100 N.E. 705 | NY | 1912
Lead Opinion
[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *88 The determination of the public service commission, which the certiorari brought under review, was *90 made in the proceeding instituted by the respondent, the Long Acre Electric Light and Power Company, to obtain authority to issue stock and bonds under section 69 of the Public Service Commissions Law. The first question to be considered is whether or not we should dismiss the appeal of the relator, the New York Edison Company, and the answer to that depends, in turn, upon the question whether the relator was, within the meaning of section 2127 of the Code of Civil Procedure, aggrieved by the determination. Section 69 of the Public Service Commissions Law (L. 1907, ch. 429), provides: "A gas corporation or electrical corporation organized or existing, or hereafter incorporated, under or by virtue of the laws of the state of New York, may issue stocks, bonds, notes or other evidence of indebtedness payable at periods of more than twelve months after the date thereof, when necessary for the acquisition of property, the construction, completion, extension or improvement of its plant or distributing system, or for the improvement or maintenance of it service or for the discharge or lawful refunding of its obligations, provided and not otherwise that there shall have been secured from the proper commission an order authorizing such issue, and the amount thereof, and stating that, in the opinion of the commission, the use of the capital to be secured by the issue of such stock, bonds, notes or other evidence of indebtedness is reasonably required for the said purposes of the corporation. For the purpose of enabling it to determine whether or not it should issue such an order, the commission shall make such inquiry or investigation, hold such hearings and examine such witnesses, books, papers, documents or contracts as it may deem of importance in enabling it to reach a determination. Such gas corporation or electrical corporation may issue notes, for proper corporate purposes and not in violation of any provision of this or of any other act, payable at periods of not more than twelve months without such consent; but no such notes shall, *91 in whole or in part, directly or indirectly be refunded by any issue of stock or bonds or by any evidence of indebtedness running for more than twelve months without the consent of the proper commission. * * *"
When the present proceeding was commenced, section 68 of the Public Service Commissions Law contained this provision: "No gas corporation or electrical corporation incorporated under the laws of this or any other state shall begin construction, or exercise any right or privilege under any franchise hereafter granted, or under any franchise heretofore granted but not heretofore actually exercised without first having obtained the permission and approval of the proper commission."
The Public Service Commissions Law took effect July 1, 1907.
The Long Acre Company was incorporated April 23, 1903, pursuant to the provisions of article VI of the Transportation Corporations Law. Its objects were to manufacture and distribute electricity for light, heat, power or other purposes throughout the boroughs of Manhattan and The Bronx of the city of New York. By the statute and incorporating certificate it became empowered to lay, erect and construct suitable wires, poles and conduits on and under the streets and public places, with the consent of the municipal authorities and in such manner and under such reasonable regulations as they might prescribe.
In February, 1908, the respondent commenced this proceeding. The public service commission, by its order of June 26, 1908, refused to authorize the issuance of the securities upon a ground, among others, that no authority to begin construction had been obtained from the commission or its predecessor, the commission of gas and electricity. The Appellate Division, upon a review under a writ of certiorari, reversed the order and ordered that the application be referred back to the commission for consideration and action within the limits of its authority. *92
(People ex rel. Long Acre Electric L. P. Co. v. PublicService Commission,
In December, 1910, the commission, by its order, fixed the time and place for proceeding under the order of the Appellate Division and caused the order to be served upon the appellant. The respondent at the outset urged upon the commissioner, who was hearing the application under section 11 of the Public Service Commissions Law, its assertion that the appellant had not the right to intervene in or be a party to and had no standing in the proceeding; that the only question remaining for the commission to decide was the amount of stock and bonds to be authorized and the purposes to which their proceeds should be applied. The appellant, in opposition, asserted that the hearing and the determination involved the right of the respondent to construct a plant and operate, and the questions: whether the franchise under which the respondent claimed the right to operate had been actually exercised prior to July 1, 1907; whether the respondent had the right to begin construction without first having obtained the permission and approval of the commission, and asserted that it as the operating company had the right to intervene and appear as a party to the proceeding and produce evidence in its behalf. The commissioner, without making a ruling, permitted the appellant to introduce the evidence received upon the prior hearing and to call "on behalf of the New York Edison Company" two witnesses. At the close of their examinations the counsel for respondent formulated their position in the motions "that the Edison Company be not allowed to appear or give evidence in this proceeding except as to the securities to be allowed and the application of the proceeds," and that the testimony of the two witnesses be stricken from the record as improper and as relating to irrelevant matters. The motions were denied, with exceptions to the respondent, and the ruling made that the commission "will hear such testimony as *93
may be presented, that is germane upon the question whether the franchise has been or has not been exercised." Testimony in behalf of the appellant was then given by a score of witnesses. The respondent called witnesses in rebuttal and the issues and proof were submitted to the commission as a body upon oral and written arguments. Their order authorized the issuance of stock and bonds. Under a writ of certiorari granted the appellant the order was affirmed by the Appellate Division and the writ dismissed (People ex rel. New York Edison Co. v. PublicService Commission,
The petition by which the respondent instituted the proceeding alleged as uses to which the securities to be issued were to be put, the acquisition of property upon which to construct power houses and substations, their construction and the purchasing and laying of underground cables and ducts.
