ORDER
This case is before the Court on Amoco 00 Company’s Motion for Partial Summary Judgment [36-1]. The Court DENIES the motion.
BACKGROUND
Plaintiff Paper Recycling, Inc. (“PRI”) owns and operates a paper recycling plant located on approximately 9 acres fronting the eastern right of way of Winters Chapel Road in Doraville, DeKalb County, Georgia. Defendant Amoco 00 Company (“Amoco”) owns and operates a bulk fuel terminal which is located near PRI’s property. According to Amoco, it first discovered a fuel leak in the petroleum pipeline along Winters Chapel Road somewhere around March 31, 1986. The exact location of the pipeline is unclear, with Amoco suggesting that it runs across PRI’s property and PRI maintaining that the pipe runs just to the west of its property.
On or about April 7,1986, R.D. Pickett, the manager of field distribution at the Amoco petroleum terminal, telephoned the assistant plant manager of PRI, Kenna Toomey, to request permission to clear an area to stack pipes to repair the diesel fuel leak. Amoco received permission to proceed with the repair work for the leak.
By April of 1986, the entire pipeline running on or adjacent to PRI’s property was replaced and no further leaks occurred. Around October 17, 1986, Kenna Toomey of PRI met with Ray Jarrett and R.D. Pickett of Amoco to discuss the placement of Amoco’s equipment on the property of PRI to run recovery tests and Mr. Toomey expressed no objection to the proposed plans. Kenna Toomey chose the types of monitoring wells to be used, the location of the pumping station and executed an easement for the placement of a power pole to provide electrical power to the pumping station.
Around March 9,1987, Toomey of PRI and Jarrett and Pickett of Amoco met with a geologist trained in environmental matters to discuss the specific location of recovery wells and recovery equipment that would be located on PRI’s property to extract the petroleum product leaked. Mr. Toomey agreed to all of the proposals for the placement of the recovery wells and equipment. The first recovery well became operational on or about April 21, 1987.
The United States Environmental Protection Agency was notified of the pipeline leak. Jarrett of Amoco testified that the EPA was on the site, and monitored the excavation, the steps taken to replace the pipeline, and “approved of everything before we went back on-line with product.” He further testified he was not aware of an administrative order issued by the EPA, or any formal proceeding by the EPA. Jarrett deposition, p. 37. The Environmental Protection Division of the State of Georgia issued a consent order on March 6,1987. The consent order concerned the underground product recovery well system which was to i*ecover the petroleum product leaked from the pipeline. The system would discharge treated, extracted ground water. The order, allowed Amoco to bypass the permit requirement under the Georgia Water Quality Control Act, O.C.G.A. § 12-5-30(a).
Amoco removed this case to federal court on December 12, 1991. PRI’s original complaint included claims for nuisance, trespass, strict liability, and negligence. In an Order dated April 10, 1992, the Court granted leave to amend the complaint. PRI added two counts to its complaint: fraud and breach of contract.
*674 In an Order date December 7, 1992, the Court granted summary judgment to Amoco on PRI’s negligence and strict liability claim. The Court granted in part and denied in part summary judgment on PRI’s nuisance and trespass claims. The Court denied summary judgment on PRI’s fraud claim. The Court also granted leave to amend the complaint to include a claim under the Resource Conservation and Recovery Act (“RCRA”), as amended, 42 U.S.C. § 6972(a)(1)(B).
Presently, Amoco moves for summary judgment on Plaintiffs RCRA claim.
DISCUSSION
A. Standard of Review for Summary Judgment Motion
This Court will grant summary judgment when “there is no genuine issue as to any material fact ... and the moving party is entitled to judgment as a matter of law.” Fed.R.CivP. 56(c). In cases such as this where the movant is the defendant, that party must demonstrate that the nonmoving party, the plaintiff, lacks evidence to support an essential element of her or his claim.
Celotex Corp. v. Catrett,
Only after the movant meets its initial burden does any obligation on the part of the nonmovant arise.
Id.; Adickes v. S.H. Kress & Co.,
All evidence and factual inferences should be viewed in the light most favorable to the nonmoving party.
Everett v. Napper,
B. Application
The citizen suit provision of the Resource Conservation and Recovery Act (“RCRA”), as amended, 42 U.S.C. § 6972(a)(1)(B), provides:
Except as provided in subsection (b) or (c) of this section, any person may commence a civil action on his own behalf—
(B) against any person, including any past or present generator, past or present transporter, or past or present owner or operator of a treatment, storage, or dispos *675 al facility, who has contributed or who is contributing to the past or present handling, storage, treatment, transportation, or disposal of any solid or hazardous waste which may represent an imminent and substantial endangerment to health or the environment. ...
