Plaintiffs, Sebastian Phillips and the company he owns, Marine Design Dynamics, Inc. (hereinafter “MDD”), bring suit against various officials in the United States Navy as well as certain of MDD’s former employees. Plaintiffs allege they were effectively debarred from government contracting with the Navy without notice and a hearing, in violation of their Fifth Amendment due process rights. Plaintiffs also allege a variety of common law causes of action against MDD’s former employees as well as two government employees. When this case was initially filed plaintiffs moved for a temporary restraining order and preliminary injunction against the federal defendants, seeking to enjoin them from de facto debarring MDD from government contracting. On December 7, 2011, following a hearing on plaintiffs’ emergency motions, the plaintiffs and federal *2 defendants agreed and stipulated to a consent preliminary injunction. Now pending before the Court are (1) the federal defendants’ motion to dismiss, or in the alternative for summary judgment, (2) plaintiffs’ motion to enforce the consent preliminary injunction, and (3) motions to dismiss filed by three of plaintiffs’ former employees. Upon consideration of the motions, the responses, and the replies thereto, the relevant caselaw and the record in this case as a whole, the motions will be DENIED .
I. FACTUAL AND PRODCEDURAL BACKGROUND [1]
Plaintiff Marine Design Dynamics, Inc., a District of Columbia-based government contractor, is a Naval Architecture firm specializing in ship energy conservation for the Navy and other government clients. In 2006, MDD began working as a subcontractor to Computer Sciences Corporation (“CSC”), performing work under CSC’s SeaPort e-prime contract with the Naval Sea Systems Command of the Department of the Navy (“NAVSEA”), contract number N001788-04-D-4030-EHO2. Under CSC’s NAVSEA contract, MDD performed work for the Navy’s Operational Logistics Integration Program (“OPLOG”) at its Carderock *3 facility. From 2006 through 2011, all the work MDD performed for OPLOG was pursuant to this arrangement under the CSC contract. This work comprised most of MDD’s government contracting work, and plaintiffs derive all of their revenue and income from government contracting.
In November 2009, MDD entered into a second contract, this time as a prime contractor for the Navy, to provide engineering and program management services to the energy conservation program for the Combat Logistic Force ships of the Military Sealift Command (“MSC”). That contract, number N00033-10-802, specified a one year term, with an option for MSC to renew for two additional years, until November 2012.
Between March and July of 2011, four key MDD employees who had performed significant work on the OPLOG projects - Michael Mazzocco, Volker Stammnitz, William Muras and Matthew Miller - left MDD. Plaintiffs allege that before leaving MDD, each of the key employees solicited OPLOG management and arranged to take the work they were performing for MDD with them when they left. At least two of the departing employees, Mazzocco and Stammnitz, formed their own businesses to compete with MDD. Plaintiffs allege that after leaving MDD, all four former employees did, in fact, continue to perform the same work for OPLOG as they had performed at MDD. In addition, Mazzocco allegedly spread rumors that MDD was double or triple billing *4 the government for its work. Plaintiffs claim these rumors are false, and that moreover, they have not been given formal notice of the rumors or an opportunity to respond to them.
Nevertheless, as a result of the rumors, the government began to deny plaintiffs work. First, on April 13, 2011, plaintiffs were notified that OPLOG manager Charles Traugh was “pulling back” $700,000 of OPLOG work previously budgeted for MDD, under the CSC contract, in FY 2011. Plaintiffs allege that this $700,000 was reallocated to others, including Mazzocco, Stammnitz, Muras, and Miller, who received the money after leaving MDD.
Shortly thereafter, on or about May 18, 2011, Mazzocco, Stammnitz, and Muras met in Boston with NAVSEA and OPLOG employees, including NAVSEA Chief Technology Officer Michael Bosworth, OPLOG program manager Traugh, and assistant program manager William Robinson. Plaintiffs allege that during that meeting, Bosworth and Traugh, working with Mazzocco, Stammnitz and Muras, decided to eliminate MDD entirely from the OPLOG budget in Fiscal Year (“FY”) 2012, and redirect plaintiffs’ work to the departing or already departed MDD employees. Plaintiffs allege that OPLOG’s FY 2012 budget, developed by Traugh and Robinson, had included a minimum of $2.7 million for MDD.
During a meeting to review the OPLOG program on July 13, 2011, Bosworth implemented the decisions reached at the May 2011 meeting in Boston. He instructed Traugh that OPLOG was to *5 immediately cease giving any OPLOG work to plaintiffs, and to continue the moratorium through at least FY 2012. On July 28, 2011, Traugh met with plaintiff Phillips and informed him that OPLOG would not be tasking work to MDD for FY 2012 under the CSC prime contract or any existing prime contract. Plaintiffs allege that they have been awarded no new work at OPLOG, through the CSC contract or any other contract, since July 2011.
Without any work to perform at OPLOG, MDD attempted to get additional work through other components of the Navy. Specifically, plaintiffs attempted to obtain work as a subcontractor to Gryphon Technologies, which has a prime contract with NAVSEA. See Am. Compl. Exhibits O, P, Q; see also Fed. Defs.’ Mot. to Dismiss or in the Alternative for Summ. J., Ex. C, Decl. of Kevin D. Baetsen (“Baetsen Decl.”), Exs. 1-3. MDD’s ability to obtain this work, however, was subject to NAVSEA appointing a government employee to serve as a Technical Point of Contact (“TPOC”). Initially, Tom Martin, director of the energy office at NAVSEA headquarters, agreed to serve as TPOC, but later informed other Navy personnel that he could not do so because he had been informed that there were problems “tracking the money” MDD had charged the government for its OPLOG work. Martin explained that he had been “directed by [his] leadership not to be involved with any contract that includes MDD,” regardless of whether the contract was to perform *6 OPLOG work or work for a different component of the Navy. Am. Complaint ¶¶ 87, 89 (quoting Oct. 7, 2011 email from T. Martin).
Finally, MDD alleges that the defendants attempted to interfere with its existing contract with MSC (contract number N00033-10-802) before it was renewed for FY 2012 by, inter alia , attempting to divert work under that contract to former MDD employees. These alleged attempts were unsuccessful; in the fall of 2011, MSC exercised its final one-year option on its contract with MDD, which will expire in November 2012. Baetsen Decl. ¶ 4.
