*969Power Integrations, Inc. owns U.S. Patent Nos. 6,212,079 ("the '079 patent") and 6,538,908 ("the '908 patent"). Power Integrations sued Fairchild Semiconductor Corporation and Fairchild (Taiwan) Corporation (collectively "Fairchild") for infringement. A jury found Fairchild literally infringed claims 31, 34, 38, and 42 of the '079 patent and infringed claims 26 and 27 of the '908 patent under the doctrine of equivalents. In a second trial, a jury awarded damages of roughly $140 million, finding that the entire market value rule applied in calculating damages for infringement of the '079 patent. The district court denied Fairchild's motions for judgment as a matter of law. Fairchild appeals.
We affirm the district court's judgments of infringement. We conclude that the entire market value rule cannot be used here to calculate damages. We vacate the damages award and remand for further proceedings.
BACKGROUND
I
Power Integrations and Fairchild are both manufacturers of power supply controller chips. Power supply controller chips are integrated circuits used in power supplies, such as chargers for electronic devices. These power supplies transform alternating current ("AC") electricity, which comes from an AC outlet, into direct current ("DC") electricity, which is needed to power cell phones, laptops, and other electronic devices.
After AC electricity has been converted to DC electricity, a switching regulator directs the transistor in the circuit when to turn on and off in order to provide the desired amount of power to the electronic device. The electronic device is referred to as the "DC output" because it receives the DC current. The transistor turns on and off at defined intervals. For example, if there is a need for power at the DC output, the switching regulator will direct the transistor to stay "on" for a longer period of time so more power will flow to the DC output.
The controversy here involves the '079 and '908 patents owned by Power Integrations. The asserted claims of the '079 patent cover switching regulators. Prior-art switching regulators were inefficient during periods when the DC output required little power. During these low power periods, prior-art switching regulators would skip on/off cycles to decrease the DC power provided; the power remained off during the skipped cycle. However, skipping cycles created loud noise and delivered power in an intermittent fashion. The '079 patent addressed this problem by reducing the frequency of on/off cycles rather than by skipping cycles altogether. The frequency of on/off cycles is determined by feedback signals. Thus, the switching frequency varies based on the feedback signal. However, for a certain range of feedback signals, the frequency of the on/off cycles does not change. Each of the asserted claims requires a "fixed switching frequency for a first range of feedback signals."
The '908 patent covers a "power supply controller," which is an integrated circuit that can perform a variety of power-regulation functions. '908 pat., col. 1, ll. 32-33, 52-60. Each of the asserted claims requires a power supply controller comprising "a multi-function circuit coupled to receive a signal at a multi-function terminal for adjusting a current limit of a power switch." Id ., col. 25, l. 63-col. 26, l. 14. The current limit is a value of current that can *970be used by the circuit to turn off the power switch when the amount of current passing through the power switch reaches the threshold value.
II
Power Integrations filed suit against Fairchild, alleging infringement of various claims of the '079 patent and the '908 patent.
Six months after the jury verdict, and while the case was still pending in the district court, our court decided VirnetX, Inc. v. Cisco Systems, Inc. ,
The district court held a second damages trial in December 2015. The district court granted a Daubert motion to exclude Power Integrations' expert testimony based on apportionment, but allowed its expert to present testimony based on the entire market value rule. The jury awarded $139.8 million in damages, based on damages testimony that relied solely on the entire market value rule. Fairchild then moved for judgment as a matter of law, or in the alternative a new trial, arguing that the damages award was not supported by substantial evidence and that the use of the entire market value rule was improper. The district court denied this motion.
Fairchild now appeals the determination of literal infringement of the '079 patent, the determination of infringement under doctrine of equivalents of the '908 patent, and the damages award. We have jurisdiction pursuant to
DISCUSSION
I
We first address infringement of the '079 patent. The key issue here is *971whether the accused products have a "fixed switching frequency for a first range of feedback signal values."
In a Markman order, the district court construed "fixed switching frequency" to mean "[a] non-varying number of switching cycles per second." J.A. 2142. On appeal, Fairchild disputes: (1) whether all accused products include a "fixed" switching frequency because the frequency varies due to operating conditions, and (2) whether a particular subset of accused products, known as "frequency-hopping" products, has a "fixed" frequency. This second issue turns primarily on claim construction-whether the district court properly construed "fixed frequency" to include a per second limitation. But Fairchild contends that even if the claim construction were correct, there was not substantial evidence to support the jury verdict.
