MEMORANDUM OPINION
Plaintiff Red Lake Band of Chippewa Indians (“Plaintiff’ or the “Tribe”) filed the instant lawsuit against Defendants, the United States Department of Interior (“Department”) and Ken Salazar in his official capacity as Secretary of the Department 1 (“Secretary,” collectively with the Department, “Defendants”), alleging that Defendants breached provisions of the parties’ Compact of Self-Governance and accompanying agreements entered into pursuant to the Indian Self-Determination and Education Assistance Act, 25 U.S.C. § 450, et seq. (“ISDEAA” or the “Act”). Specifically, Plaintiff alleges that Defendants failed to obtain, assist Plaintiff in obtaining, and/or request funding for the Tribe’s new juvenile correction facility in breach of the parties’ agreement. In addition, Plaintiff claims that Defendants failed to notify the Tribe of the availability of year-end funding in breach of the parties’ agreement. Finally, Plaintiff alleges that Defendants failed to timely provide Plaintiff with certain “pay cost” analyses and also failed to provide the Tribe with the full amount of pay cost increases as required under the terms of the parties’ contract.
Currently pending before the Court are Plaintiffs [16] Motion for Summary Judg
I. BACKGROUND
A The ISDEAA
The purpose of the ISDEAA, 25 U.S.C. § 450
et seq.,
is to “assure maximum participation by Indian tribes in the planning and administration of federal services, programs and activities for Indian communities.” S.Rep. No. 100-274 at 1 (1988), reprinted at 1988 U.S.C.C.A.N 2620, 2620. Accordingly, the ISDEAA authorizes federal agencies, such as the Department, to enter into contracts with Indian tribes in which the tribes promise to supply federally funded services, for example tribal law enforcement services, that a federal agency would otherwise provide.
Cherokee Nation of Oklahoma v. Leavitt,
B. The Parties and their Contract
Plaintiff is a federally recognized Indian tribe. PL’s Stmt. ¶ l.
2
Secretary Salazar
On or about January 14, 1997, Plaintiff and the Department entered into a Compact of Self-Governance (“Compact”) pursuant to the ISDEAA. Id. ¶ 5; Defs.’ Stmt. ¶ 1. The Compact enabled the Tribe to “plan, conduct, and administer programs and services to the extent as provided in the annual funding agreement.” Defs.’ Stmt. ¶ 1. This goal is reflected in the text of the Compact itself, which provides that the Compact is intended to:
[CJarry out Self-Governance as authorized by [the ISDEAA], which ... transfers control to tribal governments, upon tribal request, over funding and decision making of Federal programs, services, functions and activities as an effective way to implement the federal policy of government-to-government relations with Indian tribes.
Pl.’s Mot., Ex. A (Compact), Art. I § 2(a).
In addition, as is relevant here, the Compact includes a provision, entitled “funding amount,” which provides that:
Subject only to the appropriation of funds by the Congress of the United States ..., the Secretary or an authorized representative shall provide to the Tribe the total amount specified in the Annual Agreement incorporated by reference ....
Id.
On or about November 15, 2004, pursuant to the Compact, Plaintiff and Defendants entered into a Multi-Year Funding Agreement (“Agreement”) for 2005-2010. Pl.’s Stmt. ¶ 10; Defs.’ Resp. ¶ 10. The Agreement is amended annually by the parties pursuant to a “reprogramming request,” and provides that “[t]he Tribe assumes all operational responsibility for all programs, functions, services, and activities as reflected in the REPROGRAMMING REQUEST ....” PL’s Stmt. ¶¶ 10-11; Defs.’ Resp. ¶ 10-11; PL’s Mot., Ex. B (Agreement and 2005 Reprogramming Request). At issue are the parties’ 2005 and 2006 reprogramming requests, which are discussed below.
1. 2005 Reprogramming Request
Count I of Plaintiffs Complaint involves the reprogramming request for the year 2005, entitled the 2005 Annual Funding Agreement — Reprogramming Request (“2005 Reprogramming Request”), which is attached to the Agreement. PL’s Stmt. ¶ Í0; Defs.’ Resp. ¶ 10; PL’s Mot. Ex. B (Agreement and 2005 Reprogramming Request);
see also
Compl. ¶¶ 48-52. Subject to the terms of the Compact and Agreement, the 2005 Reprogramming Request generally sets forth the funds to be provided in 2005 by the United States to the Tribe for the provision of the agreed upon services. PL’s Stmt. ¶ 10; Defs.’ Resp. ¶ 10; PL’s Mot., Ex. B (Agreement and 2005 Reprogramming Request). Specifically, the 2005 Reprogramming Request
The heart of Plaintiffs claims as to the 2005 Reprogramming Request is line item no. 177 of the 2005 Reprogramming Request, see Compl. ¶¶ 48-52, which provides as follows:
Info OSG OSG OSG BIA
Program Cost (Tribal Cum. Shortfall Shortfall Reprogram Total
Line # Title_Code Share) Base Base_Request Request AFA_FN
177 Law 37700 0 0 5,283 0 4,576,753 ■ 4,582,036 25 Enforcement— _NON TPA_
PL’s Mot., Ex. B (Agreement and 2005 Reprogramming Request), at 10. As indicated in the last column, line item no. 177 also contains a footnote, specifically footnote no. 25, which in turn provides, inter alia, that:
The BIA agrees to assist the Tribe in obtaining $1,218,482 for operations funding for the Tribes [sic ] juvenile correction facility 3 in CY 2005, and to request this amount in the next Presidents [sic ] budget.
PL’s Stmt. ¶ 16; PL’s Mot., Ex. B (Agreement and 2005 Reprogramming Request), at 14. According to Plaintiff, line item no. 177, together with footnote 25, obligated Defendants to do two things: (1) to obtain $1,218,482 in funding for the Tribe’s juvenile correction center in calendar year (“CY”) 2005, or, in the alternative, to assist the Tribe in obtaining such funding; and (2) to request this same amount of funding in the next President’s budget. PL’s Compl. ¶¶ 48-52.
As to Plaintiffs first allegation, it is undisputed that the Tribe did not receive $1,218,482 in CY 2005 operations funding for the juvenile correction center. PL’s Stmt. ¶ 17. Moreover, BIA officials testified that BIA did not provide any assistance to the Tribe in obtaining the specified funding. Specifically, the head of BIA’s Office of Justice Services, Christopher Chaney, testified that BIA did not provide any assistance to the Tribe in obtaining staffing and program operations funding for the juvenile correction facility in CY 2005.
Id.
¶ 18. In addition, Patrick Ragsdale, the Director of BIA, testified that he was not aware of any efforts by BIA to obtain staffing and program operations funding in CY 2005 for the facility in question.