On November 16, 2011, Plaintiffs initiated this suit against several Navy officials as well as the four former MDD employees discussed above. Plaintiffs moved for a temporary restraining order and preliminary injunction against the federal defendants only, alleging plaintiffs had been de facto debarred from government contracting without notice and a hearing in violation of their fifth amendment right to due process of law. Pls.’ Mot. for Temp. Rest. Order at 4-5. Following briefing on the motion, the Court held a hearing on December 7, 2011. At the hearing’s conclusion, the parties agreed and stipulated to the entry of a preliminary injunction. See Order Granting Stipulated Prelim. Inj.; see also Minute Order of Dec. 7, 2012. In relevant part, the Stipulated Preliminary Injunction (1) enjoined the government from taking any additional action to *7 implement or spread the de facto debarment, (2) required the Navy to allow MDD to compete for new work and to continue performing contracts it was currently performing under the same standards applicable to other contractors, and (3) required the Navy to communicate the foregoing information to CSC and Gryphon. See Id.
Following the preliminary injunction proceedings, Plaintiffs filed an Amended Complaint. Count I asserts that the federal defendants violated plaintiffs’ constitutional right to due process by blacklisting them for government contracting without procedural safeguards, and seeks declaratory and injunctive relief. Count II asserts the same claims against Bosworth and Traugh in their individual capacities and seeks damages of $2.5 million. Counts III – VIII assert breach of fiduciary duty and civil conspiracy against Mazzocco, Stammnitz, Muras, and Miller, and common law defamation against Mazzocco. Finally, Count IX alleges common law interference with contractual relations by Traugh and Robinson in their official and individual capacities. The federal defendants, as well as Mazzocco, Stammnitz, and Muras have moved to dismiss the Amended Complaint; the federal defendants have also moved in the alternative for summary judgment. Plaintiffs, for their part, have filed a motion to enforce the preliminary injunction. These motions are ripe for resolution by the Court.
II. STANDARD OF REVIEW [2]
On a motion to dismiss for lack of subject-matter
jurisdiction under Rule 12(b)(1), the plaintiff bears the burden
of establishing that the court has subject-matter jurisdiction.
Lujan v. Defenders of Wildlife
,
*9
A motion to dismiss under Federal Rule of Civil Procedure
12(b)(6) tests the legal sufficiency of a complaint.
Browning v.
Clinton
,
When ruling on a Rule 12(b)(6) motion, the Court may
consider “the facts alleged in the complaint, documents attached
as exhibits or incorporated by reference in the complaint, and
matters about which the Court may take judicial notice.”
Gustave-Schmidt v. Chao
,
Summary judgment is appropriate “if the movant shows that
there is no genuine dispute as to any material fact and the
movant is entitled to judgment as a matter of law.” Fed. R. Civ.
P. 56(a);
see Anderson v. Liberty Lobby, Inc.
,
III. ANALYSIS
A. Federal Defendants’ Motion to Dismiss, or, in the Alternative, for Summary Judgment
The federal defendants move to dismiss plaintiffs’ claims against them in Counts I, II, and IX of the Amended Complaint for lack of jurisdiction and failure to state a claim upon which relief can be granted. In the alternative, the federal defendants argue that summary judgment should be granted on Counts I and II.
1. Sovereign Immunity Federal defendants argue that sovereign immunity bars plaintiff’s claims in Count I against the federal defendants in their official capacities. Fed. Defs.’ Mot. to Dismiss or for *11 Summ. J. at 4-8 (hereinafter “Fed. Defs.’ Mem.”). The plaintiffs contend that the government has waived sovereign immunity for claims seeking non-monetary relief against the United States, its agencies and federal officers acting in an official capacity. Pls.’ Opp’n to Fed. Defs.’ Mot. to Dismiss at 27-28. Plaintiffs are correct. See 5 U.S.C. § 702; see also P&V Enters. v. United States Army Corps of Eng’rs , 466 F. Supp. 2d 134, 140-41 (D.D.C. 2006). In Count I of the Amended Complaint, plaintiffs seek only declaratory and injunctive relief, and their claims are against federal officers in their official capacities. [3] Accordingly, the waiver of sovereign immunity found in Section 702 of the APA applies to plaintiffs’ claims against the federal defendants.
2. Sufficiency of Plaintiffs’ Claims that a De Facto Debarment Occurred
Federal defendants also argue that plaintiffs cannot show the government’s actions constituted de facto debarment in violation of the due process clause of the Fifth Amendment. Fed. Defs.’ Mem. at 27-31. Defendants principally argue that no de facto debarment occurred for two reasons: (1) because MSC exercised an option on its contract with MDD on October 30, *12 2011, which provided work for MDD until late 2012, plaintiffs did not lose all of their government work and accordingly were not debarred; and (2) in order to give rise to Fifth Amendment protections, de facto debarment must be based on charges of a lack of integrity, which, according to federal defendants, plaintiffs do not allege.
De facto
debarment occurs when a contractor has, for all
practical purposes, been suspended or blacklisted from working
with a government agency without due process, namely, adequate
notice and a meaningful hearing.
Trifax Corp. v. Dist. of
Columbia
,
Plaintiffs argue that they have adequately alleged both of these options, although they need allege only one to survive a motion to dismiss. Pls.’ Opp’n at 11. First, Plaintiffs allege, and defendants do not dispute that two Navy officials, *13 Traugh and Bosworth, stated they would not permit plaintiffs to work on any future contracts. Am. Compl. ¶¶ 79-84; see also Fed. Defs.’ Mem. Ex. A, Traugh Decl. at ¶ 8 (“I decided, with Mr. Bosworth’s concurrence, that OPLOG would no longer use MDD as a subcontractor starting with work funded from FY 2012 appropriations.”); Ex. B., Bosworth Decl. at ¶ 7 (“I . . . directed Charles Traugh . . . not to renew the association of OPLOG with MDD starting in FY 2012.”) Plaintiffs allege that these statements applied to their attempts to receive work at OPLOG as well as other components of the Navy, as demonstrated by NAVSEA employee Tom Martin’s statement that “I have been directed by my leadership not to be involved with any contract that includes MDD,” even if the contract had nothing to do with OPLOG. Am. Compl. ¶ 89.
Plaintiffs also argue they have alleged a de facto debarment by the agency’s conduct: namely, the Navy has taken away MDD’s existing work and refused to permit MDD to obtain additional work in several instances. First, in April 2011, the Navy “pulled back” $700,000 that had been allocated to MDD for subcontracting work with CSC during FY 2011. Am. Compl. ¶¶ 56- 57. Next, in July 2011 the Navy announced its intention not to award MDD any more work under the CSC prime contract and to prohibit MDD from receiving any more work from OPLOG under any contract through FY 2012. Id. ¶¶ 73-74, 78-79. Plaintiffs *14 allege they have received no new work from OPLOG since summer 2011. Id. ¶ 83. Third, the Navy also indicated, via emails dated September 15, 2011 and October 7, 2011, that MDD would not get any funding on any future contract or subcontract, whether through OPLOG or NAVSEA. Id. ¶¶ 87-92. The Navy also refused to appoint a TPOC, which is a condition precedent to obtaining this work. Id. Finally, Plaintiffs allege that federal defendants attempted to stop – albeit unsuccessfully – plaintiffs from performing the final year of work on plaintiffs’ single remaining contract to perform work for the Navy. Id. ¶ 94. Plaintiffs allege that “all of their revenue and income derive from Federal Government contracts, primarily OPLOG and MSC contracts,” and that defendants’ actions threaten to put plaintiffs out of business. Id. ¶ 95.