(“citizen suit provision”). Defendant contends the citizen suit provision of RCRA does not apply to the case at hand, as the leakage of petroleum does not fall within the scope of the statute. Plaintiff argues the provision is applicable and cites to the case of
Zands v. Nelson,
The Court has considered the opinions carefully and concludes they provide persuasive authority for Plaintiff’s RCRA citizen suit against Defendant Amoco. The Court holds that leaking petroleum product constitutes “disposal” of “solid waste” which “may present an imminent and substantial endangerment to health or the environment” and which may form the basis for a claim under the citizen suit provision of RCRA. Defendant’s arguments to the contrary are without merit. Defendant has failed to cite to any cases which hold that leakage of petroleum cannot form the basis for a citizen suit under RCRA, nor is the Court aware of any such decisions.
Moreover, Defendant’s attempt to distinguish
Zands
and
Pantry
on the basis that it has already begun remediation and clean-up efforts is without merit. First, it is undisputed that although Amoco began clean-up efforts approximately six years ago, free product remains on Plaintiffs property. Defendant insists that only 5,000 gallons of free-product remain on PRI’s property. Defendant’s Reply Brief, p. 19; Schmidt Deposition, p. 38. Plaintiffs expert puts the number at 18,000 to 21,000 gallons. Lotfi Deposition, pp. 21-29. In addition, there is nothing before the Court to suggest that Defendant has attempted to remediate the dissolved product found in the groundwater. Instead, Defendant gives two explanations for this failure: (1) the state of Georgia does not require remediation of groundwater under these circumstances; and (2) Defendant’s remediation expert Gene Schmidt states that “there was no need to remove material that has dissolved in the groundwater, because it is below drinking water standards.” Schmidt deposition, p. 58. With respect to soil contamination, Defendant again points to state law and argues Georgia law does not require soil remediation efforts in this instance. Assuming the Court accepts these explanations as true for the purposes of this motion only, they still do not rule out the possibility that an imminent and substantial endangerment to health or the environment currently exists as a result of the petroleum leakage.
Cf. Fishel v. Westinghouse Elec. Corp.,
Defendant appears to be arguing that nothing could be gained by allowing the *676 RCRA claim to go forward (while at the same time admitting that it did not think RCRA applied, so it has not complied with the statute). On the contrary, much could possibly be gained — a cleaner and healthier environment, which was the purpose behind the enactment of RCRA.
It is true that a citizen suit may be barred under certain circumstances as provided in 42 U.S.C. § 6972(b)(2)(B) 3 and (C). 4 However, there is no evidence to suggest any of the circumstances are present in the case at hand.
In support of the argument that its remediation efforts bar the citizen suit, Amoco cites the case of
O’Leary v. Moyer’s Landfill, Inc.,
cient to meet the standards under the NCP or RCRA. Only then does the burden shift to Plaintiff. It is clear Defendant has failed to call the Court's attention to the specific requirements under RCRA and to offer evidence of compliance. Indeed, Defendant as much as admits that it has not complied with RCRA. However, even assuming that the so-called "substantial compliance” standard advanced by Defendant applied (instead of a total compliance standard), the Court is not convinced that Defendant has substantially complied with RCRA.
In sum, the Court has considered Defendant’s arguments .in favor of granting summary judgment on Plaintiffs claim under RCRA. The Court finds them without merit and DENIES the motion.
CONCLUSION
The Court DENIES the motion for partial summary judgment. Plaintiffs RCRA claim remains pending.
So ORDERED.
*677 ORDER
This case is before the Court on Defendant’s Motion for Reconsideration [42-1], and Defendant’s Motion to Amend Order [42-2], The Court: (1) GRANTS Defendant’s Motion for Reconsideration of the Court’s Order of August 23, 1993 [42-1], and AFFIRMS its earlier denial of Defendant’s Motion for Summary Judgment on the issue of liability under the Resource Conservation and Recovery Act; and (2) DENIES Defendant’s Motion to Amend [42-2],
BACKGROUND
Plaintiff Paper Recycling, Inc. (“PRI”) owns and operates a paper recycling plant located on approximately nine acres fronting the eastern right of way of Winters Chapel Road in Doraville, Dekalb County, Georgia. Defendant Amoco Oil Company (“Amoco”) owns and operates a bulk fuel terminal which is located near PRI’s property. According to Amoco, it first discovered a fuel leak in the petroleum pipeline along Winters Chapel Road somewhere in late March of 1986. The exact location of the pipeline is unclear, with Amoco suggesting that it runs just to the west of its property.
On April 7, 1986, R.D. Pickett, the manager of field distribution at the Amoco petroleum terminal, telephoned the assistant plant manager of PRI, Kenna Toomey, to request permission to clear an area to stack pipes to repair the diesel fuel leak. Amoco received permission to proceed with the repair work for the leak.
