Plaintiff-appellant, Rachelle Hines, appeals the district court’s order granting defendant-appellee British Steel Corporation’s (BSC) motion for summary judgment in this negligence action brought under Section 5(b) of the Longshore and Harbor Workers’ Compensation Act (LHWCA), 33 U.S.C. § 905(b). The parties, by stipulation below, dismissed defendant ship, the M.S. Ravenna, with prejudice. Rachelle Hines brought the suit as special administrator of the estate of Clark Hines, a longshoreman who was killed in an accident aboard the M.S. Ravenna. We affirm.
I. BACKGROUND
This case arose out of the death of Clark Hines (Hines), a longshoreman who was killed on October 3, 1987, while performing stevedoring activities aboard the M.S. Rav-enna (the Ravenna) while it was docked at Iroquois Landing in Chicago. Hines was an employee of Ceres Terminals, Inc. (Ceres), an independent stevedoring concern. The Ravenna had been “time-chartered” 1 by BSC from the owner of the Ravenna, Roscoe Shipping, S.A., and had been docked in Chicago on October 1, 1987, to unload BSC cargo. British Steel had hired Ceres as an independent contractor to unload a cargo of steel. The Ravenna’s Master (captain) and crew were employees of Roscoe Shipping.
At the time of the accident which caused Hines’s death, Ceres had completed the unloading of British Steel’s cargo into a barge owned by Caterpillar Corporation. Ceres employees, including Hines, were conducting clean-up of the Ravenna. The Ravenna contains five holds for cargo storage, each having a hatch at deck level through which cargo is loaded and unloaded using the ship’s deck-level cranes. Hines, along with others, was working in hold number three cleaning up dunnage (pieces of lumber used to protect a ship’s cargo from damage during transport). A full, strapped bundle of unused, new dunnage, owned by Ceres, that had been returned from the Caterpillar barge after it was loaded, lay on the Rav-enna’s deck. This bundle of dunnage was to be removed from the deck of the Raven-na and brought ashore.
Ceres employees had rigged Ceres-owned slings to the bundle of dunnage. A Ceres longshoreman secured the slings to one of the Ravenna’s cranes. This crane, serving hold number three, was situated between hatch number three and hatch number two. The crane was able to be rotated in a 360 degree circle and was in good working condition. At the time, hatch number two was shut.
Captain Tore Sorenson, a Ceres Superintendent, was in charge of the stevedoring operations aboard the Ravenna. He was standing adjacent to hold number three as his longshoremen worked below. Another Ceres longshoreman acted as signalman directing the crane operator. He was also responsible for making sure that the load of dunnage was not swung over the open hatch of hold number three while men were working below and to warn the workers when a load was to be swung over the hatch. Swinging a load of cargo or dun-nage over a hatch opening while men are working in the hatch is a prohibited activity, and Ceres crane operators are instructed not to do so. John Folan, BSC’s cargo representative, was aboard the Ravenna during its journey, but was on shore at the time of the accident.
Although the crane operator could see the open hatch and the men working below, he lifted, without warning, the load of dun-nage and swung it over hold number three. Captain Sorenson and others on the deck saw this and yelled a warning to the workers in the hatch. For reasons unknown, the bundle of dunnage then fell from the crane into the hold. The bundle of dun- *728 nage broke apart when it hit a dumpster in the hold. Some of the flying dunnage struck Clark Hines, and he later died.
Rachelle Hines filed this suit in the Circuit Court of Cook County, Illinois, but on June 1, 1988, BSC removed it to the United States District Court for the Northern District of Illinois. On June 30, 1989, BSC moved for summary judgment, arguing that BSC had no general duty to supervise the stevedoring operations aboard the Rav-enna. Plaintiff responded that the charter agreement between BSC and the Ravenna’s owners, together with the various agreements between BSC and Ceres regarding the Ravenna’s cargo, evinced an intent by BSC to control and supervise Ceres’s unloading operations.
On October 5, 1989, the district court granted summary judgment in favor of BSC. The court found that as a “time charterer,” BSC was amenable to suit under the LHWCA.
2
The court then stressed that the Supreme Court’s decision in
Scindia Steam Navigation Co., Ltd. v. De Los Santos,
II. ANALYSIS
A. Standard of Review
A grant of summary judgment is appropriate when “the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits, if any, show that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law.” Fed.R.Civ.P. 56(c). A genuine issue of material fact “exists when ‘there is sufficient evidence favoring the nonmoving party for a jury to return a verdict for that party.’ ”
Puckett v. Soo Line Ry. Co.,
*729 B. A Vessel’s Duty of Care Under 33 U.S.C. § 905(b)
In
Scindia Steam, Navigation Co., Ltd. v. De Los Santos,
In this case, there was no evidence that the crane which dropped the dunnage that killed Clark Hines was not in good working order. In fact, the deposition testimony of the stevedore captain is to the contrary. Furthermore, the act of the crane operator in swinging a load of dunnage over hold number three while men were working below was unforeseeable. Finally, BSC’s cargo representative was not on the boat at the time of the accident. Under these circumstances,
Scindia
forecloses liability on BSC absent a contract provision, positive law, or custom to the contrary.