The legislature did not intend or enact that a corporation subject to the provisions of section 69 or section 55 (of identical effect in relation to railroads, street railroads and common carriers) of the Public Service Commissions Law should be given authority by the commissions to issue stock and bonds for the purposes prescribed in those sections until its right to effect those purposes was certain and complete. That law was enacted in response to a pronounced and insistent public opinion and was a radical and important modification of the relations and policy of the people toward the corporations which are its subjects. Its paramount purpose was to protect and enforce the rights of the public. It made the commissions the guardians of the public by enabling them to prevent the issue of stock and bonds for other than statutory purposes or in appreciable and unfair excess of the value of the assets securing them, and to prevent also unneeded or extortionate competition, or indifferent and *94
unaccommodating methods of operation or oppressive or discriminating charges or rates. It provided for a regulation and control which were intended to prevent, on the one hand, the evils of an unrestricted right of competition and, on the other hand, the abuses of monoply. (People ex rel. D. H. Co. v.Stevens,
The language of the sections 69 and 55 establishes the conclusion that the commissions are not empowered to authorize the issue of securities upon the application of a corporation which has not received the permission and approval provided in sections 68 or 53 or is not validly superior to the provisions of those sections. Those sections cannot be evaded by obtaining an order under sections 69 or 55 and the permission to construct implied through it. The issue of the stock and bonds is to be authorized "when necessary for the acquisition of property, the construction, completion, extension or improvement of its plant or distributing system, or for the improvement or maintenance of its service * * * provided and not otherwise that there shall have been secured from the proper commission an order authorizing such issue, and the amount thereof, and stating that, in the opinion of the commission, the use of the capital to be secured by the issue of such stock, bonds, notes or other evidence of indebtedness is reasonably required for the said *95 purposes of the corporation." The commission cannot, under this language, order the issue of the securities for the purposes mentioned, unless it is satisfied that the applicant has the present and absolute right to accomplish the uses for which the securities are authorized. Problematical uses or purposes do not necessitate or require funds or capital for their execution. The commission may, perhaps, be thus satisfied from its own records, of which, of course, it may take judicial notice. Otherwise it must require allegation and proof. For the purpose of enabling it to determine whether or not it shall issue an authorizing order, it is empowered to hold hearings and examine witnesses. In the present case the petition alleged that the respondent "has the right to place wires for electric light, heat and power in the boroughs of Manhattan and The Bronx as appears by the franchise, a copy of which accompanies this petition." Inasmuch as it had not made an application under section 68 and the records of the commission did not evidence the existence of the alleged right, it was bound to establish it by proof.