Claim terms are given their ordinary and customary meaning, which is the meaning the term would have to a person of ordinary skill in the art at the time of the invention. Phillips v. AWH Corp. ,
A
Fairchild argues that the jury verdict is not supported by substantial evidence because none of the Fairchild products has a "fixed switching frequency" according to the language of the claims or a "non-varying frequency" under the district court's claim construction, because even during "fixed" frequency mode, the products operate with 5% to 15% variance in frequency. This variance is due to operating conditions, such as temperature and input voltage. The question is whether this variability renders the products non-infringing.
*972Fairchild argues that the term "fixed" under the district court's construction of "non-varying number of switching cycles per second" requires an absolutely fixed frequency with no variance, even due to operating conditions. The district court, Fairchild asserts, rejected a construction of "fixed" frequency that permits natural variation when it rejected Power Integration's proposed construction of "fixed switching frequency" as "the target switching frequency is intended to be substantially fixed." J.A. 2125. Rather, the court adopted "fixed" as meaning "non-varying." J.A. 2142.
Fairchild's argument is unpersuasive. The district court's construction of "fixed switching frequency" as "non-varying" does not exclude the possibility of natural variation because doing so would impermissibly render the claims inoperable. See Ecolab, Inc. v. FMC Corp. ,
Thus, the jury could have properly concluded that the terms "fixed frequency" and "non-varying" left open the possibility for minor frequency variations due to operating conditions. A reasonable jury could have found that the accused products have a "fixed" or "non-varying" frequency despite slight variance due to operating conditions.
B
Fairchild alternatively argues that there was no basis for finding that the "fixed" frequency limitation was satisfied for a subset of the accused products because the Fairchild "frequency-hopping" products intentionally vary frequency in order to reduce electromagnetic interference. The intentional varying of frequency is referred to as "jittering." For example, one Fairchild frequency-hopping product jittered its switching frequency from 62 kilohertz to 68 kilohertz, around a center frequency *973of 65 kilohertz. Even though the frequency varies in any given microsecond interval, the average number of cycles per second is 65,000.
On appeal, Fairchild argues that the district court erred in construing "fixed switching frequency" as a "non-varying number of switching cycles per second " rather than looking to overall variation.
The district court construed claim terms in a series of Markman orders in 2011 and 2012-two years before trial. Power Integrations proposed that "fixed switching frequency" be construed to mean "the target switching frequency is intended to be substantially fixed; but does not preclude the presence of a frequency jittering circuit." J.A. 2125. Fairchild proposed that: "the switching frequency does not vary."
Although Fairchild later proposed further construction for other claim terms, Fairchild never objected to the "per second" construction and did not seek rehearing or supplemental construction. At trial, Fairchild did not object to the district court's instructing the jury using the "per second" language. Even in its post-trial motion, Fairchild did not argue that the court's construction was incorrect. The claim construction issue is argued for the first time on appeal.
Power Integrations argues that because Fairchild did not seek additional claim construction at the district court and chose to litigate this issue as a factual dispute about infringement, Fairchild has waived its "per second" claim construction argument. Fairchild responds that it did not waive its claim construction argument because the claim construction it proposes now is the same as the claim construction it proposed during the Markman hearing, which did not contain the "per second" limitation.
We have held that a party does not waive a claim construction argument by failing to object during trial when the construction proposed on appeal is the same as the construction proposed in a Markman hearing. O2 Micro Int'l Ltd. v. Beyond Innovation Tech. Co. ,
The problem for Fairchild is that the issue of the appropriate time interval over which to measure frequency was not fully litigated-or even raised as an issue in dispute-at the Markman stage of this proceeding. During the Markman proceedings, there was no dispute about the time interval. Neither Fairchild nor Power Integrations proposed a construction with the "per second" limitation. The district court added this limitation to the construction on its own without providing a clear explanation. Because the district court had not specifically addressed this issue in its claim construction order, in order to preserve an objection to the district court's claim construction, Fairchild was required to raise the issue before submission to the *974jury. Yet even when this dispute arose at trial, Fairchild did not ask the district court to modify or clarify its claim construction with regard to "per second," nor did it object to the jury instructions. Instead, Fairchild waited until this appeal to argue that the district court's claim construction was erroneous.