The Court agrees that plaintiffs have met their burden to
allege a
de facto
debarment sufficient to survive a motion to
dismiss. First, plaintiffs have alleged multiple Navy officials
stated that plaintiffs would not be awarded any future
contracts. As noted above, courts have found categorical
statements that contractors will not be awarded any future
contracts may amount to a
de facto
debarment.
See TLT Constr.
Corp.
,
Second, plaintiffs have alleged that the agency’s conduct
amounts to a systematic effort to preclude it from future
contracting. In
Art-Metal USA, Incorporated v. Solomon
, this
Court found that
de facto
debarment occurred when the government
terminated one of the movant’s contracts in its entirety and
held in abeyance the awards of four additional contracts for
which the contractor had submitted bids. The plaintiff did not
have to prove that it had lost 100% of its work to show
de facto
debarment; it was sufficient to show that the government’s
actions were aimed at the overall status of the plaintiff as a
contractor, specifically at plaintiff receiving new contracts.
Defendants contend that plaintiffs cannot show a de facto debarment as a matter of law because plaintiffs “were subsequently awarded work by the alleged debarring agency;” namely, on October 30, 2011, MSC exercised the final option of a three-year contract with MDD. The MSC contract, which was initially awarded in 2009, will expire in November 2012. Fed. Defs.’ Mot. at 27-28, Baetsen Decl. ¶ 4. [4]
The present record is cloudy as to the extent of the Navy’s
disqualification of plaintiffs. The facts currently before the
court do not reveal whether MSC’s exercise of the final option
of its three year contract with MDD is tantamount to a new or
“future” contract awarded after the alleged debarment, or, in
the alternative, is effectively a continuation of a contract
awarded in 2009, well before the alleged debarment. Ultimately,
*17
development of these facts may be dispositive as to the
de facto
debarment claim. However, at the motion to dismiss stage, when
the Court must view all facts in the light most favorable to
plaintiffs, the statements and actions alleged in the Amended
Complaint make out a plausible claim to
de facto
debarment.
While plaintiffs have not lost 100% of their contracting work,
they have plausibly claimed that they have been barred from
performing work on several contracts and thus have been broadly
precluded from future work with the Navy. Courts have often
found that, while “[p]reclusion from a single contract is
insufficient to establish
de facto
debarment,” an allegedly
broad based preclusion across multiple contracts (or, in this
case, subcontracts) gives rise to a viable claim for
de facto
debarment.
Highview Eng’g, Inc. v. United States Army Corps. of
Eng’rs
, Case 3:08-647,
The Court likewise rejects the federal defendants’ claim
that plaintiffs have not asserted a
de facto
debarment claim
because they have not alleged they were barred from government
contracting due to charges of fraud, dishonesty, or lack of
*18
integrity. As this Circuit has held, individuals and
corporations have a due process liberty interest in avoiding the
damage to their reputation and business caused by the stigma of
broad preclusion from government contracting.
Reeve
, 982 F.2d
at 598;
see also Trifax
,
Specifically, plaintiffs have alleged Bosworth and Traugh decided to bar them from Navy work because of rumors that plaintiffs were submitting fraudulent bills to the government. Am. Compl. ¶¶ 52, 87-93. Indeed, Bosworth and Traugh provided declarations in support of the government’s motion to dismiss stating that they decided to stop working with plaintiffs because of their “lack of transparency.” Fed. Defs.’ Mem., Decl. of Charles Traugh at ¶ 8. Traugh and Bosworth assert that MDD’s invoices did not contain sufficient information “to evaluate whether the price [the Navy] paid for [MDD’s] work was reasonable” and, despite repeated requests for more detail, MDD refused to provide additional information. Id. at ¶¶ 6-7; see also Fed. Defs.’ Mem., Decl. of Michael Bosworth at ¶¶ 4-5. Defendants’ own statements confirm that concerns about *19 plaintiffs’ honesty and integrity animated the decision to stop them from performing more government work.
3. Standing and Mootness In their reply, defendants argue for the first time that plaintiffs lack standing under Article III. Fed. Defs.’ Reply at 2. To satisfy Article III's standing requirements, a plaintiff must show that, at the time the suit is filed,
(1) [he] has suffered an "injury in fact" that is (a) concrete and particularized and (b) actual or imminent, not conjectural or hypothetical; (2) the injury is fairly traceable to the challenged action of the defendant; and (3) it is likely, as opposed to merely speculative, that the injury will be redressed by a favorable decision.
Friends of the Earth, Inc. v. Laidlaw Envtl. Servs., Inc.
, 528
U.S. 167, 180-81 (2000). While the proof required to establish
standing increases as the suit proceeds, at the motion to
dismiss stage “general factual allegations of injury resulting
from the defendant’s conduct may suffice.”
Lujan v. Defenders
of Wildlife
,
Reprising their arguments that plaintiffs have not been
de
facto
debarred as a matter of law, the federal defendants claim
plaintiffs have suffered no “injury in fact because they were
not
de facto
debarred.” Fed. Defs.’ Reply at 2. For the
reasons explained above, plaintiffs have stated a claim for
de
facto
debarment. The Court also rejects federal defendants’
*20
claim that plaintiffs cannot show injury in fact because they
have not presented evidence “that they attempted to get future
contracts” after the alleged debarment, but “were prevented from
doing so.”
Id.
at 5. A claim of
de facto
debarment may be
justiciable absent the formality of plaintiffs bidding on and
being denied future contracts after the alleged debarment.
See
Dynamic Aviation v. Dep’t of Interior
,
Defendants also argue that plaintiffs’ injuries are not
redressable because, even if they were
de facto
debarred, they
are not currently entitled to receive any contract work. Fed.
Defs.’ Reply at 7-9. As discussed
supra
, this argument is
premature; plaintiffs have alleged that they lost work to which
*21
they were entitled, which is all that is required at the
pleading stage.
Lujan
,
Finally, the complaint is not moot. Federal defendants’
mootness argument rests solely on the assertion that they have
taken action to change their conduct after the lawsuit was
filed, mainly, that they have complied with the consent
Stipulated Preliminary Injunction. Fed. Defs.’ Reply at 9-10.