The appellant was and for many years had been furnishing electricity for light, heat and power in the boroughs of Manhattan and The Bronx. It was directly and seriously interested in this proceeding which thus involved the consideration and determination of the present right of the respondent to place wires for those uses in those boroughs or acquire property or construct a plant to be used in competition with it. The commission might legally and justly permit it to become a party to the proceeding and the determination adverse to it after its intervention was reviewable, under certiorari, upon its application as the party aggrieved thereby. (People ex rel.N YC. H.R.R.R. Co. v. Public Service Commission,
The respondent has not applied under section 68 for the permission and approval of the commission, that it begin the construction of its electrical plant and system. It asserts that its right to construct is superior to and independent of the restrictions imposed by the section. It is manifest and admitted that the language of the section as hereinbefore quoted is equivocal and may be given either of two interpretations. The one would be fully expressed as follows: "No gas corporation or electrical corporation * * * shall begin construction without first having obtained the permission and approval of the proper commission. No such corporation shall exercise any right or privilege under any franchise hereafter granted, or under any franchise heretofore granted, but not heretofore actually exercised, without first having obtained the permission and approval of the proper commission." The other would be fully expressed as follows: "No gas corporation or electrical corporation * * * shall begin construction under any franchise hereafter granted, or under any franchise heretofore granted, but not heretofore actually exercised, without first having obtained the permission and approval of the proper commission. No such corporation shall exercise any right or privilege under any franchise hereafter granted, or under any franchise heretofore granted, but not heretofore actually exercised, without first having obtained the permission and approval of the proper commission." The commission in the first decision adopted the construction that the respondent could not begin the construction of its plant without first having obtained its permission and approval. The Appellate Division in reversal held that it could begin the construction because the franchise did *98 not fall within the class of franchises "not heretofore actually exercised," thus holding in effect that any gas or electrical corporation might, under section 68 as it was at the commencement of this proceeding, begin any and all construction of its plant or system, which did not come within the franchise, without applying for and receiving the permission and approval of a commission.
The consent or franchise through which the respondent asserts its right to construct is evidenced by a resolution of the board of aldermen of the city of New York of May 31, 1887, as follows: "Resolved, that permission and authority are hereby given and granted unto * * * the American Electric Manufacturing Company * * * to locate and erect poles and hang wires and fixtures thereon, and to place, construct and use wires, conduits and conductors for electrical purposes, in the City of New York, in, over and under the streets, avenues, wharves, piers and parks therein, or adjacent thereto; according to such plans as may be directed, approved or allowed by and subject to the powers of the Electrical Subway Commissioners, and to the provisions of chapter 499 of the Laws of 1885, and under the supervision of the Commissioner of Public Works and of the Department of Public Parks, within their respective territorial jurisdiction, and subject also to all existing ordinances applicable thereto, and to all reasonable regulations of the privilege hereby conferred, which the Common Council may hereafter impose by ordinance or otherwise."
In March, 1906, the respondent became, through mesne assignments, the assignee of such permission and authority. (Matter of Long Acre Electric L. P. Co.,
Certain facts and established principles guide irresistibly to the conclusion that the respondent shall not begin the construction of an electric plant without first having obtained the permission and approval of the commission. It is the settled policy of the state arising through an *99
extended and instructive experience to withdraw the unrestricted right of competition between corporations occupying through special consents or franchises the public streets and places and supplying the public with their products or utilities which are well nigh necessities. (People ex rel. New York Electric LinesCo. v. Ellison,
The construction given section 68 by the Appellate Division, as contrasted with that adopted by the commission in its first order, thwarts the policy in two respects: thereunder any gas or electrical corporation might begin the construction of that part of its plant which did not come under the consent without applying to the commission for its permission; and might begin, without such permission, the construction of its entire plant and system, provided it held a franchise granted and actually exercised prior to July 1, 1907. The respondent has stated, and we perceive, no ground for a legislative partiality towards the corporations holding consents existing at the adoption of the Public Service Commissions Law, or for the requirement that the permission and approval of the commission must be had for the construction under the franchise only. A scrutiny of other sections of the law creates the conviction that it intends to bring under its restrictions and regulation, in so far as is lawful, the franchises, powers and rights of the corporations existing at its enactment and to which it relates, and under the *100