Cameron v. Consolidated Grain and Barge Co.,
Appellant makes her argument on the authority of Restatement of Torts, Second, § 414, and its accompanying comments.
Section 414 of the Restatement provides: One who entrusts work to an independent contractor, but who retains the control of any part of the work, is subject to liability for physical harm to others for whose safety the employer owes a duty to exercise his control with reasonable care.
The comments to Section 414 suggest, however, the parameters of the “retention of control” concept:
It is not enough that [the employer] has merely a general right to order the work stopped or resumed, to inspect its progress or to receive reports, to make suggestions or recommendations which need not necessarily be followed, or to prescribe alterations and deviations. Such a general right is usually reserved to employers, but it does not mean that the contractor is controlled as to his methods of work or as to operative detail. There must be such a retention of a right of supervision that the contractor is not entirely free to do the work in his own way.
*730 Restatement (Second) of Torts, § 414 comment (c).
Few courts have applied Section 414 in the context of a lawsuit under Section 905(b) of the LHWCA. In fact, in
Scindia,
the Supreme Court rejected the application of Restatement Sections 343 and 343A to actions under Section 905(b). The Fourth Circuit has interpreted
Scindia
as having rejected all land-based negligence standards in maritime cases, which would presumably include Restatement Section 414.
See Hodges v. Evisea Maritime Co., S.A.,
Although we consider Section 414 to be helpful in explaining the contractual arrangements between employers like BSC and their independent contractors, such as Ceres, it does not address the contractual relationship between BSC and the owner of the Ravenna. Thus, comment c to Section 414 is relevant only to the extent its terms are implicated by the stevedoring agreements between BSC and Ceres. Our inquiry into the contract between BSC and Roscoe Shipping is governed by ordinary contract law. However, as the following analysis makes clear, the time charter agreement contains no indication that BSC intended to undertake any duty of care in addition to that imposed by Scindia. Nor do the stevedoring agreements between BSC and Ceres give BSC “control” over the longshoremen activities aboard the Raven-na, as Section 414, Comment (c) defines the term.
C. BSC’s Duty of Care to Clark Hines
Appellant argues that Clause 8 of the charter agreement between BSC and Roscoe Shipping gave BSC control over the ship’s master and the responsibility to “load, stow, trim, and discharge the cargo” under the direction and control of the master. She asserts that Clause 8, in conjunction with paragraph “j” of the instructions from BSC to the ship’s Master shows that BSC took control of the stevedoring operations by its control of the Master. Paragraph “j” states that although BSC would appoint the stevedores, they would remain under the “direct control” of the Master who was instructed “to ensure that cargo is loaded in a safe and seamanlike manner.”
Clause 8 of the charter party provides: That the Captain shall prosecute his voyages with the utmost dispatch, and shall render all customary assistance with the ship’s crew and boats. The Captain (although appointed by the Owners), shall be under the orders and directions of the Charterers as regards employment and agency; and Charterers are to load, stow, trim and discharge the cargo at their expense but such stowage shall be conducted by and under the control of the Master and the Owners shall be responsible for the proper stowage and correct delivery of the cargo....
(emphasis added). With the exception of the italicized language, which replaces deleted language in the contract, “under the supervision of the captain,” Clause 8 is apparently a standard provision in time-charter agreements.
See
e.g.,
Woods v. Sammisa Co., Ltd.,
*731
The weight of
post-Scindia
authority indicates that the inclusion of Clause 8 in the charter agreement does not constitute a special contractual promise by the shipowner to the time charterer that the Captain would take direct responsibility for supervising the discharge of cargo.
See e.g., Woods,
The only remaining avenue that appellant argues in favor of reversal under Scindia is that BSC’s contract with Ceres gave BSC such control of the stevedoring operations on the Ravenna as to raise a duty on BSC’s behalf to ensure the safety of Ceres employees. She points to the provisions in the agreement between Ceres and BSC granting BSC’s representative the right to be present during stevedoring operations; the representative’s right to make recommendations to the Captain if he noticed improper stevedoring practices; and the ten pages of BSC instructions to Ceres regarding proper handling of BSC cargo.