It is well-settled that a party cannot reserve a new claim-construction argument for the post-trial motion stage of litigation. Lazare Kaplan Int'l, Inc. v. Photoscribe Techs., Inc. ,
The present situation is similar to Solvay S.A. v. Honeywell International, Inc. ,
Because Fairchild has waived its "per second" claim-construction objection, we only review whether substantial evidence supported the jury verdict under the court's construction. See Lazare ,
II
Next, we address infringement of the '908 patent under the doctrine of equivalents. The '908 patent is directed towards a power supply controller, where an integrated circuit can perform multiple functions within a single terminal. Claim 26 requires:
26. A power supply controller circuit, comprising:
*975a multi-function circuit coupled to receive a signal at a multi-function terminal for adjusting a current limit of a power switch, the multi-function circuit to generate a current limit adjustment signal in response to the signal; and
a control circuit coupled to receive the current limit adjustment signal, the control circuit coupled to adjust the current limit of a current through the power switch in response to the current limit adjustment signal.
'908 patent, col. 25 l. 63-col. 26, l. 7 (emphasis added). Claim 27, the only other asserted claim, depends from claim 26.
The dispute focuses on the "current limit" term. There is no dispute about claim construction. The district court construed "current limit" as "a value of current that can be used by the control circuit to turn off the power switch when the amount of current passing through the power switch reaches the threshold." J.A. 2155.
The accused products use a value of voltage, rather than a value of current, as the signal to implement the current limit, so there could not be literal infringement of this limitation. Fairchild moved in limine to preclude Power Integrations from arguing infringement under the doctrine of equivalents based on prosecution-history estoppel. Fairchild argued that prosecution-history estoppel existed because during prosecution of a related patent, Power Integrations explicitly distinguished voltage from current and therefore could not now assert voltage as an equivalent. The district court denied the motion in limine because the prosecution history was for a different term in a different patent, allowing Power Integrations to argue voltage as an equivalent for monitoring current.
At trial, Power Integrations' expert testified that a value of voltage qualifies as a "value of current" because under Ohm's Law, current is equal to voltage divided by resistance. J.A. 572-73, 901. The jury then found infringement under the doctrine of equivalents, and the district court denied judgment as a matter of law. On appeal, Fairchild argues that Power Integrations' equivalents theory is barred by prosecution-history estoppel.
Prosecution-history estoppel limits the application of the doctrine of equivalents. If a patentee surrenders certain subject matter during prosecution, the patentee is then barred from using the doctrine of equivalents to recover for infringement based on that same subject matter. Festo Corp. v. Shoketsu Kinzoku Kogyo Kabushiki Co. ,
Fairchild argues for argument-based estoppel based on a statement that Power Integrations made during prosecution of
[a] power supply controller circuit, comprising a current input circuit coupled to receive a current representative of an input voltage, the current input circuit *976to generate an enable/disable signal when the current crosses a threshold having a hysteresis of greater than or equal to zero, the power supply controller to activate and deactivate the power supply in response to the enable/disable signal.
'971 pat., col. 23, ll. 30-36 (emphasis added).
The examiner rejected the claims based on the Agiman reference. In an effort to overcome the rejection, Power Integrations argued that "Agiman's circuit monitors voltage rather than current." J.A. 2283 (emphasis in original). Power Integrations then urged that "Agiman fails to disclose ... a current input circuit coupled to receive a current representative of an input voltage, the current input circuit to generate an enable/disable signal when the current crosses a threshold."
