210 Pa. Super. 22 | Pa. Super. Ct. | 1967
Opinion by
This is an appeal by the Reading Company from the order of the Pennsylvania Public Utility Commission, dated October 24, 1966, directing the establishment of a temporary grade crossing of appellant’s tracks at Broad Street in the Borough of Souderton (borough), Montgomery County, Pennsylvania, and apportioning
On April 13, 1926, at C.6546, the Public Service Commission abolished as dangerous a grade crossing of appellant’s tracks at Broad Street in Souderton and approved the construction of an underpass for vehicular traffic at Chestnut Street, some 500 feet west of the abolished crossing. The 1926 order also provided for a pedestrian underpass to be constructed at the site of the closed Broad Street crossing. On July 9, 1964 the borough filed a complaint (C.17998) against Beading Co., the Department of Highways and Montgomery County, seeking relief from traffic congestion at the Chestnut Street underpass, and suggesting re-establishment of the grade crossing at Broad Street, abolished by the Public Service Commission in 1926. After hearings, the commission dismissed this complaint April 26, 1965 for lack of jurisdiction, on the basis the question should be raised by application rather than complaint. An appeal to this Court was quashed. Later, on May 13, 1965, Souderton filed an application (A.92329) seeking reopening of the Broad Street crossing. Subsequently, October 18, 1965, the commission filed a complaint on its own motion against Souderton, the Department of Highways, Reading Co. and Montgomery County to inquire fully into the public safety at the Chestnut Street and the Broad Street crossings simultaneously. The proceedings at C.6546, C.17998 and A.92329 were incorporated by reference into the record at C.18140. Following hearings, the commission is
Appellant argues that the order of October 24, 1966, directing the establishment of a temporary grade crossing at Broad Street, is arbitrary, unreasonable, not supported by evidence and constitutes a flagrant abuse of discretion. A review of the evidence supports the commission’s finding that the Chestnut Street crossing is inadequate to handle the present day traffic, and that the Broad Street grade crossing is necessary as a temporary remedy. The record shows conditions have changed since 1926 when Broad Street crossing was closed. The population of Souderton grew from 3,125 in 1920 to 5,381 in 1960, and was estimated to exceed 8,000 by 1985. A map shows that Front Street and Main Street run parallel, along and immediately adjacent to each side of appellant’s tracks in the borough, and form a right angle intersection with both Broad Street and Chestnut Street. Front Street stops at Chestnut forming a T-intersection at the north side of the Chestnut Street underpass. There were five crossings of appellant’s tracks in the borough, excluding Broad Street and including the Chestnut Street underpass, two of these at grade. From evidence introduced by the borough and the Department of Highways, the commission found that vehicular traffic had doubled and re-doubled in the forty years since the 1926 closing of the Broad Street crossing, and that the Chestnut Street underpass was operating at its maximum capacity of almost 10,000 vehicles daily. The commission
The evidence shows that 32,529 passenger cars used the Chestnut Street crossing on five days of the week of March 3, 1964, as compared to 13,085 passenger cars and trucks using the Broad Street crossing for a seven day period in September of 1925. There was a 25% increase in vehicles using the Chestnut Street underpass on April 7 and 9 of 1966, as compared to March 5 and 7 of 1964. The borough offered many witnesses, including the mayor, borough officers, president of the Borough Planning Commission, together with resolutions of twelve civic, religious and fraternal organizations, all of whom supported the reopening of the Broad Street grade crossing. The president of the Borough Planning Commission testified that present traffic congestion problems could not be alleviated by using the five crossings in the borough and that re-establishment of the Broad Street crossing was the only practical solution. In opposition appellant produced the testimony of Mr. Williams, a traffic engineer, who stated that modification of traffic controls at the Chestnut Street underpass and widening of the roadway would improve traffic conditions at that crossing. The witness described these measures as palliatives, a characterization concurred in by the commission. In the opinion of Mr. Williams the proposed Broad Street crossing would involve sharp turns, steep grades, complex signals at the adjoining intersections, and would be unsafe. Both Mr. Williams and an expert from the Department of Highways testified that the Chestnut Street underpass was adequate for traffic and would be for years to come.