Defendants cannot rely on their voluntary cessation of the
challenged conduct as a basis for mootness unless “subsequent
*22
events made it absolutely clear that the allegedly wrongful
behavior could not reasonably be expected to recur.”
Friends of
the Earth,
4. Federal Tort Claims Act In Count IX of the Amended Complaint, plaintiffs allege Traugh and Robinson tortiously interfered with their contractual relations, their prospective contractual relations, and their prospective advantageous relationships. Specifically, they allege that Traugh and Robinson:
Induced MDD’s key employees to breach their fiduciary duties to MDD, by taking its work and its business opportunities;
Prevented MDD from performing task orders under the CSC contract, and redirected funds allocated for MDD under that contract;
Interfered with other contracts of MDD’s, such as its contract with the MSC;
Published defamatory statements about MDD to injure plaintiffs in their trade or business.
Am. Compl. ¶ 195. In response, the federal defendants filed a certification pursuant to the Westfall Act, 29 U.S.C § 2679, *23 stating that Traugh and Robinson were acting within the scope of their employment during the incidents alleged by plaintiffs, and that the United States should therefore be substituted as sole defendant in lieu of Traugh and Robinson. The federal defendants then moved to dismiss Count IX, arguing that plaintiffs’ claims against the United States are excluded from the Federal Tort Claims Act’s (“FTCA”) waiver of sovereign immunity and that plaintiffs failed to exhaust their administrative remedies under the FTCA. In their opposition to defendants’ motion, plaintiffs have requested discovery in order to contest whether Traugh’s and Robinson’s actions were, in fact, within the scope of their employment. For the following reasons, the Court concludes that plaintiffs have met their burden to obtain limited discovery on the scope of Robinson’s and Traugh’s employment.
The Westfall Act provides that federal officials are immune
from state tort lawsuits for money damages if the employee was
“acting within the scope of employment during the alleged
incident.”
Haddon v. United States
,
Upon certification by the Attorney General that the defendant employee was acting within the scope of his office or employment at the time of the incident out of which the claim arose, any civil action or proceeding commenced upon such a claim in a United States district court shall be deemed an action against the United States . *24 . . . and the United States shall be substituted as the party defendant.
28 U.S.C. § 2679(d)(1). The Attorney General’s certification
constitutes
prima facie
evidence that the employee was acting
within the scope of his employment, and once the certification
has been made, the plaintiff challenging the certification has
the burden of “alleging facts that, if true, would establish
that the defendants were acting outside the scope of their
employment.”
Stokes v. Cross
,
In order to determine whether a federal employee was acting within the scope of his employment, the Court must apply the law in the state in which the alleged tort occurred. Id. at 1214. District of Columbia law is drawn from the Restatement (Second) of Agency. Id. The Restatement provides in pertinent part:
Conduct of a servant is within the scope of employment if, but only if, (a) it is of the kind he is employed to *25 perform; (b) it occurs substantially within the authorized time and space limits; (c) it is actuated, at least in part, by a purpose to serve the master; and (d) if force is intentionally used by the servant against another, the use of force is not unexpected by the master.
Restatement (Second) of Agency § 228(1). The second, third and fourth elements are irrelevant here because plaintiffs do not contest that the alleged events occurred substantially within authorized time and space limits or were actuated, in some part, with the purpose to serve the master, nor do they allege the use of force. The plaintiffs do, however, attempt to rebut the United States’ scope-of-employment certification under the first prong of the Restatement test, claiming “it is difficult to understand that the [actions described in paragraph 195 of the Amended Complaint] could be considered to be related to the work Robinson and Traugh were employed to perform.” Pls.’ Opp’n at 33.
To qualify as conduct of the kind they were employed to perform, Robinson’s and Traugh’s actions must have either been “of the same general nature as that authorized” or “incidental to the conduct authorized.” Restatement (Second) 229. The current record sheds little light on the duties Traugh and Robinson are authorized to perform. In the Amended Complaint, plaintiffs assert that Traugh, in his capacity as OPLOG program manager, and/or Robinson, in his capacity as OPLOG’s assistant program manager, had the authority to, inter alia , (1) oversee *26 plaintiffs’ work, (2) review and approve their “deliverables” and invoices, (3) develop OPLOG’s budget and allocate funds to various contractors, and (4) block any contractor from contracting to perform work on OPLOG projects. Am. Compl. ¶¶ 29-31, 73, 82.
However, in their opposition to the federal defendants’ motion to dismiss, plaintiffs take a contrary position. They assert that Traugh (and presumably his assistant Robinson), have limited, if any authority to (a) oversee OPLOG funding to government contractors and ensure it is well and prudently spent; (b) request that prime contractors replace employees or subcontractors, or assign follow-on tasks to current employees or subcontractors; or (c) ensure that the work performed by government contractors and subcontractors conforms to contract requirements. See Pls.’ Opp’n to Fed. Defs.’ Mem., Ex. B., Decl. of Sebastian Phillips, ¶¶ 28-31, 39. Plaintiffs assert that most or all of this authority is vested in either the prime contractors for whom MDD works or in the Navy’s contracting officers, not Traugh or Robinson. [5] Id . Traugh maintains that he *27 is authorized to perform all of these duties, but, other than his declaration, has provided no evidence to support his assertions. See Fed. Defs.’ Mem., Ex. A., Traugh Decl.
The Court is troubled by plaintiffs’ contradictory characterizations of the scope of Traugh’s and Robinson’s employment. Nevertheless, plaintiffs have alleged facts in their opposition to the Motion to Dismiss that, taken as true, could rebut the Attorney General’s certification. Accordingly, plaintiffs will be allowed to conduct limited discovery on the scope-of-employment issue. The federal defendants’ motion to dismiss Count XI on grounds of sovereign immunity and failure to exhaust under the FTCA is therefore denied without prejudice to refiling at the appropriate time.
5. Qualified Immunity In Count II of the Amended Complaint, plaintiffs sue Traugh and Bosworth in their individual capacity for the de facto debarment. Qualified immunity is “a defense that shields officials from suit if their conduct did not violate clearly established statutory or constitutional rights of which a reasonable person would have known.” Bame v. Dillard , 637 F.3d 380, 384 (D.C. Cir. 2011) (internal citations omitted). To contractual direction may be issued only by cognizant contracting officers.” See Pls.’ Mot. to Enforce Stip. Prelim. Inj. at Ex. K, Mem. from NAVSEA Commander K.M. McCoy to NAVSEA and Naval Service War Center, Dec. 20, 2011.
determine whether an official is entitled to qualified immunity,
the Court must consider whether the facts, viewed in the light
most favorable to plaintiffs, establish a violation of a
constitutional right, and if so, whether that right was clearly
established at the time of the alleged violation.
