any such interpretation would lead to the kind of absurd and unreasonable result proscribed by Article 32 of the Vienna Convention [on the Law of Treaties].” 11 Award ¶ 147. And, the arbitral panel concluded that a strict textual interpretation of Article 8(2)(a)(i) would result in an “absurd and unreasonable result” because Argentina had promulgated “emergency legislation ... whose purpose was to bar recourse to the courts by those whose rights were felt to be violated.” Id. ¶ 148; see also id. ¶ 149 (concluding that Argentina had also implemented a decree which “provided for a stay of all suits brought by those whose rights were allegedly affected by the [government’s] emergency measures”). As the cited language illustrates, the panel correctly turned to the text of Article 8(2)(a)(i) of the Investment Treaty and relevant international law sources in attempting to discern its jurisdiction to hear BG Group’s claims, and it relied upon a colorable, if not reasonable, interpretation of these provisions in concluding that the matter was arbitrable. Under Section 10(a)(4) and controlling case law, the Court is without authority to disturb the panel’s conclusions.
Argentina’s remaining efforts to vacate the Award under Section 10(a)(4) must also be rejected. In determining whether international law authorized BG Group to bring “a derivative claim on behalf of MetroGAS,” Pet’r’s Pet. ¶ 60, the panel reviewed several arbitration decisions and ultimately concluded that those cases supported the proposition that derivative claims are allowable under international law. In fact, the two cases cited by Argentina to support its argument that the panel could not hear derivative claims were actually found by the arbitral panel to stand for the opposite proposition.
See
Award ¶ 192 (“In support for its position [that derivative claims are not allowable] under international law, [Argentina] initially relied on
Barcelona Traction, Light and Power Co. [(Belg. v. Spain),
1970 I.C.J. 3 (Feb. 5)], and it later invoked ...
[GAMI Investments, Inc. v. United Mexican States,
UNCITRAL/NAFTA, Final Award (Nov. 15, 2004) ]”),
id.
¶ 197 (concluding that international law “does not require a claimant shareholder to be a majority or controlling owner for his investment to qualify for protection”);
id.
¶ 193 (“The Tribunal finds the
GAMI
decision apposite and compelling as it relates generally to derivative claims, and specifically to the significance of
Barcelona Traction.”).
Similarly, when the panel concluded that Section 2.2 of the Investment Treaty was silent on the standard for calculating damages, the arbitral panel properly turned to sources of international law to “identify the rule of law that governs in that situation.”
StolG-Nielsen
*123
S.A.,
— U.S. at -,
2. Whether the Arbitral Panel Acted In Manifest Disregard of the Law
To prevail under the “manifest disregard of the law” standard, Argentina must demonstrate “more than error or misunderstanding with respect to the law.”
LaPrade,
In resolving the jurisdictional question, the arbitral panel did not “ignore[] the plain language of the [Investment] Treaty,” as Argentina suggests. Pet’r’s Reply at 10 (emphasis added). Rather, as noted above, the arbitral panel construed Article 8(2)(a)(i) of the Investment Treaty together with Article 32 of the Vienna Convention and determined that the former was not applicable under the particular circumstances of this case. Given that the arbitral panel provided a colorable justification for its interpretation of the Investment Treaty, it can hardly be said that the panel disregarded the applicable law.
Similarly, Argentina’s argument that the arbitral panel “misunderstood ... and failed to correctly apply the [‘state of necessity’] doctrine” is nothing more than a mere assertion of error, and not that the panel manifestly disregarded the law. Pet’r’s Pet. ¶ 61. Indeed, Argentina even admits that the panel addressed the “state *124 of necessity” doctrine in issuing the Award. See id. ¶ 64 (contending that “[i]n a mere[] short seven paragraphs of the Award ... the [panel] arbitrarily dismissed [the ‘]state of necessity[’] defense”). But putting aside the fact that the arbitral panel considered, rather than ignored, Argentina’s invocation of the .“state of necessity” doctrine, it is far from certain that the doctrine is “clearly applicable” in this case. As the arbitral panel explained in issuing the Award, a country cannot invoke the “state of necessity” doctrine without being subject to “very restrictive conditions” to ensure that the country does not abuse the doctrine and “violate ... international law with impunity.” Award ¶ 410; see also International Court of Justice, Case Concerning The Gabcikovo-Nagymaros Project (Hungary/Slovakia), 1997 I.C.J. 7 (Sept. 25) (concluding that the “state of necessity” doctrine, as codified in Article 25 of the International Law Commission’s Articl.es on State Responsibility, is limited to circumstances in which there is “grave and imminent peril”). And, the panel found that Argentina could not invoke this doctrine because, inter alia, it had lured BG Group and other investors to accept measures that Argentina described as temporary, but later “set[ ] up a mechanism ... that was never intended to restore the conditions of Argentina’s initial representations.” Award ¶ 411. Thus, the “state of necessity” doctrine is by no means “clearly applicable” to this case; if anything, the arbitral panel explained why this doctrine has no application to the facts of this case whatsoever. The Court, therefore, rejects Argentina’s challenges to the arbitral panel’s decision based on the “manifest disregard of the law” standard.
