Case Information
*1 Filed 7/2/18
CERTIFIED FOR PUBLICATION IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA THIRD APPELLATE DISTRICT
(Sacramento)
---- PACIFIC GAS AND ELECTRIC COMPANY et al., C085308 Petitioners, (Super. Ct. No. JCCP4853) v.
THE SUPERIOR COURT OF SACRAMENTO
COUNTY,
Respondent;
RICHARD ABI-HABIB et al.,
Real Parties in Interest. ORIGINAL PROCEEDING in mandate. Petition Granted. Allen H. Sumner, Judge.
Quinn, Emanuel, Urquhart & Sullivan, Kathleen M. Sullivan, Robert Feldman and Daniel H. Bromberg for Petitioners.
No appearance for Respondent.
Dreyer, Babich, Buccola, Wood, Campora, Steven M. Campora, Robert A. Buccola, Catia G. Saravia; Corey, Luzaich, de Ghetaldi, Nastari & Riddle, Dario de *2 Ghetaldi, Amanda L. Riddle; Cotchett, Pitre & McCarthy and Frank M. Pitre for Real Parties in Interest.
This coordinated proceeding arises out of the Butte Fire, a devastating wildfire that swept through Calaveras and Amador counties in September 2015. The fire started when a tree came into contact with an overhead power line owned and operated by petitioners Pacific Gas and Electric Company and PG&E Corporation (together, PG&E or the company). Real parties in interest (plaintiffs) brought suit against PG&E, seeking punitive damages under Public Utilities Code section 2106 and Civil Code section 3294. 1 PG&E sought summary adjudication of plaintiffs’ request for punitive damages under section 3294 only. The trial court denied the motion.
PG&E seeks writ relief from the trial court’s order. We conclude there are no triable issues of fact which, if resolved in plaintiffs’ favor, could subject PG&E to punitive damages under section 3294. 2 Accordingly, we grant the petition.
I. BACKGROUND
A. The Butte Fire
The Butte Fire started on September 9, 2015, near Butte Mountain Road in Jackson, California. 3 The fire spread rapidly through drought-stricken Amador and Calaveras counties. By the time the blaze was contained some three weeks later, the fire had consumed more than 70,868 acres, damaging hundreds of structures and claiming two lives. It is undisputed that the fire started when a gray pine (the subject tree) came into contact with one of PG&E’s power lines.
1 Undesignated statutory references are to the Civil Code.
2 We express no opinion as to PG&E’s potential liability for punitive damages under Public Utilities Code section 2106.
3 The Butte Fire was named for its point of origin near Butte Mountain Road. *3 B. The Litigation
More than 2,050 plaintiffs brought suit against PG&E and others. Plaintiffs’ complaints were consolidated in a Judicial Council Coordinated Proceeding in Sacramento Superior Court. A master complaint was filed on behalf of plaintiffs (many of whom have been named as real parties in interest) who suffered personal injuries and losses to real and personal property as a result of the fire. The master complaint names PG&E, ACRT, Inc. (ACRT) and Trees, Inc. as defendants. According to the master complaint, ACRT and Trees, Inc. (together, contractors) provided vegetation management services to PG&E as independent contractors.
The master complaint alleges that PG&E and the contractors failed to properly maintain the power line and adjacent vegetation. According to the master complaint, the events leading to the Butte Fire were set into motion when two trees were removed from a stand near the power line, leaving the subject tree exposed and unsupported. The master complaint alleges that the removal of the two trees left the subject tree open and leaning to the south, towards the path of the sun and the nearby power line. The subject tree is alleged to have been approximately 44 feet tall and seven inches in diameter. Under the circumstances, the master complaint avers, it was foreseeable that the subject tree would fail and come into contact with the power line, producing sparks that could— and tragically, did—ignite a wildfire.
The master complaint asserts causes of action against PG&E for negligence, wrongful death and survival, inverse condemnation, public nuisance, private nuisance, premises liability, trespass, violation of Public Utilities Code section 2106 and violation of Health and Safety Code section 13007. The master complaint seeks punitive damages from PG&E under Public Utilities Code section 2106 and section 3294.
C. The Motion for Summary Adjudication
PG&E moved for summary adjudication of the request for punitive damages under section 3924, arguing that plaintiffs could not raise a triable issue of material fact to *4 support the request under any theory. In support of the motion, PG&E presented evidence that contractors’ employees visited the area near the subject tree several times over the course of the year preceding the fire, but did not identify the subject tree as a danger or report any compliance issue to PG&E. PG&E also presented evidence that the company has expended substantial resources to establish vegetation management programs intended to prevent or minimize the risk of wildfire. According to PG&E, the existence of such programs affirmatively disproves any inference that PG&E acted with conscious disregard for the safety of others, thereby negating a necessary element of plaintiffs’ claim for punitive damages.
Plaintiffs opposed the motion, arguing that contractors’ employees are unqualified and improperly trained, and PG&E’s vegetation management programs are superficial and ineffective. According to plaintiffs, these programs are little more than window dressing, designed to create the appearance of an effective risk management program and attention to public safety. In support of their opposition, plaintiffs submitted evidence that PG&E’s risk and compliance committee merely assumed that the company’s risk mitigation measures were functioning as intended, but failed to take steps to ensure that this was the case. Plaintiffs also submitted evidence that PG&E failed to ensure that contractors’ employees were qualified and properly trained to identify vulnerable trees, such as the subject tree. According to plaintiffs, the evidence established that “the Butte Fire was the result of PG&E’s years of continued, conscious disregard for ensuring the proper functioning of risk management controls that [PG&E] knew were essential to safeguard the public and their property from the risk of wildfire.”