Pearson v.
Callahan
,
As set forth above, de facto debarment of a government contractor without due process and on grounds of dishonesty, fraud or lack of integrity violates the Fifth Amendment. Traugh and Bosworth contend, however, that (1) their job duties permitted them to terminate all of MDD’s work with OPLOG, bar it from obtaining new work with OPLOG, and refuse to appoint a TPOC for MDD to obtain work via NAVSEA based on their concerns that MDD was not charging a reasonable price or providing the best value to the government, and (2) their actions did not bar plaintiff from obtaining any and all additional work for the Navy, and therefore did not constitute de facto debarment. Fed. *29 Defs.’ Mem. at 12-15. [6] Federal Defendants’ framing of Traugh’s and Bosworth’s actions highlights the factual disputes that prevent dismissal of Count II on grounds of qualified immunity. The resolution of these questions, specifically, defendants’ authority to bar MDD from performing future work at OPLOG, as well as the breadth of MDD’s preclusion from government contracting, depend on development of the facts, and the Court must accept the truth of the plaintiffs’ factual allegations on a motion to dismiss. Accordingly, the Court will deny defendants’ Rule 12(b)(6) motion to dismiss on the ground of qualified immunity.
*30 6. Summary Judgment
Federal defendants have presented material outside the
pleadings, and the Court has considered those materials.
Accordingly, the Court will treat the motion as one for summary
judgment in the alternative.
See Holy Land Found. for Relief &
Dev. v. Ashcroft
,
7. Conclusion For the foregoing reasons, the Court concludes plaintiffs have stated a claim for de facto debarment in Count I. Further, because of the factual allegations presented by plaintiffs at this state of the litigation, the court cannot find, as a matter of law, that the qualified immunity defense is properly asserted as to Count II or that substitution of the United States and dismissal under the FTCA is appropriate as to Count IX. *31 Accordingly, the Federal Defendants’ motion to dismiss or, in the alternative, for summary judgment is DENIED.
B. Plaintiffs’ Motion to Enforce Stipulated Preliminary Injunction
1. Factual Background and the Parties’ Positions As discussed supra , on December 7, 2011, the parties agreed and stipulated to a Consent Preliminary Injunction. Plaintiffs argue that defendants have refused to comply with the terms of the injunction. They seek to have this Court enforce its terms and hold the federal defendants in contempt.
The terms of the Consent Preliminary Injunction enjoin the Navy as follows.
(1) Federal defendants are enjoined from taking any action to implement, enforce, or spread to any agency of the federal government the de facto debarment of plaintiffs from contracting.
(2) Federal defendants are required to allow Marine Design Dynamics, Inc. (“MDD”) to compete for, and if awarded, receive and perform contracts, subcontracts, task orders, task instructions and orders under indefinite quantity contracts, in the same manner and under the same standards applicable to other contractors and subcontractors, unless and until debarment or suspension proceedings are properly initiated, or until further order of this Court, including but not limited to the following:
(a) Plaintiffs’ subcontract under the Navy’s prime contract with Computer Sciences Corporation (“CSC”) pursuant to its SEAPORT-e contract, N00178-04-D-4030-EH02. The government shall appoint a Technical Point of Contact between Operational Logistics Integration Program (“OPLOG”) and CSC for this purpose.
(b) Successor contracts to MDD’s prime contract with *32 Military Sealift Command (“MSC”), N00033-10-C- 8002, which is expected to expire November 1, 2012.
(c) Federal Defendants shall communicate to CSC and Gryphon Technologies, rescinding any guidance or instruction that work was to be removed from or not given to MDD, in effect restoring the status quo ante. [7] Federal Defendants shall appoint a Technical Point of Contact between Naval Sea Systems Command of the Department of the Navy (“NAVSEA”), MSC and Gryphon Technologies for this purpose.
(3) Federal defendants are required to allow MDD to maintain and perform its existing contracts, subcontracts, task orders, task instructions and orders under indefinite quantity contracts, in the same manner and under the same standards applicable to other contractors, unless and until debarment or suspension proceedings are properly initiated, or until further order of this Court, including but not limited to the following:
(a) Plaintiffs’ existing prime contract with MSC, N00033-10-C-8002.
(b) Plaintiffs’ existing subcontract under the Navy’s prime contract with CSC pursuant to its SEAPORT-e contract, N00178-04-D-4030-EH02.
In response to the Consent Preliminary Injunction, the Navy took the following actions. First, on December 20, 2011, defendant Vice Admiral McCoy, NAVSEA’s Commander, sent a memorandum from NAVSEA’s counsel, Sophie Krasik, with the Consent Preliminary Injunction attached, to NAVSEA’s Contracts Directorate, NAVSEA’s Ship Engineering Directorate (where *33 Bosworth is employed) and the Naval Surface Warfare Center (under whose command OPLOG falls). Defs.’ Opp’n to Pls.’ Mot. to Enforce at 4. The memorandum explains the Consent Preliminary Injunction and directs Navy employees to “maintain a position of strict neutrality toward MDD, neither encouraging nor interfering with: (1) the efforts of MDD to obtain work from prime contractors; or (2) prime contractors’ decision whether or not to subcontract with MDD . . . The injunction is consistent with the Navy’s SeaPort-e prime contracts, which do not permit Command personnel to direct a prime contractor to select, or decline to select, a given subcontractor for a given item of work. Other contractual direction may be issued only by cognizant contracting officers.” See Pls.’ Mot. to Enforce, Ex. K.
Second, on December 16, 2011, Michael Kistler, the Executive Director in the NAVSEA Engineering Directorate, issued an email designating Chris Cable as TPOC for any MSC work ordered through a Seaport-e prime contractor, including but not limited to Gryphon Technologies, and Charles Traugh as TPOC for any OPLOG work. Plaintiffs immediately objected to the choice of Traugh, and in response the Navy replaced him with another NAVSEA employee, Greg Doerrer. Pls.’ Mot. to Enforce at 6; Fed. Defs.’ Opp’n at 14.