Id.
¶ 19. Finally, Kenneth Fe
As concerns the second allegation, there appears to be some dispute as to whether the language stating that BIA “request this amount in the next Presidents [sic] budget” refers to the President’s budget for fiscal year (“FY”) 2006 or FY 2007. See Pl.’s Stmt. ¶ 21 (stating that, as the 2005 Reprogramming Request was negotiated and executed in the fall of 2004, the next President’s budget was for FY 2006); Defs.’ Stmt. ¶ 21 (denying Pl.’s Stmt. ¶ 21 and suggesting that the Agreement was not effective until after the budget had been finalized for FY 2006). Nonetheless, it is undisputed that Defendants did not include a request for $1,218,482 for the Tribe’s juvenile correction facility in the President’s budget for either FY 2006 or FY 2007. PL’s Stmt. ¶¶ 22-23.
In addition, Plaintiff has proffered undisputed evidence concerning the Department’s budget for BIA Public Safety and Justice law enforcement programs — i.e., the likely source of any potential funding for the juvenile correction facility — during the years in question. As Plaintiff emphasizes, Chaney, the head of BIA’s Office of Justice Services, testified at deposition that the Department had experienced “significant funding increases for Indian country correction facilities for staffing and operation” in FY 2005 and FY 2006. PL’ Stmt. ¶ 32; Defs.’ Resp. ¶ 32; PL’s Mot., Ex. E (Chaney Dep.) at 47:4-15, 48:12-17. More specifically, the parties agree that:
• In FY 2005, Congress appropriated $180,063,000 for BIA’s Public Safety and Justice law enforcement and correction facilities, which equaled an increase of $7,568,000 over what was appropriated for the same purposes in FY 2004. PL’s Stmt. ¶ 33.
• In FY 2006, the President’s budget requested $192,265,000 for BIA Public Safety and Justice law enforcement programs, including funding for the operation of correction services, programs, and facilities. Id. ¶ 34. Congress subsequently increased this funding request by an additional $1.1 million, appropriating a total of $193,377,000, an increase of $13,314,000 over what was appropriated for the same purposes in FY 2005. Id. ¶ 35.
• In FY 2007, the Department requested a lump sum of $201,620,000 in the President’s budget for BIA Public Safety and Justice law enforcement programs, including funding for operation of correction services, programs, and facilities. Id. ¶ 36. Congress again increased the funding over and above the requested amount, appropriating a total of $204,454,00, an increase of $11,077,00 over what was appropriated for the same purposes in FY 2006. Id. ¶ 37.
2. 2006 Reprogramming Request
In January of 2006, the Tribe and Defendants completed bilateral negotiations on a Fourth Amendment to the MultiYear Funding Agreement for 2005-2010 (“Fourth Amendment”) and an associated “Self Governance 2006 Annual Funding Agreement — Reprogramming Request” (“2006 Reprogramming Request”). PL’s Stmt. ¶ 24;
see also
PL’s Mot., Ex. 1 (Fourth Amendment and attached 2006 Reprogramming Request). Counts II
i. Year-end funding
Count II of Plaintiffs Complaint centers on section 17 of the Agreement and the Fourth Amendment, which both contain the following identical language:
Additional Funds — If the Midwest Region Office of the BIA receives notice of the availability of any additional funding in any fiscal year for any purpose, including any unspent funds, that the Tribe is eligible to apply for or receive, then it must notify the Tribe as soon as possible about such funds so that the Tribe may access or apply for those funds. The Midwest Region Office commits to keeping the Tribe informed of the existence of funding immediately upon learning of its existence.
Pl.’s Stmt. ¶ 41; see also PL’s Mot, Ex. B (Agreement) at 4 (emphasis in original); id., Ex. L (Fourth Amendment) at 4 (emphasis in original). Plaintiff also directs the Court to Article IV, Section IV of the Compact, which states that “[t]he Tribe shall be eligible for new programs, activities, services and functions on the same basis as other tribes and the Secretary or his authorized representative shall advise the Tribe of the funding available for such programs.” PL’s Stmt. ¶ 42; see also PL’s Mot., Ex. A (Compact) at 12.
In September of 2006, the BIA Midwest Regional Office received and distributed FY 2006 year-end funds 4 to five of the thirty-five Indian tribes and tribal organizations within the BIA Midwest Region. PL’s Stmt. ¶ 43; Defs.’ Resp. ¶43. The Tribe, however, was not informed about the availability of these funds until weeks after they were distributed, and did not receive any of these year-end funds. PL’s Stmt. ¶¶ 44-45. Defendants later explained that the BIA Central Office had made a decision to distribute the year-end funds only to tribes having contracts under Title I of Public Law 93-638 (codified at 25 U.S.C. § 450f), and not to tribes — like Plaintiff — having contracts under Title IV of Public Law 93-638 (codified at 25 U.S.C. § 458cc). Id. ¶ 46. BIA Director Rags-dale explained at his deposition that, although the latter self-governance tribes, including Plaintiff, were technically eligible for the year-end funds, those tribes were excluded from the year-end funds distribution because, as a practical matter, the OSG did not have an adequate process in place to distribute the funds to those tribes:
Self-governance tribes [such as Plaintiff] were eligible for funds, but my understanding is [ ] that the money had to be obligated within a very short period of time and the Bureau’s mechanism through the Office of Self-Governance could not mechanically do that. So the self-governance tribes were excluded from that — from that potential allocation.
Id. ¶ 48 (quoting PL’s Mot., Ex. K (Rags-dale Dep.) at 64:1-7). Count II of Plaintiffs Complaint asserts that Defendants’ failure to notify the Tribe of these funds in a timely matter was a breach of the parties’ agreement as quoted above. PL’s Compl. ¶¶ 53-57.
Counts III and IV of the Plaintiffs Complaint center on the 2006 Reprogramming Request and more specifically, on language in footnote 15 to line item 103 addressing “pay costs,” which provides inter alia:
The BIA will make every effort to treat Red Lake Tribal employees the same as all other Tribal and Federal employees for purposes of pay cost adjustments in FY 2006.... Further, the BIA and OSG agree to provide to the Tribe by April 1, 2006, a detailed Pay Cost analysis for the years 2003-2006, showing what the Tribe was eligible to receive each year based upon Pay Cost data the Tribe provided, the actual amount received, and the shortfall or unfunded amount. This analysis will include Law Enforcement. The analysis will separately show the total amounts received each year for Self-Governance tribes, contracting tribes, and BIA programs, as well as the total amounts the BIA was eligible to receive for these programs based upon data it compiled. The above information has been requested by the Tribe to verify whether Red Lake, other Self Governance tribes, contracting tribes, and BIA programs were treated the same way with regard to the distribution of Pay Costs for the years 2003-2006.
