Opinion
On this consolidated appeal, Pacific Custom Pools, Inc., challenges the trial court’s granting of summary judgment based on the failure of Pacific Custom Pools to substantially comply with the contractor’s licensing requirements, and Turner Construction Company questions the court’s denial of its attorney’s fees. We hold that the trial court properly granted summary judgment but erred in denying attorney’s fees.
Factual Background and Procedural History
Universal City Studios, Inc. (Universal) entered into a general contract with Turner Construction Company (Turner) for the construction of the Jurassic Park ride (the project) at the theme park in Universal City, California. In turn, Turner entered into a subcontract (the Agreement) on the project with Pacific Custom Pools, Inc. (PCP), pursuant to which PCP agreed to furnish and install all water treatment work for the project for the contract price of $959,131. PCP further subcontracted its work to Harrington Industrial Plastics, Inc. (Harrington) and Pacific Engineered Projects (PEP) for those companies to provide materials and supplies on the project.
Harrington filed an action 1 for breach of contract and foreclosure of mechanics’ liens against PCP, Turner, and Universal, alleging that PCP had failed to pay $95,941.85 due under a contract for performance of work on the project. PEP also filed suit 2 against the same parties for similar relief, claiming that it was owed $55,587.38 under its contract with PCP.
Turner then filed a cross-complaint against PCP for indemnification against the claims of Harrington and PEP, and later PCP filed a cross-complaint against Turner and Universal, seeking damages of $2 million based on claims that misrepresentations had been made as to the scheduling of the order of work.
3
By order of
On February 27, 1998, the trial court granted summary judgment to Turner and Universal on PCP’s cross-complaint on the grounds that PCP was unlicensed during a period of its contract, and under Business and Professions Code section 7031 4 an unlicensed contractor may not maintain an action for work performed. Turner’s cross-complaint against PCP for indemnity was thereafter voluntarily dismissed without prejudice.
In the judgment that was entered in favor of Turner and Universal, the court identified Turner and Universal as the prevailing parties. Turner then filed a motion for attorney’s fees under Code of Civil Procedure section 1032.5 and Civil Code section 1717, which was denied by the court.
PCP appeals from the judgment, and Turner appeals from the order denying attorney’s fees. Both appeals will be addressed in this opinion.
Discussion
A. Summary Judgment Motion
Under Code of Civil Procedure section 437c, subdivision (o)(2), the statute governing summary judgment motions, “[a] defendant . . . has met his or her burden of showing that a cause of action has no merit if that party has shown that one or more elements of the cause of action . . . cannot be established, or that there is a complete defense to that cause of action. Once the defendant. . . has met that burden, the burden shifts to the plaintiff. . . to show that a triable issue of one or more material facts exists as to that cause of action or defense thereto.” The appellate court undertakes a de novo review of the trial court’s decision to grant summary judgment and is not bound by the reasons or rationales stated by the trial court.
(Pensinger
v.
Bowsmith, Inc.
(1998)
In the second amended complaint PCP alleges that at all relevant times it “was licensed by the State of California, under the applicable sections of the Business and Professions Code to do the kind of work” performed under its contract on the project. Turner and Universal filed motions for summary judgment, claiming that they are entitled to judgment as a matter of law because PCP was not a duly licensed contractor all times during its performance on the project and section 7031 bars an unlicensed contractor from maintaining any claim for compensation for work performed. In support of their motions, Turner and Universal presented evidence from the Contractors’ State License Board (CSLB) indicating that PCP’s license was suspended from October 12, 1995, to March 14, 1996, and that the license was under expiration from January 31, 1996, to May 3, 1996.