3. Whether There was Evident Partiality or Corruption With the Arbitrators
To have the award vacated under Section 10(a)(2), Argentina must present evidence of partiality or corruption that is “direct, definite, and capable of demonstration^] rather than remote, uncertain, or speculative.”
Al-Harbi v. Citibank, N.A.,
Jan van den Berg’s failure to provide an explanation for his decision is hardly evidence of nefarious intent on his part, especially given the well-settled principle, that arbitrators have no obligation to disclose the basis upon which their awards are made..
Wilko v. Swan,
4. Whether the Award was Procured by Corrupt, Fraudulent, or Undue Means
Argentina asserts that the Award was procured by “corrupt, fraud, or undue means” because witness statements presented in this case contain “passages that are identical or substantially identical to a witness statement presented in [another unrelated] case.” Pet’r’s Pet. ¶ 82. Specifically, Argentina observes that the “witness statements presented in this case have many passages that are identical or substantially identical to a witness statement presented in [an earlier] case,” and that because counsel for BG Group represented the plaintiff involved in the earlier case, the statements must “reflect what [c]ounsel would have [the] witnesses] declare,” rather than “what the witnesses] saw, thought[,] or believed at the time” the statements were made. Id. ¶ 82.
But Argentina assumes too much. At best, the similarities between the witness statements establish that counsel drafted the declarations in both cases. Assuming that counsel did in fact have a heavy hand in drafting the declarations at issue in these cases, their actions do not rise to the level of wrongdoing unless Argentina can prove that the witness signed the statement without subscribing to the facts stated therein.
See Resolution Trust Corp. v. Bright,
5. Whether a “Disproportionate, ” “Unfair, ” and “Irrational” Award Can Be Modified Under 9 U.S.C. § 11
Finally, Argentina argues that the Court should modify the Award because the arbitral panel’s rejection of the “discounted cash flow basis” standard resulted in a disproportionate, unfair, and irrational Award. Pet’r’s Reply at 17. Unfortunately for Argentina, Section 11 of the FAA does not authorize the Court to modify the Award on these grounds. Rather, the Court can modify the Award under Section 11 only if it finds that the Award contains a “material miscalculation of figures,” 9 U.S.C. § 11(a), i.e., a “mathematical error appearing] on [its] face,”
Grain v. Trinity Health, Mercy Health Servs., Inc.,
*126 IV. Conclusion
“A federal court cannot vacate [or modify] an arbitral award merely because it is convinced that the arbitration panel made the wrong call on the law.”
Howard Univ. v. Metro. Campus Police Officer’s Union,
The remaining question in this matter, therefore, is whether the Court should grant BG Group’s cross-motion to confirm the Award. Argentina argues that it “should be given [a] full opportunity to respond to [BG Group’s cross-motion] once the Court has [rendered] a decision” regarding its Petition, “considering the serious violations of public policy” allegedly committed by the arbitral panel,
12
Pet’r’s Reply at 22, while BG Group responds that Argentina has had more than a month to oppose the cross-motion, but that in any event, “Argentina’s challenge to the Award on public policy grounds is entirely without foundation,” Resp’t’s Reply at 4 n. 4. The Court shares a level of empathy with BG Group’s position (i.e., that Argentina could have (and should have) set forth in its memorandum in opposition to BG Group’s cross-motion the basis for vacatur on public policy grounds), and that given the nature of the Award, the Court is highly skeptical that the Award violates this country’s “most basic notions of morality and justice.”