Id. ¶ 49 (quoting Pl.’s Mot., Ex. L (2006 Reprogramming Request) at 3 n. 15).
It is undisputed that BIA and OSG failed to provide a pay cost analysis to the Tribe by April 1, 2006. Id. ¶ 50. Indeed, Defendants did not provide the pay cost analysis until they filed their Cross-Motion and Opposition in this case, at which time Defendants attached a pay cost report to their pleading. See Defs.’ Cross-Mot./Opp’n, Ex. A (Pay Cost Report). Plaintiffs nonetheless allege that Defendants have not provided an adequate pay cost analysis in violation of the parties’ agreement. Pl.’s Compl. ¶¶ 58-66.
C. Procedural History
Pursuant to the ISDEAA and the Contract Disputes Act, Plaintiff filed its Complaint in the instant action in federal court alleging that Defendants had breached the parties’ agreement, as set forth in the Compact, Agreement and the 2005 and 2006 Reprogramming Requests (collectively, the “Contract”). See Compl., Docket No. [1]. Specifically, Count I of Plaintiffs Complaint alleges that Defendants: (a) failed to obtain and/or make its best efforts to obtain $1,218,482 in operations funding for the juvenile correction facility in CY 2005 as agreed to in the parties’ Contract; and (b) failed to request that same amount in the President’s budget for FY 2006 as agreed to in the parties’ Contract. Compl. ¶¶ 48-52. Plaintiff therefore seek $1,218,482 in damages for CY 2005 and an additional $1,218,482 in damages for FY 2006, plus interest. Id. ¶ 51.
Count II of Plaintiffs Complaint alleges that Defendants failed to notify the Tribe that it was eligible for FY 2006 year-end funds that were received and distributed by the BIA Midwest Regional Office in breach of the parties’ agreement that the office would inform the Tribe as soon as possible of any additional funding in any fiscal year for any purpose that the Tribe was eligible to receive. Id. ¶¶ 53-57. Plaintiff seeks monetary damages, plus interest, for Defendant’s alleged breach as to Count II. Id. ¶ 56.
Counts III of Plaintiffs Complaint asserts that Defendants failed to provide a pay cost analysis to the Tribe for the years 2003-2006 by April 1, 2006 as agreed to in the parties’ Contract.
Id.
¶¶ 58-62. Plaintiff seeks an order directing the Secretary to provide the Tribe with a detailed
Finally, Count IV of Plaintiffs Complaint alleges that Defendants underpaid Plaintiffs pay costs in violation of Defendants’ agreement to treat the Tribe’s employees the same as all other Tribal and Federal employees, and seeks monetary damages equal to the difference between the amount the Tribe received and the amount the Tribe should have received for pay costs in FY 2006. Id. ¶¶ 63-66.
Plaintiff subsequently moved for summary judgment as to Counts I and III and for partial summary judgment as to Count II. See Pl.’s Mot., Docket No. [16]. Defendants thereafter filed their Cross-Motion for Summary Judgment as to all Counts (i.e., Counts I — IV), and Opposition to Plaintiffs Motion. See Defs.’ Cross-Mot./ Opp’n, Docket No. [16]. Briefing on the parties’ motions is now complete and the case is ripe for adjudication. The Court therefore turns to the merits of the parties’ arguments.
II. LEGAL STANDARDS
In this case the Court is presented with cross motions for summary judgment. A party is entitled to summary judgment if the pleadings, depositions, and affidavits demonstrate that there is no genuine issue of material fact in dispute and that the moving party is entitled to judgment as a matter of law.
See
Fed. R. Civ. P. 56(c);
Tao v. Freeh,
Although a court should draw all inferences from the supporting records submitted by the nonmoving party, the mere existence of a factual dispute, by itself, is not sufficient to bar summary judgment.
See Anderson v. Liberty Lobby, Inc.,
III. DISCUSSION
As an initial matter, given that Plaintiffs Complaint raises questions of general contract law and alleges various claims for breach of contract, the Court must first identify the law to be applied and the precise elements that Plaintiff must show to succeed on a breach of contract claim. Accordingly, before turning to the merits of the parties’ arguments, the Court briefly pauses to delineate the controlling law applicable to Plaintiffs breach of contract claims — an issue that, unfortunately, neither party has addressed.
First, as to the question of controlling law, the Supreme Court has held “that obligations to and rights of the United States under its contracts are governed exclusively by federal law.”
Boyle v. United Tech. Corp.,
Second, as to the elements of a breach of contract claim under federal law, “a party must allege and establish: (1) a valid contract between the parties; (2) an obligation or duty arising out of the contract; (3) a breach of that duty; and (4) damages caused by the breach.”
Pryor v. United States,
Although the parties, in their respective pleadings, have confused the issue, the Court emphasizes that Plaintiff “bears the burden of proving the fact of loss with certainty” in proceeding with its breach of contract claim for money damages.
Willems Indust. Inc. v. United States,
A. Count I of Plaintiff’s Complaint Alleging that Defendants Failed to Assist and/or Request Funding for the Tribe’s Juvenile Correction Center in CY 2005 and FY 2006
As stated previously, both Plaintiff and Defendants have moved for summary judgment as to Count I of Plaintiffs Complaint, which focuses on funding for the Tribe’s juvenile correction center in CY 2005 and FY 2006. The Court shall examine each argument in turn.
1. Plaintiffs Allegations that Defendants Failed to Obtain, or Alternatively to Make their Best Efforts to Obtain, Funding in CY 2005
Plaintiff argues that Defendants breached the parties’ Contract by failing to obtain, or alternatively, by failing to make their best efforts to obtain, funding in CY 2005 for the Tribe’s juvenile correction center. Plaintiff makes two alternative arguments. First, Plaintiff argues that Defendants were obligated by the parties’ Contract to obtain $1,218,482 in funding for the juvenile correction center in CY 2005. Plaintiff directs the Court to Section 5 of the Agreement, which provides that “the Secretary shall make available to the Tribe the total amounts of funds negotiated as they are identified in the attached REPROGRAMMING REQUEST for Calendar Year 2005.” Pl.’s Mot. at 12 (quoting
id.,
Ex. B (Agreement) § 5). The 2005 Reprogramming Request in turn specifies in line item no. 177 that Defendants shall provide the Tribe with a total of $4,582,086 for law enforcement in CY 2005, which Plaintiff contends includes the $1,218,482 in funding for the juvenile correction facility referred to in footnote 25. PL’ Mot. at 12-13; PL’s Opp’n/Reply at 2-3. Plaintiff therefore claims that Defendants agreed to
Second, Plaintiff argues in the alternative that even if footnote 25 is construed to qualify Defendants’ agreement in line item no. 177, Defendants were — at a minimum' — required to make their best efforts to obtain the specified funding for the Tribe. PL’s Mot. at 13-14; PL’s Opp’n/Reply at 4-5. Because Defendants concede that they made no efforts to obtain the funding, PL’s Stmt. ¶¶ 18-20, Plaintiff contends that Defendants clearly breached the parties’ Contract. PL’s Mot. at 13-14; Reply at 4-5. Accordingly, Plaintiff asserts the Tribe is entitled to recover its “expectation damages” — defined as the amount Plaintiff “reasonably anticipated that defendant’s [sic] best efforts would have produced.” PL’s Mot. at 14. Plaintiff argues that the Tribe reasonably anticipated that Defendants’ best efforts would result in obtaining the promised funding and thus, the proper amount of damages is $1,218,482. Id.
