Potomac Electric Power Company v. Federal Energy Regulatory Commission, First Energy Corp., IntervenorsPotomac Electric Power Company v. Federal Energy Regulatory Commission, First Energy Corp., Intervenors
Opinion for the Court filed by Circuit Judge ROGERS.
Potomac Electric Power Company (“PEPCO”) petitions for review of two orders of the Federal Energy Regulatory Commission (“FERC”) denying its request under § 206 of the Federal Power Act (“FPA”), 16 U.S.C. § 824e (1994), for unilateral modification of the rates prescribed by a long-term, fixed rate, power transmission service agreement between PEPCO and the Allegheny Power System (“APS”). Because FERC did not abuse its discretion in applying the stringent Mobile-Sierra public interest standard, and because a mere rate disparity or a benefit to the purchasing utility or its customers from a rate modification does not suffice, without more, to satisfy that standard, we conclude that FERC’s decision to dismiss the complaint was a reasonable exercise of its authority. Accordingly, we deny the petition.
I.
In 1987, PEPCO entered into an 18.5 year power supply agreement with the Ohio Edison System,-which was comprised of Ohio Edison Company and Pennsylvania Power Company. In order to effect delivery of the power to PEPCO’s service area, PEPCO and the Ohio Edison System each entered into a transmission service agreement with the APS, an integrated electric utility system directly connected to both PEPCO and the Ohio Edison System. Under the three agreements, PEPCO would purchase contract entitlements to a share of the Ohio Edison System’s installed generating capacity and associated energy, APS would purchase from the Ohio Edison System the power intended for PEPCO, and APS would, in turn, resell the power purchased from the Ohio Edison System to PEPCO. The dispute in the
PEPCO’s agreement with APS provided in relevant part that the base rate for the APS transmission service would commence at $1.70 per kW-month, increase to $2,255 per kW-month in 1994, and increase again to $2,815 per kW-month in 1999. In addition, the agreement required PEPCO to pay an “adder” of $1.00 per megawatt-hour for each megawatt-hour of energy that APS delivered. Furthermore, the agreement was a “fixed rate” contract, meaning that the parties agreed not to unilaterally request a rate change from the Commission, as provided in section 9.3 of the agreement, which stated:
It is the intention of the parties that the rates and terms of service specified herein shall remain in effect for the entire term set forth in this Article, and shall not be subject to change pursuant to the Federal Power Act absent mutual agreement of the parties or as provided in seption 3.4.
Section 3.4, in turn, provided for renegotiation “[i]n the event that reasonably unforeseeable circumstances beyond the control of any party to this Agreement result in a gross inequity to any party” and outlined a procedure for dispute resolution in case parties fail to reach a new agreement.
APS submitted the three agreements for FERC approval in March 1987. See Monongahela Power Co., 39 F.E.R.C. ¶ 61,350, reh’g denied, 40 F.E.R.C. ¶ 61,-256 (1987). In its review of the filing, FERC noted that PEPCO represented that “the rate levels are completely justified on the basis of cost factors.” Id. at 62,093. Also as recounted by FERC at the time, PEPCO maintained that “once rates are determined to be cost-justified, the noncost factors such as the potential savings to PEPCO are superfluous, the filing cannot be deemed deficient even if the noncost support were deemed insufficient.” Id. FERC also noted that “[n]o party to [the] proceeding has alleged that the rates under the three proposed agreements are unjust and unreasonable,” and that “[o]ur review indicates that the rates to PEPCO will not generate excessive revenues and should be accepted for filing without suspension.” Id. at 62,096. FERC accepted the three contracts for filing to become effective June 1, 1987. See id. at 62,098.
In 1996, FERC issued the first in a series of orders known collectively as “Order No. 888” to address problems associated with electric transmission monopolies in the bulk power markets. See Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public Utilities, 61 Fed. Reg. 21,540 (1996), codified as revised at 18 C.F.R. Pts. 35 & 385 (1999). 1 The Order required all public utilities that own, operate, or control interstate transmission facilities to file an open access nondiscriminatory transmission tariff. See id. at 21,540. In its open access transmission tariff (“OATT”) proceeding pursuant to Order No. 888, APS agreed to charge a rate of $1.49 per kW-month for its transmission service, a rate substantially less than the rate PEPCO was obligated to pay under its 1987 agreement with APS.