Contrary to appellant’s assertions, the contractual provisions that she argues gave BSC operative control of stevedoring operations, in fact, merely determine and regulate the proper handling of BSC cargo so as to avoid damage to it. For example, provision 3.5 of the Memorandum of Agreement states that “[Ceres is] to ensure all handling of steel products are carried out in accordance with B.S.C.’s ‘Instructions to stevedores’ ... If persistent negligent handling and/or damage to cargo attributable to contractor or their employees should occur as a result of failing to follow or comply with said instructions, B.S.C. shall have the right to immediately terminate this agreement.” (emphasis added). Likewise, paragraph 3.9 of the same document merely states that Ceres is “to liaise closely with B.S.C. shipping agent on all aspects of vessel’s work program and to fully cooperate in the provision of relevant information thereto.” This provision contains no language that would indicate that BSC was trying to control the “work program.” Rather, paragraph 3.9 simply ensures that BSC will know what that work plan is. In Supplementary Agreement No. 3, paragraph 1, plaintiff cites certain language out of context, to imply that BSC had power to stop work in the event of stevedoring malpractice. Indeed, the title of Supplementary Agreement No. 3 is “[Agreement] in respect of Handling Products Originating From United Engineering Steels and Allied Steel and Wire.” The full text of paragraph 1 is as follows:
The stevedores are to remain fully responsible for all damage incurred as a result of their fault during discharge/handling operations. Full details are to be recorded at the time of occurrence. BSC cargo superintendent is empowered to cease operations in the event of stevedoring malpractice,
(emphasis added). As with the other provisions relied on by appellant, no reasonable *732 inference can be gleaned from paragraph 1 that this provision concerns the undertaking of an affirmative duty by BSC to supervise or ensure the safety of longshoremen. It concerns, explicitly, the safety of BSC’s cargo. Finally, the ten pages of instructions to Ceres, concerning which appellant poses the question, “how much more control could BSC exercise,” are entitled “Instructions to Stevedores Loading/Discharging BSC Steel Products.” They are a laundry list of instructions which could only be described as suggestions on how to handle the various different products that BSC ships.
As we explained with regard to Clause 8 of the time charter agreement, there is no plain language in any of the agreements between BSC and Ceres which would indicate that BSC undertook to either control the manner in which Ceres employees did their work or to supervise or ensure the safety of Ceres employees beyond the duty established by the Supreme Court
in Scin-dia.
Furthermore, even assuming Restatement (Second) Torts § 414 applies to LHWCA cases, BSC did not exercise the type of control described in Comment (c). (“It is not enough that the employer has merely a general right to order work stopped or resumed, to inspect its progress, receive reports, to make suggestions or recommendations which need not necessarily be followed, or to prescribe alterations or deviations. Such a general right is usually reserved to employers, but it does not mean that the contractor is controlled as to his methods of work or as to operative detail.”).
See Hurst v. Triad Shipping Co.,
Because, under Scindia, BSC has no general duty to supervise stevedoring operations and because BSC’s contractual arrangements did not impose a duty upon it, there is no evidence which could support a jury verdict in plaintiff’s favor. Therefore, we Affirm the judgment of the district court granting summary judgment in favor of defendant-appellee, BSC.
Notes
. A “time charter" is “a contract to use a vessel for a particular period of time, although the vessel owner retains possession and control.” Schoenbaum, Admiralty and Maritime Law, § 10-1 at 381 (West 1987). A vessel that is time chartered is "typically fully equipped by the owner, who is responsible for normal operating expenses, repairs, the crew’s wages, and insurance. The charterer is responsible for expenses relating to the cargo that is loaded and the port's use.” Id. at § 10-1 n. 10.
. BSC does not challenge the district court’s finding that the corporation was amenable to suit under the LHWCA. Under 33 U.S.C. § 905(b), a longshoreman who is both covered by the LHWCA and injured due to the negligence of a vessel may file a negligence suit against the "vessel.” Under the LHWCA, however, "vessel” is defined as the "vessel’s owner, owner pro hac vice, agent, operator, charterer or bare boat charterer, master, officer, or crew member.” 33 U.S.C. § 902(21). A "time charterer” such as BSC is in this case, is not specified as being a "vessel;” however, courts have generally interpreted the statutory definition of "vessel” to include time charterers.
See,
e.g.,
Woods v. Sammisa Co., Ltd.,
. The Fifth Circuit has noted its view that
Scin-dia
"does not set the duty of time-charterers. Though the Supreme Court used the word 'vessel' throughout its opinion, the context of the case, as well as - the Court's alternate use of ‘shipowner’ throughout its opinion suggest that the duties prescribed in
Scindia
apply only to true owners.”
Kerr-McGee v. Ma-Ju Marine Services, Inc.;