Defendant counters that the plain language of footnote 25 demonstrates that Defendants did not promise to obtain funding for CY 2005, but rather agreed only to “assist” the Tribe in obtaining such funding. Defs.’ Cross-Mot./Opp’n at 8-9. Accordingly, Defendants’ failure to actually pay the Tribe the specified funding is not a breach of the parties’ Contract. Id. at 8. Moreover, Defendants contend that footnote 25 should be read as a non-binding statement of intention that Defendants would support or aid the Tribe’s own efforts to obtain funding' — i.e., that Defendants agreed only that, if the Tribe made its own efforts to obtain the funding for the juvenile correction center, Defendants would assist the Tribe in doing so. Id. at 8-9. Defendants argue that because Plaintiff has provided no evidence that it made any effort to obtain CY 2005 funding, Defendants therefore did not breach their agreement to assist the Tribe. Id. at 9. Finally, Defendants argue that Plaintiff has not demonstrated that it incurred any injury or damages as a result of Defendants’ action (or inaction, as the case may be). Defs.’ Cross-Mot./Opp’n at 14-15; Defs.’ Reply at 7-8. According to Defendants, because the Contract does not contain an actual promise to pay the specified funds, Plaintiff could not have possessed any reasonable expectation of receiving any particular amount, or indeed, any amount at all. Defs.’ Cross-Mot./Opp’n at 14-15; Defs.’ Reply at 7-8.
The parties’ arguments thus raise three issues: (1) what is the proper interpretation of the parties’ Contract — specifically line item no. 177 and the accompanying footnote no. 25; (2) did Defendants breach the parties’ Contract; and (3) has Plaintiff
i. Interpretation of the parties’ Contract
“Contract interpretation is a question of law and thus presents an appropriate question for resolution on summary judgment.”
Hallwood Plaza, Inc. v. United States,
Here, the language in footnote 25 explicitly states that “[t]he BIA agrees to assist the Tribe in obtaining $1,218,482 for operations funding for the Tribes [sic] juvenile correction facility in CY 2005.... ” Pl.’s Mot., Ex. B (Agreement and 2005 Reprogramming Request), at 14. This is the only language in the 2005 Reprogramming Request that directly addresses CY 2005 funding for the juvenile correction facility. See generally id. The Court finds that this language is plain and unambiguous, and provides only that the Government shall “assist the Tribe in obtaining” the specified funds in CY 2005. Accordingly, the Court concludes that Defendants had a duty to assist under the plain language of the parties’ Contract.
Plaintiffs argument that this language should be read to impose an actual duty to pay, rather than a duty to assist, is without merit. First, although Plaintiff is correct that the Contract must be liberally construed for the benefit of the tribe,
see
PL’s Mot. at 12 (citing 25 U.S.C. § 450i(c)), that does not mean that the Contract’s plain language may be ignored.
See Mergentime Corp.,
Second, the Court does not agree with Plaintiff that the text of line item no. 177 should be read as a promise by Defendants to
pay
the Tribe the specified funding at issue, regardless of the qualifying language in footnote 25.
See
PL’s Mot. at 12-14; PL’s Opp’n/Reply at 2-5. Upon review of the parties’ Contract, it is evident that the 2005 Reprogramming Request is intended to generally set forth the funds the United States shall provide to the Tribe for the provision of the agreed services.
See
PL’s Mot., Ex. A (Compact), Art. II § 3 (“Subject only to the appropriation of funds by the Congress of the United States ..., the Secretary or an authorized representative shall provide to the Tribe the total amount specified in the Annual Agreement incorporated by reference .... ”). It is, however, equally clear from the 2005 Reprogramming Request, taken as a whole, that the dollar figures set forth in the line items therein do not necessarily constitute the final agreed-upon amount that Defendants shall provide, as Plaintiff would urge. Rather, a substantial number of the funding line items in the 2005 Reprogramming Request are accompanied by footnotes, which in many cases appear to qualify the total dollar amount noted in the line item.
See
For example, line item no. 102, entitled “TPA General Increase,” provides in the text of the line item for a total of $227,030 in funding, but the accompanying footnote, no. 14, explains that “[t]his amount is to be determined by Congressional appropriation.” See id. As an another example, line item no. 116 provides in the text of the line item for a total of $244,000 in funding for “Tribal Management and Development,” but the accompanying footnote, no. 18, qualifies that statement with “[t]his line item includes an estimate of $70,000” and that the “actual amount ... will be based on an existing, competitive process .... ” See id. Similarly, line item no. 121 provides in the text of the line item for a total of $495,000 in funding for “Forestry” programs, but footnote no. 20 provides that “[tjhis amount is an estimate” and that “[t]he actual amount will be based on specific forestry development projects, forest acres, and need for the Forest Development portion, and on the approved scheduled project amount for Forest Inventories/Plans portion in CY 2005.” See id. The examples go on, but the point is clear. Contrary to Plaintiffs arguments, the text of the line items — specifically, the final dollar amount listed in each line item — does not, in all cases, represent the final determinative amount of funding to be provided to the Tribe. Rather, consideration of the 2005 Reprogramming Request as a whole demonstrates that the line items and the dollar amounts provided therein may be qualified by the text of the relevant footnote, as is the case with the language at issue here. Accordingly, the $4,582,036 figure amount in line item no. 177 cannot be read in isolation from footnote 25 as actually obligating the Government to pay the Tribe the specified funding^,218,482) for the juvenile correction center, when the specific language in the footnote plainly provides that the Government shall only “assist the Tribe in obtaining” the funds. 6 The Court therefore finds that the plain and unambiguous language of the Contract imposes upon Defendants a duty to assist the Tribe in obtaining the specified funding.