Third, on December 20, 2011, Lindsay Alexander, Contracting Officer for CSC and Gryphon Technologies, the two SeaPort-e prime contractors from whom MDD alleged it had been precluded from receiving subcontracting work, sent CSC and Gryphon a letter enclosing the Consent Preliminary Injunction and explaining, inter alia , that MDD must have the same opportunity to compete for and perform work as any other contractor. The letter also states, in relevant part, “the terms of your prime task order do not permit most Navy personnel to issue direction to you to select, or decline to select, a given subcontractor for a given item of work or to issue any other contractual direction. Rather, only contracting officers may issue contractual direction, and that direction cannot contradict the terms of the court order.” Pls.’ Mot. to Enforce, Exs. M, N. [8]
Plaintiffs argue none of these actions comply with the Consent Preliminary Injunction. According to Plaintiffs, the Navy’s actions are deficient in three respects. First, they claim the Navy’s communications with its own personnel as well as CSC, Gryphon and Alion “distort” the terms of the preliminary injunction and convey a negative impression of plaintiffs. *35 Pls.’ Mot. to Enforce at 8-14. Second, they claim the Navy did not appoint a “suitable” TPOC for the OPLOG work, first, by appointing defendant Traugh, and then, upon plaintiffs’ objection, replacing him with defendant Greg Doerrer, who has not been accused of any wrongdoing but who “was present at the [July 13, 2011] meeting at which” Bosworth instructed Traugh to terminate MDD’s work for OPLOG in 2012. Id. at 6. Finally, plaintiffs claim that the Navy has not restored “the status quo ante” by awarding MDD subcontracting work with CSC, at OPLOG, or with Gryphon, at NAVSEA/MSC. According to plaintiffs, MDD was “scheduled to receive $2.7 in OPLOG work in FY 2012” and “was in the final stages of being awarded a $5.529 M contract with the MSC under a subcontract with Gryphon.” Id. at 5. Plaintiffs request the Court fine the Navy, award attorneys’ fees, and order the Navy to (1) prohibit the Navy from disseminating any communications regarding this litigation without plaintiffs’ consent; (2) appoint a “suitable” TPOC, and (3) “restore the status quo ante” with respect to OPLOG and MSC work. Pls.’ Proposed Order Granting Motion to Enforce.
The Navy responds that it has not violated the terms of the injunction. The government notes that all of its communications to Navy personnel and government contractors provided a copy of the Stipulated Preliminary Injunction as an attachment, thereby enabling every recipient to review the Order’s terms. Fed. *36 Defs.’ Opp’n at 16-19. It also asserts that the letters explaining the Injunction accurately conveyed the Navy’s responsibilities under the Order. Id. With respect to appointment of a TPOC for OPLOG work, the Navy points out the Injunction “only directed the Navy to appoint a TPIC for OPLOG work; it did not . . . grant Plaintiffs any voice in the appointment.” Id. at 14. Nevertheless, at plaintiffs’ request it replaced Traugh with Doerrer “who is also an OPLOG employee but is not in a subordinate or supervisory position to Mr. Traugh.” Id .
Finally, the government points out that restoration of “the status quo ante” does not require plaintiffs to be awarded additional work with CSC or a new subcontract with Gryphon Technologies. The government claims that “plaintiffs nowhere assert, nor can they, that MDD had an actual contract terminated or a pending award withheld because of the alleged debarment.” Id. at 6. With respect to work to be performed for OPLOG under a subcontracting agreement with CSC, the government points out that “performance under the [CSC] contract does not commence until the contractor receives a delivery order . . . plaintiff MDD did not have a delivery order to perform Fiscal Year 2012 work under its . . . contract with CSC.” Id. at 6, n.4. “A company’s placement in the budget” for FY 2012, which is all that MDD alleged had occurred with respect to its award of OPLOG *37 work, “does not guarantee work for that company.” Id. at 7. Likewise, the government asserts that MDD had not been awarded a contract to perform MSC work under a subcontract with Gryphon; indeed, federal defendants argue that the government had not even agreed upon the scope of work to be done under any proposed subcontract. Id. at 7-9. The Navy therefore argues that:
The status quo ante of each of the alleged debarments found the parties far from ready to enter into any sort of contractual arrangement. Rather, MDD was eligible for prime contracts and subcontracts, a very different status . . . . Restoring the status quo ante therefore meant restoring MDD’s eligibility to compete, which is just what the Navy did.
Id. at 11.
1. Discussion
An order granting injunctive relief is enforceable by the
district court’s power of contempt.
See Gunn v. Univ. Comm. to
End War in Viet Nam
,
In this case, neither party argues that the Stipulated
Consent Preliminary Injunction they reached is ambiguous; the
parties only dispute whether the Navy violated the Order.
Armstrong
,
It may be that the plaintiffs will be able to establish
that they had been awarded, or all-but-awarded, additional work
for OPLOG or MSC, and that they would have received such work
but-for the
de facto
debarment. However, no requirement that
the Navy or the contractors give plaintiffs this work is plain
on the face of the Stipulated Preliminary Injunction.
See,
e.g.
,
United States v. Armour & Co.
,
Plaintiffs’ arguments that the government violated the Consent Preliminary Injunction by its allegedly misleading communications with Navy personnel and government contractors, and by failing to appoint a “suitable” TPOC likewise fail. While plaintiffs may wish the government’s communications had been worded differently, they describe the substance of the Stipulated Injunction and, indeed, plaintiff does not dispute that a true and correct copy of the Injunction was provided as an attachment. Likewise, while the Court agrees that the government’s initial appointment of Traugh as TPOC was at best, imprudent, the government has since replaced him with Greg *40 Doerrer, an OPLOG employee who has not been charged by plaintiffs with any wrongdoing.
Based on the foregoing, the Court concludes that plaintiffs have not met their burden to show, by clear and convincing evidence, that the Navy violated the Stipulated Preliminary Injunction. Accordingly, the Motion to Enforce is DENIED .
C. MDD’s Former Employees’ Motions to Dismiss Three of MDD’s four former employees named in this action have filed motions to dismiss. See Motions to Dismiss by Michael Mazzocco, Volker Stammnitz, and William Muras. The Amended Complaint alleges breach of fiduciary duty and civil conspiracy as to each of them. Am. Compl. Counts III, IV, V, and VIII. Additionally, the Amended Complaint asserts a common law defamation claim against Mazzocco. Id. Count VII. The Court will address each cause of action in turn.
1. Breach of Fiduciary Duty
Employees, particularly managers and officers, “owe an
undivided and unselfish loyalty to the corporation” during the
term of their employment, “such that there shall be no conflict
between duty and self-interest.”
Mercer Management Consulting
v. Wilde
,
As a general rule, an employee’s fiduciary duty ends upon
termination of the employment relationship.
Draim v. Virtual
Geosatellite Holdings, Inc.