control of the commissions all construction of their plants. Section 53 in article III of the law relating to common carriers, railroads and street railroads provides: "Without first having obtained the permission and approval of the proper commission no railroad corporation, street railroad corporation or common carrier shall begin the construction of a railroad or street railroad, or any extension thereof, for which prior to the time when this act becomes a law a certificate of public convenience and necessity shall not have been granted by the board of railroad commissioners or where prior to said time said corporation or common carrier shall not have become entitled by virtue of its compliance with the provisions of the railroad law to begin such construction; nor, except as above provided in this section, shall any such corporation or common carrier exercise any franchise or right under any provision of the railroad law, or of any other law, not heretofore lawfully exercised, without first having obtained the permission and approval of the proper commission. * * *," upon proof of public convenience or necessity. The policy which inspired the effects of this section was as applicable to gas and electrical corporations as to the corporations it affects. The law places the former under the supervision and regulation of the commission quite as broadly as the latter. Whatever inference may be drawn from the differing phraseology of the sections 53 and 68 is overborne by the purpose of the law; moreover, it may well be that the conditions which were created between the corporations to which article III relates and the board of railroad commissioners, and by the many statutory provisions relating to those corporations may have made inexpedient in section 53 the conciseness of the language of section 68. Our view is further strengthened by the fact that the amendment of section 68 taking effect June 14, 1910, provided: "No gas corporation or electrical corporation shall begin construction of a gas plant or electric plant without first having obtained the *101
permission and approval of the commission of each district within which any part of the work or construction is to be performed. No such corporation shall exercise any right or privilege under any franchise hereafter granted, or under any franchise heretofore granted but not heretofore actually exercised, or the exercise of which shall have been suspended for more than one year, without first having obtained the permission and approval of the proper commission, * * *" (Cons. Laws, ch. 48, section 68), upon proof of public convenience or necessity. The amended section may correctly be deemed, through the nature of the Public Service Commissions Law, a statement in clearer terms of the intention of the original section. (People ex rel. Binghamton L., H. P.Co. v. Stevens,
The consent of the municipal authorities, given under the provisions of the statute, was for the construction of the part of the plant on or under the streets of the two boroughs to be used in conducting and distributing electricity. (Transportation Corporations Law, § 61.) The actual exercise of the consent or franchise necessarily involved the beginning of the construction of that part of the plant. The effect of the decision of the Appellate Division, therefore, is that the corporation shall not begin construction under the consent without the permission and approval of the commission, unless it has through an actual exercise of the consent begun construction under the consent. This inharmonious conclusion does not arise *102 if it is held that the words "under any franchise hereafter granted, or under any franchise heretofore granted but not heretofore actually exercised" apply only to the words "or exercise any right or privilege." Another result of the Appellate Division decision is that the construction of the part of the plant not within the franchise, including the power houses, sub-stations, machinery and appliances could be had with any application to the commission, and as a consequence the corporation could apply for and receive authority to issue stock and bonds under section 69 although it might not have or thereafter obtain the right to construct the part of its plant essential for conducting and distributing the electricity. This is contrary to the intention of the law, as we have stated in this opinion. The commission had not the power to authorize the issue of the stock and bonds for the reason that the respondent had not its permission and approval to begin the construction of its plant.
We do not consider the question as to whether or not the franchise held by the respondent was actually exercised prior to the taking effect of the Public Service Commissions Law, for the reason that the commission did not make or base the final order upon a finding of fact in regard to it.
The orders of the Appellate Division and the order of the commission of July 28, 1911, should be reversed, with costs in the Appellate Division and in this court.
Dissenting Opinion
At the threshold of this case the question arises whether, in the eyes of the law, the appellant is the party aggrieved by the determination it seeks to review on appeal, for otherwise, no matter how erroneous that determination may have been, the appellant has no standing in court to prosecute the appeal, and it must be dismissed. In 1908 the respondent, claiming to be the owner of a valid franchise to furnish electric light and power in the city of New York, applied to the public service *103
commission for authority to issue stock and bonds as required by section 12 of the Gas Commission Act (Laws of 1905, chap. 737). The application was denied by the commissioners on the ground, among others, that the existing companies were properly serving public interests, and that it would not be to the advantage of the community to have a new company. On a writ of certiorari obtained by the petitioner this determination was reversed by the Appellate Division and the matter remitted to the commissioners for a further hearing (
The restriction upon the authority of a gas and electric light company to issue stock and bonds without the approval of the proper public service commission was enacted to protect the public who may invest in such securities, and also to some extent to protect the public so far as it might become a patron of the company; for every one knows that when the question of rates or price arises the appeal is always strenuously made that the holders of the securities who have invested in the same should be allowed an adequate return on their investment, though the securities may not represent a real investment of capital or outlay in the construction or maintenance of the company's plant.