In so finding, the Court also rejects Defendants’ assertion that footnote 25 is “a mere statement of intention” and is “not binding.” Defs.’ Cross-Mot./Opp’n at 9 (citing
Cutler-Hammer, Inc. v. United States,
In addition, the Court cannot agree with Defendants that BIA’s agreement “to assist” was not implicated unless and until the Tribe initiated its own independent effort to obtain funding.
See
Defs.’ Cross-Mot./Opp’n at 9; Defs.’ Reply at 4. Defendants argue that the Court should interpret the word “assist” to mean “to give support or aid, indicating a secondary role of assistance in cooperation with the primary actor.” Defs.’ Reply at 4. According to Defendants, because the Tribe does not claim to have made any independent effort to obtain the funding at issue, Defendants’ obligation to assist was never triggered.
See id.
Such an argument is disingenuous, given that self-determination contracts are intended to transfer control and resources
(■i.e.,
funding) for federally funded services and programs from the
federal government
to the Tribe.
See Ramah Navajo,
ii. Breach
Having determined that Defendants had an affirmative duty to assist, the Court now turns to the question of whether Defendants breached that duty. The Court need not dwell long on this question as BIA officials conceded at deposition that BIA did not provide
any
assistance to the Tribe in obtaining program operations funding for the juvenile correction facility in CY 2005. Specifically, the head of BIA’s Office of Justice Services, Christopher Chaney, testified that BIA did not provide any assistance to the Tribe in obtaining staffing and program operations funding for the facility in CY 2005.
Id.
¶ 18. In addition, Patrick Ragsdale, the Director of BIA, testified that he was not aware of any efforts by BIA to obtain staffing and program operations funding for the facility in CY 2005
Id.
¶ 19. Finally, Kenneth Feinfeld, the Acting Director of the OSG and the person who executed the 2005 Reprogramming Request on behalf of the United States, testified that he personally did not make any efforts to obtain staffing and program operations funding for the juvenile correction facility for CY 2005.
Id.
¶ 20. Defendants do not
in. Injury or Loss
The Court next turns to whether Plaintiff has adequately demonstrated that it suffered a loss or injury (here, whether it suffered monetary damages) as a result of Defendants’ breach. Defendants argue that Plaintiff cannot establish that it suffered any injury or loss as a result of Defendants’ failure to assist the Tribe to obtain the CY 2005 funds. Defs.’ Cross-Mot./Opp’n at 14-15. Plaintiff responds that the Tribe reasonably anticipated that it would have received $1,218,482 in CY 2005 funding for the juvenile correction center if Defendants had not breached the Contract, and that it is therefore entitled to recover damages based on its expectation interest. Pl.’s Mot. at 14.
As an Initial matter, the Court notes that the parties have, to some extent, conflated the threshold question of whether Plaintiff has proven it suffered a injury or loss — ie., established liability — with the subsequent question of the type and amount of damages Plaintiff should be awarded for any such loss. Nonetheless, the Court understands that the parties’ principal dispute at this stage is whether Plaintiff has shown it suffered a loss or injury as a result of the breach. As stated above, to recover for breach of contract, a party must establish,
inter alia,
that they suffered a loss caused by the breach.
Willems Indust.,
Plaintiff argues that the Department had sufficient CY 2005 funding, such that the funding in question would have been available and provided to the Tribe if Defendants had made any effort to assist the Tribe as promised.
See
PL’s Opp’n/Reply at 9. Specifically, Plaintiff provides evidence that the Department had experienced “significant funding increases for Indian country correction facilities for staffing and operation” in FY 2005, PL’s Mot., Ex. E (Chaney Dep.) at 47:4-15, 48:12-17, and that Congress had appropriated $180,063,000 for BIA’s Public Safety and Justice law enforcement and correction facilities, an increase of $7,568,000 over what was appropriated for the same purposes in FY 2004,
see
PL’s Stmt. ¶ 33. Defendants counter that Plaintiffs alleged injury is too speculative and hypothetical, and that the Department in fact did not have sufficient funding.
7
See
Defs.’
2. Plaintiffs Allegations that Defendants Failed to Request Funding in the Next President’s Budget
Plaintiff next argues that Defendants failed to request $1,218,482 for operations funding for the Tribe’s juvenile correction facility in FY 2006, as agreed to in the parties’ contract. Footnote 25 in the 2005 Reprogramming Request states that “[t]he BIA agrees to ... request this amount [$1,218,482] in the next Presidents [sic] budget.” Pl.’s Mot., Ex. B (Agreement and 2005 Reprogramming Request), at 14. As mentioned above, although there is some debate as to whether the “next President’s budget” refers to FY 2006 or FY 2007, see supra 8, it is undisputed that Defendants did not submit a request for $1,218,482 for the Tribe’s juvenile correction facility in the President’s budget for either FY 2006 or FY 2007. PL’s Stmt. ¶¶ 22-23. Accordingly, Plaintiff argues that Defendants breached the parties’ Contract, and Plaintiff is entitled to recover $1,218,482 in damages. PL’s Mot. at 14-15.
Defendants respond with two principal arguments: (1) that the Department does not possess the authority to insert a request into the President’s budget and the agreement is therefore unenforceable; and (2) the Tribe has not demonstrated any damages or injury. See Defs.’ Cross-Mot./ Opp’n at 10-15. The Court shall examine each argument in turn.
i. Defendants’ authority to enter into an agreement to request funding in the President’s budget
Defendants argue that the agreement at issue is unenforceable because “[n]o one at BIA or at the OSG possessed the authority to insert a budget request into the President’s budget.” Defs.’ Mot. at 11. According to Defendants, “only the President possesses the authority to insert a budget request into the President’s budget,” and therefore any promise by Defendants to insert a budget request into the next President’s budget is unenforceable. Id. The Court, however, does not agree.
Defendants are correct that contracts entered into by government personnel who lack authority to bind the Government are unenforceable.
See City of El Centro v. United States,
Second, the Court is persuaded that the Director of OSG, who executed the 2005 Reprogramming Request on behalf of the United States, had authority to promise that the Department would request the specified funding in the next President’s budget. The Director is head of the OSG, which is the office within the Department responsible for administering the Secretary’s tribal self-governance program, including BIA programs.
See
Pl.’s Mot., Ex. B (2005 Reprogramming Request); Pl.’s Stmt. ¶ 3. The Court is hard pressed to find that the Director lacked the authority to enter into this
agreement
— ie., an agreement governing funding for programs transferred to the Tribe pursuant to a self-determination agreement — as doing so is quite clearly “an integral part of the duties assigned” to the Director of the OSG.