Hence, Turner and Universal came forth with evidence to support a complete defense to the action, shifting the burden to plaintiff to show that there was a triable issue of fact with respect to the licensure defense. (Code Civ. Proc., § 437c, subd. (o)(2).) Section 7031, subdivision (c) itself provides that when licensure is controverted, the burden of proof to establish licensure is on the licensee. (See
Buzgheia v. Leasco Sierra Grove
(1997)
B. Doctrine of Substantial Compliance with Licensing Requirements
Section 7031, subdivision (a)
6
provides that a contractor may not maintain an action for the recovery of compensation for the performance of work requiring a license unless it was “a duly licensed contractor at all times during the performance of that” work. In
Hydrotech Systems, Ltd. v. Oasis Waterpark
(1991)
“The purpose of the licensing law is to protect the public from incompetence and dishonesty in those who provide building and construction services. (Lewis & Queen v. N. M. Ball Sons (1957)48 Cal.2d 141 , 149-150 [308 P.2d 713 ].) The licensing requirements provide minimal assurance that all persons offering such services in California have the requisite skill and character, understand applicable local laws and codes, and know the rudiments of administering a contracting business. (Ibid.; Conderback, Inc. v. Standard Oil Co. (1966)239 Cal.App.2d 664 , 678-679 [48 Cal.Rptr. 901 ].)
“Section 7031 advances this purpose by withholding judicial aid from those who seek compensation for unlicensed contract work. The obvious statutory intent is to discourage persons who have failed to comply with the licensing law from offering or providing their unlicensed services for pay.
“Because of the strength and clarity of this policy, it is well settled that section 7031 applies despite injustice to the unlicensed contractor. ‘Section 7031 represents a legislative determination that the importance of deterring unlicensed persons from engaging in the contracting business outweighs any harshness between the parties, and that such deterrence can best be realized by denying violators the right to maintain any action for compensation in the courts of this state. [Citation.] . . .’ (Lewis & Queen, supra,48 Cal.2d at p. 151 , italics added; see also Brown v. Solano County Business Development, Inc. (1979)92 Cal.App.3d 192 , 198 [154 Cal.Rptr. 700 ]; Rushing v. Powell (1976)61 Cal.App.3d 597 , 605 [130 Cal.Rptr. 110 ].)” (52 Cal.3d at p. 995 .)
Through a series of cases beginning in 1966, the courts attempted to alleviate the severity of the application of section 7031 by allowing recovery to a contractor who has
substantially complied
with the licensing statutory scheme.
(Asdourian v. Araj
(1985)
In reaction to this development in the law, the Legislature amended section 7031 in 1989 to add a subdivision (d) which provided that the substantial compliance doctrine shall not apply to that statute. (Stats. 1989, ch. 368, § 1, p. 1509;
Hydrotech Systems, Ltd. v. Oasis Waterpark, supra,
Section 7031, subdivision (d) was amended in 1994 to its present state. The statute reads: “(d) The judicial doctrine of substantial compliance shall not apply under this section where the person who engaged in the business or acted in the capacity of a contractor has never been a duly licensed contractor in this state. However, the court may determine that there has been substantial compliance with licensure requirements under this section if it is shown at an evidentiary hearing that the person who engaged in the business or acted in the capacity of a contractor (1) had been duly licensed as a contractor in this state prior to the performance of the act or contract, (2) acted reasonably and in good faith to maintain proper licensure, and (3) did not know or reasonably should not have known that he or she was not duly licensed. . . .”
An unlicensed contractor may thus avoid the consequences of the prohibition against the substantial compliance doctrine under section 7031, subd. (d) if the contractor proves that it had been licensed before performing work, acted reasonably in trying to maintain a license and did not know or reasonably should not have known that it was not licensed. The parties concur that PCP was licensed before commencing work on the project. However, the parties dispute whether PCP acted reasonably and in good faith to maintain its license, and whether PCP knew or should have reasonably known that it was not licensed.
In support of its contention that it substantially complied with licensing requirements, PCP submitted the declaration of James F. Barger, president of PCP, stating that unbeknownst to him the license of PCP was suspended on October 12, 1995, under section 7071.6,
8
but he did not find
Barger explained in his declaration that sometime prior to 1994 he had a dispute with a supplier, Tim Goodwin; he had posted a bond for the amount owed; and thereafter entered into a settlement and made payments to Goodwin. At some point unknown to Barger, the bonding company filed for bankruptcy and a judgment was entered against PCP. After Barger was informed of the license suspension, he attempted to contact Goodwin and learned that Goodwin had passed away. Barger then contacted Goodwin’s successor and reached an agreement for satisfaction of the remaining debt. When proof of the satisfaction was submitted to CSLB, PCP’s suspension was lifted.