In anticipation of the hearing, the trial court issued a lengthy tentative ruling granting the motion for summary adjudication. The tentative ruling found that, “in most instances, plaintiffs fail to contend much less offer evidence supporting, any connection between the alleged failings in PG&E’s [vegetation management] programs and the Butte Fire.” The tentative ruling further found that, “much of the evidence plaintiffs cite as *5 failings in PG&E’s management of its power lines does not support a finding that PG&E acted with ‘malice’—that it was aware of the dangerous consequences of its conduct and deliberately failed to avoid those consequences.” Accordingly, the trial court tentatively found that plaintiffs’ evidence was insufficient as a matter of law to raise a triable issue of fact as to their entitlement to punitive damages.
At the hearing on the motion for summary adjudication, plaintiffs argued for the
first time that punitive damages are appropriate because (1) PG&E has a nondelegable
duty to operate its power lines safely, (2) PG&E sought to delegate responsibility for this
duty to independent contractors, and (3) PG&E failed to ensure that contractors hired
employees who were qualified and properly trained, such that (4) PG&E’s conduct
demonstrates conscious disregard of the safety of others, whether or not PG&E was
aware of its contractors’ alleged deficiencies. Relying on
Romo v. Ford Motor Co.
(2002)
After the hearing, the trial court invited the parties to submit supplemental briefs addressing plaintiffs’ newly articulated theory. Following further briefing, the trial court changed its tentative ruling and denied the motion for summary adjudication. The trial court explained, “PG&E was aware of the risk and the need for those inspecting or removing trees to be qualified. Its contracts required ACRT and Trees[, Inc.] to use qualified personnel. Plaintiffs offer evidence the inspectors were in fact not qualified, and this resulted in their failure to identify the danger posed by the Subject Tree. Plaintiffs, however, offer no evidence PG&E was on notice of this.” The trial court asked, “Does the fact PG&E deferred to its contractors to assure their employees were qualified amount to clear and convincing proof (1) PG&E was aware of the probable *6 dangerous consequences of its conduct, and (2) deliberately failed to avoid those consequences?” The trial court concluded, “The court is not prepared to hold no reasonable jury could so find.” Accordingly, the trial court denied PG&E’s motion for summary adjudication.
D. The Petition for Writ of Mandate
PG&E filed a petition for writ of mandate, prohibition, or other relief, challenging the trial court’s denial of summary adjudication as to the request for punitive damages. We reviewed PG&E’s petition and supporting papers and issued an order to show cause. 4
II. DISCUSSION
PG&E contends the trial court erred in denying the motion for summary adjudication of plaintiffs’ request for punitive damages under section 3294. We agree.
A. Standard of Review
“An order denying a motion for summary adjudication may be reviewed by way of a petition for writ of mandate. [Citation.] Where the trial court’s denial of a motion for summary judgment will result in trial on non-actionable claims, a writ of mandate will issue. [Citations.] Likewise, a writ of mandate may issue to prevent trial of nonactionable claims after the erroneous denial of a motion for summary adjudication. [¶] Since a motion for summary judgment or summary adjudication ‘involves pure matters of law,’ we review a ruling on the motion de novo to determine whether the moving and opposing papers show a triable issue of material fact. [Citations.] Thus, the appellate court need not defer to the trial court’s decision. ‘ “We are not bound by the 4 PG&E also filed a “motion for stay of trial, calendar preference, and expedited hearing date” with this court. PG&E subsequently filed an unopposed motion to withdraw the portion of the earlier motion seeking a stay of the trial. PG&E’s unopposed motion to withdraw is granted. PG&E’s motion for calendar preference and expedited hearing are granted.
trial court’s stated reasons, if any, supporting its ruling; we review the ruling, not its rationale.” ’ [Citations.]” ( Travelers Casualty & Surety Co. v. Superior Court (1998) 63 Cal.App.4th 1440, 1450, fn. omitted.)
“A summary adjudication motion is subject to the same rules and procedures as a
summary judgment motion. Both are reviewed de novo.” (
Lunardi v. Great-West Life
Assurance Co.
(1995)
A defendant “moving for summary judgment bears the burden of persuasion that
there is no triable issue of material fact and that [the defendant] is entitled to judgment as
a matter of law.” (
Aguilar v. Atlantic Richfield Co.
(2001)
(
Fisherman’s Wharf Bay Cruise Corp. v. Superior Court
(2003)
B. Standard of Proof
Punitive damages may be recovered under section 3294 “where it is proven by clear and convincing evidence that the defendant has been guilty of oppression, fraud, or malice.” (§ 3294, subd. (a), italics added.) In reviewing a summary judgment or summary adjudication ruling on a claim for punitive damages, we view the evidence presented through the prism of the substantive clear and convincing evidentiary burden. ( American Airlines, Inc. v. Sheppard, Mullin, Richter & Hampton (2002) 96 Cal.App.4th 1017, 1048 ( American Airlines ); see also Basich v. Allstate Ins. Co. (2001) 87 Cal.App.4th 1112, 1121 [“on a motion for summary adjudication with respect to a punitive damages claim, the higher evidentiary standard applies. If the plaintiff is going to prevail on a punitive damages claim, he or she can only do so by establishing malice, oppression or fraud by clear and convincing evidence”]. )
Under the clear and convincing standard, the evidence must be “ ‘ “ ‘so clear as to
leave no substantial doubt’ ” ’ ” and “ ‘ “ ‘sufficiently strong to command the
unhesitating assent of every reasonable mind.’ ” ’ ” (
Shade Foods, Inc. v. Innovative
Products Sales & Marketing, Inc.
