687 P.2d 1310 | Colo. | 1984
We granted certiorari to review the decision of the court of appeals in Pepcol Manufacturing Co. v. Denver Union Corporation, 668 P.2d 971 (Colo.App.1983), relating to the construction of the term “at seller’s cost” in a contract between Denver Union Corporation (Denver Union) and Pepcol Manufacturing Company (Pepcol) for the payment of water supplied by the Denver Water Board to Denver Union and ultimately used by Pepcol. Denver Union sought a judgment against Pepcol for $10,-732.39, which represented the amount of surcharge allegedly owed by Pepcol for water used by it under its contract with Denver Union. The trial court construed the term “at seller’s cost” to mean the per gallon rate charged to Denver Union by the Denver Watér Board and, concluding that
The facts are not in dispute. Denver Union’s claim against Pepcol for $10,732.39 was based on a surcharge for water furnished to Pepcol during the years 1973 through 1976.
Seller [Denver Union] agrees to sell and convey to Buyer [Horwich] and Buyer agrees to purchase from Seller the real property described particularly on Exhibit A hereto attached ... subject to utility easements and rights-of-way of record. Seller further agrees to grant and convey to Buyer for use in connection with the property the following:
* * ⅝ $5 Sfc *
The right to connect for water usage to the existing water line owned by Seller located on the east side of the property without payment of a tap fee therefor to Seller (it is understood however that the hookup and meter installation charges shall be at Buyer’s expense and that water usage by Buyer shall be metered and the charges of water so used shall be paid by Buyer, its successors or assigns or designee at Seller’s cost) ....
Pepcol, which commenced operation of a rendering plant on its property in 1971, connected to Denver Union’s main water line and installed a water meter at its plant location. The general manager of Pepcol testified that during 1971 and 1972 Denver Union billed Pepcol each month for the amount of water shown on Pepcol’s plant meter. The cost of the water to Pepcol was billed at the same per gallon rate as the Denver Water Board charged Denver Union. The president of Denver Union corroborated this testimony. He testified that during the first two years of Pepcol’s operation Denver Union would receive a bill from the Denver Water Board for water metered to Denver Union’s master meter; a Denver Union employee would then read the meters of the various users connected to Denver Union’s main line; and Denver Union would “bill the users for their pro-rata share of the water” at the same per gallon rate as the Denver Water Board charged Denver Union. This method was followed because, according to Denver Union’s president, “[w]e had agreed not only with Pepcol but with all of the other users of the system to provide water at our cost, so we were being consistent here.”
In mid-1973, however, Denver Union became aware that it was paying the Denver
The trial court found in relevant part as follows: that the 1970 agreement contemplated installation of a water meter at Pep-col’s plant to measure its water use; that the reference in the contract to “water meter was to the separate meter on [Pep-col’s] property and did not refer to the main meter used as a basis for the Denver Water Board’s billing to [Denver Union]”; that until mid-1973 Pepcol was billed on the basis of this internal metering at the same per gallon rate as Denver Union paid the Denver Water Board; and that Denver Union’s discovery of a water loss within the system did not give it the right to surcharge Pepcol in order to recoup its loss.
Pepcol argues that the term “at seller’s cost” is ambiguous and that the extrinsic evidence of the course of conduct engaged in by the parties in performing their obliga-, tions under the contract supports the contractual construction adopted by the trial court. Basic and long-standing principles of contract law provide the framework for our resolution of the issue raised in this case.
A fundamental rule of contract law is that the court should strive to ascertain and give effect to the mutual intent of the parties. 4 S. Williston, A Treatise on the Law of Contracts § 601 (W. Jaeger ed. 1961). Interpretation of a written contract is generally a question of law for the court. E.g., Union Rural Elec. Ass’n v. P.U.C., 661 P.2d 247, 251 (Colo.1983); Radiology Professional Corp. v. Trinidad Area Health Ass’n, 195 Colo. 253, 256, 577 P.2d 748, 750 (1978). An integrated contract in the first instance is to be interpreted in its entirety with the end in view of seeking to harmonize and to give effect to all provisions so that none will be rendered meaningless. E.g., Union Rural Elec. Ass’n, 661 P.2d at 252; Radiology Professional Corp., 195 Colo. at 256, 577 P.2d at 750; 4 S. Williston, supra, § 601; Restatement (Second) of Contracts § 202(2) (1981). In the absence of contrary manifestation of
Whether an ambiguity exists is also a question of law. Buckley Bros. Motors, 633 P.2d at 1083; Alley v. McMath, 140 Colo. 600, 602, 346 P.2d 304, 305 (1959).
[W]hen a contract or agreement has been given a practical construction, as reflected by the conduct and acts of the parties in its performance, such construction may, and perhaps even should, be considered by the court in eliminating any ambiguity, and in ascertaining the mutual meaning of the parties at the time of the contracting.
174 Colo. at 552, 484 P.2d at 1237. “Once a contract is determined to be ambiguous, the meaning of its terms is generally an issue of fact to be determined in the same manner as other disputed factual issues.” Union Rural Elec. Ass’n, 661 P.2d at 251 n. 5.
Guided by these principles, we turn to an examination of the contractual provision which is the source of the dispute in this case. The term “at seller’s cost” is facially ambiguous. On the one hand, it could be interpreted as the cost of the water actually used by Pepcol, calculated at the same rate as the per gallon cost charged to Denver Union by the Denver Water Board. In the alternative, this term could mean the cost actually expended by Denver Union in furnishing water to all its users, even though Denver Union’s cost was in excess of the per gallon rate charged it by the Denver Water Board. Because other provisions of the contract fail to resolve the meaning of “at seller’s cost,”
The judgment is reversed.
. Pepcol commenced this litigation by filing a complaint against both Denver Union and Western Stock Center, Inc. So far as the pleadings and trial record reflect, however, the role of Western Stock Center, Inc., is identical to that of Denver Union and we refer to them collectively as Denver Union. Pepcol’s complaint against Denver Union was for breach of a 1976 contract between Denver Union and Pepcol. Pepcol alleged that Denver Union failed to refund funds advanced by Pepcol for the installation of connecting lines in a new water system that was to be installed in the stockyards area by the Denver Water Board. The purpose of this new system was to replace the water system originally constructed by Denver Union in the stockyards area. The trial court entered judgment in favor of Pepcol on its claim, and this aspect of the case is not contested by Denver Union in this proceeding.
. We note that the trial court at one point in its written findings stated that the agreement was "clear and unambiguous" and at another point stated that it "must look to the intent of the parties in the first instance as evidenced by the language of the agreement and the course and conduct of the parties.” Although the trial court erred in stating that the agreement was unambiguous, this error was corrected when the trial court admitted extrinsic evidence relating to Denver Union’s billing practices for the first two years of the agreement in order to resolve the meaning of the contractual term “at seller’s cost.”
. In determining whether a contract is ambiguous, the court may conditionally admit extrinsic evidence on this issue. 4 S. Williston, A Treatise on the Law of Contracts § 601 at 311 (W. Jaeger ed. 1961). If the court, after considering the extrinsic evidence, determines that there is no ambiguity, then the extrinsic evidence must be stricken. Id.
. From the context of the term "at seller's cost” it might be argued that, because the water usage by Pepcol was to be metered and Pepcol was to pay for the water "so used ... at Seller’s cost,” the word "cost” refers to the same per gallon rate charged Denver Union by the Denver Water Board. This argument, however, is circular because it assumes the very definition of the term "at seller's cost” that is in issue here. Resort to extrinsic evidence, therefore, is the only method by which the ambiguity can be resolved.