delivered the opinion of the Court.
In this appeal, we consider whether the trial court erred in admitting parol evidence to aid in interpreting the terms of an easement, and in granting an injunction against Pyramid Development, L.L.C. (“Pyramid”) to prevent it from interfering with D&J Associates’ (“D&J”) use of an easement over certain property (“the property”) owned by Pyramid.
I. Facts and Proceedings Below
On March 30, 1984, D&J acquired title to a building located at 1719 and 1721 Summit Avenue in the City of Richmond. The building’s public entrances are located on Summit Avenue, with the commercial entrances and loading bays for shipping and receiving located at the rear of the building. Another row of connected buildings runs parallel to Summit Avenue fronting on Altamont Avenue to the south. The property in question lies between both rows of buildings.
The deed conveying the property to D&J includes the building and an easement to use railroad spur tracks located behind each row of buildings. The easement provides in pertinent part:
[T]he right, privilege and easement to use in common the said spur tracks and sidings, and so much of the property of Davis Brothers, Incorporated, in the block bounded by Patton Avenue, the Boulevard, Altamont Avenue, Norfolk Street, and Summit Avenue, and abutting said spur tracks and sidings as may be necessary to afford the property hereby conveyed and the improvements thereon free and convenient access to and use of the said spur tracks and sidings. . . .
The deed refers to “the location of said spur tracks and sidings” on a particular plat which identifies an “easement to use in common spur tracks.” The railroad spur tracks referenced in the deed branched from a main railroad line nearby, entered the property, and ran along the rear of each row of buildings. The rail service was discontinued sometime in the 1970’s. The parties agree that if D&J’s easement has not been extinguished, then it encumbers the property owned by Pyramid.
Beginning before the rail service was discontinued and continuing to the present, the property was used by motor vehicles for deliv *753 eries and for parking by the occupants of the building. After Pyramid purchased the property in 1998, it wished to improve the property by paving it and adding parking spaces and asked the owners of the other buildings, including D&J, to enter into an agreement to defray the costs involved in exchange for the use of parking spaces. Pyramid planned to rent the spaces to those owners who chose not to enter into the agreement.
D&J did not enter into the agreement or pay for parking spaces. Instead, D&J filed a bill of complaint requesting injunctive relief to prevent Pyramid from restricting access to the property. D&J asserted in the bill of complaint that the easement in its deed allowed for ingress and egress to its building and for the parking of vehicles. In response, Pyramid maintained that when the rail service was discontinued, the essential purpose of the easement was abandoned.
The trial court found the language of the easement ambiguous and permitted the introduction of parol evidence to determine whether the scope of the easement allowed for the use of trucks and other vehicles. At trial, D&J’s evidence demonstrated that it regularly used the property for loading and unloading trucks and other vehicles. The trial court found that the easement granted to D&J included the “use of the way to access [its] building in a reasonable manner in the ordinary course of [its] business.” Relying on our decision in
Wagoner
v.
Jack’s Creek Coal Corp.,
The trial court enjoined Pyramid from impeding D&J’s access to the property. Following issuance of the trial court’s order, both parties requested clarification. After a hearing, the trial court entered a subsequent order to clarify the rights of the parties. The revised order provided D&J with “the non-exclusive right of ingress and egress over and across” the property for access to its building and for loading and unloading vehicles, delivery and shipment of goods, placement of a dumpster, and the non-exclusive right to park motor vehicles at the rear of its building. Pyramid appeals the adverse judgment of the trial court.
II. Standard of Review
The trial court’s finding of facts are binding upon this Court unless they are plainly wrong or unsupported by the evidence.
Quantum Dev. Co. v. Luckett,
III. Analysis
On appeal, Pyramid argues that the trial court erred in allowing the introduction of parol evidence to aid in determining the scope of the easement. Additionally, Pyramid argues that the easement was extinguished because the subject of the easement, rail service, ceased to exist.
When an easement is granted by deed, unless it is ambiguous, “the rights of the parties must be ascertained from the words of the deed, and the extent of the easement cannot be determined from any other source.”
Gordon
v.
Hoy,
The trial court, citing reliance on our decision in
Strickland v. Barnes,
The present case is different from Strickland. The deed at issue in Strickland referenced an easement to a railroad siding that was not yet constructed, and the intended use of the easement prior to construction of the siding rendered the language in the deed ambiguous. In the present case, however, the deed unambiguously granted an easement “to use in common the said spur tracks and sidings, and so much of the property . . . abutting said spur tracks and sidings as may be necessary to afford the property hereby conveyed . . . free and convenient access to and use of the said spur tracks and sidings.” The language employed in D&J’s deed is not ambiguous; the purpose of the easement was expressly limited to allowing access to the spur tracks and sidings, and nothing more. Accordingly, we hold that the trial court erroneously admitted parol evidence to determine the scope of the unambiguous easement.
The trial court also relied on our decision in
Wagoner;
however, the present case differs from
Wagoner
as well. The easement at issue in
Wagoner
granted a right of way across a road described as “a wagon haul road.”
Wagoner,
Finally, based on the unambiguous language in the deed, the easement to use the spur tracks and sidings was extinguished when rail service was discontinued. “If the particular purpose for which [an] easement is granted is fulfilled or otherwise ceases to exist, the easement . . . falls to the ground.” 1 Frederick D.G. Ribble, Minor on Real Property § 107.1, at 145-46 (2d ed. 1928).
Accord American Oil Co. v. Leaman,
IV. Conclusion
For the foregoing reasons, we hold that the trial court erred in finding the language of the deed ambiguous and in permitting the introduction of parol evidence. The trial court further erred in finding that an easement continued to exist over the property, despite the discontinuance of rail service. Because the injunction was based upon an erroneous premise, the trial court further erred in granting injunctive relief. *
Accordingly, we will reverse and vacate the judgment of the trial court, and will enter final judgment for Pyramid dismissing the Bill of Complaint.
Reversed and final judgment.
Notes
Pyramid also asserted that the trial court erred in finding that the easement included the use of delivery vehicles and parking privileges, and the placement of a dumpster on the property. Because we find that the easement was extinguished, we need not address this assignment of error.