By April of 1986, the entire pipeline running on or adjacent to PRI’s property was replaced and no further leaks occurred. Around October 17, 1986, Kenna Toomey of PRI met with Ray Jarrett and R.D. Pickett of Amoco to discuss the placement of Amoco’s equipment on the property of PRI to run recovery tests. Toomey expressed no objection to the proposed plans. Toomey chose the types of monitoring wells to be used, the location of the pumping station and executed an easement for the placement of a power pole to provide electrical power to the pumping station.
Around March 9,1987, Toomey of PRI and Jarrett and Pickett of Amoco met with a geologist trained in environmental matters to discuss the specific location of recovery wells and recovery equipment that would be located on PRI’s property to extract the petroleum product leaked. Mr. Toomey agreed to all of the proposals for the placement of the recovery wells and equipment. The first recovery well became operational on April 21, 1987.
The United States Environmental Protection Agency was notified of the pipeline leak. Jarrett of Amoco testified that the EPA was on the site, and monitored the excavation, the steps taken to replace the pipeline, and “approved of everything before we went back on-line with product.” He further testified that he was not aware of an administrative order issued by the EPA, or any formal proceeding by the EPA. Jarrett depo., p. 37.
The Environmental Protection Division of the State of Georgia issued a consent order on March 6, 1987. The consent order concerned the underground product recovery well system which was to recover the petroleum product leaked from the pipeline. The system would discharge treated, extracted ground water. The order allowed Amoco to bypass the permit requirement under the Georgia Water Quality Control Act, O.C.G.A. § 12-5-30(a).
PRI brought a complaint for nuisance, trespass, strict liability and negligence in the Superior Court of Fulton County. Amoco removed this ease to federal court on December 12, 1991. In an Order dated April 10, 1992, the Court granted leave to amend the complaint. PRI added two counts to its complaint: fraud and breach of contract.
In its Order of December 7, 1992, the Court granted summary judgment to Amoco on PRI’s negligence and strict liability claim. The Court granted in part and denied in part summary judgment on PRI’s nuisance and trespass claims. The Court denied summary judgment on PRI’s fraud claim. The Court also granted leave to amend the complaint to include a claim under the Resource Conservation and Recovery Act (“RCRA”), as amended, 42 U.S.C. § 6972(a)(1)(B).
*678 In its Order of August 23, 1993, the Court denied Defendant’s Motion for partial summary judgment on Plaintiffs claim under RCRA. In the Order the Court found that leaking petroleum product constitutes “disposal” of “solid waste” which “may present an imminent and substantial endangerment to health or the environment” and which may form the basis for a claim under the citizen suit provision of RCRA. Presently, Amoco moves the Court for reconsideration or amendment of the August 1993 Order.
DISCUSSION
I. Motion for Reconsideration
A motion for reconsideration should be filed only when, after careful consideration, it is deemed “absolutely necessary” by the movant. Local Rule 220-6. Such a motion may not be employed as a vehicle to tender new legal theories or to introduce new evidence that could have been presented in conjunction with the previously filed motion or response. Rather, a motion for reconsideration serves that limited purpose of correcting manifest errors of law or fact, or in certain circumstances, calling newly discovered evidence to the Court’s attention. Thus, the court is most willing to reconsider a prior ruling on an issue in the face of new Eleventh Circuit or Supreme Court authority. Additionally, the Court is willing to correct a legal or factual error where made despite a clear presentation of the issue by the party seeking reconsideration. Finally, the Court will consider a legal theory not previously presented upon a showing that the theory was unavailable to the movant at the time of the original filing. Defendant moved the Court to Reconsider its August 23, 1993 Order.
II. Defendant’s Motion for Reconsideration
Defendant brings this Motion for Reconsideration on the theory that the Court erred in holding that the Resource Conservation and Recovery Act (“RCRA”), 42 U.S.C. § 6901, et seq., applied to the case at bar. After careful reconsideration of the arguments, the Court upholds its original findings.
The objectives of Congress in promulgating RCRA are to regulate “the treatment, storage, transportation, and disposal or hazardous wastes which have adverse effects on health and the environment.” 42 U.S.C. § 6902(4) (emphasis added). In order for the Court to determine that RCRA applies to the case at bar, the Court must conclude that leaked petroleum
may be
hazardous waste. As stated earlier, the Court has already concluded that leaked petroleum product is a “solid waste” which
“may
present an imminent and substantial endangerment to health or the environment.” Order of the Court, August 23, 1993. Like the district court in
Zands v. Nelson,
An imminent and substantial endangerment to health or the environment requires only a showing that risk of threatened harm is present; it does not require a showing that actual harm will occur immediately.