Thereafter, PEPCO filed a complaint against APS, requesting that FERC summarily order APS to reduce the rate for transmission services under the 1987 agreement to the same level as APS’s rate for comparable service under its OATT. The Federal Power Act provides that electricity rates may be modified in one of two ways: under § 205, the seller may attempt to prompt rate changes by filing a new
APS moved to dismiss the complaint, citing section 9.3 of the agreement under which the parties had agreed to eliminate the right of either party to initiate rate modification pursuant to FERC’s § 206 authority. APS relied primarily on the
“Mobile-Sierra”
doctrine, named after the two Supreme Court cases that established the “public interest” standard for FERC review of electricity rates in contracts restraining unilateral rate changes.
See United Gas Pipe Line Co. v. Mobile Gas Serv.,
In response, PEPCO asserted that the public interest was adversely affected by the contractual rate because the excessive rates were entirely borne by its ratepayers. PEPCO also maintained that because of APS’s market power, it had little bargaining power at the time it entered the agreement to influence the terms of the contract, including the Mobile-Sierra provision in section 9.3. Furthermore, PEP-CO contended that the rate APS charged itself and others, approximately half of what PEPCO was being charged for the same service, constituted undue discrimination prohibited under the Mobile-Sierra doctrine.
FERC dismissed PEPCO’s complaint. See Potomac Elec. Power Co. v. Allegheny Power Sys., 85 F.E.R.C. ¶ 61,160 (1998). Emphasizing that it “does not take contract modification lightly,” FERC reasoned that the mere fact that PEPCO was subject to higher rates under its agreement with APS than it would be under APS’s OATT was insufficient reason for abrogating an agreement that PEPCO had fully supported at the time of filing and FERC had approved as just and reasonable. Id. at 61,632-33. FERC also rejected PEPCO’s request that it act sua sponte to reduce the rates for the benefit of PEP-CO’s ratepayers, reasoning that it would be inappropriate to convert PEPCO’s unilateral request for reformation into a FERC-initiated contract modification where the parties’ agreement contained a Mobile-Sierra provision, and where PEP-CO had failed to satisfy the public interest standard. See id. at 61,633.
In denying PEPCO’s petition for rehearing, FERC rejected PEPCO’s contention that FERC had erred by failing to assess whether the rates were just and reasonable, and defined the issue instead to be whether the rates, having been found to be just and reasonable when originally approved, had become contrary to the public interest.
See Potomac Elec. Power Co. v. Allegheny Power Sys.
87 F.E.R.C-¶ 61,030, at 61,105 (1999). FERC noted that, under
II.
On appeal, PEPCO contends that by emphasizing only the policies favoring fixed rate contracts and ignoring the FPA's concerns with fairness and anti-competitiveness, FERC failed to meet the FPA's mandate. More specifically, PEP-CO first maintains that FERC's application of the Mobile-Sierra public interest standard ignored FERC's precedent calling for a "flexible" version of the test in situations where FERC is acting or is requested to act on behalf of non-party ratepayers that are affected by the contract. Even if FERC applied the correct "version" of the standard, PEPCO maintains second that FERC failed to fulfill its obligation under the public interest standard to ensure that the rates charged under PEPCO's agreement with APS are neither unduly discriminatory nor excessively burdensome on PEPCO's ratepayers. Nor had FERC, PEPCO continues, taken into account that the agreement was the result of uneven bargaining power, even though FERC had stated this factor was relevant to a public interest analysis and had made a general finding that transmission contracts entered into before Order No. 888 often reflected the exercise of market power. In other words, PEPCO submits, FERC acted arbitrarily and capriciously by not applying a flexible public interest standard and, alternatively, by concluding that PEPCO had not met its burden under the stringent Mobile-Sierra public interest standard.
The court will uphold FERC's orders unless they are "arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law." 5 U.S.C. § 706(2)(A). Likewise, the court will uphold FERc's factual findings as long as they are supported by substantial evidence. See 16 U.S.C. § 8251(b); see also Texaco, Inc. v. FERC,
PEPCO concedes, implicitly in its briefs and explicitly at oral argument, that the public interest standard set out in Mobile and Sierra, and not the just and reasonable standard, controls PEPcO's § 206 request. The court has observed that the Mobile-Sierra public interest standard is much more restrictive than the FPA's "just and reasonable" standard, see, e.g., Union Pacific Fuels, Inc. v. FERC,
For this proposition, PEPCO relies on
Northeast Utilities Service Company,
66 F.E.R.C. ¶ 61,332 (1994),
aff'd
[I]f the Commission is to comply with both the Mobile-Sierra imperative to respect contractual arrangements, on the one hand, and our statutory mandate to protect the public interest and ensure that rates are just and reasonable and not unduly discriminatory or preferential, on the other, the “public interest” standard of review under the Mobile-Sierra doctrine cannot be “practically insurmountable” in all cases.
