82 N.Y. 247 | NY | 1880
[EDITORS' NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.] *249 Some facts in this case are apparently beyond dispute, and narrow the discussion to a single point.
It is entirely certain that the arch in Forty-second street fell as the consequence of "bad workmanship and the use by the contractor of bad materials." When its fall impelled investigation, the commissioner of public works demanded of the relator an explanation of the cause. The latter answered that it was "bad workmanship, bad mortar used in the work, and the spandril backing imperfectly laid." As between the commissioner and the engineer this fact was distinctly conceded, and needed no additional or formal proof. The inference followed irresistibly that somebody was in fault; not merely the contractor and his servants who did the imperfect work, but also the person or persons whose supervision should have detected and prevented the careless and insufficient construction. All this was practically conceded by the relator, when called upon for an explanation, for resting his defense upon the sole ground left to him, consistent with his own distinct admission, he answered merely that he was not responsible for the defect; that the fault was not his.
It is equally certain that the relator could only be removed for cause. (People ex rel. Munday v. Board of Fire Com'rs,
The question, therefore, which confronts us is whether he was so responsible, and that leads to a study of his office and its duties, and of his relation to the work in question.
Under the law, he was "chief engineer of the Croton aqueduct," and in that capacity merely had no duty or responsibility imposed upon him, in respect to the defective structure. The arch in process of construction supported a roadway, and was a street improvement having no connection with the aqueduct or the city's water supply. But the facts stated in the return show that while the relator, under the charter, was only engineer of the Croton aqueduct, as matter of fact, he was also engineer of the department of public works. He became so by the action of the chief of that department and his own concurring assent. In signing the vouchers for the work in Forty-second street he adopts that title. The duty limited by the law to the aqueduct and water supply became, apparently through necessity, but at least with his assent, and that of the commissioner, extended over the department of public works. While technically the head of one of several bureaus in the department of public works, he was really the only chief engineer in the whole department. The charter seems to have mistakenly assumed that only the bureau having charge of the water supply needed an engineer; and when in the work of some other bureau the need of an engineer became apparent, it was quite natural, in the absence of any legal provision, that the remedy chosen should be an extension of the duties of the engineer at the head of a single bureau to the engineering work of the whole department. The relator suffered this change to be made. He placed himself, or allowed himself to be placed, relatively to the work in Forty-second street, in the attitude of supervising engineer, and is described in the contract as engineer of the department of public works. Granting *252 that he might lawfully have declined such added duties and kept within the narrower range indicated by his official title, it is enough to say that he did not, and the commissioner of public works had therefore the right to hold him responsible in the capacity which he assumed.
That our conclusions must necessarily rest on this basis is apparent from another view of the situation. The conceded fact of imperfect work and bad material in the construction of the arch proves inefficiency or dishonesty on the part of the person who in fact had the responsible supervision, independent of any question as to its origin. The relator assumed the supervision, undertook the duty, and if, in the process of its performance, he developed a want of skill or ability as an engineer or an inefficient and slack control, the commissioner might well deem it imprudent to trust the water supply of the metropolis in such unsafe hands, and assign as sufficient cause for removal, incapacity or want of skill betrayed in the attempt to supervise a construction which the relator need not have touched, but which, when voluntarily undertaken, at least tested his faithfulness and skill.
The conclusion therefore follows, that the commissioner of public works had a right to judge the relator as the supervising engineer of the work in Forty-second street, and to call on him for an explanation. The charge was fairly and sufficiently stated; an opportunity for explanation was given, the defense that the fault was not his was interposed, and the head of the department deciding otherwise, removed him.
The question is thus narrowed down to the relator's defense and to the inquiry whether he was in truth responsible for the conceded fault.
It is not alleged or claimed that he had any knowledge of the imperfect work or materials, until the fact was developed by the falling of the arch or the cracking and settling which preceded this fall; and we must assume that he had not. If, however, as supervising engineer he ought to have known it, he was in fault. If it was not his duty to have discovered it, he was blameless.Prima facie, and in the absence of modifying *253
facts, it was his duty as supervising engineer to have discovered and prevented the defect. Upon his skill and capacity the employer had a right to rely. The supervision of an engineer is a farce or a fraud, if the work he controls can crumble without his fault. But this ordinary and usual rule may be modified by the necessities of a great city or the pressure of a multitude of important enterprises. It was plainly impossible for the relator to watch personally the placing of every brick and the composition of the mortar daily prepared, where a large number of structures were in progress at once in the various and distant sections of the city. If he did it at all, it could only be through assistants detailed to the special duty. In a case where such an engineer is sole master within the range of his appropriate duties, and selects and appoints his assistants, he may justly be held responsible for their inefficiency or incapacity, because he appointed them and is responsible for their skill and fidelity. But he is not so responsible where he has no power of appointment. (Kelly v. The Mayor, etc.,
We do not see any thing in the contract itself, or in the action of the engineer, to modify this conclusion. The contract, as a general rule, recognizes the commissioner as the controlling and supervising authority. It requires that the engineer shall explain any doubt or ambiguity in the specifications; that he may extend the time of performance, if the contractor is delayed by the construction of a sewer; that the engineer in charge shall inspect the cement unless other persons are assigned by the commissioner to that duty; and in the end that the engineer, conjointly with the inspector and superintendent of street improvements, shall give the final certificate of completion. These provisions cast no duty of inspection on the engineer. On the contrary, they recognize that it belongs elsewhere. The inspector is required to join in the final certificate, for the very reason that he, and not the engineer, is expected to know and be responsible for the quality of materials and honesty of daily work.
That the relator advised or instructed the inspector does not change the situation. That he explained to him how to test mortar does not make the relator responsible for the inspector's failure to apply the test. It is not shown or claimed that any advice or information so given was unwise or improper.
The learned counsel for the respondent insists that we are not to review the decision of the commissioner upon the merits, and authority is cited for that rule. (People v. Board of Police,
The order of the General and of the Special Terms should be reversed, with costs, and the order of removal reversed and annulled.
RAPALLO, ANDREWS and EARL, JJ., concur.
FOLGER, Ch. J., MILLER and DANFORTH, JJ., dissent.
Ordered accordingly.