,
Plaintiffs allege that Mazzocco, Stammnitz, and Muras breached their fiduciary duty of loyalty to MDD both during and for a year after their employment, during which they were allegedly subject to a non-compete agreement. Am. Compl. ¶¶ 34- 36 and Exs. A-C, MDD Employee Handbook and Code of Business Conduct. All three employees were senior officers and key employees at MDD. Am. Compl. ¶¶ 33, 128-29, 146-47, 159-60. All three employees resigned from MDD in the spring of 2011; Mazzocco and Stammnitz formed independent companies to compete with plaintiffs either during or immediately following their employment with MDD. Am. Compl. ¶¶ 47-51, 62-65. Plaintiffs principally allege that Mazzocco violated his fiduciary duties as follows:
“Confirmed” with Robinson, before leaving MDD in March 2011, that he would be able to continue performing the same work for OPLOG, and in the same position, after leaving MDD, thus soliciting MDD’s customers and business opportunities. Am. Compl. ¶¶ 44-45, 139.
Signed an agreement in February 2011 on behalf of his new company, Alytic, Inc., with a competitor of MDD to exchange proprietary information, thus competing with MDD while still employed there and misusing its confidential and proprietary information. Am. Compl. ¶¶ 49, 140.
Solicited other employees to resign their positions with MDD and join him at OPLOG, thus leading to a “mass resignation” of plaintiffs’ employees. Am. Compl. ¶ 139.
Attended a meeting with Muras, Stammnitz, and Navy officials in Boston in May 2011, at which he worked to have plaintiffs removed from OPLOG’s 2011 and 2012 *43 budget in order to obtain plaintiffs’ work for himself, thus soliciting MDD’s customers and business opportunities during the term of his alleged non- compete agreement. Am. Compl. ¶¶ 68-88, 138-39.
Plaintiffs’ allegations regarding Stammnitz and Muras are very similar. Plaintiffs primarily allege that both solicited MDD’s customers and business opportunities at OPLOG while they were employed with MDD, as well as during the term of their non- compete agreements, by (1) arranging to continue performing the same work for OPLOG after leaving MDD, while still employed with MDD; and (2) attending the Boston meeting, at which they worked to exclude MDD from OPLOG’s 2011 and 2012 budgets in order to obtain plaintiffs’ work for themselves, also while still employed with MDD. Am. Compl. ¶¶ 59-64, 66, 68-77, 152-55, 164- 67.
The defendants argue that these allegations are insufficient. They claim they had no binding non-compete contract with MDD, therefore plaintiffs cannot state a claim for any of their actions after they resigned from MDD. See Muras Mot. to Dismiss at 9, Stammnitz Mot. to Dismiss at 7-9, Mazzocco Mot. to Dismiss at 6-8. They also claim plaintiffs cannot show proximate cause between the alleged breach and plaintiffs’ injuries, because the Navy, not MDD’s former employees, made the decisions to remove work from plaintiffs. Muras Mot. to Dismiss *44 at 6-7, Stammnitz Mot. to Dismiss at 11-12, Mazzocco Mot. to Dismiss at 8-9. [10]
*45
Plaintiffs have clearly stated a claim for breach of
fiduciary duty. Even assuming
arguendo
that plaintiffs had no
enforceable non-compete agreement with the employees after the
termination of employment, the Amended Complaint contains
factual allegations that Mazzocco, Stammnitz, and Muras all
solicited MDD’s customers and business opportunities while they
were still employed by MDD. Plaintiffs have also alleged that
they suffered damages – namely, loss of OPLOG work in 2011 and
2012 – as a proximate cause of their former employees’ actions.
To establish proximate cause, the plaintiffs must allege that
prejudice to one of the parties.
Johns v. Rozet
, 770 F. Supp.
11, 15 (D.D.C. 1991) (citations omitted). The Court is not
persuaded that parallel litigation would severely prejudice
defendant in this case, particularly because the plaintiffs have
indicated a willingness to dismiss their counterclaims in the
Superior Court case and where the Superior Court Judge has
demonstrated sensitivity to the burdens of duplicative
discovery.
See
Pls.’ Opp’n to Stammnitz Mot. at 14-16;
Stammnitz’ Suppl. Reply, Ex. B, Order of Superior Court Judge
Craig Iscoe. The fourth factor, the order in which the courts
obtained jurisdiction, is neutral because neither case has
progressed beyond the early stages. The fifth factor, the source
of law, does not weigh in favor of abstention because state law
issues do not govern all claims in this lawsuit, and the state
law claims alleged do not appear to involve novel or complex
legal issues. See
Rozet
,
“there was a direct and substantial causal relationship between
the defendant’s breach of the standard of care and the
plaintiff’s injuries and that the injuries were foreseeable.”
Convit v. Wilson
,
2. Civil Conspiracy
Civil conspiracy is not an underlying tort, but only a
means for establishing vicarious liability for an underlying
tort.
Paul v. Howard Univ.
,
To establish a
prima facie
case of civil conspiracy,
plaintiffs must show (1) an agreement between two or more
persons (2) to participate in an unlawful act, and (3) an injury
caused by an unlawful overt act performed by one of the parties
to the agreement in furtherance of the common scheme.
Paul
, 754
A.2d at 310 (citation omitted). Plaintiffs must plead the
elements of conspiracy with particularity; “bald speculation or
a conclusory statement that individuals are co-conspirators is
insufficient to establish” a claim for conspiracy.
3M Co. v.
Boulter
,
Plaintiffs have met their burden to plead a conspiracy between their former employees. Plaintiffs allege the following *48 facts in support of their claim that the employees agreed to leave MDD and to take MDD’s business for themselves in their new ventures. First, when plaintiff Phillips asked Mazzocco, the first employee to leave MDD, whether he was taking other employees with him, he responded “not initially.” Am. Compl. ¶ 45. Second, in the following months, three additional employees left MDD to “join” Mazzocco. Id. ¶ 55. Third, the departing employees needed funding for their new ventures, so they obtained “help” from Defendants Robinson and Traugh to obtain the $700,000 “pull-back” from MDD’s FY 2011 budget and all of the money from MDD’s FY 2012 budget, with money from both fiscal years to be reallocated to MDD’s former employees. Id. ¶ 56-58; 68-77. Fourth, the departing employees all met in Boston where they agreed, with Bosworth, Traugh, and Robinson, to eliminate MDD’s funding for FY 2012 and prepare a new budget in which the former employees would receive the work instead. Id. ¶ 68-77. Taking these allegations and all reasonable inferences therefrom as true, plaintiffs have stated a plausible claim of civil conspiracy.
3. Defamation Finally, Mazzocco moves to dismiss Count VII, in which plaintiffs seek damages for defamation. Plaintiffs allege that Mazzocco spread rumors to OPLOG and MSC that plaintiffs had double and triple billed OPLOG for services rendered to OPLOG, *49 that these statements were false, and that the statements injured plaintiffs in their profession. Am. Compl. ¶¶ 179-186.