Dague v. City of Burlington,
Defendant argues that it is unfair to hold the application of RCRA to contamination which initially occurred in 1986. RCRA explicitly applies to “past or present actions that contributed to or are contributing to the disposal of any solid waste which may present an imminent and substantial endangerment to health or the environment.” 42 U.S.C. § 6972(a)(1)(B). Questions persist concerning Amoeo’s investigation of the remaining contamination and remedial measures. Because the statute itself directs a citizen to past as well as present contamination, and because Defendant has consistently *679 misjudged the amount of time needed to rectify the situation, the Court finds that it would not be unfair or inequitable to recognize Defendant’s actions as subject to RCRA. Accordingly, the Court GRANTS Defendant’s Motion for Reconsideration, and AFFIRMS its earlier denial of Defendant’s Motion for Summary Judgment on the issue of liability under the Resource Conservation and Recovery Act.
III. Defendant’s Motion to Amend
An order denying a motion for summary judgment is interlocutory and unappealable.
Madry v. Sorel,
Defendant has failed to show that a reversal of the Court’s order on the applicability of RCRA would materially advance the ultimate termination of the litigation. Discovery is completed, and Plaintiff presently has pending against Defendant other counts which would be unaffected by the dismissal of the RCRA count. Thus, even if PRI’s RCRA claims against Amoco were dismissed, Plaintiffs other counts against Amoco would proceed to trial and would require much the same proof and about the same amount of time to present such proof. Accordingly, the Court DENIES Defendant’s Motion to Amend.
CONCLUSION
The Court: (1) GRANTS Defendant’s Motion for Reconsideration of the Court’s Order of August 23,1993 [42-1], and AFFIRMS its earlier denial of Defendant’s Motion for Summary Judgment on the issue of liability under the Resource Conservation and Recovery Act; and (2) DENIES Defendant’s Motion to Amend [42-2],
So ORDERED.
Notes
. In contrast, where the movant is the plaintiff, that party must demonstrate the absence of an issue of material fact with regard to every element essential to his or her claim. See Id.
. Defendant argues Plaintiff has not met its burden on summary judgment because it failed "to produce any evidence to indicate that [Amoco’s] remedial efforts were insufficient to meet the standards under the NCP or RCRA.” Reply Brief, p. 14. Defendant seems to have forgotten who bears the initial burden on summary judgment. It is Defendant's burden to come forward with evidence which points to an absence of material fact as to whether its efforts were suffi-
. 42 U.S.C. § 6972(b)(2)(B) provides:
No action may be commenced under subsection (a)(1)(B) of this section if the Administrator, in order to restrain or abate acts or conditions which may have contributed or are contributing to the activities which may present the alleged endangerment—
(i) has commenced and is diligently prosecuting an action under section 6973 of this title or under section 106 of the Comprehensive Environmental Response, Compensation and Liability Act of 1980 [42 U.S.C. 9606];
(ii) is actually engaging in a removal action under section 104 of the Comprehensive Environmental Response, Compensation and Liability act of 1980 [42 U.S.C.A. § 9604];
(iii) has incurred costs to initiate a Remedial Investigation and Feasibility Study under section 104 of the Comprehensive Environmental Response, Compensation and Liability Act of 1980 [42 U.S.C.A. § 9604] and is diligently proceeding with a remedial action under that Act [42 U.S.C. § 9601 et seq.]; or
(iv) has obtained a court order (including a consent decree) or issued an administrative order under section 106 of Comprehensive Environmental Response, Compensation and Liability Act of 1980 [42 U.S.C.A. § 9606] or section 6973 of this title pursuant to which a responsible party is diligently conducting a removal action, Remedial Investigation and Feasibility Study (RIFS), or proceeding with a remedial action.
In the case of an administrative order referred to in clause (iv), actions under subsection (a)(1)(B) of this section are prohibited only as to the scope and duration of the administrative order referred to in clause (iv).
. 42 U.S.C. § 6972(b)(2)(C) provides:
No action may be commenced under subsection (a)(1)(B) of this section if the State, in order to restrain or abate acts or conditions which may have contributed or are contributing to the activities which may present the alleged endangerment—
(i) has commenced and is diligently prosecuting an action under subsection (a)(1)(B) of this section;
(ii) is actually engaging in a removal action under section 104 of the Comprehensive Environmental Response, Compensation and Liability Act of 1980 [42 U.S.C.A. § 9604]; or
(iii) has incurred costs to initiate a Remedial Investigation and Feasibility Study under section 104 of the Comprehensive Environmental Response, Compensation and Liability Act of 1980 [42 U.S.C.A. § 9604] and is diligently proceeding with a remedial action under that Act [42 U.S.C.A. § 9601 et seq.].