(2000)
C. Section 3294
As noted, section 3294 permits an award of punitive damages “where it is proven by clear and convincing evidence that the defendant has been guilty of oppression, fraud, or malice.” (§ 3294, subd. (a).) Plaintiffs contend PG&E acted with malice.
Malice is defined by section 3294, subdivision (c)(1) as “conduct which is intended by the defendant to cause injury to the plaintiff or despicable conduct which is carried on by the defendant with a willful and conscious disregard of the rights or safety of others.” “Despicable conduct” is conduct that is “ ‘so vile, base, contemptible, miserable, wretched or loathsome that it would be looked down upon and despised by most ordinary decent people.’ ” ( Mock v. Michigan Millers Mutual Ins. Co. (1992) 4 Cal.App.4th 306, 330.) Such conduct has been described as having the character of outrage frequently associated with crime. ( Tomaselli v. Transamerica Ins. Co. (1994) 25 Cal.App.4th 1269, 1287.) “Conscious disregard” means “ ‘that the defendant was aware of the probable dangerous consequences of his conduct, and that he willfully and deliberately failed to avoid those consequences.’ ” ( Hoch v. Allied-Signal, Inc. (1994) 24 Cal.App.4th 48, 61.) Put another way, the defendant must “have actual knowledge of the risk of harm it is creating and, in the face of that knowledge, fail to take steps it knows will reduce or eliminate the risk of harm.” ( Ehrhardt v. Brunsick, Inc. (1986) 186 Cal.App.3d 734, 742.)
Section 3294’s malice requirement has evolved over time. As another panel of
this court explained in
Lackner v. North
(2006)
Our Supreme Court addressed the then existing malice requirement in
Taylor v.
Superior Court
(1979)
The Legislature amended section 3294 in 1980. (
Lackner, supra,
135 Cal.App.4th
at p. 1211; Stats. 1980, ch. 1242, § 1, pp. 4217-4218.) Among other things, the
Legislature added subdivision (b), which “limited the circumstances under which an
employer could be held liable for punitive damages ‘based upon acts of an employee.’ ”
(
College Hospital Inc. v. Superior Court
(1994)
The Legislature revisited section 3294 in 1987. (
College Hospital, supra,
8
Cal.4th at p. 713; Stats. 1987, ch. 1498, §§ 1-7, pp. 5777-5782.) As relevant here, the
Legislature increased the plaintiffs’ burden of proving punitive damages to “clear and
convincing evidence.” (
College Hospital, supra,
at p. 713.) As previously discussed, the
statute now “ ‘requires a finding of high probability . . . “ ‘so clear as to leave no
substantial doubt,’ [and] ‘sufficiently strong to command the unhesitating assent of every
reasonable mind.’ ” ’ ” (
Lackner, supra,
Our Supreme Court considered the effect of the 1987 amendments in
College
Hospital,
noting: “By adding the word ‘willful’ to the ‘conscious-disregard’ prong of
malice, the Legislature has arguably conformed the literal words of the statute to existing
case law formulations. (See [
Taylor
]
, supra,
“Because punitive damages are imposed ‘for the sake of example and by way of punishing the defendant’ (§ 3294, subd. (a)), they are typically awarded for intentional torts such as assault and battery, false imprisonment, intentional infliction of emotional *12 distress, defamation, nuisance intentionally maintained, fraud, trespass, conversion, civil rights violations, insurer’s breach of covenant of good faith, wrongful termination and job discrimination, and products liability cases.” ( Lackner, supra, 135 Cal.App.4th at p. 1212.) By contrast, “cases involving unintentional torts are far fewer and the courts have had to consider various factors in determining whether the defendant’s conduct was despicable. Thus, punitive damage awards have been reversed where the defendant’s conduct was merely in bad faith and overzealous [citations], or the defendant took action to protect or minimize the injury to the plaintiff.” ( Ibid. ) We have found no case considering an award of punitive damages in circumstances similar to those presented here.
D. Analysis
In reviewing a summary adjudication, “we apply the same three-step analysis
required of the trial court: We first identify the issues framed by the pleadings, since it is
these allegations to which the motion must respond. Secondly, we determine whether the
moving party has established facts which negate the opponents’ claim and justify a
judgment in the movant’s favor. Finally, if the summary judgment motion prima facie
justifies a judgment, we determine whether the opposition demonstrates the existence of a
triable, material factual issue.” (
Torres v. Reardon
(1992)
1. The Master Complaint
The master complaint alleges that PG&E contracted with contractors to provide vegetation management services in Amador and Calaveras counties. According to the master complaint, “Those services include, but are not limited to, assessing, monitoring, inspecting, trimming, cutting, maintaining, managing, and/or replacing vegetation surrounding and in close proximity to the lines and facilities operated by PG&E to [e]nsure that those power lines operate safely and consistently with State and Federal regulations.” The master complaint describes ACRT as “an Ohio corporation doing business all over the United States as a utility vegetation management consulting and *13 training company.” The master complaint describes Trees, Inc. as “a Delaware corporation doing business all over the United States as a utility vegetation management company.”
The master complaint alleges that “defendants” inspected a stand of gray pines near the power line in October 2014. Two trees from the exterior of the stand were targeted for removal. The two trees were removed in January 2015, leaving the subject tree exposed and leaning towards the power line. According to the master complaint, “It is commonly known that when a stand is altered and interior trees previously captured are then exposed to open spaces, they are prone to failure. It is also well understood that trees have a physical orientation toward the path of the sun and this can have significant consequences for maintaining safety.” Within less than a year, the subject tree made contact with the power line and ignited the Butte Fire.
