87 Tenn. 494 | Tenn. | 1889
This was an action by Scott to recover from the Railroad Company damages for the negligent killing of a mule by a train running upon the same while on its track.
There were two trials. The first resulted in a verdict for the railroad. A new trial was granted upon motion of plaintiff, to which action of the Court a bill of exceptions was taken,' and duly filed.
At the second trial there were verdict and judgment for the plaintiff in the sum of $135. Hew trial being refused, the Railroad Company has appealed in error.
The first error assigned is to the action of the Court in granting new trial.
The record shows that such new trial was
The correct practice, under the Act of 1815, Ch. 106, carried into the M. & V. Code, §§ 3836 and 38.37, authorizing a bill of exceptions to the action . of the Court in granting a new trial is, when the case finally comes before this Court on appeal from the final judgment, at the succeeding trial, to first examine the record of the first trial so far as it concerns the action of the Court in granting the new trial. If the trial judge has committed no error in allowing such new trial (and very much is necessarily left to his disei’etion, especially where he is dissatisfied with the verdict), this Court will refuse to disturb his action thereon, and will pass to the consideration of the record of the second trial.
If, on the other hand, the trial judge has committed manifest error in setting aside the first verdict, this Court will enter judgment on such verdict, without looking to the record of the succeeding trial or trials.
Applying this rule, let us see what the record of the first trial discloses. It shows a case where a mule appeared upon the track some fifteen or twenty yards in front of a passenger train, the latter running at the rate of thirty miles an hour.
This was all the evidence concerning the accident.
The Court charged the jury that “if the engineer was on the lookout ahead, and as soon as the mule appeared upon the track, the engineer put on the brakes, and reversed the engine, and that by reason of the close proximity of the mule to the train the engineer was unable to comply with any other of the statutory, precautions, or apply any other means to stop the train and prevent the accident, and that at the time of the accident the train was supplied with proper head-light (the accident having occurred in the night time) and all necessary and proper equipment for the running and stopping of the train, then you will find for the defendant.”
This was error, for which the Circuit Judge rightfully granted a new trial.
JVhere he can do so he is required to use each and every precaution named in the statute, as also “ every possible means to stop the train and prevent the. accident.”
Under the proof in this cause he may have used every means at his disposal “ to stop the train,” and yet not have used every means “to prevent the accident.”
One of the means of preventing the accident, and perhaps the most effectual under the circumstances, was the alarm whistle, which might have frightened the animal instantly from the track..
The charge, as given, directs the jury to find for the defendant if, together with proper equipment,
It should have been left to the jury to determine whether, under the facts as found by them, the engineer had complied with the statute.
And while they were properly told that the several statutory requirements need not necessarily be complied with in the order in which they are enumerated in the statute, they should likewise have been told that where it was impossible to observe each of them, by reason of the suddenness of the appearance, and the proximity of the animal, such of them should have been resorted to as were best calculated to prevent the accident.
Such is manifestly the intent and meaning of the statute in question, and such is the common law rule as well. Railroad v. Scales, 2 Lea, 688; Railroad v. Swayne, 5 Lea, 119; Railroad v. Thomas, 5 Heis., 266; Hill v. The Railroad, 9 Heis., 827; Railroad, v. Pratt, 1 Pickle, 18.
Having determined that the new trial was rightfully granted for error in the charge, let us see if .there be error in the record of the second trial.
The proof was identical in this as in the first trial.
The Court, after reading to the jury the statute, continuing, said:
*500 ‘‘If you. find from tlie evidence that after the mule appeared upon the track, owing to nearness to the approaching train, the engineer, on the lookout, did not have sufficient time to observe all the precautions, then it was his duty to first sound the alarm whistle, and if he had time, next to put down the brakes, and then, if he had time, to employ every possible means to stop the train and avoid the accident; or, in other words, to observe the precautions in the exact order in which they are named in the statute, and for failure to thus observe them when plaintiff’s mule so appeared upon the track, defendant would be liable.”
This was error.
The statute requires the company to have “the engineer, or fireman, or some other person upon the locomotive, always upon the lookout ahead, and when any person, animal, or other obstruction appears upon the road, the alarm whistle shall be sounded, the brakes put down, and every possible means employed to stop the train and prevent an accident.”
The Act also provides that a failure to observe these precautions renders the company liable, and places the burden of proof upon the company to show a compliance therewith; providing at the same time that, a compliance being shown, the company is not liable.
It is further enacted, that “ where a railroad company is sued for killing or injuring stock, the
It is manifest that all of these provisions are to be taken as a whole, and construed together.
When so considered it is clear that there is nothing indicative of a legislative intent to render it obligatory upon the company, at all hazards, to observe the precautions in the order they happen to be enumerated in the statute.
In enumerating several precautions it wTas necessary that some should be placed before others, but this necessity does not warrant the idea that the order of statement renders imperative performance in the order stated.
The employment of “ every possible means to prevent the accident” in all cases, and the burden of proof placed on the company in the case of killing or injuring stock, “to show that the accident was unavoidable,” is, by the statute, just as imperative as the things enumerated.
Some of these means may be more efficacious, in particular cases, than others; and from the nature of the case it may be more prudent to resort to the precautions in an order different from that named in the' statute.
Eor instance, if there was discovered upon the track an object known to the engineer to be incapable of hearing or moving, and there was not time sufficient to perform each enumerated precaution, it might be gross negligence to sound the alarm whistle at the expense of postponing the ap
On the other hand, in a case where the object was a man or an animal that might be frightened off', and when discovered the train was so near that at the rate of speed at which the train was moving it was impossible ' to stop before striking the object, it would seem to he equal negligence to apply the brakes and reverse the engine at the expense of -postponing the alarm whistle, which .might avoid the accident.
The Court should, therefore, have instructed the jury that it was the duty of the company to ob■serve all of the precautions prescribed by the statute, together with every other means at its disposal, to stop the train and prevent the accident; .but that if, by reason of the suddenness of the appearance of the obstruction upon- the track, and the proximity and speed of the train, it was impossible to observe each of the precautions, then it wras the duty of the engineer, or person in charge, to perform such of the requirements and precautions as, under all the circumstances, were best calculated, and most effectual, to prevent the accident.
There was no error in the refusal of the Court to give the first request for special charge made by defendant. It was substantially what was given at the first trial, and which we have pronounced erroneous. It assumed that the applying of the air brake, and reversal of the engine, were a sufficient compliance with the statute where there was not
The matter of the second special request is disposed of in what we have already said with reference to the main charge, and need not be mem tioned further. It should have been given, with the qualifications indicated herein, by our statement of what should have been charged concerning the duty of the company under such circmstances.
For the errors stated the judgment must be reversed, and cause remanded for a new trial.