TermoRio S.A. E.S.P. v. Electranta S.P.,
Nonetheless, in light of Argentina’s express reservation for further briefing on the issue of whether vacatur is appropriate under Article V(2)(b) of the New York Convention, the Court concludes that Argentina should be given the opportunity to submit a supplemental memorandum. Thus, any supplemental memorandum that Argentina desires to submit on this issue shall be filed on or before June 30, 2010, BG Group shall file its memorandum in opposition to Argentina’s supplemental memorandum on or before July 21, 2010, and Argentina shall file its brief in reply to BG Group’s opposition memorandum on July 30, 2010. And, to ensure the prompt resolution of this matter, the parties shall then appear before the Court at 9:30 a.m. on August 13, 2010, for a hearing on the merits of BG Group’s motion to confirm the Award. The Court expects strict adherence to this schedule, given the inconvenience and additional delay that BG Group will have to endure as a result of additional briefing. Accordingly, the Court will not grant Argentina any extensions of time to file its submissions absent the most compelling circumstances, and the failure of Argentina to timely file a supplemental memorandum will result in the Court treating BG Group’s cross-motion as conceded.
*127 SO ORDERED on this 7th day of June, 2010. 13
Notes
. In addition to Argentina’s petition and BG Group’s cross-motion, the Court considered the following documents in reaching its decision: (1) Argentina’s Memorandum of Points and Authorities in Reply to Respondent's Opposition to the Motion to Vacate or Modify Arbitration Award and in Opposition to Respondent’s Cross-Motions for Confirmation of the Award and For a Pre-Judgment Bond (the ''Pet'r’s Reply”); (2) BG Group’s Memorandum of Points and Authorities in Reply to Petitioner’s Opposition to Respondent's Cross-Motion for Recognition and Enforcement and for a Pre-Judgment Bond (the "Resp’t's Reply”); (3) BG Group’s Supplemental Memorandum of Law in Support of Respondent’s Motion for Pre-Judgment Bond (the ''Resp’t’s Supp. Mem.”); (4) Argentina's Supplemental Memorandum of Points with Regard to Posting a Bond (the "Pet'r's Supp. Mem.”); (5) Argentina’s Second Supplemental Memorandum of Points with Regard to Posting of Bond (the '‘Pet'r’s 2d Supp. Mem.”); (6) BG Group’s Supplemental Memorandum of Law on the Applicability of the New York Convention (the "Resp’t’s 2d Supp. Mem.”); and (7) BG Group’s Supplemental Memorandum in Support of Respondent’s *113 Motion for a Pre-Judgment Bond (the "Resp’t’s 3d Supp. Mem.”).
. Article 8(2) of the Investment Treaty provides for recourse to arbitration under the following circumstances:
(a) if one of the Parties so requests ...:
(i) where, after a period of eighteen months has elapsed from the moment when the dispute was submitted to [a] competent tribunal of the [country] in whose territory the investment was made
(ii) where the final decision of the aforementioned tribunal has been made but the Parties are still in dispute;
(b) where the [Parties] have so agreed.
Furthermore, the Investment Treaty provides that "where the dispute is referred to international arbitration,” the parties "may agree to refer the dispute either to: (a) the International Centre for the Settlement of Investment Disputes [ (the "ICSID”) ] ... or (b) an international arbitrator or ad hoc arbitration tribunal ... under the Arbitration Rules of the United Nations Commission on International Trade Law [(the “UNCITRAL Rules”)]. Award at 6 (citing Article 8(3)(a)-(b) of the Treaty). Here, "[b]ecause the [p]arties failed to agree on submission of the dispute to the ... []ICSID[], BG [Group] submitted to arbitration under ... []the UNCITRAL Rules[].” Id. at 7.
. Over 25 foreign investors initiated arbitration against Argentina claiming violations of bilateral investment treaties caused by the emergency law’s enactment. Resp't’s Opp'n at 2.
. Under Article 12(l)(b) of the UNCITRAL Rules, which governed the arbitration at issue in this case, a challenge to the seating of an arbitrator on an arbitral panel must be brought before an "appointing authority” that has been previously designated by the parties. In this case, the ICC Court had been designated as the "appointing authority” by the parties. Award V 9.
.Argentina argued that it could invoke the "state of necessity” doctrine because it was purportedly "compelled to depart from [its] obligations with [the United Kingdom] in order to preserve an essential state interest in a situation of grave or imminent danger.” Award ¶ 391.
. BG Group also seeks an order from the Court requiring Argentina to post a pre-judgment bond before having its petition considered by the Court. On March 31, 2010, the Court issued an order requiring Argentina to post a pre-judgment bond. Upon further reflection, however, the Court concludes that the posting of a bond is unnecessary, in light of the Court's conclusion here that Argentina’s petition to vacate or modify the Award is entirely without merit. Accordingly, the March 31, 2010 Order is vacated, and BG Group’s cross-motion for a pre-judgment bond is denied as moot.