PCP also presented a certification of records from CSLB evidencing PCP’s license suspension on October 12, 1995; expiration under suspension on January 31, 1996; suspension lifting on March 14, 1996; and renewal on May 3, 1996.
In reply, Turner and Universal submitted copies of records from CSLB showing that Barger signed a stipulation for judgment in the Goodwin case on January 22, 1993; judgment was entered in favor of Goodwin International, Inc., and against PCP and Barger, individually, on March 22, 1993; PCP received a renewal of license form from CSLB on November 27, 1995, advising of the license expiration date of January 31, 1996, and stating: “A license cannot be renewed active while under suspension (License suspended for failure to file a Judgment Bond)”; CSLB advised PCP on February 23, 1996, that PCP’s renewal application was untimely filed and that PCP’s license was still under judgment suspension; CSLB notified PCP on March 15, 1996, that the judgment suspension under section 7071.6 had been lifted, however, the license was still not in good standing because the license had expired; and CSLB informed PCP on April 22, 1996, that PCP’s license had not been renewed because PCP had presented a dishonored check.
Based on this evidence, the trial court found that there was no lack of knowledge of license suspension by PCP and PCP’s conduct with respect to the maintenance of licensing was not reasonable. Concluding there was no substantial compliance under section 7031, subdivision (d), the court granted summary judgment to Turner and Universal.
In the recent case of
ICF Kaiser Engineers, Inc.
v.
Superior Court
(1999)
The Court of Appeal concluded that the contractor had substantially complied with section 7031 to allow recovery of fees for services, under circumstances where during the period of the contract the contractor had no actual knowledge that its license
In contrast to Kaiser, in the case at bar: (a) PCP was aware in November 1995 that its license was suspended for failure to file a judgment bond and that the deadline date for license renewal was January 31, 1996; (b) PCP knew shortly after February 23, 1996, that a renewal application sent in February 1996 was untimely; and (c) that PCP was advised on April 22, 1996, that its license had not been renewed because PCP’s filing fee check had been dishonored. These facts do not suggest that PCP acted reasonably or in good faith to maintain licensure or that PCP did not know or reasonably should not have known that it was not duly licensed, to support a claim of substantial compliance within the meaning of section 7031.
The cases cited by PCP to support its contentions regarding substantial compliance,
G. E. Hetrick & Associates, Inc. v. Summit Construction & Maintenance Co.
(1992)
The Court of Appeal upheld a dismissal of the claims of a non!icen sed contractor based upon the 1991 version of section 7031 in
Construction Financial
v.
Perlite Plastering Co., supra,
“. . . there is no basis for applying the doctrine of substantial compliance under the facts of this case. We are not unmindful of the evident harshness of this result. However, the Legislature provided in the 1991 amendment to section 7031 that, except as provided in section 7031(d), section 7031(a) should apply ‘regardless of the merits of the cause of action’ brought by an unlicensed contractor. (Stats. 1991, ch. 632, § 1.) . . . The Supreme Court has also reasoned that ‘the deterrent purpose of section 7031 outweighs any harshness in a particular case.’
(Hydrotech Systems, Ltd.
v.
Oasis Waterpark, supra, 52
Cal.3d at p. 977.) We are bound by this reasoning.
(Auto Equity Sales
v.
Superior Court
(1962)
It
As a last resort, PCP argues that claims for “noncontractual” costs of delay and added materials and services are not demands for “compensation for performance” of services and, therefore, are not covered by the licensing strictures of section 7031. This argument has little merit. In each of its causes of action in the second amended complaint for quantum meruit, reasonable value of goods and services and unjust enrichment, PCP incorporated the allegations concerning the written contract with Turner and the terms of that contract. Moreover, in each of those claims, PCP alleged that the services for which PCP sought recovery was overseen by Universal on the Jurassic Park job. Under these circumstances, it cannot be seriously disputed that PCP is seeking additional compensation for matters arising out of the contractual relationship.
An argument similar to that raised by PCP was made by an unlicensed contractor in
Ranchwood Communities Limited Partnership
v.