See First Federal Lincoln Bank,
Finally, the Court is persuaded by the Federal Circuit’s reasoning in
LDG Timber Enterprises, Inc. v. Glickman,
When the contracting officer administers a contract with which the officer is charged, the promises and representations made by the officer, when within the scope of the subject matter of the contract can not [sic ] be avoided by simply disclaiming the contracting officer’s authority when the contract reaches litigation.
Id. at 1143. Accordingly, when, as here, the actions of the government official at issue are “within the authority that pertains to the subject matter of the contract, and no statute or regulation limits that authority,” the government should bear the burden of coming forward with specific evidence that the contracting officer lacked authority for the actions at issue. Id. Having determined that Defendants have failed to do so, the Court concludes that BIA’s promise to request the specified funding in the next President’s budget is enforceable.
Because Defendants concede that they did not, in fact, submit a request for $1,218,482 for the Tribe’s juvenile facility in the President’s budget for
either
FY 2006 or FY 2007, Pl.’s Stmt. ¶¶ 22-23, it is
ii. Injury or Loss
Defendants’ also argue that Plaintiff did not suffer any injury or loss as a result of Defendants’ breach. Plaintiff responds that the Tribe reasonably anticipated that it would have received $1,218,482 in FY 2006 funding for the juvenile correction center if Defendants had not breached the Contract, and it is therefore entitled to recover damages based on its expectation interest. Pl.’s Mot. at 14-15. Defendants counter that because BIA agreed only to request — i.e., not to pay — the specified amount, and because the President or Congress may have modified or rejected the request, Plaintiff could not have reasonably expected to receive the FY 2006 funding. See Defs.’ Cross-Mot./Opp’n at 11,14-15.
Once again, the parties have conflated the threshold question of whether Plaintiff has proven it suffered a injury or loss—
i.e.,
established liability — with the question of the type and amount of damages Plaintiff should be awarded for any such loss. The Court, however, understands that the parties’ principal dispute to focus on the question of whether Plaintiff has shown it suffered a loss or injury as a result of the breach. As previously explained, to recover for breach of contract, a party must establish,
inter alia,
that they suffered a loss caused by the breach.
Willems Indust.,
Plaintiff contends that Congress would have appropriated the specified funding if requested because Congress not only appropriated all requested funds for BIA Public Safety and Justice law enforcement programs in FY 2006 and FY 2007, but in fact appropriated additional funds over and above the amounts requested. For example, the President’s budget for FY 2006 requested $192,265,000 for BIA Public Safety and Justice law enforcement programs, including funding for the operation of correction services, programs, and facilities. Pl.’s StmO 34. Congress subsequently increased this funding request by an additional $1.1 million, appropriating a total of $193,377,000. Id. ¶ 35. Similarly, as to FY 2007, the Department requested a lump sum of $201,620,000 in the President’s budget for BIA Public Safety and Justice law enforcement programs, including funding for operation of correction services, programs, and facilities. Id. ¶ 36. Congress again increased the funding over and above the requested amount, appropriating a total of $204,454,00 for FY 2007, an increase of $11,077,00 over what was appropriated for the same purposes in FY 2006. Id. ¶ 37. Defendants contend that Plaintiffs alleged expectancy damages are too speculative and hypothetical. See Defs.’ Cross-Mot./Opp’n at 14-15; Defs.’ Reply at 7-9. Accordingly, as presented by the parties, the key issue, once again, is one of causation — i.e., whether Plaintiff would have received the specified amount of funding but for Defendants’ breach. Although the question remains a close one, the Court finds that Plaintiff has presented sufficient evidence to create a disputed issue of material fact as to whether the Defendants’ breach caused the Tribe injury, that is, a loss of FY 2006 or FY 2007 funding. Summary judgment on this issue is therefore not appropriate.
Accordingly, the Court shall deny both Plaintiffs Motion for Summary Judgment and Defendants’ Motion for Summary
B. Count II of Plaintiffs Complaint Alleging that Defendants Failed to Notify the Tribe of the Availability of End-of-Year Funds
Plaintiff next alleges that Defendants failed to notify the Tribe of the availability of year-end funds as promised in the parties’ Contract. Section 17 of the Agreement and the Fourth Amendment both provide:
Additional Funds — If the Midwest Region Office of the BIA receives notice of the availability of any additional funding in any fiscal year for any purpose, including any unspent funds, that the Tribe is eligible to apply for or receive, then it must notify the Tribe as soon as possible about such funds so that the Tribe may access or apply for those funds. The Midwest Region Office commits to keeping the Tribe informed of the existence of funding immediately upon learning of its existence.
Pl.’s Mot, Ex. B (Agreement) at 4 (emphasis in original); id., Ex. L (Fourth Amendment) at 4 (emphasis in original). In September of 2006, the BIA Midwest Regional Office received and distributed FY 2006 year-end funds to five of the thirty-five Indian tribes and tribal organizations within the BIA Midwest Region, but did not inform the Tribe about the availability of these funds until weeks after they were distributed. Pl.’s Stmt. ¶¶ 43-45. Plaintiff therefore contends that Defendants breached the Contract and that Plaintiff is entitled to partial summary judgment as to liability with respect to the breach, reserving determination as to the amount of damages. Pl.’s Mot. at 15.
As explained above, however, proof of injury or loss (here, monetary damages, as alleged by Plaintiff) is an element of Plaintiffs breach of contract claim, and, in order to survive summary judgment, Plaintiff must produce sufficient evidence from which a trier of fact could conclude that Plaintiff suffered a loss as a result of Defendants’ breach.
See Pryor,
In this instance, Plaintiff has not proffered any evidence that it suffered a loss as a result of Defendants’ failure to notify it of the year-end funds. To the contrary, the unrebutted evidence in the record shows that, although the Tribe was technically eligible to receive the year-end funds, the Tribe would not have, as a practical matter, received any year-end funds because it did not have a contract under Title I of Public Law 93-638. As Defendants explained, in light of time constraints attached to the funding, the BIA Central Office had decided to distribute the year-end funds only to tribes having contracts under Title I of Public Law 93-638 (codified at 25 U.S.C. § 450f), and not to tribes — like Plaintiff — having contracts under Title IV of Public Law 93-638 (codified at 25 U.S.C. § 458cc). PL’s Strata 46. As BIA Director Ragsdale explained at deposition:
Self-governance tribes [such as Plaintiff] were eligible for funds, but my understanding is [ ] that the money had to be obligated within a very short period of time and the Bureau’s mechanism through the Office of Self-Governance could not mechanically do that. So the self-governance tribes were excluded from that — from that potential allocation.
Id.