In People ex rel. Delaware Hudson Company v. Stevens
(
That this view, that the statutory provision was intended to protect the investing public, is correct is made clear by the terms of the provision itself. The company does not require the consent of the commission to enable it to borrow money or incur debt, unless it issues therefor securities of some kind, stock, bonds or evidences of indebtedness, and in the case of evidences of indebtedness, only when they are payable more than twelve months after date. Therefore, if the Long Acre Company was to borrow the money on open account or on short term notes, no consent would be necessary. It is said by the learned counsel for the respondent: "To allow securities to be issued and then not to permit the proceeds to be used in the business of the company would be an inane and futile act; and it would also be practicing a gross deception on investors who might have purchased such securities relying upon the order of the Commission." Assuming for the argument the correctness of this position, the question remains, how was the appellant made the champion of the rights of the investing public so as to give it a standing in court to appeal from what it deems an erroneous decree? It does not propose to invest in the securities of the Long Acre Company or to become a patron of its services. If the appellant can prosecute an appeal because the order of the Appellate Division *105
may injuriously affect the public, then any or all of the nine million citizens of this state, or, at least, all the adults, have the same right. The real object of the appellant is to cripple a proposed competitor by rendering it difficult for the latter to obtain funds to prosecute its enterprise. In this respect it is interested in the result of this proceeding, but it is not such an interest as the law recognizes. It often occurs that the question which determines a litigation in court is of vital importance to other parties who have controversies depending upon the determination of the same question. At such times it is the common practice of the court to allow such third parties to file briefs on the argument of the case so that their rights may not practically, though not in the eyes of the law, be decided without their having an opportunity to be heard. But such persons cannot become parties to the suit. Though they should be heard at the Appellate Division it would give none of them any right to appeal from an adverse decision. On the argument it was conceded that no decision that we make in this case would be conclusive on the appellant in any litigation that may arise between the two companies, and, apart from any concession of counsel, the proposition is clear. We have already decided on an application of the Long Acre Company to compel the subway company to assign space in the subway for the Long Acre Company's wires, that that company had a valid franchise and the right to furnish electric light. (Matter of Long Acre Elec. L. P. Co.,
At the time this proceeding was instituted section 68 of the Public Service Act required any gas or electrical corporation before beginning construction or exercising any right or privilege under any franchise thereafter granted, or theretofore granted but not actually exercised, to obtain the approval of the public service commission. In 1910 (Chap. 480) this statute was amended so as to provide: "The Commission within whose district such construction is to be made, or within whose district such right, privilege or franchise is to be exercised, shall have power to grant the permission and approval herein specified whenever it shall after due hearing determine that such construction or such exercise of the right, privilege or franchise is necessary or convenient for the public service." (Cons. Laws, ch. 48.) To an application to exercise the franchise made under this section as amended, doubtless the appellant would be a proper party, if it saw fit to intervene. By the amendment the status of gas and electric companies is made similar to that of railroad companies, as to which we have held that an existing company has a standing to oppose the granting of a franchise to a competing company. (People ex rel. N.Y.C. H.R.R.R. Co. v.Pub. Service Com.,
It is urged, but not by counsel for the appellant, that the decision of the public service commission would conclude the appellant in any litigation that might hereafter arise between the parties on the question of the possession by the respondent of a valid franchise to furnish electric light and power. As already said, it was admitted by the appellant on the argument that the decision would not have that effect. The reason for that position to me seems plain. A franchise to furnish electric light and power and lay conduits for that purpose in the city streets is property, the same as other property, though it is doubtless liable to forfeiture by judicial decree for non-user or abandonment. (People v. Atlantic Ave. R.R. Co.,
It may be suggested that this objection would be fatal to the rights of competitors to appear before the commission in proceedings, under section 68 of the statute, as amended in 1910, or under section
Therefore, we are brought back to the original question whether the appellant is aggrieved in law by the authority accorded the respondent to issue stock and bonds. Three cases are cited as authority for the proposition that because the appellant was allowed to intervene below it is entitled to prosecute the appeal. They are Matter of Attorney-General v. No. Am. L. Ins.Co. (
Indeed the certiorari should not have been allowed at *110 the instance of the appellant, for section 2122 of the Code of Civil Procedure forbids its issue to review "a determination which does not finally determine the rights of the parties with respect to the matter to be reviewed." Assuming for the argument that the determination of the public service commission imports as between the commission and the respondent that the latter has a valid franchise, that is of no importance under the section quoted unless that decision finally determines the question as between the appellant and the respondent.