Id.
(footnote omitted) (quoting
Papago,
FERC, in two subsequent cases that PEPCO also relies on, reaffirmed its position in Northeast Utilities. In Southern Company Services, Inc., 67 F.E.R.C. ¶ 61,-080 (1994), FERC reiterated that “the public interest standard of review does not bind the Commission to a practically insurmountable burden in all cases in which the Commission might act to change rates.” Id. at 61,227. More specifically, FERC stated that the cases do not “impose a practically insurmountable burden when the Commission proceeds sua sponte or at the request of non-parties to change rates, terms and conditions in order to protect non-parties to a contract.” Id. (citing Northeast Utils., 66 F.E.R.C. at 62,081-88). Similarly, in Florida Power & Light Co., 67 F.E.R.C. ¶ 61,141 (1994), FERC stated, “when we are acting sua sponte or at the request of non-parties to change rates, terms and conditions in order to protect non-parties, we are not bound to a standard of review that is practically insurmountable.” Id. at 61,399.
Thus, as PEPCO contends, FERC has at times expressed an intent to apply a standard that is more flexible than the “practically insurmountable” standard that
Papago
described. However, unlike the circumstances in which FERC has stated it would apply a more flexible standard, PEPCO’s § 206 request does not involve “the Commission proceeding]
sua sponte
or at the request of non-parties to change rates ... in order to protect non-parties to a contract.”
Southern Co.,
67 F.E.R.C. at 61,227;
see also Florida Power,
67 F.E.R.C. at 61,399. PEPCO is not itself a
The question remains whether FERC abused its discretion in concluding that PEPCO failed to meet its burden under the Mobile-Sierra public interest standard. PEPCO contends that FERC, in its public interest analysis, failed to consider the excessive burden on PEPCO's ratepayers and the discriminatory impact of the disparity between the transmission rates set by the 1987 agreement and APS's OATT transmission rate. The problem with PEPCO's position is that, other than pointing out that the contract rate is twice APS's OATT rate, it has presented no evidence regarding how the contract rates are unduly discriminatory or excessively burdensome on PEPCO ratepayers. The court has repeatedly emphasized the importance of contractual stability in a number of cases involving the Mobile-Sierra doctrine. See, e.g., Maine Pub. Serv. Co. v. FERC,
PEPCO also maintains that because of uneven bargaining power in 1987, it did not necessarily enter into the fixed-rate agreement with APS willingly. However, PEPCO’s willingness was not part of FERC’s rationale for dismissing the complaint. FERC pointed out in denying rehearing:
The “premise” for the Commission’s ruling is not that PEPCO willingly agreed to the Agreement’s rates and terms. Rather, the “premise” for the Commission’s ruling is that contract modification is not to be taken lightly and that, in this ease, PEPCO has failed to demonstrate that a revision to the Agreement is in the public interest.
PEPCO,
87 F.E.R.C. at 61,106 (footnote omitted). Moreover, PEPCO can hardly escape the consequences of the fact that its statements to FERC in 1987 show that it fully supported the fixed-rate agreement,
see id.
at 61,106 n. 10, and that it has not alleged bad faith negotiation on the part of the parties to the agreement. Nothing in the record on appeal demonstrates that the contract was the result of APS’s market power; to the contrary, PEPCO has admitted that it had other supply options when it entered the agreement with APS in 1987.
See Monongahela Power Co.,
39 F.E.R.C. at 62,092. While the existence of other options does not necessarily mean an absence of market power, PEPCO’s assertion to FERC in 1987 that the transmission agreement was cosb-justifíed and represented cost savings over other supply options supports such a conclusion. Therefore, absent any claim, much less evidence, of unfairness or bad faith in the original negotiations, it is reasonable for FERC to require parties “to live with their bargains as time passes and various projections about the future are proved correct or incorrect.”