Jim Beat Construction, supra,
Similarly, the courts have rejected arguments of unlicensed contractors that have attempted to characterize claims for compensation under a contract as reimbursement for lost profits from third parties resulting from a breach of the contract
(K & K Services, Inc. v. City of Irwindale
(1996)
The cases cited by PCP are distinguishable and not applicable to the instant proceeding.
Gaines
v.
Eastern Pacific, supra,
However alleged or described, the gravamen of PCP’s claim is a demand for compensation under its contract on the project. PCP’s failure to comply with licensure requirements of section 7031 bars recovery.
C. Attorney’s Fees
California has adopted the “American” rule of each party bearing its own attorney’s fees in litigation, unless otherwise provided by contract or statute. (Code Civ. Proc., § 1021 ;
9
Trope v. Katz
(1995)
With reference to contracts which contain an attorney’s fees clause, Civil Code section 1717, subdivision (a) states in relevant part: “In any action on a contract, where the contract specifically provides that attorney’s fees and costs, which are incurred to enforce that contract, shall be awarded to one of the parties or to the prevailing party, then the party who is determined to be the party prevailing on the contract, whether he or she is the party specified in the contract or .not, shall be entitled to reasonable attorney’s fees in addition to other costs.” As to voluntary dismissals pursuant to settlement, Civil Code section 1717, subdivision (b) provides there shall be no prevailing party.
Section 1717 was enacted by the Legislature to ensure mutuality of remedy in the recovery of attorney’s fees.
(Trope v. Katz, supra,
Code of Civil Procedure section 1033.5 itemizes those expenses of litigation that
The subcontract between PCP and Turner contains the following clauses:
1. “Subcontractor [PCP] shall promptly pay to Turner all costs and reasonable attorney’s fees in any legal action in which Turner or the Owner [Universal] prevails, in whole or in part, brought against Subcontractor based on a breach of this Agreement.” (Par. 4 of “Standard Provisions”, exhibit B to the Agreement.)
2. “If any subcontractor, laborer, materialman or supplier of the Subcontractor . . . files or maintains a lien or claim, whether a mechanic’s lien or an attested account or otherwise . . . , the Subcontractor agrees to indemnify, protect and save harmless Turner and the Owner from and against any and all such liens and claims and actions brought or judgments rendered thereon, and from and against any and all loss, damages, liability, costs and expenses, including legal fees and disbursements, which Turner and/or the Owner may sustain or incur in connection therewith.” (Agreement, art. XVIII.)
In denying Turner’s motion for attorney’s fees, the trial court stated that it believed the attorney’s fees clause in the contract between the parties pertained “only to pleadings brought against the subcontractor, not to pleadings brought by the subcontractor or to any pleadings brought in an action in which a subcontractor was sued.” The trial court concluded that there was no prevailing party entitled to attorney’s fees under either Code of Civil Procedure section 1032, subdivision (a)(4) or Civil Code section 1717. In.light of applicable case law interpreting Civil Code section 1717, the attorney’s fees provision of the contract was read too narrowly.
In
International Industries, Inc.
v.
Olen, supra,
In
Hunt v. Smyth
(1972)
In
Boyd
v.
Oscar Fisher Co.
(1989)
Under the trial court’s interpretation of the Agreement, to wit, that the attorney’s fees clause applies only to actions
against
PCP, Turner would be able to recover attorney’s fees if it successfully sued on a complaint against PCP, but not if it prevailed on a cross-claim filed in an action instituted by PCP. Conversely, PCP would not be able to recover attorney’s fees as a victorious plaintiff, but only as a successful cross-complainant in an action commenced against it by Turner. Such results would undermine the bilateral nature and required liberal interpretation of Civil Code section 1717.
(Boyd
v.
Oscar Fisher Co., supra,
Since under Civil Code section 1717, an attorney’s fee provision will be given effect whether the action is commenced by the obligor or the obligee
(Hunt v. Smyth, supra,
This litigation was commenced by PCP’s suppliers and subcontractors filing suits for the foreclosure of mechanics’ liens relating to work performed on the project. In response to these complaints, Turner filed a cross-complaint against PCP for indemnity. Under the indemnity provision of the Agreement cited above, Turner would be entitled to recover its attorney’s fees expended in defense of those claims.