. In addition to Sections 10(a) and 11 of the FAA, Argentina relies on the non-statutory ground that an arbitral award may be vacated where the award was issued in "manifest disregard of the law.”
Lessin
v.
Merrill Lynch, Pierce, Fenner & Smith, Inc.,
. For ease of reference, the Court will refer to the first provision of Article I(1) as the "extraterritorial” provision, and the second provision as the "non-domestic” provision.
. Article I(3) of the New York Convention states the following:
When signing, ratifying!,] or acceding to this Convention, or notifying extension under article X hereof, any State may on the basis of reciprocity declare that it will apply the Convention to the recognition and enforcement of awards made only in the territory of another Contracting State. It may also declare that it will apply the Convention only to differences arising out of legal relationships, whether contractual or not, which are considered as commercial under the national law of the State making such declaration.
. BG Group contends that the Court should not entertain the Petition because Argentina failed to comply with 9 U.S.C. § 12, which requires a party moving to vacate, modify, or correct an arbitral award to serve "[n]otice of [the] motion ... upon the adverse party or his attorney within three months after the award is filed or delivered.” Specifically, BG Group alleges that the Award was delivered to the parties on December 24, 2007, and that Argentina did not serve notice of the Petition until April 8, 2008, approximately two weeks after the limitations period expired on March 24, 2008. Resp't’s Cross-Mot. at 14. On the other hand, Argentina asserts that it had sent an e-mail, with the Petition attached, to both BG Group and its counsel on March 20, 2008. Pet'r’s Reply at 5; see also Pet’r’s Pet., Ex. 3 (Affidavit of Fernando Koatz) ¶ 6-7 (declaring under oath that the Petition was served on BG Group and its counsel on March 20, 2008).
While Section 12 of the FAA is unquestionably applicable to the Petition now before the Court,
see 9
U.S.C. § 208 (providing that 9 U.S.C. §§ 1-12 are applicable to matters covered under the New York Convention "to the extent that [they] are not in conflict with [9 U.S.C. §§ 201-208] or the Convention as ratified by the United States”), the problem with construing Section 12 in the context of international arbitration awards is that this provision "is an anachronism [that does not] account for the internationalization of arbitration law subsequent to its enactment.”
Matter of Arbitration Between InterCarbon Bermuda, Ltd. and Caltex Trading and Transp. Corp.,
Fortunately for the Court, the quandary of applying Section 12 in the international arbitration context is a perplexing problem whose resolution will be left for another day, as this issue does not involve a question of jurisdiction, Da
lal,
. Article 32 of the Vienna Convention on the Law of Treaties, to which Argentina is a signatory, provides that "[rjecourse may be had to supplementary means of interpretation” when standard means of treaty interpretation would ”leave[] the meaning [of the provision] ambiguous or obscuref] or ... lead[ ] to a result which is manifestly absurd or unreasonable.” The arbitral panel was authorized, if not compelled, to resort to sources of international law in construing Article 8(2)(a)(i) of the Investment Treaty. See Investment Treaty, art. 8(4) (requiring "[t]he arbitral tribunal [to] decide the dispute in accordance with the provisions of [the Investment Treaty] and the applicable principles of international law”).
. Article V(2)(b) of the New York Convention provides a court with the authority to refuse recognition of an arbitral award if confirmation of the award "would be contrary to the public policy of that country.”
. The Court issued an order on March 31, 2010, granting BG Group’s motion for a prejudgment bond and, inter alia, staying further action in this case until otherwise ordered by the Court. In light of the foregoing analysis, the Court will issue an order accompanying this memorandum opinion (1) vacating the March 31, 2010 order; (2) lifting the stay and administratively reopening the case; (3) denying Argentina's Petition to Vacate or Modify an Award; (4) denying as moot BG Group’s Motion for a Pre-Judgment Bond; (5) directing Argentina to file a supplemental memorandum explaining its reasons why the Court should refrain from confirming the Award pursuant to Article V(l)(c) of the New York Convention, if any it intends to file, on or before June 30, 2010; (6) directing BG Group to file its memorandum in opposition to Argentina’s supplemental memorandum, if any it intends to file, on or before July 21, 2010; (7) directing Argentina to file its brief in reply to BG Group's opposition memorandum, if any it intends to file, on or before July 30, 2010; and (8) directing the parties to appear before the Court at 9:30 a.m. on August 13, 2010, for a hearing on the merits of BG Group’s motion to confirm the Award.