In order to state a claim for defamation, a plaintiff must
allege “(1) that the defendant made a false and defamatory
statement concerning the plaintiff; (2) that the defendant
published the statement concerning the plaintiff; (3) that the
defendant’s fault in publishing the statement amounted to at
least negligence; and (4) either that the statement was
actionable as a matter of law irrespective of special harm or
that its publication caused the plaintiff special harm.”
Jankovic v. Int’l Crisis Group
,
Mazzocco first claims plaintiffs did not plead sufficient
factual allegations to support a defamation claim. Mazzocco
Mot. to Dismiss at 10-11. Not so. The Amended Complaint
alleges that Mazzocco spread false rumors “amongst the OPLOG
community, including OPLOG’s management and Plaintiff MDD’s
customers on its prime contract with the Military Sealift
Command, that Plaintiff MDD was double billing, and even triple
billing, the government on OPLOG projects.” Am. Compl. ¶¶ 52-
53. The Amended Complaint further alleges that these false
statements caused plaintiffs to lose their government
contracting work. The plaintiffs clearly allege defamatory
*50
statements.
See Jankovic
,
Second, Mazzocco claims that even if he made these
statements, they are covered by the “common interest privilege.”
Mazzocco Mot. to Dismiss at 11-12. The common interest
privilege protects otherwise defamatory statements made “(1) in
good faith, (2) on a subject in which the party communicating
has an interest, or . . . honestly believes he has a duty to a
person having a corresponding interest or duty, (3) to a person
who has such a corresponding interest.”
Mastro v. Potomac Elec.
Power Co.
,
Accordingly, the Court will DENY Mazzocco’s motion to dismiss Count VII of the Amended Complaint.
IV. CONCLUSION
For the foregoing reasons, the Court will deny the Federal Defendants’ Motion to Dismiss or in the Alternative for Summary Judgment, the Plaintiffs’ Motion to Enforce the Stipulated Preliminary Injunction, Michael Mazzocco’s Motion to Dismiss, Volker Stammnitz’s Motion to Dismiss, and William Muras’s Motion to Dismiss. An appropriate Order will accompany this Memorandum Opinion.
Signed: Emmet G. Sullivan
United States District Judge
September 30, 2012
Notes
[1] For purposes of ruling on a motion to dismiss, the factual
allegations must be presumed true and liberally construed in
favor of the plaintiff.
Scheuer v. Rhodes
,
[2] This section addresses the standard of review for the motions to dismiss, or in the alternative for summary judgment. The standard of review for plaintiff’s motion for enforcement of the stipulated preliminary injunction is addressed infra .
[3] For the same reasons, federal defendants’ assertion that plaintiffs may not allege Bivens claims against Mabus, Greenert, McCoy and Kaskin for the actions of Bosworth and Traugh on a theory of respondeat superior is irrelevant. Fed. Defs.’ Mem. at 15-17. Plaintiffs do not bring Bivens claims against these four federal defendants. See Pls.’ Opp’n at 30.
[4] Defendants point out that, under the Federal Acquisition Regulations, agencies may not exercise options on current contracts with contractors that have been debarred absent compelling circumstances. Fed. Defs.’ Reply at 9 (citing 48 C.F.R. § 9-405-1(b)(3)). This provision is not dispositive here, as it only governs contractors who have been officially debarred. Plaintiffs here have alleged de facto debarment, which rests on the claim that defendants have ignored their own regulations and are instead engaged in an unauthorized effort to preclude them from receiving future work.
[5] It is worth noting that other documents provided by the Navy seem to provide at least some support for these assertions. Specifically, the memorandum issued by NAVSEA in response to the Consent Preliminary Injunction provides, in relevant part, that the Navy’s Seaport-e contracts, which include the contracts with CSC and Gryphon at issue in this case, “do not permit Command personnel to direct a prime contractor to select, or decline to select, a given subcontractor for a given item of work. Other
[6] Traugh and Bosworth also contend that plaintiffs’
constitutional rights are not clearly established. They claim
there is no authority specifically permitting subcontractors, as
opposed to prime government contractors, to allege
de facto
debarment, or holding that a government official other than a
contracting officer or a “senior official” may effect a
de facto
debarment. Fed. Defs.’ Mem. at 12. These claims are
unpersuasive.
See
,
e.g.
, 48 C.F.R. § 9.405-2 (subcontractors
are impacted by debarments; once a contractor has been debarred,
it is effectively prohibited from serving as a subcontractor on
government contracts);
see also Highview Eng’g v. Hawkins
, Case
08-647,
[7] This sentence was crafted by the parties in off the record discussions and the parties inserted it into the Stipulated Preliminary Injunction at the end of the hearing. Tr. of Oral Argument at 70-71.
[8] The Navy also sent this letter to one additional company, Alion Science and Technology Corporation. In the letter to Alion, Lindsay Alexander explained that the Consent Preliminary Injunction only required communication to CSC and Gryphon, but “because Alion holds a [prime contract] substantially identical to those of CSC and Gryphon, we are informing you as well of this aspect of the court order.” Id. Ex. L.
[9] Plaintiffs rely on a phrase the parties added to the Injunction during off the record discussions -- “in effect restoring the status quo ante,” –- to justify their position that the Navy is required to award MDD additional OPLOG and MSC work. Plaintiffs’ argument is meritless. The sentence in which the phrase appears reads as follows: “Federal Defendants shall communicate to CSC and Gryphon Technologies, rescinding any guidance or instruction that work was to be removed from or not given to MDD, in effect restoring the status quo ante.” Stip. Prelim. Inj. ¶ 2(c). Read in context, this requires the Navy to tell CSC and Gryphon that the Navy had withdrawn any objection to MDD, a requirement the Navy has fulfilled. It does not state that CSC or Gryphon had contracted, or would have contracted, with MDD for present or future work but for the Navy’s instructions not to use MDD.
[10] Stammnitz additionally argues that the claim against him
should be dismissed on abstention grounds because plaintiffs
filed a substantially identical counterclaim in Stammnitz’
pending Superior Court lawsuit against the MDD and Sebastian
Phillips. The Court will not dismiss on this basis. Federal
district courts have a “virtually unflagging obligation... to
exercise the jurisdiction given them.”
Colorado River Water
Conservation Dist. v. United States
,
[11] Additionally, Mazzocco and Stammnitz claim immunity under the
“intracorporate immunity” doctrine, in which an entity, its
officers and agents are presumed to act as a single enterprise
and may not be found to have conspired with one another.
Wesley
v. Howard Univ.
,