The master complaint alleges that “defendants” failed “to properly train and to supervise employees and agents responsible for maintenance and inspection of the distribution lines and/or vegetation areas near those lines.” The master complaint further alleges that PG&E has a pattern and practice of disregarding public safety, as demonstrated by other fires attributed to PG&E’s power lines, various regulatory actions against PG&E by the California Public Utilities Commission, and the rupture of a PG&E gas line in San Bruno in September 2010. According to the master complaint, “The deaths, injuries, and damage occasioned by the Butte Fire are the result of the ongoing policies, practices, and/or financial decisions made by [PG&E] [which has] acted with a conscious disregard for public safety, and created a corporate culture that places a priority for profits above safety in their business operations.”
The master complaint seeks punitive damages from PG&E on the grounds that it “acted willfully, wantonly, with . . . malice, and/or with a knowing, conscious disregard for the rights and or safety of others.” The master complaint avers that punitive damages *14 are appropriate “for the sake of example” and seeks an award “sufficient to punish . . . PG&E . . . for [its] despicable conduct.”
2. PG&E’s Showing
In seeking summary adjudication, PG&E submitted evidence that the company devotes significant resources to vegetation management programs, which are intended to minimize the risk of wildfire. According to PG&E, the company spends more than $190 million per year on vegetation management operations, which target a roughly 70,000 square mile service area, with nearly 135,000 miles of overhead power lines.
PG&E’s vegetation management operations encompass a variety of programs and initiatives, including routine annual patrols, quality assurance and quality control programs, a vegetation management improvement initiative, a vegetation management catastrophic event memorandum account (CEMA) program, and a public safety and reliability program. We discuss the routine annual patrol program momentarily, in the context of PG&E’s fire mitigation activities in the area near the subject tree. (See Section II.D.2.b, infra. ) We briefly describe PG&E’s other vegetation management programs below.
a. Vegetation Management Programs PG&E established the quality assurance department in 2000. The quality assurance department conducts twice yearly audits to determine whether the company’s vegetation management programs are functioning as intended. As relevant here, the audits sample areas along the power lines to ensure that trees comply with applicable regulations and PG&E’s internal standards.
PG&E established a separate quality control program in 2002. The quality control program evaluates PG&E’s contractors for compliance with applicable regulations and PG&E’s internal standards.
PG&E implemented the vegetation management improvement initiative in 2006. The vegetation management improvement initiative offers independent contractors *15 incentives to work more efficiently, for example, by encouraging them to remove trees that would otherwise require continuous annual maintenance.
PG&E established the public safety and reliability program as part of the vegetation management improvement initiative. The public safety and reliability program was created to identify trees with the highest risk of failure in order to prevent them from coming into contact with power lines. As part of the public safety and reliability program, the company maintains a tree failure database which identifies trees with the highest potential to fail and locations where such failure-prone trees are most likely to come into contact with power lines.
PG&E established the CEMA program in 2014 in response to a state of emergency due to severe drought conditions. The CEMA program encompasses several initiatives intended to mitigate the risk of fire from drought affected trees. As part of the CEMA program, the company conducts aerial patrols in selected areas during fire season, searching for trees showing signs of defect, decay or decline. If such trees are found, ground patrols are dispatched to the area to inspect the trees and mitigate any issues.
As part of the CEMA program, the company uses another independent contractor, Quantum Spatial, to collect data using Light Detection and Ranging (LiDAR) and hyperspectral imaging. Quantum Spatial analyzes and interprets the data, which can be used to assess the relative health of a tree. If Quantum Spatial determines that a tree tall enough to strike the power lines is dead, dying or non-compliant, this information is passed along to an independent inspection company, such as ACRT, which is then required to visit the tree and mitigate the issue.
b. Routine Annual Patrols: ACRT and Trees, Inc. PG&E estimates that approximately 55 million trees have the potential to come into contact with its power lines. As noted, PG&E addresses this risk, in part, by *16 conducting routine annual patrols of all such trees. 5 PG&E contracts with inspection companies to assess potentially non-compliant trees and prescribe any work that needs to be done, such as trimming or removal. PG&E contracts with tree-trimming companies to perform the work prescribed by the inspectors. As noted, ACRT was PG&E’s inspection company in Amador County, where the fire originated, and Trees, Inc. was PG&E’s tree- trimming company.
PG&E’s contract with ACRT provides that, “Contractor shall diligently perform all [w]ork in a proper and professional manner in accordance with the requirements of all applicable federal, state, and/or local laws, rules, ordinances, and regulations, in accordance with the approved principles of modern Arboriculture, and to the satisfaction of PG&E.” PG&E’s contract with Trees, Inc. similarly provides that, “Contractor shall diligently perform all [w]ork in a proper, appropriate and professional manner, in accordance with [a]ll [a]pplicable [r]equirements [defined to include applicable law, industry standards, and PG&E’s vegetation management standards] and approved principles of modern Arboriculture.”
PG&E’s contracts also require that contractors hire personnel with specified qualifications, depending on their duties. For example, a consulting utility forester with ACRT is required to have “at least two years’ experience in line clearance tree pruning work or equivalent experience as determined by the PG&E Representative.” An associate’s degree in forestry, arboriculture, or a related field is desired, but not required. PG&E’s contracts also require that ACRT and Trees, Inc. train their employees on vegetation management programs and practices.