¶ 48 (quoting PL’s Mot., Ex. K (Rags-dale Dep.) at 64:1-7). Plaintiff offers no
In order to survive summary judgment on its breach of contract claim, the Tribe must proffer some evidence that it suffered a loss caused by Defendants’ breach.
See Malissa,
18 CLCt. at 674 (“This court has long held that in contract cases, where plaintiff has alleged a breach of contract, the plaintiff must shoulder the burden of establishing the fundamental facts of liability, causation, and resultant injury.”) (internal quotation marks and citations omitted);
see also Willems Indust.,
C. Count III of Plaintiff’s Complaint Alleging that Defendants Failed to Timely Provide a Pay Cost Report as Contractually Required
Plaintiff next alleges that Defendants failed to provide the Tribe with a complete and adequate pay cost report as required by the parties’ Contract. As explained above, footnote 15 to line item no. 103 in the 2006 Reprogramming Request provides inter alia:
[T]he BIA and OSG agree to provide to the Tribe by April 1, 2006, a detailed Pay Cost analysis for the years 2003-2006, showing what the Tribe was eligible to receive each year based upon Pay Cost data the Tribe provided, the actual amount received, and the shortfall or unfunded amount. This analysis will include Law Enforcement. The analysis will separately show the total amounts received each year for Self-Governance tribes, contracting tribes, and BIA programs, as well as the total amounts the BIA was eligible to receive for these programs based upon data it compiled. The above information has been requested by the Tribe to verify whether Red Lake, other Self Governance tribes, contracting tribes, and BIA programs were treated the same way with regard to the distribution of Pay Costs for the years 2003-2006.
Pl.’s Stmt. ¶ 49 (quoting Pl.’s Mot., Ex. L (2006 Reprogramming Request) at 3 n. 15).
It is undisputed that BIA and OSG failed to provide a detailed pay cost analysis to the Tribe by April 1, 2006.
Id.
¶ 50. However, as discussed above, Defendants have now provided Plaintiff with a pay cost report, attaching the Report to Defendants’ Cross-Motion and Opposition in this case.
See
Defs.’ Cross-Mot./Opp’n, Ex. A (Pay Cost Report). Plaintiff nonetheless responds that Defendants remain in breach because the pay cost report ultimately provided by Defendants is incom
As an initial matter, neither party has directed the Court’s attention to any decision directly addressing whether the ISDEAA provides a district court with jurisdiction over a plaintiffs claim for specific performance of a self-governance contract nor is the Court aware of any such opinion. The question now before the Court thus appears to be one of first impression. “As in all statutory construction cases, we begin with the language of the statute.”
Barnhart v. Sigmon Coal Co., Inc.,
The Court therefore turns first to the plain language of the relevant section of the ISDEAA, which provides:
The United States district courts shall have original jurisdiction over any civil action or claim against the appropriate Secretary arising under this [Act] and, subject to the provisions of subsection (d) of this section and concurrent with the United States Court of Claims, over any civil action or claim against the Secretary for money damages arising under contracts authorized by this [Act]. In anaction brought under this paragraph, the district courts may order appropriate relief including money damages, injunctive relief against any action by an officer of the United States or any agency thereof contrary to this subchapter or regulations promulgated thereunder, or mandamus to compel an officer or employee of the United States, or any agency thereof, to perform a duty provided under this subchapter or regulations promulgated hereunder (including immediate injunctive relief to reverse a declination finding under section 450f(a)(2) of this title or to compel the Secretary to award and fund an approved self-determination contract).
25 U.S.C. § 450m-Z(a) (emphasis added). Thus, the plain statutory language provides that this Court has “original jurisdiction over any civil action or claim against the appropriate Secretary arising under” the ISDEAA and this [Act] and “may order appropriate relief including ... injunctive relief against any action by an officer of the United States or any agency thereof ...., or mandamus to compel an officer or employee of the United States, or any agency thereof, to perform a duty provided under this [Act] or regulations promulgated hereunder.” Id. Moreover, as Plaintiff emphasizes, the legislative history of section 450m-Z states explicitly that the ISDEAA, as amended, “affords self-determination contractors the opportunity to secure injunctive relief ... for violations of the Self-Determination Act (or the terms of contracts under the Act).” S.Rep. No. 100-274 at 34 (1988), reprinted at 1988 U.S.C.C.A.N. 2620, 2653.
Significantly, Defendants fail to make any specific argument, with citations to relevant case law or legal authority, that the plain language of the ISDEAA should be read to the contrary. Rather, Defendants make only a conclusory and unsupported assertion that “the express language of the statute ... does not provide the Court with authority to grant the specific performance Red Lake requests.”
See
Defs.’ Reply at 11. Such a statement, made without further explanation, is puzzling to say the least, given the language quoted above. Defendants only other argument in support of their position is the assertion that, as a general matter, courts do not possess jurisdiction to award specific performance of a contract against the government, as such an action is an action against the sovereign and is not maintainable unless consented to.
See
Defs.’ Cross-Mot./Opp’n at 16-17; Defs.’ Reply at 10-11. It would appear, however, from the plain language of the Act, that the government has, in fact, consented to actions for specific performance for breach of self-governance contracts under the ISDEAA — and Defendants offer no reason why the general principle of sovereign immunity should trump the specific, plain language of the statute at hand. Moreover, even if the Court were to give Defendants the benefit of the doubt and find that the statutory language is ambiguous, Defendants do not reconcile their position with the well-established cannon of statutory interpretation that “statutes are to be construed liberally in favor of the Indians, with ambiguous provisions interpreted to their benefit.”
Montana v. Blackfeet Tribe of Indians,
Finally, as Defendants do not contest that the pay cost report attached to their Cross-Motion/Opposition is inadequate, the Court shall deny Defendants’ motion for summary judgment and shall grant Plaintiffs motion for summary judgment as to Count III of Plaintiffs Complaint. Defendants shall therefore be required, by no later than April 30, 2009, to provide Plaintiff with a pay cost analysis for the years 2003-2006 that fully complies with the terms of the parties’ Contract and that shows: (1) “what the Tribe was eligible to receive each year based upon Pay Cost data the Tribe provided, the actual amount received, and the shortfall or unfunded amount;” and (2) “the total amounts received each year for Self-Governance tribes, contracting tribes, and BIA programs, as well as the total amounts the BIA was eligible to receive for these programs based upon data it compiled.” PL’s Stmt. ¶ 49 (quoting PL’s Mot., Ex. L (2006 Reprogramming Request) at 3 n. 15).
