63 N.Y.S. 286 | N.Y. App. Div. | 1900
■The action is for damages resulting from alleged negligence. The defendant was engaged at the time of the accident in constructing an underground trolley road through Sixth avenue, in the borough of Manhattan, New York city, having a contract for that purpose with the Metropolitan Street Railway Company. It was. also in possession of a permit from the municipal authorities conferring the privilege of placing materials upon the avenue and intersecting streets, subject, among other provisions, to the conditions-that the street should be covered with planking before such material should be placed thereon, and that no material or other incumbrances should be placed upon the highway outside the limits of said planking. About two weeks before the accident certain iron rails were delivered to the defendant in West Twenty-sixth street, near Sixth avenue, for its use in fulfilling the contract, and were piled upon that street without planking. The delivery was made by the truck-man then under contract with the defendant to haul rails for the section of work included in the locality referred to. This pile of rails remained in the street until the 3d day of August, 1898, when the defendant’s servants commenced loading them upon a two-wheeled truck for the purpose of removing them to some place where they were to be used in the work of construction. At the time of the accident the pile of rails was between two and three feet in height and about a foot in width, and was apparently in the-same condition as when originally piled up, excepting that some,
The plaintiff, a boy ten years of age, and then residing in West Twenty-sixth street, was attracted by this pile of rails and the process of removal. He went over to them and sat down upon the top rail, intently watching the operation. This was between three and four o’clock in the afternoon, and while the workmen were placing one of the rails upon the truck. The rail upon which the plaintiff was sitting was to have been next removed, but before the workmen came to it, and after the boy liad sat upon it a minute or two, it slipped with him from the pile, crushing his left leg so severely as to require amputation. While the plaintiff was sitting upon the rails, a man whose identity is unknown crossed the street, .stepping upon the rail on which the plaintiff was sitting, hut the witnesses agree that this act had no perceptible effect upon the rail. Just before the rail slipped one of the workmen called to the boy to get off, but the warning, if intended as a warning, was not heard by him, nor was it in time to have enabled him to avoid the accident.
The rails were about twenty-five feet long and very heavy, requiring several men to lian die them. The one which slipped was described by a witness as “lying on top, a little on a slant, didn’t lay straight, a little slant to it.” He further described it as being “ tilted ” by a cobble 'stone or a part of a cobble stone which had been placed under one end of it. He said “ the shape of that cobble stone was kind of roundish, kind of round, take a real round cobble stone and just as if it was split or cracked in two; ” and again, “ there was this cobble stone or what you call a half of a cobble stone underneath it. The rail was" tilted, a little slanting, tilted and slanted.”
The defendant offered no evidence beyond the permit. The case was submitted to the jury in a charge which correctly stated the law of contributory negligence as applicable to a child of the plaintiff’s age, and which limited the defendant’s duty to the exercise of reasonable care in the original piling of the rails, and which limited liability in this action solely to negligence in that regard.
The evidence was sufficient to justify the jury in finding that the accident was caused by the original insecure piling of the rails. In the first place they were piled in violation of the requirements of
In Earl v. Crouch (32 N. Y. St. Repr. 13), the court, reversing a nonsuit, said (p. 14): “ Assuming that the defendant had a right, under the circumstances, to pile the lumber in the street, it was undoubtedly his duty to pile it in such position and in such manner as not unnecessarily to impede the public use of the highway, and, still more, so as not to endanger the life or limb of those passing therein. He was bound to know that young children were likely to be at play on the street, and it is probably not unreasonable "to chárge'him with the knowledge that a pile of new lumber is a very attractive object to such children, and is likely to become the scene of their exploits and sports. Unquestionably, reasonable care is required of the person erecting such an object on the public street that it shall not be a source of danger to any person using the street in any reasonable or ordinary manner. It was for the jury to say whether precisely what this little boy did "was not one of those things that was to have been expected to occur, and against the fatal consequences of which the defendant ought to have used reasonable care to provide. That this lumber could have been piled in such a way as not to have been precipitated by the weight of a child of five years of age is undoubtedly trad; whether in the exercise of reasonable care it would have been so piled seems, really, to be the
The defendant cannot find shelter in the act of its truckman on the theory of an independent contract. The duty of exercising the-requisite care rested upon the defendant, and as between it and the traveling public could only be discharged by performance. (Weber v. Buffalo Railway Co., 20 App. Div. 292; Downey v. Low, 22 id. 460; Dunn v. Ballantyne, supra.) Were the rule otherwise, we might still be unwilling to hold that the defendant owed the public no duty of supervision and inspection, or that two weeks did not furnish ample time to charge it with constructive notice of its sub-contractor’s original carelessness.
The respondent invokes the doctrine of res ipsa loquitur. It finds possible support under the circumstances of this case in Clarke v. Nassau Electric R. R. Co. (9 App. Div. 51); Stallman v. New York Steam Co. (17 id. 397); Reed v. McCord (18 id. 381), and Hogan v. Manhattan R. Co. (149 N. Y. 23); but a decision of this question is not necessary in the view of the facts herein taken.
The only alleged error in the charge of the court, presented on the argument and in the brief, is the refusal to charge, at defendant’s request, that in awarding any sum to the plaintiff they must take into consideration the interest which that sum would produce-annually. The meaning of the request is not obvious. The court-had just charged at defendant’s request that the jury could not award a sum which would capitalize the plaintiff’s yearly losses, which was equivalent to saying that the award, must not be regarded as capital producing by way of interest a sum of money equal to-the plaintiff’s annual loss. If at the same time they were told that they must regard the award in the light of capital to be invested,, and must consider the rate of interest which it would earn, they might, have very naturally regarded the second request as in conflict with the first. The' distinction between the two is not pointed out, nor-
The verdict, $10,000, was not excessive.
The judgment and order should be affirmed.
Judgment and order unanimously affirmed, with costs.