113 Wash. 95 | Wash. | 1920
The plaintiff commenced this action in the superior court for King county, seeking recovery
At the time in question, the city maintained, a few feet under the surface of the street at the intersection of Weller street and Sixth avenue south, a large water main. The main at that point was under a head pressure of over two hundred feet. It had apparently been laid in ground over what was formerly tide land, and just under it at that point was an old pile, which seems to have contributed to the breaking of the main by the latter settling down upon it. The main broke so as to let the entire flow of the water therein escape. In its escape the water tore up a large section of the street pavement, some thirty feet or more across, and overflowed into and under the: adjacent buildings and plant of appellant, causing an amount of damage thereto far in excess of the amount awarded by the jury. The award was manifestly made upon the theory that the city had successfully maintained its affirmative defenses as to most of the damage, and that appellant was entitled to compensation for only a small portion of the damage it actually suffered.
It is contended in appellant’s behalf that the trial court erred in overruling the demurrer to the city’s first affirmative defense, and also in submitting that de
“The undersigned, in signing, this petition, hereby expressly reserve the right to claim a just compensation for the damages to their property caused by the*99 grading and regrading of the streets embraced in the district. . . .
“The city of Seattle, in entering into a contract for the performance of the said improvement, shall insert therein a provision for and on behalf of any owner of property within the limits of the district as set forth above, who may desire the same to be excavated or filled to an even grade with the streets abutting the same at the time said streets are graded or regraded, and at the price bid by the contractor for the excavation and filling of the streets embraced in said district; provided that where private property is to be filled, the owner may require that said property be not filled above a specified height for the construction of a basement therein.
“Third: That the undersigned do hereby severally stipulate that all private property belonging to them within the limits of the said district may be excavated or filled by said contractor as hereinabove provided, and they do further severally agree, upon demand of said contractor after the execution of the contract between said contractor and the city, to enter into a written contract with said contractor for the performance of said excavation or filling, as may be required by the owner, at the prices bid by said contractor per cubic yard for the grading of the streets embraced in said district; . . .
“It is expressly understood and agreed that the city of Seattle shall in no wise be held responsible for the carrying out of any agreement which may be made between the contractor and the owners of private property within the district for the excavations and fills thereon, as hereinabove set forth; it being expressly understood and agreed that such stipulations shall be entered into "by the city of Seattle with the contractor for the improvement solely for and on behalf of and for the use and benefit of the private owners interested. . . .”
Thereafter, in compliance with the petition, the city council passed ordinances establishing the proposed new higher grades of the streets; authorizing the prose
“Upon payment to said respondents, or into the registrar of the court, of said amounts and the taxable costs of these proceedings, if any, the petitioner, the city of Seattle, shall be entitled, at any time thereafter, to grade and regrade said streets, avenues, alleys and approaches thereto, and to enter into possession of said premises, or such portion thereof as may be necessary, in the construction of said improvements, as provided for in said ordinance.”.
Thereafter, in April, 1907, the city having paid the awards of the eminent domain judgment, it entered into a contract for the physical improvement of the streets at the level of the new grades, and in the carrying on of the work took possession of and damaged
We think there is nothing for the city’s claim of estoppel to rest upon save the stipulations in the petition signed by appellant’s predecessor in interest, the conditions of the same import found in the ordinances establishing the new grades and providing for the improvement of the streets at the new grades, and the judgment rendered in the eminent domain proceedings. We have noticed every stipulation and provision to be found in the petition, ordinances, and eminent domain judgment which might in the slightest measure sug
We have ignored the oral evidence introduced in the city’s behalf which it is claimed by counsel supports its first affirmative defense, for the reason, first, that, even if such evidence was admissible, it did not materially tend to support the defense; and second, for the reason that we regard it as wholly inadmissible touching that defense, since the record in the eminent domain proceedings, including the judgment, is plain and unambiguous as to the rights that the city acquired by that judgment, and there is therefore no occasion for the receiving of oral evidence in explanation of what was litigated in that proceeding, or what was determined by the judgment rendered therein.
It is contended in behalf of appellant that the court erred in submitting for the consideration of the jury the city’s second affirmative defense, which was, in substance, that of contributory negligence, in three particulars: (1) In that the appellant was negligent in maintaining its heat and power plant at such a low level below the established street grades; (2) in that appellant so maintained its plant without proper drains being provided to enable the water to freely flow therefrom, and that, had appellant provided proper drains, no damage would have resulted to its plant; and (3) in that the appellant maintained in a negligent manner a tunnel across and under Sixth avenue, connecting two of its buildings on opposite sides of the
We are of the opinion that the maintaining of appellant’s plant at the level of approximately thirty feet below the street grades was not contributory negligence, and that it must be here so decided as a matter of law. It may seem that this was maintaining a plant in a basement of unusual depth, but, as we have already noticed, appellant was within its legal rights in so occupying its property. It may have, been obliged to anticipate damage from the natural flow of water and the accumulation of surface water, but manifestly it was not obliged to anticipate danger from any such source as the bursting of this water main. In 29 Cyc. 516, the elementary rule touching appellant’s rights in this regard is well stated as follows:
“The general rule is that every person has a right to presume that every other person will perform his duty and obey the law, and in the absence of reasonable ground to think otherwise it is not negligence to assume that he is not exposed to danger which can come to him only from violation of law or duty to such other person. Hence failure to anticipate defendant’s negligence does not amount to contributory negligence, even though he places his property in an exposed or hazardous position.”