5 As we shall discuss, the routine patrol cycle was extended to fifteen months in 2013. (See Section II.D.3.a, infra. )
c. Vegetation Management Activities in the Area Near the Subject Tree Joy Mellera was a consulting utility forester with ACRT. Mellera conducted a routine patrol of the area near the subject tree on October 17, 2014. She recommended that two trees be removed, recording her recommendations on an electronic work request. Trees, Inc. removed the two trees on January 6, 2015, recording the activity on another electronic form. Both forms were transmitted to PG&E. Neither form indicates that the subject tree presented any danger or had the potential to grow or fall into the power line before the next annual patrol. 6
Contractors performed an additional inspection and other work in the area near the subject tree in April and July 2015. Contractors generated electronic forms documenting these efforts, some of which were considered by the trial court in ruling on the motion. None of the forms contain any indication that the subject tree presented a danger.
PG&E also presented evidence that Quantum Spatial collected hyperspectral imaging and LiDAR data in the area near the gray pine during the summer of 2015. Although the data was not delivered to PG&E until after the Butte Fire, the subject tree was not identified by Quantum Spatial as dead, dying, or non-compliant.
3. Plaintiffs’ Showing
In opposing summary adjudication, plaintiffs submitted evidence that PG&E views wildfire as the single greatest threat to the company’s business, and the gray pine as the species of tree posing the greatest risk of wildfire. According to plaintiffs, PG&E demonstrated conscious disregard for the rights and safety of others by failing to ensure 6 Plaintiffs’ objected to the trial court’s consideration of the forms, arguing they were inadmissible hearsay. The trial court overruled some of plaintiffs’ objections and sustained others. The trial court considered the form deemed inadmissible as hearsay for the limited purpose of determining whether the form gave notice to PG&E that the subject tree posed a danger. As we shall discuss, plaintiffs fail to show that the trial court abused its discretion in ruling on any evidentiary objection. (See Section II.D.5, infra. ) *18 the proper functioning of risk management controls and fire mitigation measures designed to protect the public from the known risk of wildfire.
Plaintiffs submitted evidence that PG&E’s risk management controls were flawed in numerous respects. Among other things, plaintiffs argued that PG&E’s risk and compliance committee was ineffective, its quality assurance and quality control audits unreliable, and its instructions to contractors inconsistent with the goal of mitigating fire risk. Plaintiffs also submitted evidence that PG&E made no changes to its risk management controls and fire mitigation measures as a result of the Butte Fire. Of greatest significance, plaintiffs submitted evidence that PG&E failed to ensure that ACRT’s employees were properly trained. We discuss the evidence that PG&E failed to train or ensure the training of ACRT’s employees momentarily (see Section II.D.3.b, infra ), pausing first to consider plaintiffs’ other challenges to PG&E’s risk management controls and fire mitigation measures.
a. Flawed Risk Management Controls and Fire Mitigation Measures In opposing summary adjudication, plaintiffs submitted evidence that PG&E’s risk and compliance committee did not directly verify that company’s fire mitigation measures were functioning as intended. Instead, the committee expected that each of the departments responsible for implementing the measures would evaluate their efficacy and report to the committee. According to plaintiffs, the committee’s bureaucratic structure, which delegates responsibility for managing wildfire risk to individual departments within PG&E, demonstrates conscious disregard for the rights and safety of others, stemming “from the highest levels of PG&E.”
Plaintiffs also submitted evidence that PG&E extended the routine patrol cycle to fifteen months in 2013, resulting in more non-compliant and hazardous trees in the area near the subject tree. However, it was undisputed that PG&E returned to an annual patrol cycle in 2014, and inspected the gray pine in October 2014.
Plaintiffs also submitted evidence that PG&E instructed ACRT to hire people lacking the minimum education and experience specified in its contract. 7 However, the undisputed evidence established that these people were seasonal CEMA inspectors, whose primary responsibility was to search for drought-affected trees. There was no showing that the subject tree was a drought-affected tree.
Plaintiffs also submitted expert opinion evidence that the audits performed by the quality assurance department and quality control program were scientifically unreliable. According to plaintiffs’ expert, PG&E “confused the sampling units between their design and implementation,” “used an incorrect formula for sample size planning,” and “failed to calculate the actual margin of error of their estimates after samples were selected, only reporting estimated percentages.” Additionally, the expert opined, “PG&E failed to exploit key information about the location of risk from year to year in improving their sampling methods” and “ignored estimation of the total number of trees in a district that posed fire risks due to (potential) facility contact thereby creating a false sense of whether the level of tree/line potential contact was acceptable.” There was, however, no showing that PG&E’s audit methodology contributed to the Butte Fire.
Plaintiffs also argued that PG&E’s vegetation management improvement initiative created perverse incentives for contractors to refrain from identifying or working on 7 In response, PG&E explained that PG&E and ACRT decided to recruit CEMA inspectors from a larger applicant pool when ACRT was unable to find inspectors meeting the criteria specified in the contract.
8 PG&E responds that the initiative sought to reduce the routine patrol workload by working selected trees more efficiently, not by refraining from doing the work at all. For example, a tree that might otherwise require annual or bi-annual pruning could be removed, thereby eliminating the need to work the same tree year after year. Alternatively, contractors could clear a larger distance between trees and power lines, thereby reducing the need for future work.
potentially hazardous trees. 8 However, there was no showing that the vegetation management initiative contributed to the Butte Fire.
Plaintiffs also argued that PG&E’s use of LiDAR to search for dead, dying or non- compliant trees was ineffective because the company did not receive Quantum Spatial’s analysis of the data until after the fire season was over. However, there was no showing that the subject tree was identified as dead, dying or non-compliant.
b. Failure to Train or Ensure Training In opposing the motion for summary adjudication, plaintiffs argued that PG&E understood that properly trained personnel were essential to controlling the risk of wildfire, but demonstrated conscious disregard for the rights and safety of others by failing to confirm that contractors “trained their own employees on the risks presented by the gray pine, specifically in the foothills.” (Emphasis omitted.) Specifically, plaintiffs submitted evidence that PG&E does not train contractors on managing vegetation near power lines, and does not ensure that contractors provide appropriate training to their employees.