D. Count FV of Plaintiff’s Complaint Alleging that Defendants Did Not Treat Tribe Employees the Same as Other Employees for Purposes of Pay Cost Adjustments in FY 2006
Count IV of Plaintiffs Complaint asserts that, although all of BIA’s fixed costs, including pay costs, were funded in FY 2006, BIA did not fully fund the Tribe’s pay costs and therefore breached its promise in the parties’ Contract that:
The BIA will make every effort to treat Red Lake Tribal employees the same as all other Tribal and Federal employees for purposes of pay cost adjustments in FY 2006.
PL’s Mot., Ex. L (2006 Reprogramming Request) at 3 n. 15.
Although Plaintiff has not moved for summary judgment on Count IV, Defendants appear to claim that summary judgment in their favor is appropriate on this claim. See Defs.’ Cross-Mot./Opp’n at 17. The Court notes only that it “appears” Defendants have so moved because, despite Defendants’ assertion that summary judgment on Count IV is appropriate, Defendants have failed to include any factual or legal support for that conclusion. Indeed, Defendants’ entire discussion of this issue is relegated to a single sentence at the close of Defendants’ briefing, providing — without citation to any legal authority or reference to the factual matter in this case — that: “any claim [Plaintiff] may raise concerning payment of pay costs is not contractual, but if anything, statutory, subject to review pursuant to the Administrative Procedures Act, under which money damages are not available.” Id. Plaintiff counters that its claim is appropriately characterized as a breach of contract claim, as the Tribe alleges that Defendants breached the parties’ agreement that BIA would make every effort to treat the Tribe’s employees the same as Federal employees vis-a-vis pay cost adjustments. The Court, however, need not resolve this issue at this juncture, in light of Defendants’ failure to proffer any factual or legal authority in support of its motion for summary judgment as to Count IV, in violation of local rules. See LCvR 7(a) (“Each motion shall include or be accompanied by a statement of the specific points of law and authority that support the motion.”). Accordingly, the Court shall deny Defendants’ motion for summary judgment as to Count TV. 10
For the reasons set forth above, the Court shall GRANT-IN-PART and DENY-IN-PART Plaintiffs Motion for Summary Judgment and shall GRANT-IN-PART and DENY-IN-PART Defendants’ Cross-Motion for Summary Judgment. Specifically, as to Count I (juvenile correction facility funding), the Court finds that there are genuine issues of material fact in dispute that preclude summary judgment, and therefore DENIES the parties’ cross-motions with respect to Count I. As to Count II (FY 2006 year-end funds), the Court finds in favor of Defendant, and therefore GRANTS Defendants’ Cross-Motion for Summary Judgment and DENIES Plaintiffs Motion for Summary Judgment with respect to Count II. As to Count III (specific performance for Pay Cost analysis), the Court finds in favor of Plaintiff, and therefore GRANTS Plaintiffs Motion for Summary Judgment and DENIES Defendants’ Cross-Motion for Summary Judgment with respect to Count III. Specifically, the Court hereby requires that, by no later than April 80, 2009, Defendants shall provide Plaintiff with a pay cost analysis for the years 2003-2006 that fully complies with the terms of the parties’ Contract, as discussed above. Finally, the Court DENIES Defendants’ Cross-Motion for Summary Judgment as to Count IV (underpaid pay costs).
Notes
. Secretary Salazar is automatically substituted for Dirk Kempthorne, pursuant to Federal Rule of Civil Procedure 25(d).
. As a preliminary matter, the Court notes that it strictly adheres to the text of Local Civil Rule 7(h)(1) (formerly 56.1 when resolving motions for summary judgment).
See Burke v. Gould,
. Regarding the reference to a "juvenile correction facility” in footnote 25, Plaintiff explains that the Tribe had previously used Department of Justice and BIA grant funds to design and construct two correction facilities comprising parts of the Red Lake Law Enforcement Complex: a Phase I facility housing medium and minimum security adults and juveniles, and a Phase III facility housing minimum security juveniles in a rehabilitative setting. PL’s Stmt. ¶¶ 8-9. The reference in footnote 25 is to the Phase III facility. Although the parties dispute whether the facility is appropriately characterized as a "detention facility” or as a “work camp,” see PL’s Stmt. ¶ 8; Defs.' Resp. ¶ 8, the Court need not resolve this issue as neither party’s arguments now before the Court depend upon or otherwise implicate the proper characterization of the Phase III facility. Accordingly, because the proper characterization of the facility is not material to the issues at hand, the Court shall, for ease of convenience, refer to the facility as it is described in the 2005 Reprogramming Request, i.e., as a "juvenile correction facility” — although the Court expressly does not take a position on whether the description is factually accurate.
. There is a dispute between the parties as to the exact amount of the funds distributed by the BIA Midwest Regional Office. According to Plaintiff, the office distributed approximately $200,000 in FY 2006 year-end funds, PL's Stmt. ¶ 43, while Defendants assert that the office in fact distributed only $85,000, Defs.’ Resp. ¶ 43. For the reasons discussed below, the Court finds that this dispute is not material to the resolution of the parties' motions for summary judgment. See infra at 24 n. 9.
. In addition, the Court notes that Plaintiff's Complaint invokes this Court's jurisdiction pursuant to 28 U.S.C. § 1331, which provides that "district courts shall have original jurisdiction of all civil actions arising under the Constitution, laws, or treaties of the United States." Compl. ¶ 3. "Although choice of law provisions may be relevant in a diversity action, we are required to apply federal cornmon law when deciding federal questions.”
Prudential Ins. Co. of America v. Doe,
. Plaintiff s reliance on
Segar v. Mukasey,
. Although unclear from the briefing, the Court understands Defendants’ argument that the Department lacked sufficient funding, such that payment to the Tribe would have resulted in decreasing monies directed to other tribes, as addressing the issue of causation.
See
Defs.' Cross-Mot./Opp’n at 12-14; Defs.’ Reply at 6-7. That is, that Plaintiff would not
. Because the Court determines that Plaintiff has not proffered evidence that it suffered a loss as a result of Defendants' failure to notify the Tribe of the year-end funds, the parties' dispute as to whether those funds totaled $200,000 or only $85,000 is immaterial. See Pl.'s Stmt. ¶ 43; Defs.’ Resp. ¶ 43.
. The Court emphasizes that it was largely unaided by Defendants' briefing in reaching this conclusion. Defendants provided a bare page of discussion addressing this novel question of statutory interpretation, citing only two cases for legal support.
See
Defs.' Cross-Mot./Opp'n at 16-17. Moreover, one of those citations is incorrect as, contrary to Defendants’ representations, the opinion in
Designer Direct, Inc. v. DeForest Redevelopment Auth.,
. Although Defendants have not raised the issue, the Court notes that it is not clear from the record before it that Plaintiff has exhausted its administrative remedies as to Count IV