Following the granting of summary judgment in favor of Turner and Universal on PCP’s cross-complaint, Turner dismissed without prejudice its own cross-complaint for indemnity against PCP. According to the declaration of counsel for Turner, the cross-complaint against PCP was dismissed
because of the time and expense that would be involved in prosecution of its indemnity claims, given that it had contributed only $20,000 to the settlement with PCP’s suppliers and had
Code of Civil Procedure section 1032, 12 dealing with the recovery of costs, 13 defines the prevailing party as (a) a party with net monetary recovery; (b) a defendant 14 in whose favor a dismissal is entered; (c) a defendant where neither plaintiff nor defendant obtains relief; and (d) a defendant as against those plaintiffs who do not recover any relief against that defendant. Turner claims that it is entitled to attorney’s fees as an element of costs, under Code of Civil Procedure sections 1032, subdivision (a) and 1033.5, subdivision (a)(10)(A), because on the cross-complaint of PCP, Turner was a cross-defendant where neither cross-complainant nor cross-defendant obtained relief and a cross-defendant as against a cross-complainant who did not recover any relief. The trial court found that since Turner had dismissed its own cross-complaint against PCP, this case involved a situation other than the four possibilities enumerated in Code of Civil Procedure section 1032, subdivision (a). The court concluded that when both adverse parties fall within the definition of prevailing party, the statute did not mandate “a prevailing party” and did not require an award of attorney’s fees. 15
In
Hsu v. Abbara
(1995)
In the second amended cross-complaint, PCP sought damages against Turner and Universal of $2 million. By succeeding in having summary judgment granted on the cross-complaint, there can be no doubt that Turner obtained a “simple, unqualified win.” After settling with the mechanic’s lien claimants for $20,000, 18 Turner dismissed its own cross-complaint for indemnity against PCP because of the time and expense that would be incurred in pursuing the indemnity claims further. 19 Comparing the relief awarded on the contract claims with the parties’ demands and litigation objectives as disclosed by the pleadings, as required by Hsu v. Abbara, supra, 9 Cal.4th 863, we must conclude that Turner greatly succeeded in achieving its litigation objectives of defeating PCP’s claims, while PCP clearly failed to accomplish its desired goals. One could not contend that the results are mixed. Under these circumstances, Turner should have been declared the prevailing party within the meaning of Civil Code section 1717, entitling it to the recovery of attorney’s fees. The trial court’s refusal to award attorney’s fees was an abuse of discretion.
Disposition
The summary judgment is affirmed; the order denying attorney’s fees is reversed. The case is remanded to the trial court for a determination as to the amount of attorney’s fees. Turner and Universal to recover costs on appeal.
Vogel (C. $.), P. J., and Epstein, J., concurred.
Notes
Judge of the Los Angeles Superior Court, assigned by the Chief Justice pursuant to article VI, section 6 of the California Constitution.
Los Angeles Superior Court No. BC145992.
Los Angeles Superior Court No. BC152029.
In its second amended cross-complaint, PCP alleged causes of action for breach of contract, quantum meruit, reasonable value of goods and services, unjust enrichment, foreclosure of stop notice, interference with prospective economic advantage, and interference with contractual relation.
Unless otherwise indicated all statutory references are to the Business and Professions Code.
PCP claims that the suspension was “not final.”
Section 7031 states, in relevant part, as follows: “(a) Except as provided in subdivision (d), no person engaged in the business or acting in the capacity of a contractor, may bring or maintain any action, or recover in law or equity in any action, in any court of this state for the collection of compensation for the performance of any act or contract for which a license is required by this chapter without alleging that he or she was a duly licensed contractor at all times during the performance of that act or contract, regardless of the merits of the cause of action brought by the person, except that this prohibition shall not apply to contractors who are each individually licensed under this chapter but who fail to comply with Section 7029.”