To determine whether prosecution-history estoppel applies, "the relevant inquiry is whether a competitor would reasonably believe that the applicant surrendered the relevant subject matter." Conoco ,
Here, the claim language on its face is different than the language of the claims to which the prosecution argument was directed. Claim 26 of the '908 patent covers "a multi-function circuit coupled to receive a signal at a multi-function terminal for adjusting a current limit of a power switch, the multi-function circuit to generate a current limit adjustment signal in response to the signal." '908 pat., col. 25 l. 63-col. 26, l. 7 (emphasis added). The current limit in the '908 patent is externally adjustable and helps prevent a power switch from overloading due to excessive current flow. The '971 patent, on the other hand, claims a "current input circuit coupled to receive a current representative of an input voltage, the current input circuit to generate an enable/disable signal when the current crosses a threshold." '971 pat., col. 23, ll. 30-33 (emphasis added). The functions performed in the two patents are related but different. The '908 patent claims receiving a signal to adjust the current limit, which in turn determines when to turn the power supply on and off. The '971 patent claims receiving a signal that directly turns the power supply on and off. Importantly, the claim in the '971 patent specifically distinguishes voltage from current, claiming "a current representative of an input voltage." The '908 claim, in contrast, does not distinguish between current and voltage within the claim. It merely describes a "signal" to adjust the current limit.
On appeal, Fairchild provides only a cursory argument of why the statement in the '971 patent prosecution history should apply the embodiments claimed in the '908 patent. Fairchild failed to establish that the prosecution history is sufficiently clear as to create an estoppel. We conclude that the district court correctly determined that prosecution-history estoppel does not apply, and affirm the finding of infringement as to the asserted claims of the '908 patent.
*977III
Lastly, we address damages. The jury awarded Power Integrations $139.8 million in the form of a reasonable royalty. The jury's reasonable royalty covered the three types of losses Power Integrations' damages expert Dr. Putnam testified the parties would anticipate during a hypothetical negotiation: lost sales, reduction in price due to competition, and lost licensing fees. The district court denied Fairchild's motion for judgment as a matter of law or in the alternative a new trial with respect to damages. We agree with Fairchild that the district court should have granted the new trial motion.
A patentee is only entitled to a reasonable royalty attributable to the infringing features. The patentee "must in every case give evidence tending to separate or apportion the defendant's profits and the patentee's damages between the patented feature and the unpatented features." Garretson v. Clark ,
Undertaking an apportionment analysis where reasonable royalties are sought generally requires a determination of the royalty base to which the royalty rate will be applied. We have articulated that, where multi-component products are accused of infringement, the royalty base should not be larger than the smallest salable unit embodying the patented invention. We have cautioned against reliance on use of the entire market value of a multi-component product that includes a patented component because it "cannot help but skew the damages horizon for the jury, regardless of the contribution of the patented component to this revenue." Uniloc ,
The damages verdict here rests on Power Integrations' reliance on a demanding alternative to our general rule of apportionment, the entire market value rule.
*978Id ."The entire market value rule allows for the recovery of damages based on the value of an entire apparatus containing several features, when the feature patented constitutes the basis for consumer demand." Lucent Techs., Inc. v. Gateway, Inc. ,
If the product has other valuable features that also contribute to driving consumer demand-patented or unpatented-then the damages for patent infringement must be apportioned to reflect only the value of the patented feature. This is so whenever the claimed feature does not define the entirety of the commercial product. In some circumstances, for example, where the other features are simply generic and/or conventional and hence of little distinguishing character, such as the color of a particular product, it may be appropriate to use the entire value of the product because the patented feature accounts for almost all of the value of the product as a whole. See AstraZeneca AB v. Apotex Corp. ,
Power Integrations' royalty rate is premised on the '079 patent 's frequency reduction feature as driving consumer demand for Fairchild's controller chips. To support this contention, Power Integrations provided evidence that the '079 patent ed frequency reduction feature was essential to many customers, as it allowed the products to meet the federal government's Energy Star program. In addition, Power Integrations provided evidence that some customers asked for the '079 feature, that products with the '079 feature outsold other products, and that technical marketing materials promoted the '079 feature. Both parties, however, agreed that the accused products contained other valuable features as well. Power Integrations presented no evidence about the effect of those features on consumer demand or the extent to which those features were responsible for the products' value. Power Integrations did not seek a separate jury determination as to damages for infringement of the asserted claims of the '908 patent, and it is clear that the jury calculated damages only for the '079 patent.