Testimony was offered showing a decrease in rail traffic combined with an increase in vehicular traffic since the 1926 order. Present rail traffic includes 14 passenger trains and 6 freight trains, or a total of 20 trains a day. This compares with 50 trains a day in 1925, with 3,100 pedestrians and 2000 vehicles traversing the crossing daily. The commission estimates that 5,000 vehicles would use the proposed Broad Street crossing each day.
Appellant contends the order of a temporary grade crossing at Broad Street constituted error as a matter of law because the crossing will be dangerous and unsafe. Admittedly the former crossing at Broad Street, with manually operated gates, was closed as unsafe. And here the commission found the possibility of accident prevented acceptance of the Broad Street grade crossing as a permanent solution. For this reason the commission limited Broad Street as a temporary crossing (not to exceed two years) and ordered a comprehensive engineering study to aid in finding a permanent solution. The evidence as to the adequacy of the Chestnut Street crossing was conflicting. The commission’s order reopening the Broad Street crossing was supported by evidence, and within the discretion granted the commission in highway-rail crossing cases. Traffic congestion is an element to be considered in determining the public interest in cases involving highway-rail crossings: Bridgewater Borough v. Pa. P.U.C., 181 Pa. Superior Ct. 84, 99, 124 A. 2d 165 (1956).
Paragraph 11 of the order directs the appellant to “abolish or close temporarily the pedestrian underpass.” The main thrust of the order is to afford pedestrians adequate protection at the grade crossing. The part of the order directing closing of the underpass is not uncertain or indefinite. The commission allocated the cost of automatic protection at the crossing against appellant, estimated to be $54,000. Appellant does not object to this cost allocation, as such, but contends there should be no grade crossing at Broad Street. Under the commission’s order, appellant is reimbursed 75% of the automatic protection cost by the Department of Highways and Montgomery County. We affirm the order for a temporary grade crossing at Broad Street.
Appellant also objects to that part of the order of October 24, 1966 which directs an engineering study of (a) traffic crossings in the borough, with a view to solving that problem by additional crossings, if necessary, and (b) a study of the feasibility of eliminating
We think the commission had full power to order the highway crossing study it did in this ease and allocate the costs thereof. The commission has broad powers under §409, 66 PS §1179, and, though it deals with construction of highway “crossing,” this necessarily includes jurisdiction over more than one crossing. Here the crossings were adjacent and contiguous on a six mile stretch of appellant’s right of way. Certainly the commission may consider these crossings as interrelated for the purpose of determining what crossings are necessary in a given area, within and adjacent to the Borough of Souderton. The commission properly found in this case that the Chestnut Street underpass was inadequate and that “related” crossings, both within and outside the borough, “are within the corridor of highway traffic necessarily considered in this investigation.” Under §401 of the Public Utility Law, 66 PS §1171, the commission may require appellant to furnish
Appellant had notice throughout the various hearings that the adequacy of the Chestnut Street underpass to handle vehicular traffic in the Borough of Souderton was in issue. Such alleged inadequacy was the reason for opening the Broad Street crossing. Indeed, appellant’s counsel repeatedly asked whether the borough had made any engineering studies in relation to the Chestnut and Broad Street crossings. Appellant can hardly be heard to object when relevant engineering studies are ordered by the commission. Under the facts of these proceedings appellant had notice and opportunity to be heard on the issues raised which encompassed the adequacy of the rail-highway crossings in and adjoining the Borough of Souderton. There was no violation of due process or lack of fair play. This part of the order involved only a preliminary study and contained no definite direction as to the measures to be taken with regard to the crossings involved. These are matters for future proceedings before the commission in which the parties concerned will have an opportunity to be heard.
On November 9, 1966 appellant filed a petition for rehearing of the October 24, 1966 order of the commission, under §1006 of the Public Utility Law, 66 PS §1396. By its order of January 30, 1967 the commission refused the petition for rehearing. This petition related principally to alleged errors of law in the commission’s order of October 24, 1966, and it is evident
Order affirmed.