The majority of my brethren holding that the appellant is entitled to prosecute its appeal, I am brought to the consideration of the merits of the case and dissent from the decision about to be made as contravening both the settled substantive law of this state and also the settled method of procedure. The decision of my brethren proceeds on the proposition that under the Public Service Law all gas and electric companies must obtain the consent of the commission, under section 68 of the act, to exercise their franchises before they can apply for leave to issue stock and bonds, and this whether the company had a valid franchise at the time of the enactment of the statute or not. In the opinion of the majority of the court it is stated: "We perceive no ground for a legislative partiality towards the corporations holding consents existing at the adoption of the Public Service Commissions Law, or for the requirement that the permission and approval of the commission must be had for the construction under the franchise only. A scrutiny of other sections of the law creates the conviction that it intends to bring under its restrictions and regulation, in so far as is lawful, the franchises, powers and rights of the corporations existing at its enactment and to which it relates, and under the control of the commissions all construction of their plants." I think there is the best of reasons for so-called legislative partiality to corporations existing at the time of the enactment of the statute, that is to say, it *111
was beyond the power of the legislature to require any corporation having a valid franchise for supplying gas or electricity in a municipality to obtain the consent of the public service commission as a condition precedent to the exercise of its franchise, because, under the decisions already cited in this opinion, that franchise was property and as immune from legislative attack as any other property. We have decided exactly that principle in People ex rel. Third Ave. R. Co. v. PublicService Commission (supra). Nor is the principle affected by the fact that the franchise might not have been actually exercised at the time. A franchise, though unexercised, is property within the constitutional safeguards. (Suburban RapidTransit Co. v. Mayor, etc., of N.Y.,
The only question on which the respondent's right to an issue of stock and bonds depends — the possession of a valid franchise — is not passed upon by the court. It is assumed that the respondent has exercised its franchise so far as the erection of poles, wires, fixtures and conduits for electrical purposes in the streets, avenues and public places of the city are concerned. A distinction is sought to be drawn between this franchise and a franchise to build an electric plant for the generation of electric power and current. This distinction seems to be wholly without foundation. A franchise to furnish gas in a municipality and to use the streets for that purpose necessarily includes the franchise to manufacture gas to be *112
delivered; a franchise to furnish electric power through the streets of a city necessarily includes the right to construct a plant for the generation and development of electricity; a franchise to maintain a street railroad includes the right to build a car barn for the storage of cars and a horse stable for the care of horses, if the right is to operate by horses, or an electric plant, if the road is to be operated by electricity. All these are inseparable incidents of the franchises and cannot be severed from them. Indeed, it requires no franchise for a company to build on its own property an electric plant or a horse stable, or a car barn, unless these uses constitute a nuisance against the neighbors, in which case the grant of a franchise would be no protection. (Cogswell v. N.Y., N.H. H.R.R. Co.,
On the matter of practice it is said the court does not consider the question whether the franchise held by the respondent was actually exercised by it prior to the enactment of the Public Service Commissions Law, because the commission did not make or base the final order upon a finding of fact in regard to it. I know of no rule requiring the public service commission to make findings of fact, and, indeed, in the great mass of special proceedings — the exceptions being very few — no findings of fact are made by the tribunal of first instance, whether judicial or quasi judicial. In such cases all that is required in this court to sustain the orders appealed from is that the record should present some evidence to justify the order. The commission made no findings of fact on which the present order was based. But this is equally true of many, if not all of the orders of the public service commissions. If a new practice is to be established and the order reversed for a defect of that character, the case should be remitted to the commission for a further determination.
There are too many embarrassments attending the disposition *113 of this case on the merits for us to enter upon its decision needlessly. The right of the Long Acre Company to any franchise whatever can be properly determined in an action brought by the attorney-general on behalf of the People and there it should be determined.
HAIGHT, HISCOCK and CHASE, JJ., concur with COLLIN, J.; VANN and WILLARD BARTLETT, JJ., concur with CULLEN, Ch. J.
Orders reversed, etc.