In its JMOL motion, Fairchild argued that the evidence presented by Power Integrations was insufficient as a matter of law to invoke the entire market value rule, pointing to our decision in LaserDynamics . The district court noted that three prior cases relied on evidence that " LaserDynamics ... arguably would find inadequate to support EMVR," and that the evidence presented by Power Integrations was comparable to the evidence in the prior cases. J.A. 26; see Bose Corp. v. JBL, Inc. ,
Despite the district court's suggestion to the contrary, there is no conflict between LaserDynamics and these earlier cases, and subsequent cases have relied on LaserDynamics . See VirnetX ,
*979Versata Software, Inc. v. SAP Am., Inc. ,
As LaserDynamics, Versata, and VirnetX held, the entire market value rule is appropriate only when the patented feature is the sole driver of customer demand or substantially creates the value of the component parts. LaserDynamics ,
Here, the power supply controllers had other valuable features, such as jittering. The district court noted that "there is evidence in the record that other features are important and are highlighted by the respective parties" and that "there is no question that ... there are other valuable features."
Because the evidence presented by Power Integrations was insufficient as a matter of law to invoke the entire market value rule, we vacate the award of damages and remand for a new trial. In light of this disposition, we need not address Fairchild's other arguments about the sufficiency of the reasonable-royalty evidence.
CONCLUSION
We affirm the judgment of infringement of the asserted claims of the '079 and the '908 patents. We vacate the damages award and remand for further proceedings consistent with this opinion.
AFFIRMED-IN-PART, VACATED-IN-PART, REMANDED
COSTS
Costs to neither party.
Fairchild counterclaimed for infringement of
All of the asserted claims in this proceeding have been found unpatentable in two IPR proceedings. Those proceedings are currently pending on appeal to this court. See Semiconductor Components Indus., LLC v. Power Integrations, Inc. , IPR No. 2016-00809,
Claim 31, which is representative, reads in full:
31. A switching regulator, comprising: a power switch coupled between first and second terminals, the first terminal to be coupled to an energy transfer element of a power supply and the second terminal to be coupled to a supply rail of the power supply, and
a control circuit coupled to a third terminal and the power Switch, the third terminal to be coupled to an output of the power supply, the control circuit coupled to generate a feedback signal responsive to the output of the power supply, the control circuit coupled to switch the power switch in response to the feedback signal, the control circuit coupled to switch the power switch at a fixed switching frequency for a first range of feedback signal values, the control circuit coupled to vary a switching frequency of the power switch without skipping cycles in response to the feedback signal for a second range of feedback signal values, wherein the control circuit comprises:
a feedback signal circuit coupled to the third terminal, the feedback signal circuit coupled to generate the feedback signal; and
a pulse width modulator circuit coupled to switch the power switch in response to the feedback signal, wherein the first and second ranges of the feedback signal correspond to first and second ranges of on-time values of a drive signal generated by the pulse width modulator circuit to switch the power switch.
'079 patent, Ex Parte Reexamination Certificate, col. 2, ll. 4-32.
Fairchild also argues that the term "fixed" cannot include any variations due to operating conditions based on statements made by Power Integrations during the reexamination about a particular prior art reference, the Zhou reference. However, this argument is waived because Fairchild did not raise the prosecution history concerning the Zhou prior art as a claim construction argument before the district court. Moreover, the Zhou reference did not disclose holding frequency constant over a range of feedback signals but instead varied frequency over the entire range of operation. Therefore, the prosecution history statement describing Zhou as not containing a "fixed" frequency was not directed to determining whether the switching frequency has been fixed when environmental variations occur while holding a fixed frequency over a certain range of signals.
This case is unlike that in Chef America, Inc. v. Lamb-Weston, Inc. , where the claims were unambiguously written in a manner that rendered them inoperable.
Moreover, in an order denying a permanent injunction, the district court noted that the circuits "contain numerous features aside from the patented features." J.A. 2293.
Power Integrations provided testimony that the patented feature drove demand for the purchase of some products. This evidence almost entirely concerned Power Integrations' own products, TOPSwitch-Fx and TOPSwitch-Gx, not Fairchild's. Power Integrations contends that the only difference between the older TOPSwitch-Fx and the newer TOPSwitch-Gx controller chips is the frequency reduction feature covered by the '079 patent, and that the frequency reduction feature was the reason why its customers would buy the Gx product over the Fx product. We, however, explained in LaserDynamics that such a comparator, without more, is not enough to prove that the frequency reduction feature alone drives consumer demand for power supply controller chips.