Plaintiffs also submitted evidence that Mellera was not trained to recognize the danger posed by the subject tree. Of greatest significance, Mellera was not trained to identify trees that might become unstable due to the ratio between height and diameter, and was not trained to evaluate whether removing trees from the edge of a stand would be likely to affect interior, adjacent trees. According to plaintiffs’ expert witness, certified 8 PG&E responds that the initiative sought to reduce the routine patrol workload by working selected trees more efficiently, not by refraining from doing the work at all. For example, a tree that might otherwise require annual or bi-annual pruning could be removed, thereby eliminating the need to work the same tree year after year. Alternatively, contractors could clear a larger distance between trees and power lines, thereby reducing the need for future work.
arborist Kenneth Menzer, “A properly trained and educated inspector, properly evaluating the subject tree, should have marked the tree for removal.”
4. PG&E Met Its Initial Burden
Based on our independent review, we conclude that PG&E has carried its initial burden of showing the nonexistence of any triable issue of material fact on the issue of malice. PG&E presented evidence that (1) the company devotes substantial resources to vegetation management programs intended to mitigate the risk of wildfire, (2) the company hired contractors to conduct routine patrols in the area near the subject tree, and (3) contractors’ employees visited the area near the subject tree on several occasions, and did not report anything that should have put PG&E on notice that the subject tree posed a danger. PG&E’s evidence negates any inference that the company acted despicably, and with willful and conscious disregard for the rights and safety of others, and was sufficient to shift the burden to plaintiffs to present admissible evidence creating a triable issue of material fact as to malice.
Plaintiffs challenge PG&E’s prima facie showing, arguing the trial court should have sustained their numerous objections to PG&E’s supporting evidence. Specifically, plaintiffs argue the trial court should have sustained their objections to the declarations of April Kennedy, Stephen Tankersley, Eric Woodyard and Niel Fischer. 9 According to 9 Kennedy is a supervising program manager in the company’s vegetation management program, overseeing the Central Valley region, which includes Jackson, California. Prior to his retirement in 2015, Tankersley was the senior manager of vegetation management operations. Woodyard is a program manager for vegetation management, overseeing technology and innovation. Fischer is a supervising program manager for vegetation management. In 2015, Fischer was a principal program manager for vegetation management, overseeing the CEMA program.
plaintiffs, the foregoing declarations “were largely incompetent, lacking foundation because they contained statements not within the personal knowledge of the declarants, but rather derived from documents that they may or may not have reviewed and which they could not authenticate, or because PG&E’s counsel provided them with the information.” As support for their argument, the substance of which is set forth in full above, plaintiffs direct our attention to their complete set of evidentiary objections, which spans more than 50 pages, and the transcript of the hearing on the motion for summary adjudication. Plaintiffs do not discuss their specific objections to specific declarations, and do not elaborate on their reasons for believing the trial court erred.
“ ‘Pursuant to the weight of authority, appellate courts review a trial court’s rulings on evidentiary objections in summary judgment proceedings for abuse of discretion. [Citations.]’ [Citation.] The party challenging a trial court’s evidentiary ruling has the ‘burden to establish such an abuse, which we will find only if the trial court’s order exceeds the bounds of reason. [Citation.] “Where a trial court has discretionary power to decide an issue, an appellate court is not authorized to substitute its judgment of the correct result for the decision of the trial court.” [Citation.] We will only interfere with the lower court’s judgment if appellant can show that under the evidence offered, “ ‘no judge could reasonably have made the order that he did.’ ” ’ [Citation.]” ( Duarte v. Pacific Specialty Insurance Company, supra, 13 Cal.App.5th at p. 52, fn. omitted.)
Plaintiffs have failed to show any abuse of discretion. As PG&E observes, each of
the challenged declarations was made by a present or former PG&E manager with
personal knowledge of one or more aspects of the company’s vegetation management
programs. Each of the declarants averred under penalty of perjury that the facts stated in
their declarations were true and correct, based on their personal knowledge of PG&E’s
operations and their review of records used in the course of their employment. The trial
*23
court was entitled to accept these assertions of personal knowledge.
10
(Cf.
People ex rel.
Owen v. Media One Direct, LLC
(2013)
Each of the declarants also averred that the documents attached to their respective
declarations were true and correct copies of records maintained by PG&E in the ordinary
course of its business. The trial court could reasonably conclude that the documents
attached to the challenged declarations were sufficiently authenticated and admissible as
business records. (See
People ex rel. Owen v. Media One Direct, LLC, supra,
213
Cal.App.4th at p. 1484 [authentication adequate where declarant averred that she
reviewed files relating to the matter and attached documents were true and correct copies
of pertinent correspondence]; and see
Jazayeri v. Mao
(2009)
Plaintiffs have failed to show that the trial court abused its discretion in overruling
and/or impliedly overruling their objections to PG&E’s supporting evidence. We
therefore reject plaintiffs’ challenge to the trial court’s evidentiary rulings, and conclude
that PG&E carried its initial burden of showing the nonexistence of any triable issue of
material fact on the issue of malice. (
Aguilar, supra,
5. Plaintiffs Failed to Raise a Triable Issue of Material Fact Having concluded that PG&E carried its initial burden, we next consider whether plaintiffs presented sufficient evidence to raise a triable issue of fact as to malice. Based on our independent review, we conclude they did not.
