24 S.W. 306 | Tex. App. | 1893
On August 15, 1890, the appellee instituted suit against the receivers of the International Great Northern Railway, for damages claimed to have resulted to his land and crops on account of the diversion of the flow of the surface water falling on his land and adjoining tracts, by reason of the construction and maintenance of the roadbed of the International Great Northern Road. He also prayed for a mandatory injunction to compel the opening of a ditch; but this count was stricken out on demurrer, and is not before the court.
The defendant pleaded general demurrer and some special demurrers, the rulings on which are not excepted to, and the general issue; and he also pleaded two special defenses; the first setting up the proper construction of the road more than ten years before the bringing of the suit, and its continuous maintenances in the same condition during all that time, and hence that the claim for damage was barred by limitation; and the second, that at the time the right of way was acquired by the railway company and the roadbed constructed, the land now claimed by appellee belonged to other parties, and that he bought it after the road was built, with full knowledge and for a reduced price. The particular facts as to each defense are detailed in the answer.
By supplemental petition the appellee demurred to these defenses, and the court sustained both demurrers; the appellant excepted. These rulings present the only issues in the case; for if the claim of appellee is not defeated by one or both of the defenses above given, the judgment is sustained by the testimony and should be affirmed.
The above statement is from the brief of appellants, and to it we will add, that the overflows complained of occurred after the appellee had acquired the land, and within two years before the filing of suit.
No error was made in sustaining the demurrers. We regard the questions presented in appellants' brief settled against them by the cases of Railway v. Anderson,
The fact that appellee acquired the land subsequent to the construction of the railway, and at a reduced price, would not affect his remedy for damages that resulted to his land and crop by reason of the negligent and faulty manner in which roadbed was constructed and maintained. It is not alleged by appellants as an excuse for constructing the roadbed in such a way as to cause the adjacent land to overflow, that the railway company, by reason of an agreement between it and the former proprietors, had the right to so construct its road in a manner as to cause the surface water to collect on the land in question; but the defense relied upon simply is, that the appellee, subsequent to the construction of the roadbed, acquired the land at a reduced price.
Neither the appellants nor the railway company were parties to the transaction by which the appellee acquired the land, and they entered into no contract with him concerning it. Whether he paid full value for the land or acquired it as a gift, or upon any other consideration that is not esteemed valuable in law, is a matter about which the appellants could have no concern. The owner has the right to the enjoyment of his lands, and the consideration by which he acquired his title would not relieve the railway company from a compliance with its duty in the construction of its roadbed as required by article 4171, Sayles' Civil Statutes, which was in force at the time the road in question was constructed.
Of course if the railway acquired its right of way under such a contract between it and the adjacent owners as would relieve it of its duty to properly construct the roadbed so that the surface water may escape, this would present a different question, but here nothing of the kind is alleged.
Judgment affirmed.
Affirmed. *563