This is an action by a seaman to recover damages for personal injuries sustained by him allegedly from the negligence of the respondent, United States of America. The facts have been stipulated between the parties and I am called upon to decide the issues on the basis of the following
Stipulation of Facts
1. United States of America owned and operated the Steamship William Moultrie at all times material hereto.
2. Libellant was forty years of age on May 14, 1946, and has been a merchant seaman for over twenty yеars.
3. Libellant joined the Steamship William Moultrie on March 19, 1946 as Chief Engineer and was paid off and discharged at Norfolk, Va. on June 11, 1946. During his period of service on board said vessel, his gross earnings were $1,278.20 in wages, including a bonus of $70.
4. The Steamship1 William Moultrie sailed from Philadelphia on April 18, 1946 and arrived at the Port of Brindisi, Italy in the morning of May 6, 1946. The vessel was moored at a long dock which was constructed parallel to the shore line and did not extend out into the water. A railroad track ran the length of the dock, and alongside this track and parallel to it was a cement walkway. The cement walkway was accessible via three or four steps. It was above the level of the said track to the extent of the height of said steps.
5. The cement walkway on which libellant was walking on the оccasion of his injury was about six or seven feet wide and several hundred feet long. It had no railings, and was sheltered by a V-shaped roof. There were no lights on the walkway.
6. On May 7, 1946, the dock at which the Steamship William Moultrie was moored was owned by the Italian Government, and both the said dock and the Port of Brindisi were under British Military control.
7. Libellant had been ashore in Brindisi the day before, in the daylight, on which occasion he elected to walk along the railroad track rather than use the cement walkway.
8. On the evening of Mаy 7, 1946, the Port of Brindisi, Italy, was not blacked out and another American ship, the Steamship William Halstad, besides the Steamship William Moultrie was moored alongside the same dock, which was several ships’ length in extent. (Lloyd’s Register of Shipping states that the Steamship William Moultrie was 422 feet in length)
9. On May 7, 1946, after dark, libellant left the Steamship William Moultrie via the gangway, mounted to the walkway, and walked along it parallel to the railroad track until he reached a point about 100 feet beyond the bow of the Steamship William Moultrie, when he fell into an unguarded and unlighted hole which he did not see, and the presence of which he had been given no notice by the ship’s officers or crew. This hole was about feet square and 4% feet deep; it was a permanent part of the dock structurе. It contained shunting gear used in the operation of the railroad track. The foregoing conditions existed when the Steamship William Moultrie docked on the morning of May 6, 1946, and continued until the evening of May 7, 1946 when libellant was injured.
10. As a result of his accident on May 7, 1946, libellant sustained a contusion of the right knee and an aggravation of a preexisting arthritic condition.
11. Libellant received first-aid treatment aboard the vessel, at an English Army-Dispensary in Brindisi, Italy, and at Trieste, Italy.
12. Libellant was a patient at the United States Marine Hospitаl in Baltimore, Maryland from August 28, 1946-to September 5, 1946, and received out-patient treatment at the United States Public Health Service in Philadelphia, Pennsylvania during the period from June 18, 1946 to November 6, 1946.
13. As a result of the injuries sustained on May 7, 1946, libellant was disabled from performing his usual seafaring duties from the date of his discharge from the Steamship William Moultrie, on June
Discussion
The libel presents a claim both for maintenance and cure and for negligence. The maintenance and cure aspect of the case has been settled leaving only the question •of liability of the respondent for negligence. The libellant asserts that the respondent was negligent in that it failed to provide '.him with a reasonably safe place to perform his duties, failed to provide him with -a safe and proper passageway over the dock ■area, failed to provide adequate illumination along the route of access to and from the vessel, allowed an opening in the said passageway to be and remain open without adequate protection under the circum•stances, failed to provide him with a safe means of ingress to and egress from the vessel, failed to give him adequate warning •of unsafe and dangerous conditions prevailing along the route through the dock and finally failed to inspect all ways, means and equipment to determine the existence •of any unsafe and dangerous condition.
The facts as stipulated present a very ■interesting problem, whether a shipowner is under a duty to provide seamen safe ■means of passage from the ship to a public ■street, over dock area over which the shipowner has no control.
At the outset, it is necessary to ■distinguish between the obligation of a shipowner to furnish maintenance and cure and his liability for negligence. The first mentioned obligation is one which arises •out of the relationship of the shipowner and the seaman and may be characterized as liability without fault. In many respects it is analogous to modern workmen’s compensation statutes in that the liability is limited in amount but greatly expanded in scope in the sense that there is no necessity to show fault on the part of the employer so long as the employee is injured in the course of his employment. The analogy is not a perfect one, however, in that under workmen’s compensation statutes liability is limited to injuries sustained because of or 'while engaged in activities required by the employment, whereas, liability for maintenance and cure has been held to extend beyond the confines of the ship and to injuries incurred while not performing services for the ship. The result, therefore, has been to permit recovery for maintenance and cure while the seaman is off the ship on his own business on shore leave. Before the decision of the Supreme Court of the United States in Aguilar v. Standard Oil Company of New Jersey,
Libellant in this case seeks tо have imposed upon the shipowner liability for negligence co-extensive in scope with the duty to furnish maintenance and cure as defined in the Aguilar case supra. This
Another case is Marceau v. Great Lakes Transit Corporation, 2 Cir.,
Another case cited by the libellant is Walton v. Continental Steamship Co., D.C.,
In none of these cases is there any expression of a duty on the part of the shipowner to inspect the various routes through the dock area to the public streets and to give warning of any condition discovered through such inspection or to make them safe.
In the second category of cases are Monteiro v. Paco Tankers, Inc., D.C.,
Both the libellant and respondent have cited the case of Farrell v. United States, 2 Cir.,
Conclusions of Law
1. This Court has jurisdiction of the parties and of the subject matter.
2. The injuries sustained by the libellant on the dock at Brindisi were not caused by negligence of the respondent, United States of America.
3. The respondent is entitled to judgment in its favor.