Norwood,
To the extent that PEPCO maintains that FERC’s refusal to modify the contract is inconsistent with Order No. 888-A, it fares no better. In Order No. 888-A, FERC found that, prior to July 11, 1994, wholesale requirements contracts were “entered into during an era in which transmission providers exerted monopoly control over access to their transmission facilities,” and that, as a result, “[m]any of these contracts were the result of uneven bargaining power.” Order No. 888-A, FERC Stats. & Regs. ¶ 31,048, at 30,193 (1997). Accordingly, FERC concluded that it was in the public interest to permit those requirements customers to seek modification of their contracts under the just and reasonable standard, even if the contract contained a Mobile-Sierra provision. See id. at 30,189. However, as PEPCO concedes, Order No. 888-A’s exception to application of the Mobile-Sierra standard plainly applies only to requirements contracts. Moreover, as PEPCO again concedes, for nonrequirements contracts, such as the APS agreement, FERC declined to extend its generic Mobile-Sierra findings to all long-term block purchases of electricity. See id. at 30,195. FERC distinguished these contracts from requirements contracts based on its conclusion that, in “the majority of circumstances, such long-term supply contracts are voluntary arrangements in which neither party had market power.” Id. FERC noted, “[plarties can avail themselves of the section 205 and 206 procedure already available if they want to seek modification of such contracts.” Id. That is what PEPCO did here by requesting FERC to employ its § 206 authority, and FERC denied PEPCO’s petition under the Mobile-Sierra doctrine. Therefore, FERC has precisely followed the procedure it outlined in Order No. 888-A.
It appears, then, that PEPCO’s complaint is ultimately directed at FERC’s application of the
Mobile-Sierra
doctrine. PEPCO maintains that APS had monopoly power at the time of the 1987 agreement and that FERC, “[hjaving expressly offered buyers ... the opportunity to make
Ultimately, PEPCO’s case suffers from a failure of proof. PEPCO’s counsel explained at oral argument that PEPCO did not seek a hearing before FERC on its § 206 complaint because PEPCO considered its allegations regarding the impact of the 1987 agreement on its ratepayers to be unrebutted. The court strains, in light of precedent, to imagine how PEPCO could conclude that it did not have a burden to offer evidence on this and other relevant factual issues, such as whether and the extent to which the agreement rates adversely impact PEPCO’s ratepayers and whether APS had market power at the time the 1987 agreements were signed. PEPCO’s position would undoubtedly have been strengthened had there been evidence in the record to support the assertions in its briefs regarding the asserted impact on ratepayers and APS’s market power, although we express no opinion on the outcome under those circumstances.
Notes
. For the revisions and clarifications of Order No. 888, see 76 F.E.R.C. ¶ 61,009 (1996), 76 F.E.R.C. ¶ 61,347 (1996), and 79 F.E.R.C. ¶ 61,182 (1997), on reh’g, Order No. 888-A, 62 Fed.Reg. 12274 (1997), on reh’g, Order No. 888-B, 81 F.E.R.C. ¶ 61,248 (1997), on reh’g, Order No. 888-C, 82 F.E.R.C. ¶ 61,046 (1998), on appeal sub nom. Transmission Access Policy Study Group, et al. v. FERC, No. 97-1715 (D.C.Cir.) (submitted November 3, 1999).
. This court has not had occasion to address, and need not do so here, whether FERC has authority to apply a Mobile-Sierra standard that is more flexible than the "practically insurmountable" standard whenever it reviews a "newly-filed or previously unreviewed agreement," Northeast Utils, 66 F.E.R.C. at 62,087, or "proceeds sua sponte or at the request of non-parties to change rates ... in order to protect non-parties to a contract." Southern Co., 67 F.E.R.C. at 61,227; see also Florida Power, 67 F.E.R.C. at 61,399.
. In fact, at least one circuit court has expressed skepticism about the relevance of uneven bargaining power in Mobile-Sierra analysis. The First Circuit stated:
As for the seller’s market power, reliance on this factor threatens to erode the Mobile-Sierra doctrine so substantially that a fuller explanation from the Commission is required before proceeding down this route. After all, some measure of market power could be present in a large number of contracts. A case-by-case inquiry into the presence and extent of market power would inject a new and potentially time-consuming element into the Mobile-Sierra analysis, and it is not entirely clear in any event why the Commission should protect a buyer who voluntarily enters into an agreement with a dominant seller.
Northeast Utils. Serv. Co. v. FERC,