“ ‘ “Punitive damages are appropriate if the defendant’s acts are reprehensible,
fraudulent or in blatant violation of law or policy. The mere carelessness or ignorance of
the defendant does not justify the imposition of punitive damages. . . . Punitive damages
are proper only when the tortious conduct rises to levels of extreme indifference to the
plaintiff’s rights, a level which decent citizens should not have to tolerate.” ’ ”
(
American Airlines, supra,
Even viewing the evidence as favorably to plaintiffs as we can, plaintiffs fail to
demonstrate the existence of a triable issue of material fact with respect to malice.
Plaintiffs argue that PG&E evinces a cavalier attitude towards public safety, which
justifies an award of punitive damages. They point to numerous potential shortcomings
in PG&E’s risk management controls and fire mitigation efforts, raising thought-
provoking questions about the efficacy of the risk and compliance committee’s reporting
structure, the wisdom of the decision to extend the routine patrol cycle in 2013 and
loosen hiring standards for seasonal CEMA inspectors, the soundness of the company’s
audit methodologies and incentives for reducing patrol workload, and the timeliness of
Quantum Spatial’s delivery of LiDAR data. But these criticisms, whatever their merits,
do not amount to clear and convincing proof that PG&E acted with malice. At most,
*25
plaintiffs’ evidence shows “ ‘ “mere carelessness or ignorance,” ’ ” which is insufficient
to establish malice. (
American Airlines, supra,
Arguing by analogy to Romo I , plaintiffs maintain that the problems with PG&E’s risk management controls and fire mitigation measures were symptoms of a larger problem: a corporate culture that prioritizes profits over safety. According to plaintiffs, the company as a whole acted despicably, and with willful and conscious disregard for the rights and safety of others, by deciding, as a matter of corporate policy, to abdicate responsibility for ensuring the efficacy of PG&E’s risk management controls and fire mitigation measures to others. The trial court found plaintiffs’ analogy to Romo I to be persuasive. We do not.
Romo I
arose out of a car accident that resulted in the deaths of three members of
the Romo family. (
Romo I, supra,
The surviving family members sued Ford on products liability and negligence
theories, seeking compensatory and punitive damages. (
Romo I, supra,
99 Cal.App.4th at
p. 1124.) Following a four-month trial, the jury returned a verdict of approximately $6
million in compensatory damages and $290 million in punitive damages.
11
(
Id.
at p.
11
The Court of Appeal for the Fifth Appellate District subsequently struck down the
punitive damages verdict on remand after the U.S. Supreme Court’s opinion in
State
Farm Mut. Ins. v. Campbell
(2003)
On appeal, Ford argued that the plaintiffs failed to present sufficient evidence of
malicious or despicable conduct. (
Romo I, supra,
The court continued, “There is no requirement that the evidence establish that a particular committee or officer of the corporation acted on a particular date with ‘malice.’ A corporate defendant cannot shield itself from liability through layers of management Cal.App.4th 738, 763 ( Romo II ). The Romo II court issued remittitur reducing the award to $23.7 million, or five times the total compensatory damages figure. ( Ibid .) *27 committees and the sheer size of the management structure. It is enough if the evidence permits a clear and convincing inference that within the corporate hierarchy authorized persons acted despicably in ‘willful and conscious disregard of the rights or safety of others.’ [Citation.]” ( Romo I, supra, 99 Cal.App.4th at pp. 1140-1141.)
The court also rejected Ford’s argument that the plaintiffs failed to “ ‘present evidence of any “malicious or despicable” conduct with respect to the design and production of the 1978 Bronco,’ ” stating: “This ignores the fact that the design and production of the vehicle was the despicable conduct: we think it obvious that putting on the market a motor vehicle with a known propensity to roll over and, while giving the vehicle the appearance of sturdiness, consciously deciding not to provide adequate crush protection to properly belted passengers (in the words of a corporate memo introduced in evidence, ‘penalizing’ passengers for wearing a seatbelt) constitutes despicable conduct. Such conduct could kill people. The question is not whether the conduct, if it occurred, was despicable, the question is whether there is sufficient evidence from which a rational trier of fact could find that the knowing conduct occurred.” ( Romo I, supra, 99 Cal.App.4th at p. 1141.)
Applying these standards, the court found that the plaintiffs presented substantial evidence permitting an inference that Ford willfully and consciously ignored the dangers inherent in its Bronco design, resulting in the deaths of three persons. ( Romo I, supra, 99 Cal.App.4th at p. 1141.) Among other things, the court found that the plaintiffs presented clear and convincing evidence that Ford’s policymakers ignored the company’s own internal safety standards, created a false appearance of the presence of an integral roll- bar, and declined to test the strength of the roof before placing the car in production. ( Id. at p. 1148.) On this record, the court found that there was substantial evidence permitting a reasonable trier of fact to conclude that Ford’s decision to put an unreinforced fiberglass roof on the 1978 Bronco was despicable. ( Id. at pp. 1144-1145.)
Relying on
Romo I
, plaintiffs argue that they need not show that any particular
managing agent acted with malice, because the company as a whole consciously and
willfully adopted risk management controls and fire mitigation measures which, like the
design and production of the 1978 Bronco, were themselves despicable. We have no
quarrel with the notion that an inference of corporate malice can be based on the
existence of a company policy that willfully, consciously, and despicably disregards the
rights and safety of others. (
Romo I
,
supra,
99 Cal.App.4th at pp. 1144 [substantial
evidence supported an inference of corporate malice where policymakers decided to
disregard safety standards to bring product to market]; see also
Neal v. Farmers Ins.
