86 W. Va. 607 | W. Va. | 1920
Of the two causes of action, according to the averments of the declaration, one is defendant’s mining and removal of a material part of the Pittsburgh seam of coal underlying lands jointly owned by plaintiffs, without their knowledge or consent,, the other ,the consequential impairment or destruction of a natural surface issue of water from the land resulting from such operation. Defendant by demurrer challenges the sufficiency of the declaration, but as it seems to be in the form usual in cases of this sort and without any substantial imperfections, and none are pointed out, there is no necessity for analyzing it. .
Though named as the second cause of action, we choose rather first to consider and determine the right of plaintiffs to recover for the injury, if any, done the spring, considered in the light of the proof introduced to show the quantum of damage done to it by the unlawful removal of the coal. The spring was a natural flow of sweet water from a hillside, on plaintiffs’’ property, several feet above the top of the vein of coal underlying the tract, and 490 feet from the division line between their land and that owned and operated by defendant. Its existence was testified to clearly and unequivocally by Pasquale Petrelli and John N". Leech, both of whom were well acquainted with it, knew its location and .had drunk of its waters. An attempt was made by witnesses for defendant to question the existence of such a spring, at that point, but testimony in support of their contention was weak and inconclusive. The fact of its destruction was not known until late in the year 1916, when Pasquale Petrelli and Leech, the latter employed as an engineer to make a survey for a tramway which plaintiffs contemplated building for use by them in connection with proposed mining operations
There, was little attempt upon the part of plaintiffs to establish the value'of the spring so destroyed; in fact, there is only one reference to its value and that consists of an indefinite statement by Pasquale Petrelli: “I have a spring that I wouldn’t take any kinds of money for. I wouldn’t take $8,500 for the spring.” In view of the fact, which will appear more fully later, that the evidence offered upon the issue presented by the first count is amply sufficient to sustain the jury’s verdict without regard to the spring, it is unnecessary for us to consider whether this statement standing alone would be sufficient to support a verdict for damages upon the count relating to the cessation of the water flow, and probably the jury did disregard it because of the insufficiency of the proof touching the, injury done to it, if any. They' may have thought it too far removed from the property line to be affected by the trespass.
The more important claim for damages is for the removal of coal underlying that part of plaintiffs’ property which adjoins defendant’s. As noted already, the fact that the mining operations of the latter had encroached upon their land did not become known to plaintiffs until late in the year 1916, when Pasquale Petrelli and the engineer leech discovered that the spring which theretofore had existed had ceased to flow. Thereupon plaintiff and the engineer immediately sought admission to the mine at the entrance on defendant’s property, but were told that it would be impossible for them to get back as far as the division line or beyond it, because of the drawing of the ribs and pillars supporting the ceilings of the entries and rooms. Because of these, barriers, tbe existence of which were thus confessed, plaintiffs early in .1917 began to drive test entries, under-the direction of the engineer Leech, on their own side of the line, and struck abandoned rooms filled with the debris of collapsing roofs, thereby making dangerous an attempt to enter the excavations, especially because of the accumulation of black damp and other explosive gases. Defendant’s witnesses themselves
The difficulty of gaining access to old mine workings whose pillars are drawn and ceilings down is obvious. Despite these obstacles plaintiffs diligently drove their test entries during the period of more than one year between the discovery of the trespass and the, date of the trial, at a total expense of several thousand dollars, and thereby discovered many abandoned rooms and entries. Erom the admissions of witnesses for defendant that at least two encroachments extended to a depth of 90 feet, the testimony of Bywater, and observations made by plaintiffs and Leech in the test entries disclosing a probable further encroachment of indefinite depth, considered in connection with the cessation of flow of the spring 490 feet from the division line, Leech estimates that defendant has removed the coal under 11 acres of plaintiffs’ land, or an aggregate- of 55,000 tons, allowing 5,000 tons to the acre,, which is a conservative estimate.
On the other hand, it was the estimate of defendant’s witnesses, based upon the encroachments as disclosed by the company’s maps, that they had removed as much as, but not more, than, 1,044 tons of plaintiffs’ coal. When pressed, however, concerning the difficulty and danger of mining any coal which might have been left in that section of plaintiffs’ land, due to the drawing of the pillars and the, resulting subsidence of slate and other earthy substances, II. J. WVtson, defendant’s chief engineer, estimated that a line drawn parallel to the boundary
In determining whether the verdict of the jury awarding plaintiffs $15,000 was excessive, it is necessary first to consider the character of the trespass committed by defendant, for the measure of damages depends upon whether the wrongful act was done wilfully and with knowledge of the violation of another’s rights, or innocently, through bona fide but mistaken belief as to defendant’s rights, due to excusable ignorance of the facts upon which such rights depend. Pittsburgh & W. Va. Gas Co. v. Pentress Gas Co., 84 W. Va. 449, 100 S. E. 296; 18 R. C. L. p. 1256; 27 Cyc. 639, 640; note, Ann. Cas. 1913A, 562; 1 Barringer & Adams, Mines & Mining, p. 689 et seq; 2 idem p. 644 et seq.
It is admitted by the officers and agents of the defendant corporation that they had knowledge of the encroachment upon plaintiffs’ property. That knowledge dated at least from the time of the survey and preparation of maps in January, 1913, testified to by witness Taylor, and probably existed before that. Taylor swears that his map shows all entries and rooms existing at that date. If that be true, the additional rooms disclosed by the entries driven by plaintiffs, and the entry testified to by witness Bywater as extending at least 150 feet over the division line, must have been made after January, 1913, and therefore with the full and complete knowledge of the company. In this day of accurate civil engineering and skilled mine organization and management there is but little, if any, excuse for trespass
The selling price of coal of the quality mined on plaintiff’s land during the years 1912 and 1913, as testified to by witnesses for plaintiffs, ranged from $1.00 to $1.57 per ton, or an average of about $1.28. The testimony of defendant’s witnesses differs but slightly from, these figures. Mr. Robinson, defendant’s vice . president and general manager from February 1, 1913, until May 1, 1917, testifies that for the years 1912, 1913, and 1914
Plaintiff’s instruction No. 1, of which defendant complains, was more favorable to it than could reasonably be expected. We see no substantial error ini other instructions given or refused.
A plea of the statute of limitations was interposed in the court below, but defendant has not insisted upon it with much vigor in this court. Summons in the suit issued March 28, 1918, whereas defendant’s map disclosing the trespass to plaintiffs’ coal was prepared in January, 1913, and showed the encroachments as they existed on that date. There is evidence, however, referred to above, that the acts of trespass did not cease at that time but continued. That is not material here, however, for in an action for the unlawful removal of coal by wrongfully extending a mine into adjoining property, it is generally held that the statute begins to run only from the time of actual discovery of the trespass, or the time when discovery was reasonably possible. As said in 1 Barringer & Adams, Mines & Mining, pp. 690-691: “Subterranean trespasses are peculiarly susceptible of concealment from the injured owner, and it is generally within the power of the trespasser, by failing to disclose the trespass, to prevent the other party from asserting his right to redress within the statutory period. Such action on the part of the trespasser is fraudulent, and suspends the running of the statute until such time as the injured party discovers, or reasonably could have discovered, the trespa.” See also Lewey v. H. O. Frick Coke Co., 166 Pa. St. 536; Kingston v. Lehigh Talley Coal Co., 241 Pa. St. 469; 17 R. C. L. p. 792, §159
Affirmed.