Statutes 1991, chapter 632, section 1, page 2937 provided: “(d) The judicial doctrine of substantial compliance shall not apply to this section, except that a court may determine that there has been substantial compliance with licensure requirements, for purposes of this section, if it is shown at an evidentiary hearing that the person was a duly licensed contractor during any portion of the 90 days immediately preceding the performance of the act or contract for which compensation is sought, that the person’s category of licensure would have authorized the performance of that act or contract, and that noncompliance with the licensure requirement was the result of (1) inadvertent clerical error, or (2) other error or delay not caused by the negligence of the person. Subdivision (b) of Section 143 does not apply to contractors subject to this subdivision. [ft] (e) The exceptions to the prohibition against the application of the judicial doctrine of substantial compliance found in subdivision (d) shall have no retroactive effect. These exceptions to that prohibition shall only apply to an action or arbitration proceeding, at law or in equity, that is commenced after the effective date of this section.”
Section 7071.6, subdivision (e) stated: “Notwithstanding any other provision of law, the licensee shall notify the registrar in writing of any entered and unsatisfied judgments within 90 days from the date of the judgment. fl[] If the licensee fails to notify the registrar in writing within 90 days, the license shall be automatically suspended and the licensee shall automatically be prohibited from serving as the responsible managing officer, responsible managing partner, or responsible managing employee for any other licensee from the date that the registrar is informed, or is made aware of the unsatisfied judgment. The suspension of the license and prohibition against serving as the responsible managing officer, responsible managing partner, or responsible managing employee for any other licensee shall not be removed until proof of satisfaction of judgment is submitted to the registrar. . . .”
Code of Civil Procedure section 1021 states: “Except as attorney’s fees are specifically provided for by statute, the measure and mode of compensation of attorneys and counselors at law is left to the agreement, express or implied, of the parties; but parties to actions or proceedings are entitled to their costs, as hereinafter provided.”
See also
Covenant Mutual Ins. Co. v. Young, supra,
The court in
Boyd
referred to the relevant language of Civil Code section 1717: “ ‘Where a contract provides for attorney fees . . . such provision shall be construed as applying to the entire contract....’”
(Boyd v. Oscar Fisher Co., supra,
Code of Civil Procedure section 1032, subdivision (a)(4) states: “(4) ‘Prevailing party’ includes the party with a net monetary recovery, a defendant in whose favor a dismissal is entered, a defendant where neither plaintiff nor defendant obtains any relief, and a defendant as against those plaintiffs who do not recover any relief against that defendant. When any party recovers other than monetary relief and in situations other than as specified, the ‘prevailing party’ shall be as determined by the court, and under those circumstances, the court, in its discretion, may allow costs or not and, if allowed may apportion costs between the parties on the same or adverse sides pursuant to rules adopted under Section 1034.”
Although helpful in the analysis of who is the prevailing party under Civil Code section 1717, the determination of the prevailing party for the purposes of costs is not controlling as to the issue of prevailing party for the entitlement of attorney’s fees.
(Sears v. Baccaglio
(1998)
Code of Civil Procedure section 1032, subdivision (a) defines defendant to include cross-defendant, and plaintiff to include cross-complainant.
The court stated its conclusion: “Because Turner was unsuccessful on its cross-complaint and because Turner prevailed against Pacific [PCP] based on technicality, the lack of a contractor’s license, the court determines there is no prevailing party for the purposes of either Code of Civil Procedure section 1032(a)(4) or Civil Code section 1717. As to CCP section 1032(a)(4), the court could determine that one party or the other is prevailing but refuse to award costs to that party.”
With respect to mutual cross-complaints in a case, the court noted: “When there are cross-actions on a contract containing an attorney fees provision, and no relief is awarded in either action, a trial court is not obligated to find that there is no party prevailing on the contract for purposes of section 1717. If the court concludes that the defendant’s cross-action against the plaintiff was essentially defensive in nature, it may properly find the defendant to be the party prevailing on the contract.” (Hsu v. Abbara, supra, 9 Cal.4th at p. 875, fn. 10.)
See also
Sears
v.
Baccaglio, supra,
The $20,000 payment represents only 1 percent of PCP’s claim and approximately 2 percent of the construction contract price.
The law does not require a party to spend funds to maintain and continue unnecessary litigation that has become moot or pointless.
(International Industries, Inc. v. Olen, supra,