Exchange
(1978)
That PG&E adopted policies that failed to prevent the Butte Fire does not, without more, raise a triable issue as to malice. Although plaintiffs need not produce a “smoking gun,” they must nevertheless present evidence that “permits a clear and convincing inference that within the corporate hierarchy authorized persons acted despicably in ‘willful and conscious disregard of the rights or safety of others.’ ” ( Romo I, supra, 99 Cal.App.4th at p. 1141.) Plaintiffs have failed to present any such evidence.
Romo I illustrates the point. There, the plaintiffs offered evidence that Ford’s decision-makers disregarded the determination of the company’s own safety engineers that unreinforced fiberglass should never be used for components comprising the passenger compartment, and no utility vehicle should be produced without a roll bar. ( Romo I, supra, 99 Cal.App.4th at pp. 1144-1145.) The plaintiffs also offered evidence to support an inference that Ford’s decision-makers disregarded safety policies dictating that crush resistance should have been higher, and declined to conduct pre-production testing. ( Ibid. ) Here, by contrast, there was no evidence, let alone clear and convincing evidence, that the company consciously compromised standards that might have prevented harm to plaintiffs or willfully declined to conduct risk assessments that could have revealed weaknesses in the company’s approach to a known risk. ( Romo I, supra, at pp. 1144-1145 [describing evidence that policymakers disregarded recommendations of safety engineers and opted to forego routine testing in order to bring the product to market more quickly].) Although plaintiffs dismiss the company’s risk management controls and fire mitigation efforts as a mere “façade,” they fail to produce clear and convincing evidence from which a reasonable jury could find that PG&E consciously disregarded the risk of wildfire or willfully ignored fire safety standards.
Nor could a reasonable jury find that plaintiffs presented clear and convincing evidence that PG&E acted maliciously in hiring contractors or delegating training responsibility to them. Plaintiffs do not discuss this theory in their return. Nevertheless, no evidence suggests that ACRT or Trees, Inc. were manifestly unfit or unqualified. Nor does the evidence suggest that PG&E engaged in low bidding or other pricing behavior that might cast doubt on the bona fides of the company’s contractual arrangements with contractors. Nor does the evidence suggest that PG&E was aware of facts that should have put the company on notice that contractors were not fulfilling their contractual obligation to properly train employees. Although there is potentially evidence from which a reasonable jury could infer that PG&E should have devised better methods for *30 ensuring that contractors’ employees were properly trained, such evidence, at most, supports a theory that PG&E acted carelessly or negligently, not despicably, with conscious and willful disregard for the rights and safety of others. ( Taylor, supra, 24 Cal.3d at p. 894-895 [“ ‘Something more than the mere commission of a tort is always required for punitive damages. There must be circumstances of aggravation or outrage, such as spite or ‘malice,’ or a fraudulent or evil motive on the part of the defendant, or such a conscious and deliberate disregard of the interests of others that his conduct may be called willful or wanton ’ ”].)
We acknowledge that there may be circumstances in which a company policy of outsourcing essential corporate duties to independent contractors could contribute to an inference of malice. But we cannot agree with the trial court that PG&E’s unstated policy or practice of deferring to contractors to properly train their own employees could lead a reasonable jury to find by clear and convincing evidence that PG&E acted with malice. As we have suggested, nothing in the record supports an inference that PG&E willfully or consciously disregarded the need for contractors to use properly trained employees. To the contrary, PG&E required that contractors hire qualified employees, train their employees on vegetation management programs and practices, and “diligently perform all [w]ork in a proper and professional manner . . . in accordance with the approved principles of modern Arboriculture.” No reasonable jury could find by clear and convincing evidence that PG&E acted with malice in failing to ensure that contractors complied with these requirements. Contrary to plaintiffs’ previously articulated theory, on this record there was nothing despicable in PG&E’s assumption that contractors were training their employees as required.
PG&E’s nondelegable duty to maintain the power lines in a safe condition does
not convince us otherwise. “The nondelegable duties doctrine prevents a party that owes
a duty to others from evading responsibility by claiming to have delegated that duty to an
independent contractor hired to do the necessary work. The doctrine applies when the
*31
duty preexists and does not arise from the contract with the independent contractor.”
(
SeaBright Ins. Co. v. US Airways, Inc.
(2011) 52 Cal4th 590, 600-601.) As relevant
here, the nondelegable duty rule means that PG&E may be vicariously liable for
compensatory damages arising from contractors’ negligence, irrespective of fault.
(
Srithong v. Total Investment Co.
(1994)
Plaintiffs suggest other bases for affirming the trial court’s order, including
PG&E’s involvement in another wildfire in 1994 (the “Rough and Ready Fire”) and the
San Bruno pipeline explosion. As the trial court recognized, a jury may consider
PG&E’s entire course of conduct in assessing its culpability. (See generally
Johnson v.
Ford Motor Co.
(2005)
“ ‘Where there is no evidence that gives rise to an inference of actual malice or
conduct sufficiently outrageous to be deemed equivalent to actual malice, the trial court
need not, and indeed should not, submit the issue of punitive damages to the jury.’ ”
(
Kolstad v. American Dental Association
(1999)
III. DISPOSITION
Let a peremptory writ of mandate issue directing the respondent court to vacate its decision denying the motion for summary adjudication of petitioners Pacific Gas and Electric Company and PG&E Corporation, and to enter a new order granting summary adjudication in favor of those parties.
The parties shall bear their own costs in this writ proceeding. (Cal. Rules of Court, rule 8.493(a)(1)(B).)
/S/
RENNER, J.
We concur:
/S/
MAURO, Acting P. J.
/S/
MURRAY, J.