As to appellant being guilty of contributory negligence in that it failed to provide drains as required by city ordinances for the carrying off of water, we think that may become a question for the jury upon a new trial, because it might be that the providing of such drains as the ordinances may have required would have carried off the water coming from the burst main and prevented or lessened the damage which resulted
■ As to appellant’s being negligent in not properly maintaining the tunnel, we feel constrained to hold that neither the pleadings nor proof show any contributory negligence in this particular. The only alleged and proven facts as to the tunnel are that it existed by permit from the city, and did not have doors or gates to close it. There is no allegation or proof that appellant had any duty to maintain such doors or gates.
In view of our conclusion that there must be a new trial of this case, we deem it proper to here say that we think the trial court was correct in taking from the consideration of the jury the third affirmative defense. We arrive at this conclusion looking at the pleadings only.
It is contended in behalf of the appellant that the trial court erred in its instruction to the jury as follows:
“If the plaintiff was guilty of any act of negligence-alleged against it in the answer of the defendant city which contributed in any manner to the damages to said heating plant for which plaintiff sues, it is your duty to deny plaintiff the right to recover any damages to said heating plant.”
We have italicized the words to be particularly noticed. This instruction, we think, is erroneous under the decisions of this-court in Spurrier v. Front Street Cable R. Co., 3 Wash. 659, 29 Pac. 346; Cowie v. Seattle, 22 Wash. 659, 62 Pac. 121; and Atherton v. Tacoma R. & Power Co., 30 Wash. 395, 71 Pac: 39; the instruc
It is contended in behalf of appellant that the trial court erred in instructing the jury as follows:
“You are instructed that the mere fact that the water main broke is not in itself proof of negligence, but that negligence charged must be shown by facts entirely independent of the fact that the water main did break.”
We think this instruction is erroneous. It seems to us that a water main situated as this one was, under such great pressure by reason of the high head of water, suggests the duty of a high degree of care on the part of the city in maintaining it, and that its bursting is some evidence of want of proper care on the part of the city in maintaining it. This view, we think, finds support in Anderson v. McCarthy Dry Goods Co., 49 Wash. 398, 95 Pac. 325, 126 Am. St. 870, 16 L. R. A. (N. S.) 931; Abrams v. Seattle, 60 Wash. 356, 111 Pac. 168, and Lennon v. Seattle, 69 Wash. 447, 125 Pac. 770. It is true that this alleged error proved to be without prejudice, in view of the fact that the jury found that the city was negligent, otherwise it could not have awarded recovery, even in the small amount of $500, to appellant; but since the question of the city’s negligence will necessarily be involved in a new trial, we feel called upon to notice this error.
It is contended in behalf of the appellant that the trial court erred in refusing to give to the jury the following instruction requested by its counsel:
*107 “I charge you that the plaintiff was not required to anticipate that the defendant would he negligent in selecting, inspecting, placing or maintaining its water mains. It hás a right to assume that the city would exercise reasonable care in selecting, inspecting, placing and maintaining its water mains so that they would not break or flood property lawfully kept in the locality where such water mains are located, and in the absence of knowledge that a defective water main had been installed or maintained, the plaintiff would not be guilty of contributory negligence by assuming that the city had fully performed all its duties relative to inspecting, placing and maintaining its water mains.”
What we have already said, we think, renders it plain that appellant was entitled to this instruction, or one of substantially the same import. Critical examination of the numerous instructions given may possibly disclose that this view of the law was covered in the instructions, but we hardly think it was. We make this observation more because of what will probably occur upon a new trial, rather than as holding that prejudicial error was committed by the refusal to give the instruction upon the former trial.
It is contended in appellant’s behalf that the trial court erred in refusing to give to the jury the following instruction requested hv its counsel:
“I charge you that if you find from a fair preponderance of the evidence that the quantity of water which escaped from the broken main and flooded the plaintiff’s property was so great that the plaintiff would have sustained the same or as much damages regardless of whether it had a sufficient and good drain or not, then the matter of maintenance of a drain was and is entirely immaterial and you should disregard the same.”
It seems to us that appellant was entitled to this instruction, or one of substantially the same import, for plainly, if the flood of water was so great that no
We conclude that the judgment should be reversed, and the cause remanded to the trial court with directions to award appellant- a new trial consistent with the views herein expressed.
It is so ordered.
All concur.